ML051650338

From kanterella
Jump to navigation Jump to search
Acting NRC Section Chief for Wolf Creek - R.Gramm Is on Special Assignment Until Early December. Mr. D.Collins Will Be Acting Section Chief for PDIV-2 Until mid-September and Ms.M.Kotzalas Will Be Acting from mid-September Until Early Decem
ML051650338
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 06/13/2005
From: Berkow H
NRC/NRR/DLPM/LPD4
To: Muench R
Wolf Creek
Donohew J N, NRR/DLPM,415-1307
References
Download: ML051650338 (3)


Text

June 13, 2005 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation Post Office Box 411 Burlington, KS 66839

SUBJECT:

ACTING NRC SECTION CHIEF FOR WOLF CREEK

Dear Mr. Muench:

Robert A. Gramm is on a special assignment until early December 2005. During this period, Mr. Daniel S. Collins will be Acting Section Chief of Project Directorate IV, Section 2, until mid-September, and Ms. Margaret A. Kotzalas will be Acting Section Chief from mid-September until early December. While acting during the above-mentioned time period, Mr. Collins or Ms. Kotzalas may be reached by telephone at (301) 415-1395 or electronic mail at dxc1@nrc.gov or mxk5@nrc.gov, respectively.

Sincerely,

/RA/

Herbert N. Berkow, Director Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-482 cc: See next page

June 13, 2005 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation Post Office Box 411 Burlington, KS 66839

SUBJECT:

ACTING NRC SECTION CHIEF FOR WOLF CREEK

Dear Mr. Muench:

Robert A. Gramm is on a special assignment until early December 2005. During this period, Mr. Daniel S. Collins will be Acting Section Chief of Project Directorate IV, Section 2, until mid-September, and Ms. Margaret A. Kotzalas will be Acting Section Chief from mid-September until early December. While acting during the above-mentioned time period, Mr. Collins or Ms. Kotzalas may be reached by telephone at (301) 415-1395 or electronic mail at dxc1@nrc.gov or mxk5@nrc.gov, respectively.

Sincerely,

/RA/

Herbert N. Berkow, Director Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-482 cc: See next page DISTRIBUTION:

PUBLIC RidsNrrPMJDonohew PDIV-2 R/F LBerry RidsNrrDlpmLpdiv (HBerkow)

RidsRgn4MailCenter (AHowell)

DCollins MKotzalas RidsNrrLALFeizollahi ACCESSION NO.: ML OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/ASC PDIV/PD NAME JDonohew LFeizollahi DCollins HBerkow DATE 6/13/05 6/13/05 6/13/05 6/13/05 DOCUMENT NAME: E:\\Filenet\\ML051650338.wpd OFFICIAL RECORD COPY

Wolf Creek Generating Station cc:

Jay Silberg, Esq.

Shaw Pittman, LLP 2300 N Street, NW Washington, D.C. 20037 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-7005 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 311 Burlington, KS 66839 Chief Engineer, Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS 66604-4027 Office of the Governor State of Kansas Topeka, KS 66612 Attorney General 120 S.W. 10th Avenue, 2nd Floor Topeka, KS 66612-1597 County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS 66839 Vick L. Cooper, Chief Air Operating Permit and Compliance Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366 Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Supervisor Licensing Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 U.S. Nuclear Regulatory Commission Resident Inspectors Office/Callaway Plant 8201 NRC Road Steedman, MO 65077-1032