Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML051590049 + (ML051590049)
- RIS 2005-10, Performance-Based Approach for Associated Equipment in 10 CFR 34.20 + (ML051590049)
- ML051590064 + (ML051590064)
- NL-05-044, Reactor Vessel Upper Head Inspection Results; Indian Point Unit 3. Spring 2005 Refueling Outage (3R13) + (ML051590104)
- 05000306/LER-2005-001, Re Shutdown Required by Technical Specifications Due to Two Trains of Containment Cooling Inoperable + (ML051590105)
- ML051590110 + (ML051590110)
- ML051590121 + (ML051590121)
- ML051590130 + (ML051590130)
- ML051590135 + (ML051590135)
- ML051590137 + (ML051590137)
- ML051590140 + (ML051590140)
- L-PI-05-057, Revisions to Relief Requests Associated with the 4th Interval Inservice Testing Plan + (ML051590144)
- SBK-L-05122, Cycle 11 Core Operating Limits Report + (ML051590146)
- RS-05-070, Response to Request for Additional Information Regarding the Plant Loop Stop Isolation Valve + (ML051590148)
- ML051590167 + (ML051590167)
- ML051590172 + (ML051590172)
- NL-05-063, Reactor Vessel Lower Head Inspection Results; Indian Point Unit 3 + (ML051590184)
- NL-05-062, Proposed Change to IP2 Technical Specifications Regarding Pressurizer Water Level Requirements, Indian Point Unit No. 2 + (ML051590186)
- PLA-5907, Proposed Amendment No. 275 to Unit 1 Facility Operating License NPF-14 and Proposed Amendment No. 244 to Unit 2 Facility Operating License, and Proposed Operating License, Exigent Change to Technical Specification 3.8 + (ML051590190)
- ML051590203 + (ML051590203)
- ML051590206 + (ML051590206)
- ML051590211 + (ML051590211)
- ML051590214 + (ML051590214)
- ML051590217 + (ML051590217)
- ML051590234 + (ML051590234)
- IR 05000336/2005007 + (ML051590242)
- ML051590243 + (ML051590243)
- ML051590260 + (ML051590260)
- ML051590261 + (ML051590261)
- ML051590272 + (ML051590272)
- ML051590281 + (ML051590281)
- ML051590284 + (ML051590284)
- LR-N05-0275, Supplemental Report of Changes, Tests, and Experiments, Hope Creek Generating Station + (ML051590286)
- ML051590287 + (ML051590287)
- ML051590288 + (ML051590288)
- VPN-028-200, Trojan Nuclear Plant, ISFSI, Request to Update Service List + (ML051590290)
- ML051590292 + (ML051590292)
- RA-05-032, Request for Exemption from 10 CFR 50.75(f)(1) + (ML051590293)
- ML051590294 + (ML051590294)
- SVP-05-043, Core Operating Limits Report for Plant Cycle 19, Rev 1 + (ML051590300)
- ULNRC-05145, Technical Specification Revisions Associated with the Steam Generator Replacement Project + (ML051590301)
- ML051590302 + (ML051590302)
- ML051590306 + (ML051590306)
- ML051590311 + (ML051590311)
- ML051590333 + (ML051590333)
- ML051590384 + (ML051590384)
- ML051590442 + (ML051590442)
- ML051590443 + (ML051590443)
- NL-05-0923, Results of Inspections Required by NRC BL-04-001 and First Revised NRC Order EA-03-009 + (ML051590444)
- ML051590444 + (ML051590444)
- NL-05-0983, Units 1 and 2 Notification of Change in the Emergency Response Data System Data Point Library + (ML051590465)