MONTHYEARNRC-24-0050, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2024-08-12012 August 2024 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-24-0048, Submittal of Inservice Inspection Summary Report2024-08-0606 August 2024 Submittal of Inservice Inspection Summary Report NRC-24-0046, Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance2024-07-25025 July 2024 Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance NRC-24-0020, Submittal of Revision 51 to the Fermi 2 Radiological Emergency Response Preparedness Plan2024-07-24024 July 2024 Submittal of Revision 51 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-24-0044, Enrico Fermi 1 License Expiration - 10 CFR 50.51 (Continuation of License)2024-07-10010 July 2024 Enrico Fermi 1 License Expiration - 10 CFR 50.51 (Continuation of License) NRC-24-0041, Technical Specification (TS) 5.6.7 - Post Accident Monitoring Report2024-06-21021 June 2024 Technical Specification (TS) 5.6.7 - Post Accident Monitoring Report NRC-24-0042, Regulat01y Issues Summaty (RIS) 24-01 Preparation and Scheduling of Operator Licensing Examinations to Submit Fonn 536, Operator Licensing Examination Data2024-06-18018 June 2024 Regulat01y Issues Summaty (RIS) 24-01 Preparation and Scheduling of Operator Licensing Examinations to Submit Fonn 536, Operator Licensing Examination Data NRC-24-0040, Verification of No Significant Hazards Considerations for License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance Supplement Provided in NRC-24-00332024-06-0606 June 2024 Verification of No Significant Hazards Considerations for License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance Supplement Provided in NRC-24-0033 NRC-24-0033, DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-05-30030 May 2024 DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0017, 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report NRC-24-0032, Transmittal of the Core Operating Limits Report for Cycle 232024-04-25025 April 2024 Transmittal of the Core Operating Limits Report for Cycle 23 NRC-24-0027, Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-04-24024 April 2024 Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter NRC-24-0023, NRC-24-0023, Post Exam Package Submittal Letter to NRC2024-03-0707 March 2024 NRC-24-0023, Post Exam Package Submittal Letter to NRC NRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages2024-01-12012 January 2024 Report of Changes to Quality Assurance Program for Radioactive Material Packages NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122024-01-12012 January 2024 Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 222023-12-14014 December 2023 Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan2023-12-0404 December 2023 Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-23-0073, Guarantee of Payment of Deferred Premiums2023-11-29029 November 2023 Guarantee of Payment of Deferred Premiums NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-10-13013 October 2023 Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-09-11011 September 2023 Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration2023-08-31031 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval2023-08-31031 August 2023 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..2023-08-30030 August 2023 Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration2023-08-23023 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration2023-08-0101 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-07-24024 July 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration2023-06-27027 June 2023 Independent Spent Fuel Storage Installation, Cask Registration NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2023-06-0505 June 2023 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval2023-06-0505 June 2023 Snubber Program for the Fourth 10-Year Testing Interval NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi NRC-23-0031, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2023-05-16016 May 2023 Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage2023-05-0505 May 2023 License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-05-0505 May 2023 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0017, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2023-04-28028 April 2023 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-23-0025, Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2023-04-28028 April 2023 Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-23-0018, Annual Non-Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Non-Radiological Environmental Operating Report NRC-23-0024, Levels and Sources of Property Insurance Coverage2023-04-0303 April 2023 Levels and Sources of Property Insurance Coverage NRC-23-0021, ISFSI, Decommissioning Funding Plan Update2023-03-30030 March 2023 ISFSI, Decommissioning Funding Plan Update NRC-23-0015, Decommissioning Funding Status Report for Fermi 12023-03-30030 March 2023 Decommissioning Funding Status Report for Fermi 1 NRC-23-0016, Decommissioning Funding Status Report2023-03-30030 March 2023 Decommissioning Funding Status Report NRC-23-0011, License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis2023-03-0707 March 2023 License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis 2024-08-06
[Table view] Category:Annual Operating Report
MONTHYEARNRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0025, Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2023-04-28028 April 2023 Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-22-0033, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20222022-08-29029 August 2022 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2022 ML22119A1732022-04-11011 April 2022 DTE Electric Company Submittal of Fermi 3 Periodic Reports NRC-21-0044, Annual Report for Period Ending June 30, 20212021-08-30030 August 2021 Annual Report for Period Ending June 30, 2021 NRC-21-0028, 2020 Annual Non-Radiological Environmental Operating Report2021-04-29029 April 2021 2020 Annual Non-Radiological Environmental Operating Report NRC-21-0026, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2021-04-28028 April 2021 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-21-0014, Submittal of 2020 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2021-04-23023 April 2021 Submittal of 2020 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-19-0056, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20192019-08-28028 August 2019 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2019 NRC-19-0033, Annual Non-Radiological Environmental Operating Report2019-04-30030 April 2019 Annual Non-Radiological Environmental Operating Report NRC-16-0053, Annual Report for Period Ending June 30, 20162016-08-18018 August 2016 Annual Report for Period Ending June 30, 2016 NRC-15-0088, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20152015-08-27027 August 2015 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2015 NRC-15-0054, Annual Non-Radiological Environmental Operating Report for 20142015-04-29029 April 2015 Annual Non-Radiological Environmental Operating Report for 2014 NRC-14-0064, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 20142014-08-28028 August 2014 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 2014 NRC-14-0033, Annual Non-Radiological Environmental Operating Report for 20132014-04-28028 April 2014 Annual Non-Radiological Environmental Operating Report for 2013 NRC-13-0048, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20132013-08-26026 August 2013 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2013 NRC-13-0025, Annual Non-Radiological Environmental Operating Report2013-04-24024 April 2013 Annual Non-Radiological Environmental Operating Report NRC-12-0029, Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report2012-04-27027 April 2012 Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report NRC-12-0031, Annual Non-Radiological Environmental Operating Report for 20112012-04-25025 April 2012 Annual Non-Radiological Environmental Operating Report for 2011 NRC-11-0043, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report Period Ending June 30, 20112011-08-30030 August 2011 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report Period Ending June 30, 2011 NRC-11-0016, Annual Radiological Environmental Operating Report, Radioactive Effluent Release Report and Revised Offsite Dose Calculation Manual2011-04-28028 April 2011 Annual Radiological Environmental Operating Report, Radioactive Effluent Release Report and Revised Offsite Dose Calculation Manual NRC-10-0064, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20102010-08-31031 August 2010 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2010 NRC-10-0038, Annual Non-Radiological Environmental Operating Report for 20092010-04-28028 April 2010 Annual Non-Radiological Environmental Operating Report for 2009 NRC-10-0036, Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report2010-04-28028 April 2010 Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report NRC-09-0051, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report Period Ending June 30, 20092009-08-27027 August 2009 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report Period Ending June 30, 2009 NRC-08-0057, Enrico Fermi, Unit 1, Annual Report for the 2nd Quarter of 20082008-08-28028 August 2008 Enrico Fermi, Unit 1, Annual Report for the 2nd Quarter of 2008 ML0812202332008-04-24024 April 2008 Fermi 2- 2007 Annual Radioactive Effluent Release and Radiological Environmental Operating Report for the Period of January 1, 2007 Through December 31, 2007 NRC-08-0031, Fermi 2- 2007 Annual Radioactive Effluent Release and Radiological Environmental Operating Report for the Period of January 1, 2007 Through December 31, 20072008-04-24024 April 2008 Fermi 2- 2007 Annual Radioactive Effluent Release and Radiological Environmental Operating Report for the Period of January 1, 2007 Through December 31, 2007 NRC-08-0026, Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report2008-03-31031 March 2008 Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report NRC-07-0020, Annual Radiological Effluent Release and Radiological Environmental Operating Reports2007-04-27027 April 2007 Annual Radiological Effluent Release and Radiological Environmental Operating Reports NRC-05-0036, Annual Non-Radiological Environmental Operating Report for 20042005-04-29029 April 2005 Annual Non-Radiological Environmental Operating Report for 2004 NRC-04-0026, 2003 Annual Non Radiological Environmental Operating Report for Fermi 22004-04-30030 April 2004 2003 Annual Non Radiological Environmental Operating Report for Fermi 2 NRC-04-0025, 2003 Annual Reports for Fermi 22004-04-29029 April 2004 2003 Annual Reports for Fermi 2 NRC-03-0042, 2002 Annual Reports for Fermi 22003-04-28028 April 2003 2002 Annual Reports for Fermi 2 NRC-03-0041, Annual Non Radiological Environmental Operating Report2003-04-28028 April 2003 Annual Non Radiological Environmental Operating Report NRC-02-0031, 2001 Annual Non-Radiological Environmental Operating Report for Fermi 22002-04-24024 April 2002 2001 Annual Non-Radiological Environmental Operating Report for Fermi 2 2023-08-31
[Table view] |
Text
J. Todd Comner Site Vice President DTE Energy Company 6400 N.Dixie Highway, Newport, MI 48166 Tel: 734,586.4849 Fax: 734.586 .5295 Email: connerj@dteenergy.com DTE Energy-August 26, 2013 NRC-13-0048 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555
Reference:
Enrico Fermi Atomic Power Plant, Unit 1 NRC Docket No. 50-16 NRC License No. DPR-9
Subject:
Enrico Fermi Atomic Power Plant, Unit 1 Annual Report for Period Ending June 30, 2013 Pursuant to Section F.7, Reporting Requirements, of the Technical Specifications for Provisional Operating License No. DPR-9, the Annual Report for the period ending June 30, 2013 for the SAFSTOR Fermi 1 facility is enclosed.
Should you have any questions, please contact Daniel Breiding, Fermi 1 Custodian at 734-586-1912.
SincerCly, Enclosure cc: NRC Regional Administrator, Region III T. Smith, NRC (Washington, D.C.)
NRC Resident Inspector - Fermi 2 P. Lee, NRC Region III Michigan Department of Natural Resources & Environment (yalek@michigan. gov)
Enclosure to NRC-13-0048 DTE ELECTRIC COMPANY ENRICO FERMI ATOMIC POWER PLANT, UNIT 1 Docket No. 50-16 License No. DPR-9 Annual Report for Period July 1, 2012 through June 30, 2013 Approved by: Date: $
Daniel T. Breiding Fermi 1 Custodian
Enclosure to NRC-13-0048 Page 1 ENRICO FERMI ATOMIC POWER PLANT, UNIT 1 ANNUAL REPORT JULY 1, 2012 THROUGH JUNE 30, 2013 1.0 PREFACE This report provides a summary of the activities performed and the results of the facility surveillance program of the Enrico Fermi Atomic Power Plant, Unit 1, during the past twelve (12) months ending June 30, 2013.
In summary, required activities were conducted in accordance with the Operating License and Technical Specifications. Fermi 1 performed decommissioning activities with the shipment of contaminated components and debris. DTE Electric Company has returned Fermi 1 to a passive monitoring SAFSTOR status from the active final decontamination phase of SAFSTOR.
2.0 SAFSTOR STATUS 2.1 Health Physics 2.1.1 Personnel Exposure From July 1, 2012 through June 30, 2013, all monitored Fermi 1 personnel wore Dosimeters of Legal Record (DLRs). Electronic Dosimeters (EDs) were worn from July 1, 2012 through June 30, 2013 as secondary dosimetry at Fermi 1. All visitors were appropriately escorted and wore EDs, as a minimum, when entering all Fermi 1 Radiologically Restricted Areas (RRA).
The accumulated whole body dose from activities associated with Fermi 1 was 0.187 (REM) for this reporting period. The total dose is based on data from the following:
Li 0.187 REM (DLR) 01JUL12 - 31DEC12 0 0.000 REM (ED) 01JAN13 - 30JUN13 ED dose is presented for the second half of the monitoring period as DLR data were not available at the time of this report.
2.2 Surveillance Program 2.2.1 Environmental Surveys No liquid radiological releases occurred during this period; therefore, environmental monitoring samples were not required.
Enclosure to NRC-13-0048 Page 2 2.2.2 Weekly Tests and Inspections General area --- The Fermi 1 staff performed walk throughs and visual inspections as required by Technical Specifications. No significant issues were identified during the inspections.
2.2.3 Monthly Inspections Controlled Area Inspections --- During the specified interval, Fermi 1 staff conducted visual inspections of the fences, gates, doors, and surveyed the sump water levels from the top access of all active sumps. No significant issues were identified during the inspections.
2.2.4 Quarterly Surveillances Radiological Surveys --- The Radiation Protection technicians monitored the Reactor Building and the Fuel and Repair Building (FARB) for presence of gamma radiation, as well as beta, gamma, and alpha contamination. There were no unexpected radiation readings detected. The results of the quarterly contamination surveys indicated general area walkways remain <500-dpm/100 cm2 beta/gamma and <20-dpm/100-cm2 alpha.
3.0 DECOMMISSIONING PROJECT Based on a review performed in 2011, DTE Energy Company had decided to return to a passive monitoring SAFSTOR status from the active final decontamination phase of SAFSTOR.
Repackaging of waste containers from previous decommissioning activities was performed during the reporting period to allow proper characterization of the waste prior to shipment.
The Fermi 1 staff collected groundwater monitoring well samples and no plant-related radioactive isotopes were detected above background levels.
3.1 Radiological Surveys Radiological surveys were conducted in accordance with plant procedures. No unexpected radiological conditions were encountered during this reporting period.
Enclosure to NRC-13-0048 Page 3 3.2 Radiological Shipments The Fermi 1 team shipped the following materials offsite from Fermi 1 during the reporting period. Tools and equipment shipped to Fermi 2 are not included in this table. Note: no applicable radioactive waste shipments were made during the first half of 2013.
Shipment Material Shipment Activity Volume Weight Description Destination Category (mCi) Gross Cross Number EF112-08ixe-wate ilDSSI EF1-12-008 Mixed-waste Oil ngston, TN Exempt 3.59E-05 7.5 211 EnergySolutions EF1-12-009 DAW/Metals BWF LSA 1.26E+02 5,459 147,300 Clive, UT DAW/Salt/Sand/ EnergySolutions EFI-12-011 Sludge BWF LSA 1,030 4,331 193,355 Clive, UT EnergySolutions EFI-12-012 DAW/Metals BWF LSA/LQ 10.7 2,703 35,935 Clive, UT EnergySolutions EFI-12-013 DAW/Metals BWF LSA 300 644.3 35,975 Clive, UT Mixed Waste EnergySolutions Hazardous 72 4 ,3 EFI 015 (D008 Debris) Treatment Facility LQ 7.25 140 9,030 Clive, UT EnergySolutions EF1-12-016 DAW/Metals BWF LQ 1.94 638.2 24,915 Clive, UT 3 r" Quarter General 1.23E-06 EFI-12-017 Ground Water Engineering Labs Exempt uCi/g 0.7 133 Samples Charleston, SC 3 Quarter General 1.18E-06 EF1-12-018 Ground Water Engineering Labs Exempt uCi/g 0.2 20 Samples Charleston, SC BWF - Bulk Waste Facility DAW - Dry Active Waste LSA - Low Specific Activity LQ - Limited Quantity
Enclosure to NRC-13-0048 Page 4 4.0 RADIOLOGICAL EFFLUENTS There were no unplanned radiological gaseous effluent releases during the reporting period. There were no measurable releases associated with the decommissioning project during the reporting period. The gaseous effluent releases were below the Technical Specification air dose limit of 10 mrad of gamma radiation and 20 mrad of beta radiation per year. The individual dose calculated due to gaseous effluent releases was below the Technical Specification dose limit of 5 mrem TEDE.
5.0 50.59 EVALUATIONS, DESIGN CHANGES AND LER's 5.1 10 CFR 50.59 There were no 10 CFR 50.59 evaluations performed during this period. Screenings determined that 50.59 evaluations were not required.
5.2 Desigzn Changes There were no Design Changes during this reporting period.
5.3 Licensee Event Reports There were no Licensee Event Reports during this reporting period.
6.0 AUDIT SUBCOMMITTEE The Audit Subcommittee inspected the physical facility and reviewed the Technical Specification surveillance records during the reporting period. No significant problems were identified.
All audit reports are maintained on file.