Letter Sequence Request |
|---|
|
|
MONTHYEARW3F1-2004-0075, Reissue of Report BAW-2177, Analysis of Capsule W-97 Entergy Operations, Inc. Waterford Generating Station Unit 3 - Reactor Vessel Material Surveillance Program2004-09-13013 September 2004 Reissue of Report BAW-2177, Analysis of Capsule W-97 Entergy Operations, Inc. Waterford Generating Station Unit 3 - Reactor Vessel Material Surveillance Program Project stage: Request W3F1-2005-0005, 90 Day Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2005-03-0303 March 2005 90 Day Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0515305472005-05-27027 May 2005 RAI Related to GL 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at pressurized-water Reactors Project stage: RAI ML0516605012005-06-0202 June 2005 RAI Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: RAI ML0521402772005-07-28028 July 2005 Part 21 Deficiency Report Re Framatome Anp Supplied Pressurizer Heaters with Internals Manufactured by Thermocoax. Initially Reported on 07/22/05 Project stage: Request ML0603903862006-02-0909 February 2006 Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accident at Pressurized-Water Reactors Project stage: RAI ML0733900652007-12-10010 December 2007 Approval of Extension Request, Corrective Actions Due Date, GL 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors Project stage: Other ML0801400072008-01-28028 January 2008 Report on Results of Staff Audit of Corrective Actions to Address GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at PWRs Project stage: Other ML0801403182008-01-28028 January 2008 Staff Audit Report on Results of Corrective Actions to Address GSI-191 GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at PWRs Project stage: Other ML0917302832009-06-11011 June 2009 Email, Draft Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors Project stage: Draft RAI ML0917302852009-06-11011 June 2009 Draft Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors Project stage: Draft RAI ML0920901072009-08-0606 August 2009 Notice of Conference Call with Entergy Operations, Inc. to Discuss Draft Request for Additional Information on Generic Letter 2004-02 for Waterford, Unit 3 Project stage: Draft RAI ML0925101242009-09-22022 September 2009 RAI, Regarding Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents Project stage: RAI ML0927200322009-10-0101 October 2009 Notice of Forthcoming Conference Call with Entergy Operations, Inc. to Discuss Waterford Steam Electric Station, Unit 3, Planned Response to Request for Additional Information on Generic Letter 2004-02 Project stage: RAI ML1005400832010-02-24024 February 2010 Forthcoming Conference Call with Entergy Operations, Inc. to Licensees Responses to NRC Generic Letter 2004-02 for Waterford Steam Electric Station, Unit 3 Project stage: Request ML1006903722010-03-0808 March 2010 Licensee Slides from 3/8/2010 Meeting Generic Letter 2004-02 Response to RAIs Project stage: Response to RAI ML1007003012010-04-0707 April 2010 Summary Follow-Up Conference Call with Entergy Operations, Inc. to Discuss Draft Response for Waterford, Unit 3, to the Request for Additional Information for Generic Letter 2004-02 Project stage: Draft RAI ML1013400612010-05-18018 May 2010 Notice of Forthcoming Conference Call with Entergy Operations, Inc. to Discuss Draft Response on GL-2004-02 for Waterford Steam Electric Station, Unit 3 Project stage: Draft Other ML1015204762010-06-0101 June 2010 Email, Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML1015302322010-06-0909 June 2010 Summary of Conference Call Meeting with Entergy Operations, Inc. to Discuss Draft Response on GL-2004-02 for Waterford Steam Electric Station, Unit 3 ML1017301902010-06-17017 June 2010 Revised Responses to the Request for Additional Information Related to GL-2004-02 Project stage: Request ML1017301952010-06-17017 June 2010 Revised Responses to the NRCs Request for Additional Information Related to GL-2004-02 Project stage: Request ML1017302002010-06-17017 June 2010 Chemical Effects Summary Related to RAI Response to GL-2004-02 Project stage: Other W3F1-2010-0032, Response to Request for Additional Information Regarding Final Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2010-11-23023 November 2010 Response to Request for Additional Information Regarding Final Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Supplement 2009-06-11
[Table View] |
Text
Al AR EVA July 28, 2005 NRC:05:047 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 10 CFR Part 21 Notification of Existence of a Defect This letter provides notification of a reportable defect in accordance with 10 CFR Part 21. This situation was reported to the NRC Operations Center by facsimile at 4:34 p.m. EST on July 22, 2005.
This issue concerns Framatome ANP supplied pressurizer heaters with internals manufactured by Thermocoax.
The affected utilities have been informed of the planned actions. Actions already taken to address the issue are provided in the attachment to this letter.
Sincerely, Ronnie L. Gardner, Manager Site Operations and Regulatory Affairs Attachment cc:
M. C. Honcharik Project 728 FRAMATOME ANP, INC. An AREVA and Slemens company N
3315 Old Forest Road. P.O. Box 10935, Lynchburg. VA 24506-0935 Tel.: 434 832 3000 - Fax 434 832 3840 - www areva corn
Document Control Desk NRC:05:047 July 28,2005 Page 1 ATTACHMENT A Reportable Defect (i)
Name and address of the individual informing the Commission Gayle Elliott, 3315 Old Forest Road, Lynchburg, VA 24501 (ii)
Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.
The components that contain the defect are pressurizer heaters.
(iii)
Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.
Framatome ANP, Inc. supplied pressurizer heaters with internals manufactured by Thermocoax.
(iv)
Nature of the defect or failure to comply and the safety hazard which is created or could be created by such a defect or failure to comply.
This issue concerns installed pressurizer heaters that were supplied by Framatome ANP. The heaters in question had a deficiency that may have resulted in a portion of the heated length being located inside the pressurizer heater nozzles (sleeves). Evaluation indicates that the failure mode could cause heating of the pressure boundary base metal (pressurizer heater nozzle) above the design temperature specification.
(v)
The date on which the information of such a defect or failure to comply was obtained.
This issue was determined to be a deviation on June 15,2005.
(vi)
In the case of a basic component which fails to comply, the number and the location of all such components in use at, supplied for, or being supplied for one or more facilities or activities subject to the regulations in this part.
Framatome ANP supplied 36 Thermocoax pressurizer heaters to Arizona Public Service for Palo Verde Unit 3 and 30 heaters to Entergy for Waterford Unit 3.
Document Control Desk NRC:05:047 July 28, 2005 Page 2 (vii)
The corrective action which has been, is being, or will be taken, the name of the individual or organization responsible for this action; and the length of time that has been or will be taken to complete the action.
All of the heaters supplied for Palo Verde Unit 3 have been removed from service and will not be reinstalled in the plant. All of the pressurizer heaters delivered for Waterford 3 (except for five) have been removed from service. The remaining five pressurizer heaters are currently installed in the pressurizer, however, Entergy has taken steps to preclude electrically energizing of these heaters and, therefore, the adverse conditions that could be created by the defect are precluded.
(viii)
Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
See (vii) above.