ML17206A866

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-335/79-09 on 790321-23.No Noncompliance Noted
ML17206A866
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/24/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17206A867 List:
References
NUDOCS 7906250372
Download: ML17206A866 (4)


See also: IR 05000335/1979009

Text

~S RE00,

fp.

~4

0

Cl

vggPg

4p*yk

In Reply Refer To:

RII:EHW

50-335/79"09

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTASTREET, NN.

ATLANTA,GEORGIA 30303

APR 2 4 1979

Florida Power and Light Company

R. E. Uhrig, Vice President

Advanced

Systems

and Technology

P. 0. Box 529100

Miami, FL

33152

Gentlemen:

This refers to the inspection

conducted

by E. H. Webster of this office on

March 21-23,

1979, of activities authorized',by

NRC License

No. DPR-67 for the

St. Lucie Unit

1 facility, and to the discupsion of our findings held with

C.

M. Wethy at the conclusion of the inspection.

~IE

Areas

examined during the inspection

and gur findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations

of procedures

and representative

records,

interviews

with personnel,

and observations

by the inspector.

Cg

Within the scope of this inspection,

no items of noncompliance

were disclosed.

We have

examined actions

you have taken with regard to previously identified

enforcement matters

and unresolved

items.

The status of these

items is

discussed

in the enclosed

report.

In accordance

with Section 2.790 of the NRC's "Rules of Practice", Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room, If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you make

a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include

a full statement

of the reasons

on the

basis of which it is claimed that the information is proprietary,

and should

be prepared

so that proprietary information identified in the application is

contained in a separate

part of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document

Room.

7906250 PP g

Florida Power and Light Company

-2-

APR 2 4 1979

Should you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

Richard

C. Iewis, Acting Chief

Reactor Operations

and Nuclear

Support Branch

Enclosure:

Inspection Report No. 50-335/79-09

cc w/encl:

C.

M. Wethy, Plant Manager

P.

O. Box 128

Ft. Pierce,

FL

33450

Nat Weems, Assistant

gA Manager

P. 0.

Box 128

Ft. Pierce,

FL

33450