Transmittal Letter for SER Related to License Renewal of Millstone Power Station, Units 2 and 3
ML052140415
Person / Time
Site: Millstone  
Issue date: 08/01/2005
From: Kuo P
NRC/NRR/DRIP/RLEP
To: Christian D
Dominion Nuclear Connecticut
Eads J, NRR/DRIP/RLEP, 415-1471
Shared Package
ML052140162 List:
References
Download: ML052140415 (5)


Text

August 1, 2005 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

SAFETY EVALUATION REPORT (SER) RELATED TO THE LICENSE RENEWAL OF MILLSTONE POWER STATION, UNITS 2 AND 3

Dear Mr. Christian:

By letter dated January 20, 2004, Dominion Nuclear Connecticut, Inc. (DNC or the applicant) submitted applications to the U.S. Nuclear Regulatory Commission (NRC or the staff) for the renewal of the Millstone Power Station, Units 2 and 3 (MPS), operating licenses for up to an additional 20 years. The license renewal applications (LRAs) were submitted pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR 54), Requirements for Renewal of Operating Licenses for Nuclear Power Plants. The staff determined that the LRAs were complete and acceptable for docketing on March 12, 2004. Since that time, the staff has reviewed DNC LRAs, issued requests for additional information (RAIs), reviewed the applicants responses to the staffs RAIs and developed a safety evaluation report (SER) with open items dated February 24, 2005. On the basis of this review, the staff has developed the enclosed SER to document its findings associated with the safety review of the LRAs and supporting documentation for MPS.

If you have any questions regarding this matter, please contact the license renewal project manager, Johnny H. Eads, at 301-415-1471 or e-mail JHE@nrc.gov.

Sincerely,

/RA/

Pao-Tsin Kuo, Program Director License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-336 and 50-423

Enclosure:

As stated cc w/encls: See next page

OFFICIAL RECORD COPY August 1, 2005 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

SAFETY EVALUATION REPORT (SER) RELATED TO THE LICENSE RENEWAL OF MILLSTONE POWER STATION, UNITS 2 AND 3

Dear Mr. Christian:

By letter dated January 20, 2004, Dominion Nuclear Connecticut, Inc. (DNC or the applicant) submitted applications to the U.S. Nuclear Regulatory Commission (NRC or the staff) for the renewal of the Millstone Power Station, Units 2 and 3 (MPS), operating licenses for up to an additional 20 years. The license renewal applications (LRAs) were submitted pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR 54), Requirements for Renewal of Operating Licenses for Nuclear Power Plants. The staff determined that the LRAs were complete and acceptable for docketing on March 12, 2004. Since that time, the staff has reviewed DNC LRAs, issued requests for additional information (RAIs), reviewed the applicants responses to the staffs RAIs and developed a safety evaluation report (SER) with open items dated February 24, 2005. On the basis of this review, the staff has developed the enclosed SER to document its findings associated with the safety review of the LRAs and supporting documentation for MPS.

If you have any questions regarding this matter, please contact the license renewal project manager, Johnny H. Eads, at 301-415-1471 or e-mail JHE@nrc.gov.

Sincerely,

/RA/

Pao-Tsin Kuo, Program Director License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-336 and 50-423

Enclosure:

As stated cc w/encls: See next page DISTRIBUTION: See Next Page ADAMS Accession Nos.: Pkg-ML052140162; Letter - ML052140415; SER - ML052140177 Document Name: E:\\Filenet\\ML052140415.wpd OFFICE PM:DRIP/RLEP/A LA:DRIP/RLEP OGC BC:DE/EMCB BC:DE/EMEB NAME J. Eads M. Jenkins A. Fernandez W. Bateman K. Manoly DATE 07 / 14 /2005 8/ 1 /2005 07 / 28 /2005 07 / 20 /2005 07 / 21 /2005 OFFICE BC:DE/EEIB BC:DSSA/SPSB BC:DSSA/SRXB BC:DSSA/SPLB BC:DIPM/IEPB NAME R. Jenkins M. Tschiltz J. Nakoski J. Hannon T. Quay DATE 07 / 20 /2005 07 / 21 /2005 07 / 19 /2005 07 / 21 /2005 07 / 19 /2005 OFFICE D:DE D:DSSA D:DIPM D:DRIP SC:DRIP/RLEP/A NAME C. Grimes T. Martin B. Boger F. Gillespie SLee DATE 07/ 26 /2005 07 / 25 /2005 07 / 25 /2005 07/ 29 /2005 07/ 29 /2005 OFFICE PD:DRIP:RLEP NAME PTKuo DATE 08/1/2005

Millstone Power Station, Units 2 and 3 cc:

Lillian M. Cuoco, Esquire Senior Counsel Dominion Resources Services, Inc.

Rope Ferry Road Waterford, CT 06385 Edward L. Wilds, Jr., Ph.D.

Director, Division of Radiation Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Paul Eccard First Selectman Town of Waterford 15 Rope Ferry Road Waterford, CT 06385 Mr. P. J. Parulis Manager - Nuclear Oversight Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. W. R. Matthews Senior Vice President - Nuclear Operations Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. John Markowicz Co-Chair Nuclear Energy Advisory Council 9 Susan Terrace Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070

Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Mr. G. D. Hicks Director - Nuclear Station Safety and Licensing Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company Moody Street P.O. Box 426 Ludlow, MA 01056 Mr. J. Alan Price Site Vice President Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. Chris L. Funderburk Director, Nuclear Licensing and Operations Support Dominion Resources Services, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. David W. Dodson Licensing Supervisor Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Millstone Power Station, Units 2 and 3 cc:

David R. Lewis Shaw Pittman, LLC 2300 N. Street N.W.

Washington, DC 20037 Mr. S. E. Scace Assistant to the Site Vice President Dominion Nucler Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. M. J. Wilson Manager - Nuclear Training Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. A. J. Jordan, Jr.

Director - Nuclear Engineering Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. S. P. Sarver Director - Nuclear Station Operations and Maintenance Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. Charles Brinkman, Director Washington Operations Nuclear Services Westinghouse Electric Company 12300 Twinbrook Pkwy, Suite 330 Rockville, MD 20852 Mr. William D. Corbin Director - Nuclear Projects Department Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. William R. Watson, Jr.

Supervisor - License Renewal Project Building 475/5 Millstone Power Station Rope Ferry Road Waterford, CT 06385 Judy Liskov, Assistant Director Waterford Public Library 49 Rope Ferry Road Waterford, CT 06385-2806 Mildred Hodge, Director Three Rivers Community College Thames River Campus 574 New London Turnpike Norwich, CT 06360 Ralph Bunge NRC Proceedings Representative for Waterford, CT 510 Carr Ave Rockville, MD 20850 Thomas V. Wagner, AICP Planning Director Town of Waterford 15 Rope Ferry Road Waterford, CT 06385 Robert A. Avena Town Attorney for Waterford, CT Kepple, Morgan & Avena, P.C.

Box 3A Anguilla Park 20 South Anguilla Road Pawcatuck, CT 06379 Mr. James Ross Nuclear Energy Institute 1776 I Street NW, Suite 400 Washington, DC 20006-3708

DISTRIBUTION: Transmittal Letter to: D. Christian, Re: Safety Evaluation Report related to the License Renewal of Millstone, Dated: August 1, 2005 Adams Accession No.: ML052140415; PKG - ML052140162 HARD COPY RLEP RF E-MAIL:

RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li K. Winsberg (RidsOgcMailCenter)

R. Weisman M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff J. Uhle R. Laufer V. Nerses G. Wunder M. Schneider, Sr. Resident D. Screnci, RI R. Bellamy, RI T. Mensah OPA