ML17206A841

From kanterella
Jump to navigation Jump to search
Notification of 790508 Meeting W/Util in Bethesda,Md to Discuss Failure of Offsite Power W/Simultaneous Onsite Power Failure & Other ALAB-537 Matters
ML17206A841
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/02/1979
From: Birkel R
Office of Nuclear Reactor Regulation
To: Baer R
Office of Nuclear Reactor Regulation
References
NUDOCS 7906180131
Download: ML17206A841 (6)


Text

MAY '3 Docket No. 50ii389.

t<Et<ORAHDUM FOR:

FROt1:

SUBJECT:

DATE Il, TIME:.

LOCATION:

PURPOSE:

PARTICIPANTS:

Robert L. Baer, Chief, Light Water Reactors Branch Ho. 2, DPtl Ralph A. Birkel, Project Manager, Light Water Reactors Branch No. 2, DPM

'ORTHCOt1IHG MEETING WITH FLORIDA POWER AND LIGHT COMPANY-ST; LUCIE PLANT UNIT 2

Tuesday, May 8, 1979 9:00 a.m.

tlaryland National Bank Building Room 6507

Bethesda, Maryland I

Fai lure of offsite power with simultaneous onsite power failure and other ALAB 537 matters.

FLORIDA POlfER.AND LIGHT COMPANY F. Flugger, tl. Villar, et al NRC - STAFF R. Fitzpatrick, G. Edison, W. LeFave, B. Siegel, B. Sheron, J. 'Tourtellotte, W. Paton, R. Baer, R. Birkel, et al)

NOTE:

11R.

M. H.

HODDER, INTERVENOR, WAS NOTIFIED BY PHONE OF THIS MEETING ccs:

See next page Ralph A. Birkel Light tfa ter Reactors Branch No.

2 Divisi on of Project Management q 906$ 80 (5(

.,,IIPlhIIII.,K

.....RABirkel.:.a..

.......5l--./.7.9--...

orr<ca~

CMRHANC~

DATC~

RECCH 518 (9-76) NRCM 0249

0

(

I

V' l

Dr. Robert E. Uhrig Vice President of Nuclear and General Engineering Florida Power

& Light Company P. 0.

Box 529100 Miami, Florida 33152 cc:

,Jack R. Neman, Esq.

Lowenstein,

Newman, Reis

& Axelrad 1025 Connecticut

Avenue, N.

W.

Washington, D. C.

20036 Norman A. Coll, Esq.

McCarthy, Steel, Hectory

& Davis 14th Floor, First National Bank Building Miami, Florida 33131 Mr. Martin H. Hodder 1131 N. E.

86 Street Miami, Fl orida 33138 Edward Luton, Esq.,

Chairman Atomic Safety and Licensing Board U. S.

Nuclear Regulatory Commission Washington, D. C.

20555 Dr. David L. Hetrick Professor of Nuclear Engineering

'The University of Arizona Tucson, Arizona 85721 Dr. Frank F. Hooper School of Natural Resources University of Michigan Ann Arbor, Michigan 48104

0-

Meetin Notic s

Docket File ~

NRC PDR Local PDR TIC LWR g2 File NRR Reading H. Denton E.

Case D. Crutchfield D.

Bunch R.

Boyd D.

Ross R. Mattson R.

DeYoung D. Muller D. Vassallo D. Skovholt W.

Gammi ll F. Williams J.

Stol z

0. Parr S.

Varga P. Collins T.. Speis W.

Haass C.

Heltemes ACRS(16)

L. Crocker H. Berkow Project Manage

Attorney, ELD IE(3)

SD(7)

J.

Lee Receptionist-L. Rubenstein L. Soffer J.

S.

R.

S.

F.

K.

T.

Z.

R.

R.

W'.

F.

V.

W.

M.

R.

R.

B.

W.

G.

R.

J.

G.

M.

V.

R.

L.

H.

J.

Knight Hanauer Tedesco Pawl i cki Schauer Kniel Novak Rosztoczy Bosnak Satterfield Butler Rosa Moore Kreger Ernst Denise Ballard Youngblood Regan Chipman Houston Collins Lear Spangler Benaroya Jackson Hulman Ornstein

LeDoux, IE R. A. Birkel Principal Staff

Participants:

R. Fitzpatrick, G. Edison, W. LeFave, B. Siegel, J. Tourtellotte, W. Paton, OPA Maryland National Bank Building