Response to Request for Additional Information for Generic Letter 2004-02
ML052140281
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/28/2005
From: Harris A
Entergy Nuclear South, Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-04-002, W3F1-2005-0052
Download: ML052140281 (5)


Text

Entergy Nuclear South Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093

-tergy rTel 504-739-6475 Entff, y Fax 504-739-6698 aharris@entergy.com Alan J. Harris Director, Nuclear Safety Assurance Waterford 3 W3F17-2005-0052 July 28, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Response to Request for Additional Information for Generic Letter 2004-02 Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

Dear Sir or Madam:

By letter dated June 2, 2005, the NRC requested additional information on the 90-day response to Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors, for Waterford 3 Steam Electric Station. The Staff requested Entergy to provide the plans and schedule for evaluating the chemical effects and long-term downstream effects and include plans for performing testing to support the evaluation of these effects.

Entergy provided a 90-day response to GL 2004-02 based on information available at that time. Subsequent to submitting the 90-day response, additional information has become available pertaining to chemical effects and evaluation of long-term downstream effects.

Recent cooperative NRC/Electric Power Institute (EPRI) chemical testing indicates that precipitants could be formed during post-loss-of-coolant accident (LOCA) recirculation operation. The effects of chemical precipitants on sump screen strainer head loss have not been quantified nor has a methodology been formulated for determining this component of the total head loss. However, Entergy has initiated the chemical effects evaluation to address sump screen head loss during post-LOCA recirculation. As a part of the evaluation, Entergy plans to determine whether the NRC/EPRI tests bound site-specific post-LOCA parameters and reconcile the differences. Sufficient margin will be included in the new sump strainer design to accommodate chemical effects and will be validated either analytically or via testing. The design margins include margins associated with minimum sump water level, emergency core cooling system flow rate, maximum and minimum temperatures at recirculation actuation signal and the excess screen area provided over the minimum area required. Entergy will summarize the results of the chemical effects evaluation in the September 1, 2005, response. It is Entergy's understanding that the sump g\iy

W3F11-2005-0052 Page 2 screen strainer vendors are currently developing plans and schedules to quantify the head loss associated with chemical effects. Once the results of the vendor tests are published, Entergy plans to evaluate the adequacy of the sump screen strainer design for the chemical precipitant effects.

The guidance document for the evaluation of downstream effects, WCAP-1 6406, "Evaluation of Containment Sump Debris Effects in Support of GSI-191," was published on June 30, 2005. The evaluation for long-term downstream effects is currently being performed to support the September 1, 2005, response utilizing the WCAP-1 6406 methodology. Entergy plans to evaluate the effects of time-dependent circulating debris on the downstream components (i.e., valves, containment spray nozzles, orifices, downstream instrumentation, pumps, reactor vessel internals, and the fuel). Due to the late publication of WCAP-16406, a preliminary long-term downstream effects evaluation indicating susceptible components should be available in time for the September 1, 2005, response.

Entergy will provide a summary of the long-term downstream effects evaluations that have been completed and a schedule for completion of the remaining evaluations in the September 1, 2005, response.

At this time, there are no plans to perform site-specific testing in support of the long-term downstream effects or chemical effects evaluations.

The new commitments contained in this submittal are summarized in the attachment.

Should you have any questions concerning this submittal, please contact Greg Scott at (504) 739-6703.

I declare under penalty of perjury that the foregoing is true and correct. Executed on July 28, 2005.

Sine Attachment(s): List of Regulatory Commitments

W3F1 -2005-0052 Page 3 cc: NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 U. S. Nuclear Regulatory Commission Attn: Document Control Desk 11555 Rockville Pike Rockville, MD 20852-2738 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1700 K Street, NW Washington, DC 20006-3817 Morgan, Lewis & Bockius LLP ATTN: T.C. Poindexter 1111 Pennsylvania Avenue, NW Washington, DC 20004

Attachment to W3FI -2005-0052 List of Regulatory Commitments

Attachment to W3Fl-2005-0052 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE (Check One) SCHEDULED ONE- COMPLETION TIME CONTINUING DATE COMMITMENT ACTION COMPLIANCE (If Required)

Sufficient margin will be included in the x new sump strainer design to accommodate chemical effects and will be validated either analytically or via testing.

Entergy will summarize the results of X September 1, 2005 the chemical effects evaluation in the September 1, 2005, response.

Once the results of the vendor tests X are published, Entergy plans to evaluate the adequacy of the sump screen strainer design for the chemical precipitant effects.

Entergy will provide a summary of the X September 1, 2005 long-term downstream effects evaluations that have been completed and a schedule for completion of the remaining evaluations in the September 1, 2005, response.

Text

Entergy Nuclear South Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093

-tergy rTel 504-739-6475 Entff, y Fax 504-739-6698 aharris@entergy.com Alan J. Harris Director, Nuclear Safety Assurance Waterford 3 W3F17-2005-0052 July 28, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Response to Request for Additional Information for Generic Letter 2004-02 Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

Dear Sir or Madam:

By letter dated June 2, 2005, the NRC requested additional information on the 90-day response to Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors, for Waterford 3 Steam Electric Station. The Staff requested Entergy to provide the plans and schedule for evaluating the chemical effects and long-term downstream effects and include plans for performing testing to support the evaluation of these effects.

Entergy provided a 90-day response to GL 2004-02 based on information available at that time. Subsequent to submitting the 90-day response, additional information has become available pertaining to chemical effects and evaluation of long-term downstream effects.

Recent cooperative NRC/Electric Power Institute (EPRI) chemical testing indicates that precipitants could be formed during post-loss-of-coolant accident (LOCA) recirculation operation. The effects of chemical precipitants on sump screen strainer head loss have not been quantified nor has a methodology been formulated for determining this component of the total head loss. However, Entergy has initiated the chemical effects evaluation to address sump screen head loss during post-LOCA recirculation. As a part of the evaluation, Entergy plans to determine whether the NRC/EPRI tests bound site-specific post-LOCA parameters and reconcile the differences. Sufficient margin will be included in the new sump strainer design to accommodate chemical effects and will be validated either analytically or via testing. The design margins include margins associated with minimum sump water level, emergency core cooling system flow rate, maximum and minimum temperatures at recirculation actuation signal and the excess screen area provided over the minimum area required. Entergy will summarize the results of the chemical effects evaluation in the September 1, 2005, response. It is Entergy's understanding that the sump g\iy

W3F11-2005-0052 Page 2 screen strainer vendors are currently developing plans and schedules to quantify the head loss associated with chemical effects. Once the results of the vendor tests are published, Entergy plans to evaluate the adequacy of the sump screen strainer design for the chemical precipitant effects.

The guidance document for the evaluation of downstream effects, WCAP-1 6406, "Evaluation of Containment Sump Debris Effects in Support of GSI-191," was published on June 30, 2005. The evaluation for long-term downstream effects is currently being performed to support the September 1, 2005, response utilizing the WCAP-1 6406 methodology. Entergy plans to evaluate the effects of time-dependent circulating debris on the downstream components (i.e., valves, containment spray nozzles, orifices, downstream instrumentation, pumps, reactor vessel internals, and the fuel). Due to the late publication of WCAP-16406, a preliminary long-term downstream effects evaluation indicating susceptible components should be available in time for the September 1, 2005, response.

Entergy will provide a summary of the long-term downstream effects evaluations that have been completed and a schedule for completion of the remaining evaluations in the September 1, 2005, response.

At this time, there are no plans to perform site-specific testing in support of the long-term downstream effects or chemical effects evaluations.

The new commitments contained in this submittal are summarized in the attachment.

Should you have any questions concerning this submittal, please contact Greg Scott at (504) 739-6703.

I declare under penalty of perjury that the foregoing is true and correct. Executed on July 28, 2005.

Sine Attachment(s): List of Regulatory Commitments

W3F1 -2005-0052 Page 3 cc: NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 U. S. Nuclear Regulatory Commission Attn: Document Control Desk 11555 Rockville Pike Rockville, MD 20852-2738 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1700 K Street, NW Washington, DC 20006-3817 Morgan, Lewis & Bockius LLP ATTN: T.C. Poindexter 1111 Pennsylvania Avenue, NW Washington, DC 20004

Attachment to W3FI -2005-0052 List of Regulatory Commitments

Attachment to W3Fl-2005-0052 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE (Check One) SCHEDULED ONE- COMPLETION TIME CONTINUING DATE COMMITMENT ACTION COMPLIANCE (If Required)

Sufficient margin will be included in the x new sump strainer design to accommodate chemical effects and will be validated either analytically or via testing.

Entergy will summarize the results of X September 1, 2005 the chemical effects evaluation in the September 1, 2005, response.

Once the results of the vendor tests X are published, Entergy plans to evaluate the adequacy of the sump screen strainer design for the chemical precipitant effects.

Entergy will provide a summary of the X September 1, 2005 long-term downstream effects evaluations that have been completed and a schedule for completion of the remaining evaluations in the September 1, 2005, response.