ML13239A248
| ML13239A248 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 08/16/2013 |
| From: | James Shea Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML13239A247 | List: |
| References | |
| Download: ML13239A248 (2) | |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 August 16, 2013 10 CFR 50.4 10 CFR 50, Appendix E ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Browns Ferry Nuclear Plant Units 1, 2 and 3 - Revised Evacuation Time Estimates
References:
- 1. Tennessee Valley Authority letter to NRC, "Evacuation Time Estimates," dated December 18, 2012 (ML12362A471)
- 2. Tennessee Valley Authority letter to NRC, "Evacuation Time Estimates Checklist," dated March 4, 2013 (ML13070A022)
- 3. NUREG/CR-7002, "Criteria for Development of Evacuation Time Estimate Studies," published November 2011 (ML113010515)
The purpose of this correspondence is to provide revised evacuation. time estimates as requested by the Nuclear Regulatory Commission (NRC).
By letter dated December 18, 2012 (Reference 1), Tennessee Valley Authority (TVA) provided the analysis supporting Evacuation Time Estimates (ETE) for Browns Ferry Nuclear Plant BFN).
By letter dated March 4, 2013 (Reference 2), TVA provided the ETE review criteria checklist from Appendix B of NUREG/CR-7002 "Criteria for Development of Evacuation Time Estimate Studies," (Reference 3), requested by the NRC in a telephone call on February 1, 2013.
In a June 6, 2013 teleconference, NRC provided specific comments to TVA regarding the December 2012 (Reference 1) ETE submittal. As a result, TVA's ETE submittals were revised. to this letter provides a summary table of TVA responses to the specific NRC comments on TVA's 2012 ETE submittals provided in the June 6, 2013 teleconference. to this letter provides the revised Evacuation Time Estimates for Browns Ferry Nuclear Power Plant Plume Exposure Pathway Emergency Planning Zone.
Printed on recycled paper
U.S. Nuclear Regulatory Commission Page 2 August 16, 2013 to this letter provides a copy of the completed ETE review criteria checklist for the revised evacuation time estimates.
There are no new regulatory commitments in this letter. Should you have any questions or if additional information is needed regarding this submittal, please contact Walter H. Lee, Senior Emergency Preparedness Manager, at (423) 751-8577.
S
.hea Vice President, Nuclear Licensing
Enclosures:
- 2. Evacuation Time Estimates for Browns Ferry Nuclear Power Plant Plume Exposure Pathway Emergency Planning Zone
- 3. Table B-1 ETE Review Criteria Checklist - Browns Ferry cc (Enclosures):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant