Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML052140191 + (ML052140191)
- ML052140195 + (ML052140195)
- E910-05-046, Rev 0 to E900-04-017, Upper Spray Pump Area and Discharge Tunnel Entrance Survey Design, Appendix B & Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfa + (ML052140198)
- ML052140218 + (ML052140218)
- ML052140229 + (ML052140229)
- ML052140235 + (ML052140235)
- ML052140239 + (ML052140239)
- E910-05-051, Transmittal of Saxton Nuclear Experimental Corporation (Snec), FSS Report for Residual Macadam in OL1 + (ML052140240)
- ML052140241 + (ML052140241)
- E910-05-052, Rev. 0 to Calculation E900-04-027, Cv Yard Survey Design - Temporary Water Supply Trench in Cv Yard, Appendix A-1 to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area Survey Unit OL1-6 + (ML052140245)
- E910-05-056, Rev. 0 to Calculation E900-05-024, Open Land FSS Design-OL3, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL3 + (ML052140247)
- ML052140253 + (ML052140253)
- ML052140255 + (ML052140255)
- ML052140256 + (ML052140256)
- NLS2005064, Change to Emergency Plan Implementing Procedure + (ML052140258)
- ML052140259 + (ML052140259)
- RS-05-096, Response to Ral Regarding NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (ML052140271)
- ML052140271 + (ML052140271)
- ML052140274 + (ML052140274)
- RC-05-0116, Special Report (Spr) 2005-03 + (ML052140275)
- ML052140277 + (ML052140277)
- RC-05-0117, Virgil C. Sumner, Response to NRC Bulletin 2004-01 Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Connections at Pressurized-Water Reactors (C-04-1719), + (ML052140278)
- ML052140278 + (ML052140278)
- W3F1-2005-0052, Response to Request for Additional Information for Generic Letter 2004-02 + (ML052140281)
- ML052140281 + (ML052140281)
- ML052140282 + (ML052140282)
- 05000334/LER-2005-001, Re Protection System Channel Delta Temperature Time Constant Switch Found Out of Position + (ML052140305)
- L-05-130, Responses to a Request for Additional Information (RAI Dated June 30, 2005) in Support of License Amendment Request Nos. 302 and 173 + (ML052140310)
- L-05-127, Proposed Alternative to American Society of Mechanical Engineers Code Section XI Visual Examination Requirements Associated with Third Ten Year Interval Inservice Inspection Program (Request No. BV3-IWE1-4) + (ML052140314)
- L-05-129, Fitness-For-Duty Program Six Month Report for the Period of January 1, 2005, Through June 30, 2005 + (ML052140321)
- ML052140325 + (ML052140325)
- ML052140326 + (ML052140326)
- ML052140329 + (ML052140329)
- ML052140332 + (ML052140332)
- ML052140334 + (ML052140334)
- ML052140335 + (ML052140335)
- IR 05000298/2005003 + (ML052140370)
- ML052140391 + (ML052140391)
- E910-05-050, Transmittal of Saxton Nuclear Experimental Corp FSS Report for Residual Concrete in OL1 + (ML052140393)
- ML052140395 + (ML052140395)
- ML052140396 + (ML052140396)
- L-2005-162, Official Service List Change + (ML052140398)
- ML052140399 + (ML052140399)
- E900-05-015, Rev. 1 to Calculation E900-05-015, OL1 Paved & Miscellaneous Concrete Surfaces MA8, PF1, DB5, DB1, SS12, SS24-Survey Design, Appendices B - D to Final Status Survey Report for Saxton Nuclear Experimental Corp Residual Concrete in OL1 + (ML052140403)
- ML052140409 + (ML052140409)
- IR 05000030/2005009 + (ML052140414)
- ML052140415 + (ML052140415)
- 05000265/LER-2004-004-01, Re Main Steam Safety/Relief Valve As-Found Setpoint Outside of Technical Specification Allowed Value Due to Pressure Adjusting Spring Tolerances, Pressure Cap Material and Vibration + (ML052140417)
- LR-N05-0319, Technical Specification Bases Change S05-05B Re Radiation Monitoring Channels + (ML052140420)
- ML052140421 + (ML052140421)
- DCL-05-083, Supplement to Inservice Testing (IST) Program - Third Ten-Year Interval and IST Relief Requests + (ML052140423)