ML17206A848

From kanterella
Jump to navigation Jump to search
Forwards LER 79-016/01T-0
Date released: 01/25/2018 Download: ML17206A848


LER 79-016/01T-0 on 790524:during as-built Verification Insp of Restraints on Component Cooling Water Sys Piping,Four Seismic Restraints Found Installed at Wrong Locations. Caused by Improper Installation During Plant Const
ML17266A071
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/07/1979
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17266A071 (3)
Forwards LER 79-016/01T-0
ML17206A847
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/07/1979
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17206A847 (1)