ML17206A862

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-389/79-06 on 790327-29.No Noncompliance Noted
ML17206A862
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/11/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17206A863 List:
References
NUDOCS 7906210064
Download: ML17206A862 (4)


See also: IR 05000389/1979006

Text

~5 RE00

Vp

+

O~

Cy

nO

I

0

cll

0

z+/p +**++

In Reply Refer To:

RII:NE

50-389/79-06

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303

APR 1 1 1979

Florida Power and Light Company

Attn:

R. E. Uhrig, Vice President

Advanced

Systems

and Technology

Post Office Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by

March 27-29,

1979 of activities authorized

for the St. Lucie facility, Vnit 2,

and to

held with B. J.

Escue at the conclusion of

N. Economos of this office on

by NRC License

No.

CPPR-144

the discussion of our findings

the inspection.

Areas

examined during the inspection

and our findings are discussed

in

the enclosed

inspection report.

Within these

areas,

the inspection

consisted

of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were

disclosed.

One

new unresolved

item resulted

from this inspection

and is discussed

in the enclosed

report.

This item will be examined during subsequent

inspections.

lt

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title 10,

Code of Federal Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public

Document

Room.

If this report contains

any information that you (or

your contractor) believe to be proprietary, it is necessary

that you

make

a written application within 20 days to this office to withhold

such information from public disclosures

Any such application must

include

a full statement

of the reasons

on the basis of which it is

claimed that the information is proprietary,

and should

be prepared

so

that proprietary information identified in the application is contained

in a separate

part of the document.

If we do not hear from you in this

regard within the specified period,

the report will be placed in the

Public Document

Room.

7 go621004'f

.f

'I

APR 1 1 1979

Florida Power

and

Light Company

-2-

Should you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

Charles

E. Murphy,

ief

Reactor Construction

and

Engineering Support Branch

Enclosure:

Inspection Report No. 50-389/79-06

cc w/enclosure:

C.

M. Wethy, Plant Manager

St. Lucie Plant

Post Office Box 128

Ft. Pierce, Florida

33450

Nat Weems, Assistant

gA Manager

St. Lucie Plant

Post Office Box 128

Ft. Pierce, Florida

33450