Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML16281A155 | 7 October 2016 | Emergency Plan Implementing Procedure Revision |
ML16273A361 | 30 September 2016 | Emergency Plan Implementing Procedure Revision |
NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 9.0 - Auxiliary Systems, Pages 9.4-1 - 9.5-66 | 11 September 2015 | Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 9.0 - Auxiliary Systems, Pages 9.4-1 - 9.5-66 |
ML15279A278 | 11 September 2015 | Amendment 114 to Final Safety Analysis Report, Section 9.0 - Auxiliary Systems, Pages 9.4-1 - 9.5-66 |
CNL-15-104, Submittal of Revision 106, Appendix C to Central Emergency Control Center, Radiological Emergency Plan | 15 June 2015 | Submittal of Revision 106, Appendix C to Central Emergency Control Center, Radiological Emergency Plan |
ML14160B111 | 30 May 2014 | Final Safety Analysis Report, Amendment 112, Section 9.4, Air Conditioning, Heating, Cooling and Ventilation Systems |
ML13255A283 | 14 August 2013 | Final Safety Analysis Report (Fsar), Amendment 110, Section 9.4, Air Conditioning, Heating, Cooling, and Ventilation Systems |
ML12244A082 | 23 August 2012 | Final Safety Analysis Report (Fsar), Amendment 109 - Section 9, Auxiliary Systems, Page 9.4-1 Through 9.5-66 |
ML12083A172 | 5 March 2012 | Final Safety Analysis Report, Amendment 108. Chapter 9 - 9.4 Through Figure 9.5-31 |
ML12178A194 | 17 November 2011 | Final Safety Analysis Report, Amendment 107 - Section 9 - Auxiliary Systems - Page End |
ML12170A605 | 15 September 2011 | Final Safety Analysis Report, Amendment 106, Section 9.4, Air Conditioning, Heating, Cooling, and Ventilation Systems Through Figure 9.5-30 |
ML12171A105 | 12 August 2011 | Unit 2 - Final Safety Analysis Report (Fsar), Amendment 105, Section 9.0, Auxiliary Systems - Page End |
ML11178A179 | 3 June 2011 | Final Safety Analysis Report (Fsar), Amendment 104, Section 9.4 Air Conditioning, Heating, Cooling and Ventilation Systems Through Figure 9.5-30 Diesel Exhaust System Piping Schematic |
ML110871560 | 15 March 2011 | Unit 2 - Final Safety Analysis Report (Fsar), Amendment 103. Table of Contents - Section 9.4 Air Conditioning, Heating, Cooling, & Ventilation Systems Through 9.5-66 Other Auxiliary Systems |
ML11221A258 | 17 December 2010 | Amendment 102 to Final Safety Analysis Report (Fsar), Section, 9B, Redacted, Air Conditioning, Heating Cooling, and Ventilation Systems |
ML103160512 | 29 October 2010 | Amendment 101 to Final Safety Analysis Report (Fsar), Section 9, Auxiliary System, Pages 9.4-1 Through 9.5-66 |
ML101610360 | 27 May 2010 | Amendment 99 to Final Safety Analysis Report (Fsar), Section 9 - Auxiliary Systems, Pages 9.4-1 Through 9.5-66 |
ML101370401 | 7 May 2010 | Amendment 98 to Final Safety Analysis Report, Section 9.4, Air Conditioning, Heating, Cooling, and Ventilation Systems - End |
ML100191690 | 11 January 2010 | Final Safety Analysis Report, Amendment 97, Section 9 - Auxiliary System, Pages 9.4-1 Through Figure 9.5-31, Page 9.5-66 |
ML093570503 | 14 December 2009 | Final Safety Analysis Report, Amendment 96, Table of Contents - Section 9 - Table of Contents, Auxiliary Systems, Page 9.4-1 Through 9.5-66 |
ML093370347 | 24 November 2009 | Final Safety Analysis Report, Amendment 95, Chapter 9, Sections 9.4-1 Through 9.5-66 |
ML092470338 | 27 August 2009 | Final Safety Analysis Report, Amendment 94, Section 9.4 Through Figure 9.5-30 with Deleted Figure 9.5-31 |
ML091400653 | 30 April 2009 | Final Safety Analysis Report (Fsar), Amendment 93, Section 9.4, Air Conditioning, Heating, Cooling, and Ventilation Systems Through Figure 9.5-31 |
ML090340728 | 18 December 2008 | Final Safety Analysis Report, Amendment 92, Sections 9.4, Air Conditioning, Heating, Cooling, and Ventilation Systems - 9.5.8 Diesel Generator Combustion Air Intake & Exhaust System |
ML14357A319 | 26 April 2004 | TVA Nuclear Radiological Emergency Plan (Rep), Revision 73 |
ML040650643 | 2 March 2004 | TVA Central Emergency Control Center (CECC) - Revision 19 to EPIP-12, Revision 26 to EPIP-14, and Revised Epl |
ML040560496 | 20 February 2004 | Revision 29 to EPIP-5, General Emergency, Revision 19 to EPIP-8, Personnel Accountability and Evacuation, and Revision 20 to EPIP-12, Emergency Equipment and Supplies. |
ML033240160 | 17 November 2003 | TVA Central Emergency Control Center (CECC) - Emergency Plan Implementing Procedure (EPIP) Revisions |
ML032550049 | 5 September 2003 | Revision 26 to EPIP-6, Activation & Operation of the Technical Support Center, and Revision 17 to EPIP-10, Medical Emergency Response. |
ML031210651 | 28 April 2003 | TVA Central Emergency Control Center - Emergency Plan Implementing Procedure Revisions |
ML031250101 | 14 April 2003 | Emergency Plan Implementing Procedure Revision, Table of Contents - Section 4.1 |
ML031250091 | 31 March 2003 | Emergency Plan Implementing Procedure Revision, Table of Contents - Appendix V |
ML030560041 | 20 February 2003 | Emergency Plan Implementing Procedure (EPIP) Revision |
ML030220158 | 13 January 2003 | Emergency Plan Implementing Procedure (EPIP) Revisions |
ML023020081 | 25 October 2002 | Letter Regarding TVA Central Emergency Control Center Emergency Plan Implementing Procedure Revisions |
ML003690605 | 3 March 2000 | Watts BAR - Emergency Plan Implementing Procesure (EPIP) Revision |
NRC Generic Letter 1991-14 | 23 September 1991 | NRC Generic Letter 1991-014: Emergency Telecommunications |
Information Notice 1989-25, Unauthorized Transfer of Ownership or Control of Licensed Activities | 7 March 1989 | Unauthorized Transfer of Ownership or Control of Licensed Activities |
Information Notice 1989-26, Instrument Air Supply to Safety-Related Equipment | 7 March 1989 | Instrument Air Supply to Safety-Related Equipment |
Information Notice 1989-24, Nuclear Criticality Safety | 6 March 1989 | Nuclear Criticality Safety |
Information Notice 1989-23, Environmental Qualification of Litton-Veam Cir Series Electrical Connectors | 3 March 1989 | Environmental Qualification of Litton-Veam Cir Series Electrical Connectors |
Information Notice 1989-21, Changes in Performance Characteristics of Molded-Case Circuit Breakers | 27 February 1989 | Changes in Performance Characteristics of Molded-Case Circuit Breakers |
Information Notice 1989-20, Weld Failures in a Pump of Byron-Jackson Design | 24 February 1989 | Weld Failures in a Pump of Byron-Jackson Design |
Information Notice 1986-97, Emergency Communications System | 28 November 1986 | Emergency Communications System |
Information Notice 1985-62, Backup Telephone Number to the NRC Operations Center | 23 July 1985 | Backup Telephone Number to the NRC Operations Center |