NRR E-mail Capture - Firstenergy/Davis Besse Event Number 51696
ML16048A094
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/17/2016
From: Blake Purnell
Plant Licensing Branch III
To: Tom Gurdziel
References
Download: ML16048A094 (2)


Text

NRR-PMDAPEm Resource From: Purnell, Blake Sent: Wednesday, February 17, 2016 8:52 AM To: tgurdziel@twcny.rr.com

Subject:

RE: FirstEnergy/Davis Besse Event Number 51696 Mr. Tom Gurdziel, I am responding to your February 1, 2016, email to the NRC regarding a recent Davis-Besse event notification (Event No. 51696). As noted in your email, FirstEnergy personnel were calibrating nuclear instrumentation for Channel 2 of the reactor protection system (RPS) when RPS Channel 1 was in the trip position. The Davis-Besse technical specifications require nuclear instruments to be calibrated periodically. The technical specifications also permit continued operation with one channel of RPS in the trip position and a second channel in bypass. This is considered acceptable because the RPS can continue to perform its safety function.

In this event, a blown fuse caused another RPS Channel to trip and the RPS automatically tripped the reactor as expected. This event, including the licensees actions, is being evaluated by NRC inspectors. If you have any questions regarding this, please email me at Blake.Purnell@nrc.gov.

Sincerely, Blake Purnell, Project Manager Plant Licensing Branch III-2 Division of Operator Reactor Office of Nuclear Reactor Regulations 1

Hearing Identifier: NRR_PMDA Email Number: 2659 Mail Envelope Properties (Blake.Purnell@nrc.gov20160217085200)

Subject:

RE: FirstEnergy/Davis Besse Event Number 51696 Sent Date: 2/17/2016 8:52:11 AM Received Date: 2/17/2016 8:52:00 AM From: Purnell, Blake Created By: Blake.Purnell@nrc.gov Recipients:

"tgurdziel@twcny.rr.com" <tgurdziel@twcny.rr.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1141 2/17/2016 8:52:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRR-PMDAPEm Resource From: Purnell, Blake Sent: Wednesday, February 17, 2016 8:52 AM To: tgurdziel@twcny.rr.com

Subject:

RE: FirstEnergy/Davis Besse Event Number 51696 Mr. Tom Gurdziel, I am responding to your February 1, 2016, email to the NRC regarding a recent Davis-Besse event notification (Event No. 51696). As noted in your email, FirstEnergy personnel were calibrating nuclear instrumentation for Channel 2 of the reactor protection system (RPS) when RPS Channel 1 was in the trip position. The Davis-Besse technical specifications require nuclear instruments to be calibrated periodically. The technical specifications also permit continued operation with one channel of RPS in the trip position and a second channel in bypass. This is considered acceptable because the RPS can continue to perform its safety function.

In this event, a blown fuse caused another RPS Channel to trip and the RPS automatically tripped the reactor as expected. This event, including the licensees actions, is being evaluated by NRC inspectors. If you have any questions regarding this, please email me at Blake.Purnell@nrc.gov.

Sincerely, Blake Purnell, Project Manager Plant Licensing Branch III-2 Division of Operator Reactor Office of Nuclear Reactor Regulations 1

Hearing Identifier: NRR_PMDA Email Number: 2659 Mail Envelope Properties (Blake.Purnell@nrc.gov20160217085200)

Subject:

RE: FirstEnergy/Davis Besse Event Number 51696 Sent Date: 2/17/2016 8:52:11 AM Received Date: 2/17/2016 8:52:00 AM From: Purnell, Blake Created By: Blake.Purnell@nrc.gov Recipients:

"tgurdziel@twcny.rr.com" <tgurdziel@twcny.rr.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1141 2/17/2016 8:52:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: