Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16047A203 + (ML16047A203)
- ML16047A247 + (ML16047A247)
- PNP 2016-012, Revision to Emergency Implementing Procedures + (ML16047A255)
- IR 05000458/2015010 + (ML16047A268)
- ML16047A272 + (ML16047A272)
- L-MT-16-001, 54005-CALC-001, Revision 2, Evaluation of Risk Significance of Permanent ILRT Extension + (ML16047A273)
- ML16047A330 + (ML16047A330)
- ONS-2016-014, End of Cycle 27 (2EOC27) Refueling Outage Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval + (ML16047A334)
- ML16047A335 + (ML16047A335)
- PNP 2016-011, Submittal of 2015 Personnel Exposure and Monitoring Report + (ML16047A338)
- ML16047A341 + (ML16047A341)
- ML16047A342 + (ML16047A342)
- ML16047A382 + (ML16047A382)
- MNS-16-005, Response to Request for Additional Information (RAI) During January 12, 2016, NRC Teleconference Pertaining to License Amendment Request for Nuclear Service Water System Allowed Outage Time Extension + (ML16047A383)
- HNP-16-008, Response to Request for Additional Information Regarding License Amendment Request for Temporary Changes to Technical Specifications for the a Emergency Service Water Pump Replacement + (ML16047A389)
- ML16047A398 + (ML16047A398)
- IR 05000382/2016404 + (ML16047A407)
- 05000333/LER-2015-008, Regarding Containment Atmosphere Dilution System Reliability Degraded Due to Manufacturer Defect in Temperature Transmitters + (ML16047A410)
- CNL-16-020, Exceptions to Completion of Preoperational Test Instructions Prior to Fuel Load - Revised Mode of Applicability for 2-PTI-002-01 and 2-PTI-003A-03 + (ML16047A423)
- ML16047A425 + (ML16047A425)
- ML16048A001 + (ML16048A001)
- ML16048A011 + (ML16048A011)
- ML16048A024 + (ML16048A024)
- ML16048A094 + (ML16048A094)
- NL-16-0067, Response to Request for Additional Information on License Amendment Request to Permit the Use of Risk Informed Completion Times + (ML16048A096)
- ML16048A097 + (ML16048A097)
- ML16048A098 + (ML16048A098)
- ML16048A128 + (ML16048A128)
- NL-15-0581, Vogtle, Units 1 and 2 - Transmittal of Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1)) + (ML16048A128)
- ML16048A129 + (ML16048A129)
- NL-15-0581, Vogtle, Units 1 and 2 - Georgia Power Company Response on Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1)) + (ML16048A129)
- ML16048A130 + (ML16048A130)
- NL-15-0581, Vogtle, Units 1 and 2 - Oglethorpe Power Corporation Response on Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1)) + (ML16048A130)
- ML16048A131 + (ML16048A131)
- NL-15-0581, Vogtle, Units 1 and 2 - Municipal Electric Authority of Georgia Response on Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1)) + (ML16048A131)
- NL-15-0581, Dalton Utilities Response on Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1)) + (ML16048A132)
- ML16048A154 + (ML16048A154)
- ML16048A161 + (ML16048A161)
- ML16048A162 + (ML16048A162)
- ML16048A172 + (ML16048A172)
- ML16048A187 + (ML16048A187)
- 05000353/LER-2015-008, Regarding Valid Automatic Actuation of the Reactor Protection System + (ML16048A199)
- ML16048A203 + (ML16048A203)
- ML16048A204 + (ML16048A204)
- ML16048A205 + (ML16048A205)
- ML16048A206 + (ML16048A206)
- ML16048A207 + (ML16048A207)
- ML16048A208 + (ML16048A208)
- ML16048A210 + (ML16048A210)
- ML16048A211 + (ML16048A211)
- ML16048A212 + (ML16048A212)