Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NL-05-032, Draft - Outlines (Facility Ltr. Dtd - 03/22/2005 (Folder 2) + (ML051650122)
- ML051650132 + (ML051650132)
- ML051650157 + (ML051650157)
- RC-05-0088, Virgil C Summer, Operating License - 2004 Annual Financial Reports + (ML051650166)
- ML051650170 + (ML051650170)
- 05000306/LER-2005-002, Praised Island, Unit 2 Regarding Unit 2 Shutdown Required by Technical Specifications Due to Inoperable Emergency Diesel Generator + (ML051650175)
- ML051650190 + (ML051650190)
- ML051650191 + (ML051650191)
- ML051650234 + (ML051650234)
- 05000388/LER-2005-002, Re Degraded 125 Vdc Battery Charger Results in Technical Specification Required Shutdown + (ML051650236)
- 05000324/LER-2005-001, Re Operation Prohibited by Technical Specification -Inoperable Feedwater and Main Turbine High Water Level Trip + (ML051650237)
- 05000324/LER-2005-002, Re Automatic Shutdown Due to Condensate System Transient + (ML051650239)
- 05000336/LER-2005-002, Re Reactor Coolant System Pressure Boundary Leakage from PWSCC in a Pressurizer Heater Sleeve + (ML051650242)
- ML051650258 + (ML051650258)
- BVY 05-059, Revised Response to Request for Additional Information Regarding Relief Request RI-01 + (ML051650262)
- ML051650266 + (ML051650266)
- ML051650273 + (ML051650273)
- ML051650278 + (ML051650278)
- VPN-020-200, PGE-1061, Trojan Nuclear Plant Defueled Safety Analysis Report and License Termination Plan (PGE-1078), Revision 22, and Subsequent Deletion as an Active Topical Report and Licensing Basis Document + (ML051650280)
- ML051650282 + (ML051650282)
- 05000254/LER-2005-003, Re Three Main Steam Safety Valves Outside of Technical Specification Allowed Tolerance + (ML051650284)
- ML051650291 + (ML051650291)
- ML051650293 + (ML051650293)
- NRC 2005-0070, Response to Request for Additional Information Regarding Request for Exigent Review of Heavy Load Analysis + (ML051650296)
- ML051650307 + (ML051650307)
- ML051650308 + (ML051650308)
- L-PI-05-054, Unit 2 Steam Generator Inspection Results - 15-Day Report + (ML051650318)
- GO2-05-099, License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power + (ML051650320)
- ML051650324 + (ML051650324)
- ML051650335 + (ML051650335)
- ML051650338 + (ML051650338)
- 05000311/LER-2005-002, Regarding Reactor Coolant Instrument Line Through-Wall Leak + (ML051650342)
- 3F0605-03, Service List Update and Signature Authorization + (ML051650348)
- 05000255/LER-2005-004, Regarding Fuel Handling Area Ventilation System Not Properly Aligned During Movement of Irradiated Fuel Assemblies + (ML051650355)
- ML051650371 + (ML051650371)
- FOIA/PA-2005-0066 + (ML051650404)
- ML051650406 + (ML051650406)
- ML051650421 + (ML051650421)
- ML051650449 + (ML051650449)
- ML051650462 + (ML051650462)
- ML051650473 + (ML051650473)
- ML051650505 + (ML051650505)
- ML051650511 + (ML051650511)
- ML051650556 + (ML051650556)
- ML051660042 + (ML051660042)
- IR 05000346/2005004 + (ML051660047)
- ML051660069 + (ML051660069)
- ML051660071 + (ML051660071)
- ML051660073 + (ML051660073)
- ML051660075 + (ML051660075)
- ML051660078 + (ML051660078)