Regarding Valid Automatic Actuation of the Reactor Protection System
ML16048A199
Person / Time
Site: Limerick Constellation icon.png
Issue date: 02/17/2016
From: Libra R
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LG-16-009 LER 15-008-00
Download: ML16048A199 (5)


LER-2015-008, Regarding Valid Automatic Actuation of the Reactor Protection System
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation

10 CFR 50.73(a)(2)(i)

10 CFR 50.73(a)(2)(vii), Common Cause Inoperability

10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded

10 CFR 50.73(a)(2)(viii)(A)

10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition

10 CFR 50.73(a)(2)(viii)(B)

10 CFR 50.73(a)(2)(iii)

10 CFR 50.73(a)(2)(ix)(A)

10 CFR 50.73(a)(2)(x)

10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor

10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat

10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown

10 CFR 50.73(a)(2)(v), Loss of Safety Function

10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
3532015008R00 - NRC Website

text

10CFR50.73 LG-16-009 February 17, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Limerick Generating Station, Unit 2 Renewed Facility Operating License No. NPF-85 NRC Docket No. 50-353

Subject:

LER 2015-008-00, Valid Automatic Actuation of the Reactor Protection System This Licensee Event Report (LER) addresses a valid automatic actuation of the reactor protection system (RPS) during restart from a planned outage. The automatic scram was actuated by a low reactor level condition following an unexpected opening of the main steam bypass valves during reactor heat-up.

This LER is being submitted pursuant to the requirements of 10CFR50.73(a)(2)(iv)(A).

There are no commitments contained in this letter.

If you have any questions, please contact Robert B. Dickinson at (610) 718-3400.

Respectfully, Original signed by Richard W. Libra Site Vice President - Limerick Generating Station Exelon Generation Company, LLC cc: Administrator Region I, USNRC USNRC Senior Resident Inspector, LGS

NRC FORM 366 (01-2014)

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION (01-2014)

LICENSEE EVENT REPORT (LER)

(See Page 2 for required number of digits/characters for each block)

APPROVED BY OMB: NO. 3150-0104 EXPIRES: 01/31/2017 Estimated burden per response to comply with this mandatory collection request: 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />.

Reported lessons learned are incorporated into the licensing process and fed back to industry.

Send comments regarding burden estimate to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0104), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

1. FACILITY NAME Limerick Generating Station, Unit 2
2. DOCKET NUMBER 05000353
3. PAGE 1 OF 4
4. TITLE Valid Automatic Actuation of the Reactor Protection System Due to Main Steam Bypass Valves Opening
5. EVENT DATE
6. LER NUMBER
7. REPORT DATE
8. OTHER FACILITIES INVOLVED MONTH DAY YEAR YEAR SEQUENTIAL NUMBER REV NO.

MONTH DAY YEAR FACILITY NAME DOCKET NUMBER 05000 12 19 2015 2015 -

008

- 00 02 17 2016 FACILITY NAME DOCKET NUMBER 05000
9. OPERATING MODE
11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply) 2 20.2201(b) 20.2203(a)(3)(i) 50.73(a)(2)(i)(C) 50.73(a)(2)(vii) 20.2201(d) 20.2203(a)(3)(ii) 50.73(a)(2)(ii)(A) 50.73(a)(2)(viii)(A) 20.2203(a)(1) 20.2203(a)(4) 50.73(a)(2)(ii)(B) 50.73(a)(2)(viii)(B) 20.2203(a)(2)(i) 50.36(c)(1)(i)(A) 50.73(a)(2)(iii) 50.73(a)(2)(ix)(A)
10. POWER LEVEL 20.2203(a)(2)(ii) 50.36(c)(1)(ii)(A) 50.73(a)(2)(iv)(A) 50.73(a)(2)(x) 006 20.2203(a)(2)(iii) 50.36(c)(2) 50.73(a)(2)(v)(A) 73.71(a)(4) 20.2203(a)(2)(iv) 50.46(a)(3)(ii) 50.73(a)(2)(v)(B) 73.71(a)(5) 20.2203(a)(2)(v) 50.73(a)(2)(i)(A) 50.73(a)(2)(v)(C)

OTHER 20.2203(a)(2)(vi) 50.73(a)(2)(i)(B) 50.73(a)(2)(v)(D)

Specify in Abstract below or in LICENSEE EVENT REPORT (LER)

CONTINUATION SHEET revisions identified with High or Medium consequence risk factors per HU-AA-1212 are validated in accordance with AD-AA-101-F-03, Procedure/T&RM Validation Checklist.

Exceptions to this validation requirement require the site Senior Leadership Teams (SLT) consent.

Previous Similar Occurrences There was no previous RPS actuation due to DEHC BPV control response.

Unit 1 LER 2014-004 was submitted on May 5, 2014 and reported a scram due to a degraded EHC power supply that caused all 6 main turbine intercept valves to close.

Component data System:

JJ Turbine Supervisory Control System Component:

TBG Turbine Component number: XI-031-203 Component name:

DEHC Monitor Manufacturer:

526A TYCO Electronics Model number:

ET2200L System:

JJ Turbine Supervisory Control System Component:

PL Panel Component number: 20-C653 Component name:

Turbine Console Manufacturer:

G080 General Electric Model number MF