Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13239A048 + (ML13239A048)
- ML13239A061 + (ML13239A061)
- ML13239A073 + (ML13239A073)
- ML13239A074 + (ML13239A074)
- RBG-47386, Attachment 2 to RBG-47386 - Structural Integrity Report No. 1300615.401, Rev. 0, Acceptability of Weir Tricentric Butterfly Valves Having Stainless Steel Seat Fillet Welds Applied with 60 F Preheat + (ML13239A075)
- ML13239A076 + (ML13239A076)
- ML13239A077 + (ML13239A077)
- ML13239A082 + (ML13239A082)
- ML13239A084 + (ML13239A084)
- ML13239A089 + (ML13239A089)
- L-PI-13-081, Prairie Islands First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation + (ML13239A093)
- L-PI-13-080, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (ML13239A094)
- LR-N13-0176, PSEG Nuclear LLCs First Six-Month Status Report for Salem in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) + (ML13239A095)
- LR-N13-0175, PSEG Nuclear LLCs First Six-Month Status Report for the Salem in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-1 + (ML13239A097)
- ML13239A103 + (ML13239A103)
- ML13239A109 + (ML13239A109)
- ML13239A110 + (ML13239A110)
- NRC-13-0043, DTE Electric Company First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML13239A118)
- NRC-13-0048, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2013 + (ML13239A119)
- 05000285/LER-2013-006-01, Regarding Use of Teflon in LPSI and CS Pump Mechanical Seal + (ML13239A120)
- NRC-13-0044, DTE Electric Companys First Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML13239A121)
- ML13239A171 + (ML13239A171)
- ML13239A223 + (ML13239A223)
- ML13239A224 + (ML13239A224)
- ML13239A225 + (ML13239A225)
- ML13239A229 + (ML13239A229)
- ML13239A230 + (ML13239A230)
- ML13239A231 + (ML13239A231)
- ML13239A233 + (ML13239A233)
- NL-13-103, Response to Request for Additional Information (RAI) Regarding Reliable Spent Fuel Pool (SFP) Instrumentation (Order No, EA-12-051) + (ML13239A238)
- 05000412/LER-2013-001, Gas Void in Emergency Core Cooling System Pump Suction Header Results in a Condition Prohibited by Technical Specifications + (ML13239A239)
- ML13239A248 + (ML13239A248)
- ML13239A249 + (ML13239A249)
- ML13239A250 + (ML13239A250)
- ML13239A251 + (ML13239A251)
- ML13239A285 + (ML13239A285)
- ML13239A318 + (ML13239A318)
- IR 05000277/2013405 + (ML13239A321)
- ML13239A334 + (ML13239A334)
- IR 05000382/2010201 + (ML13239A335)
- ML13239A337 + (ML13239A337)
- ML13239A340 + (ML13239A340)
- W3F1-2013-0018, Request for Relief from American Society of Mechanical Engineers (ASME) Code, Section XI for the Third 10-year Interval - Inservice Inspection Request for Relief W3-ISI-022 + (ML13239A356)
- ML13239A357 + (ML13239A357)
- ML13239A358 + (ML13239A358)
- HNP-13-080, First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML13239A359)
- PLA-7072, Request for Implementation Date Relief in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (ML13239A360)
- ML13239A398 + (ML13239A398)
- 05000281/LER-2013-002, Regarding Partially Open Valve Results in Pump Inoperability That Exceeded Technical Specifications Actions + (ML13239A439)
- NL-13-091, Supplement to Application for Section 161A Preemption Authority + (ML13239A447)
- ML13239A455 + (ML13239A455)