June 24, 2005 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P. O. Box 98 Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION - REQUEST FOR ADDITIONAL INFORMATION RE: LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS - SINGLE LOOP OPERATION SAFETY LIMIT MINIMUM CRITICAL POWER RATIO (TAC NO. MC6346)
Dear Mr. Edington:
Nebraska Public Power District (NPPD/the licensee) requested the Nuclear Regulatory Commission (NRC) staffs approval for an amendment to revise the Cooper Nuclear Station Technical Specifications regarding the single recirculation loop Safety Limit Minimum Critical Power Ratio value.
The NRC staff has reviewed the information provided in the March 8, 2005, submittal and has determined that the additional information identified in the enclosure is required in order for the NRC staff to complete its review. As agreed upon with David Van Der Kamp on May 31, 2005, NPPD will respond to the request for additional information (RAI) within 45 days from the date of this letter. The RAI is enclosed.
Sincerely,
/RA by M.Fields for M.Honcharik/
Michelle C. Honcharik, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-298
Enclosure:
RAI cc w/encl: See next page
Mr. Randall K. Edington June 24, 2005 Vice President-Nuclear and CNO Nebraska Public Power District P. O. Box 98 Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION - REQUEST FOR ADDITIONAL INFORMATION RE: LICENSE AMENDMENT REQUEST TO CHANGE TECHNICAL SPECIFICATIONS - SINGLE LOOP OPERATION SAFETY LIMIT MINIMUM CRITICAL POWER RATIO (TAC NO. MC6346)
Dear Mr. Edington:
Nebraska Public Power District (NPPD/the licensee) requested the Nuclear Regulatory Commission (NRC) staffs approval for an amendment to revise the Cooper Nuclear Station Technical Specifications regarding the single recirculation loop Safety Limit Minimum Critical Power Ratio value.
The NRC staff has reviewed the information provided in the March 8, 2005, submittal and has determined that the additional information identified in the enclosure is required in order for the NRC staff to complete its review. As agreed upon with David Van Der Kamp on May 31, 2005, NPPD will respond to the request for additional information (RAI) within 30 days from the date of this letter. The RAI is enclosed.
Sincerely,
/RA by M.Fields for M.Honcharik/
Michelle C. Honcharik, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-298
Enclosure:
RAI cc w/encl: See next page DISTRIBUTION:
PUBLIC PDIV-1 Reading RidsNrrDlpmLpdiv (HBerkow)
RidsNrrDlpmLpdiv1 (DTerao)
RidsNrrPMMHoncharik RidsNrrLALFeizollahi RidsAcrsAcnwMailCenter RidsOgcRp RidsRgn4MailCenter (KKennedy)
FAkstulewicz VKlein DDuvigneaud ACCESSION NO: ML051650556 OFFICE PDIV-2/PE PDIV-1/PM PDIV-2/LA SRXB/SC PDIV-1/SC NAME DDuvigneaud MFields for MHoncharik LFeizollahi FAkstulewicz DTerao DATE 6/21/05 6/21/05 6/21/05 6/21/05 6/24/05 OFFICIAL RECORD COPY
June 2005 Cooper Nuclear Station cc:
Mr. William J. Fehrman President and Chief Executive Officer Nebraska Public Power District 1414 15th Street Columbus, NE 68601 Mr. Michael T. Boyce Nuclear Assett Manager Nebraska Public Power District 1414 15th Street Columbus, NE 68601 Mr. John C. McClure Vice President and General Counsel Nebraska Public Power District P. O. Box 499 Columbus, NE 68602-0499 Mr. Paul V. Fleming Licensing Manager Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Mr. Michael J. Linder, Director Nebraska Department of Environmental Quality P. O. Box 98922 Lincoln, NE 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, NE 68305 Ms. Cheryl K. Rogers, Program Manager Nebraska Health & Human Services System Division of Public Health Assurance Consumer Services Section 301 Centennial Mall, South P. O. Box 95007 Lincoln, NE 68509-5007 Mr. Mike Wells, Deputy Director Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 218 Brownville, NE 68321 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 State Emergency Management Agency P. O. Box 116 Jefferson City, MO 65101 Chief, Radiation and Asbestos Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson Suite 310 Topeka, KS 66612-1366 Mr. Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319 Mr. Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, MO 65102-0570 Jerry C. Roberts, Director of Nuclear Safety Assurance Nebraska Public Power District P.O. Box 98 Brownville, NE 68321
REQUEST FOR ADDITIONAL INFORMATION ISSUES RELATED TO THE LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS - SINGLE LOOP OPERATION (SLO) SAFETY LIMIT MINIMUM CRITICAL POWER RATIO (SLMCPR) VALUE COOPER NUCLEAR STATION DOCKET NO. 50-298 1.
On Page 2 in Attachment 1, and on Page 4 of Enclosure 1 of your March 8, 2005 submittal, you state the reason for the increase in your SLO SLMCPR as The actual end of Cycle 22 exposure was 360 MWd/ST less than the licensing assumption and below the minimum exposure window specified in the reload licensing analysis. On Page 6 of Enclosure 1 in Table 1 you state that the Cycle Exposure at Limiting Point (Mwd/ST) is 11000 for the RLP (Reference Loading Pattern - original reload licensing basis) and 11350 for the CMR (Cycle Management Report - reanalyzed results based on the actual end of Cycle 22 exposure). These values are in contradiction to your statement that the actual end of Cycle 22 exposure was 360 MWd/ST less than the licensing assumption. Please explain this discrepancy.
2.
For Table 2a in Enclosure 1 of your submittal, indicate whether the values listed for Cycle 23 are Cycle Management Report (CMR) or Reference Loading Pattern (RLP) calculations. Are there any differences between the two?