ML051590272

From kanterella
Jump to navigation Jump to search

Technical Specifications, Issuance of Amendments to Extend the Inspection Interval for Reactor Coolant Pump Flywheels
ML051590272
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/06/2005
From: Chernoff H
NRC/NRR/DLPM/LPD3
To: Koehl D
Nuclear Management Co
chernoff, K H, NRR/DLPM, 301-415-4018
Shared Package
ML051590102 List:
References
TAC MC4926, TAC MC4927
Download: ML051590272 (1)


Text

Programs and Manuals 5.5 5.5 Programs and Manuals.

5.5.5 Component Cyclic or Transient Limit 5.5.6 This program provides controls to-track the FSAR, Section 4.1, cyclic and transient occurrences to ensure that components are maintained within the design limits.

Reactor Coolant Pump Flywheel Inspection Program This program shall provide for the Inspection of each reactor coolant pump flywheel per the recommendations of Regulatory Position c.4.b of Regulatory Guide 1.14, Revision 1, August 1975.

In lieu of Position c.4.b(1)and c.4.b(2), a qualified In-place UT examination over the volume from the Inner bore of the flywheel to the circle one-half of the outer radius or a surface examination (MT andlor PT) of exposed surfaces of the removed flywheels may be conducted at 20 year intervals.

I Point Beach 5.5-5 Unit I - Amendment No. 218 Unit 2 - Amendment No. 223