Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2013
ML13239A119
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/26/2013
From: Conner J
DTE Energy
To:
Document Control Desk, NRC/FSME
References
NRC-13-0048
Download: ML13239A119 (6)


Text

J. Todd Comner Site Vice President DTE Energy Company 6400 N.Dixie Highway, Newport, MI 48166 Tel: 734,586.4849 Fax: 734.586 .5295 Email: connerj@dteenergy.com DTE Energy-August 26, 2013 NRC-13-0048 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555

Reference:

Enrico Fermi Atomic Power Plant, Unit 1 NRC Docket No. 50-16 NRC License No. DPR-9

Subject:

Enrico Fermi Atomic Power Plant, Unit 1 Annual Report for Period Ending June 30, 2013 Pursuant to Section F.7, Reporting Requirements, of the Technical Specifications for Provisional Operating License No. DPR-9, the Annual Report for the period ending June 30, 2013 for the SAFSTOR Fermi 1 facility is enclosed.

Should you have any questions, please contact Daniel Breiding, Fermi 1 Custodian at 734-586-1912.

SincerCly, Enclosure cc: NRC Regional Administrator, Region III T. Smith, NRC (Washington, D.C.)

NRC Resident Inspector - Fermi 2 P. Lee, NRC Region III Michigan Department of Natural Resources & Environment (yalek@michigan. gov)

Enclosure to NRC-13-0048 DTE ELECTRIC COMPANY ENRICO FERMI ATOMIC POWER PLANT, UNIT 1 Docket No. 50-16 License No. DPR-9 Annual Report for Period July 1, 2012 through June 30, 2013 Approved by: Date: $

Daniel T. Breiding Fermi 1 Custodian

Enclosure to NRC-13-0048 Page 1 ENRICO FERMI ATOMIC POWER PLANT, UNIT 1 ANNUAL REPORT JULY 1, 2012 THROUGH JUNE 30, 2013 1.0 PREFACE This report provides a summary of the activities performed and the results of the facility surveillance program of the Enrico Fermi Atomic Power Plant, Unit 1, during the past twelve (12) months ending June 30, 2013.

In summary, required activities were conducted in accordance with the Operating License and Technical Specifications. Fermi 1 performed decommissioning activities with the shipment of contaminated components and debris. DTE Electric Company has returned Fermi 1 to a passive monitoring SAFSTOR status from the active final decontamination phase of SAFSTOR.

2.0 SAFSTOR STATUS 2.1 Health Physics 2.1.1 Personnel Exposure From July 1, 2012 through June 30, 2013, all monitored Fermi 1 personnel wore Dosimeters of Legal Record (DLRs). Electronic Dosimeters (EDs) were worn from July 1, 2012 through June 30, 2013 as secondary dosimetry at Fermi 1. All visitors were appropriately escorted and wore EDs, as a minimum, when entering all Fermi 1 Radiologically Restricted Areas (RRA).

The accumulated whole body dose from activities associated with Fermi 1 was 0.187 (REM) for this reporting period. The total dose is based on data from the following:

Li 0.187 REM (DLR) 01JUL12 - 31DEC12 0 0.000 REM (ED) 01JAN13 - 30JUN13 ED dose is presented for the second half of the monitoring period as DLR data were not available at the time of this report.

2.2 Surveillance Program 2.2.1 Environmental Surveys No liquid radiological releases occurred during this period; therefore, environmental monitoring samples were not required.

Enclosure to NRC-13-0048 Page 2 2.2.2 Weekly Tests and Inspections General area --- The Fermi 1 staff performed walk throughs and visual inspections as required by Technical Specifications. No significant issues were identified during the inspections.

2.2.3 Monthly Inspections Controlled Area Inspections --- During the specified interval, Fermi 1 staff conducted visual inspections of the fences, gates, doors, and surveyed the sump water levels from the top access of all active sumps. No significant issues were identified during the inspections.

2.2.4 Quarterly Surveillances Radiological Surveys --- The Radiation Protection technicians monitored the Reactor Building and the Fuel and Repair Building (FARB) for presence of gamma radiation, as well as beta, gamma, and alpha contamination. There were no unexpected radiation readings detected. The results of the quarterly contamination surveys indicated general area walkways remain <500-dpm/100 cm2 beta/gamma and <20-dpm/100-cm2 alpha.

3.0 DECOMMISSIONING PROJECT Based on a review performed in 2011, DTE Energy Company had decided to return to a passive monitoring SAFSTOR status from the active final decontamination phase of SAFSTOR.

Repackaging of waste containers from previous decommissioning activities was performed during the reporting period to allow proper characterization of the waste prior to shipment.

The Fermi 1 staff collected groundwater monitoring well samples and no plant-related radioactive isotopes were detected above background levels.

3.1 Radiological Surveys Radiological surveys were conducted in accordance with plant procedures. No unexpected radiological conditions were encountered during this reporting period.

Enclosure to NRC-13-0048 Page 3 3.2 Radiological Shipments The Fermi 1 team shipped the following materials offsite from Fermi 1 during the reporting period. Tools and equipment shipped to Fermi 2 are not included in this table. Note: no applicable radioactive waste shipments were made during the first half of 2013.

Shipment Material Shipment Activity Volume Weight Description Destination Category (mCi) Gross Cross Number EF112-08ixe-wate ilDSSI EF1-12-008 Mixed-waste Oil ngston, TN Exempt 3.59E-05 7.5 211 EnergySolutions EF1-12-009 DAW/Metals BWF LSA 1.26E+02 5,459 147,300 Clive, UT DAW/Salt/Sand/ EnergySolutions EFI-12-011 Sludge BWF LSA 1,030 4,331 193,355 Clive, UT EnergySolutions EFI-12-012 DAW/Metals BWF LSA/LQ 10.7 2,703 35,935 Clive, UT EnergySolutions EFI-12-013 DAW/Metals BWF LSA 300 644.3 35,975 Clive, UT Mixed Waste EnergySolutions Hazardous 72 4 ,3 EFI 015 (D008 Debris) Treatment Facility LQ 7.25 140 9,030 Clive, UT EnergySolutions EF1-12-016 DAW/Metals BWF LQ 1.94 638.2 24,915 Clive, UT 3 r" Quarter General 1.23E-06 EFI-12-017 Ground Water Engineering Labs Exempt uCi/g 0.7 133 Samples Charleston, SC 3 Quarter General 1.18E-06 EF1-12-018 Ground Water Engineering Labs Exempt uCi/g 0.2 20 Samples Charleston, SC BWF - Bulk Waste Facility DAW - Dry Active Waste LSA - Low Specific Activity LQ - Limited Quantity

Enclosure to NRC-13-0048 Page 4 4.0 RADIOLOGICAL EFFLUENTS There were no unplanned radiological gaseous effluent releases during the reporting period. There were no measurable releases associated with the decommissioning project during the reporting period. The gaseous effluent releases were below the Technical Specification air dose limit of 10 mrad of gamma radiation and 20 mrad of beta radiation per year. The individual dose calculated due to gaseous effluent releases was below the Technical Specification dose limit of 5 mrem TEDE.

5.0 50.59 EVALUATIONS, DESIGN CHANGES AND LER's 5.1 10 CFR 50.59 There were no 10 CFR 50.59 evaluations performed during this period. Screenings determined that 50.59 evaluations were not required.

5.2 Desigzn Changes There were no Design Changes during this reporting period.

5.3 Licensee Event Reports There were no Licensee Event Reports during this reporting period.

6.0 AUDIT SUBCOMMITTEE The Audit Subcommittee inspected the physical facility and reviewed the Technical Specification surveillance records during the reporting period. No significant problems were identified.

All audit reports are maintained on file.