Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402-2801 March 2, 2004 10 CFR 50, Appendix E Section V U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C. 20555-0001 Gentlemen:

In the Matter of Tennessee Valley Authority

)

Docket Nos.

50 -259 50 -260 50 -296 50 -390 50-391 50-327 50-328 TVA CENTRAL EMERGENCY CONTROL CENTER (CECC) -

EMERGENCY PLAN IMPLEMENTING PROCEDURE (EPIP) REVISIONS In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, enclosed are copies of the Effective Page Listing and revisions to CECC EPIPs.

- PROCEDURE EPIP EPIP-12 EPIP-14 EPL Rev. 19 Rev. 26 EFFECTIVE DATE 2/26/04 2/26/04 2/26/04 If you have any questions, please contact Terry Knuettel at (423) 751-6673.

Sincerely, Manager Nuclear Licensing Enclosures cc:

See page 2 pThs PreedonlGcydedp

U.S. Nuclear Regulatory Commission Page 2 March 2, 2004 cc (Enclosures):

U.S. Nuclear Regulatory Commission (Enclosures 2)

Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 NRC Senior Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379-36:

NRC Senior Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381

[Enclosures provided by site DCRM]

[Enclosures provided by site DCRM]

24

[No enclosures, by request of site resident]

I.

F l

DOCUMENT RELEASE AND FILING INSTRUCTIONS wro:

Management Service Other Address:

Date Submitted to Management Services/RIMWEDM:

Date to Filed By:

!slRJM/EDM Prepared By:

Extension:

Organization:

Address:

Page 1

of I

Release No.

Gail White 751-21 08 AS&P LP 4D-C Attached are: (select one)

Release and Submitted for:

0 QA Records/Documents 1

Distribution 0

Non-QA Records/Documents 0

Retention NO.

ACCPT REMOVE INSERT DOCUMENT NUMBER REV PAGES Y

N DATE PAGES PAGES CECC-EPIP

=

List of Effective Pages 9

02A6l04 IO-Alo 1-9 CECC EPIP-12, cover sheet 19 1

L-c4 cover sheet cover sheet CECC EPIP-12, rev. log 19 1

rev. log rev. log CECC EPIP-12 19 19

__Rib Al 1-19 CECC EPIP-14, cover sheet 26 1

L-O'i cover sheet cover sheet

-CC EPIP-14, rev. log 26 rev. log rev. log CECC EPIP-14 26 21 V

All 1 - 21 Acceptance:

Date Signature Date fact.,

Ext.

K-=

=_

___=_

.V

.074 (897 [.-7 ae1o SP233[82-TVA 40074B (8-97) [08-97]

Page I of 1 SPP-2.3-3 [08-29-97)

I

b CECC-EPIP EPL Page 1 of 9 02/26/04 TENNESSEE VALLEY AUTHORITY CENTRAL EMERGENCY CONTROL CENTER EMERGENCY PLAN IMPLEMENTING PROCEDURES LIST OF EFFECTIVE PAGES This list of effective pages must be retained with the CECC-EPIPs.

Procedure No.

]

Subdivision Paae No.

List of Effective Page

)s 1 of 9 lof9 2of9 3 of 9 4of9 5 of 9 6of9 7 of 9 8 of 9 9 of 9 Rev. No.

02/26/04 02/26/04 02/26104 02126/04 02/26/04 02126/04 02126/04 02126/04 02/26/04 Table of Contents 1 of 2 2 of 2 10/28/03 10/28/03 EPIP-1 Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Appendix G Appendix H Appendix I Appendix J Appendix K Cover Sheet Rev. Log 1 of 32 2 of 32 3 of 32 4 of 32 5 of 32 6 of 32 7 of 32 8 of 32 9 of 32 10 of 32 11 of 32 12 of 32 13 of 32 14 of 32 15 of 32 16 of 32 17 of 32 18 of 32 19 of 32 20 of 32 21 of 32 22 of 32 23of32 24 of 32 25 of 32 26 of 32 27 of 32 28 of 32 29 of 32 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38

11 Appendix L Appendix M Appendix N I

CECC-EPIP EPL Page 2 of 9 02/26/04 List of Effective Pages (Continued)

I iroeurie NO.

Subaivision Pane No.

Rev Mn

 I-mi-lt-i tcontinuea) 30 of 32 31 of 32 32 of 32 38 38 38 EPIP-2 Appendix A Appendix B EPIP-3 Cover Sheet Rev. Log 1 of 5 2of5 3 of 5 4 of 5 5 of 5 Cover Sheet Rev. Log 1 of 8 2 of 8 3 of 8 4 of 8 5 of 8 6 of 8 7of8 8 of 8 30 30 30 30 30 30 30 31 31 31 31 31 31 31 31 31 31 Appendix A Appendix B Appendix C EPIP-4 Appendix A Appendix B Appendix C EPIP-5 Cover Sheet Rev. Log 1 of 8 2 of 8 3 of 8 4 of 8 5 of 8 6 of 8 7of8 8 of 8 Cover Sheet Rev. Log I of 10 2 of 10 3 of 10 4of10 5 of 10 6 of 10 7 of 10 8 of 10 9 of 10 10 of 10 32 32 32 32 32 32 32 32 32 32 34 34 34 34 34 34 34 34 34 34 34 34 Appendix A Appendix B Appendix C EPIP-6 Cover Sheet Rev. Log 1 of 23 2 of 23 3 of 23 4 of 23 25 25 25 25 25 25 I

i.

CECC-EPIP EPL Page 3 of 9 02126/04 List of Effective Pages (Continued)

- Procedure No.

EPIP-6 (Continued)

Subdivision Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Appendix G Appendix H Appendix I Appendix J Appendix K Page No.

5 of 23 6 of 23 7 of 23 8 of 23 9 of 23 10 of 23 11 of 23 12 of 23 13 of 23 14 of 23 15 of 23 16 of 23 17 of 23 18 of 23 19 of 23 20 of 23 21 of 23 22 of 23 23 of 23 Rev. No.

25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 EPIP-7 Cover Sheet Rev. Log 1 of 15 2 of 15 3 of 15 4 of 15 5 of15 6 of 15 7 of 15 8 of 15 9 of 15 10 of 15 1 1 of 15 12 of 15 13 of 15 14 of 15 15 of 15 Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F 1  :

29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 27 27 27 27 27 27 27 27 27 27 27 27 27 EPIP-8 X*)

Cover Sheet Rev. Log A

l 1 of 32 2 of 32 3 of 32 4 of 32 5of32 6 of 32 7 of 32 8of32 9 of 32 10of32 11 of 32 Appendix A Appendix B Appendix C-Appendix D

CECC-EPIP EPL Page 4 of 9 02/26/04 List of Effective Pages (Continued)

- Procedure No.

EPIP-8 (Continued)

Subdivision Appendix E Appendix F Appendix G Appendix H Appendix I Appendix J Page No.

12 of 32 13 of 32 14 of 32 15 of 32 16 of 32 17 of 32 18 of 32 19 of 32 20 of 32 21 of 32 22 of 32 23 of 32 24 of 32 25 of 32 26 of 32 27 of 32 28of32 29 of 32 30 of 32 31 of 32 32 of 32 Rev. No.

27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 EPIP-9 Cover Sheet Rev. Log 1 of 49 2 of 49 3 of 49 4 of 49 5 of 49 6 of 49 7 of 49 8 of 49 9 of 49 10 of 49 11 of 49 12 of 49 13 of 49 14 of 49 15 of 49 16 of 49 17 of 49 18 of 49 19 of 49 20 of 49 21 of 49 22 of 49 23 of 49 24 of 49 25 of 49 26 of 49 27 of 49 28 of 49 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 Appendix A Appendix B Appendix C

CECC-EPIP EPL Page 5 of 9 02/26/04 List of Effective Pages (Continued)

- Procedure No.

EPIP-9 (Continued)

Subdivision Appendix D Appendix E Appendix F -., i Appendix G - I Appendix H Appendix I Appendix J Appendix K Appendix L

! ~

Page No.

29 of 49 30 of 49 31 of 49 32 of 49 33 of 49 34 of 49 35 of 49 36 of 49 37 of 49 38 of 49 39 of 49 40 of 49 41 of 49 42 of 49 43 of 49 44 of 49 45 of 49 46 of 49 47 of 49 48 of 49 49 of 49 Rev. No.

28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 EPIP-1I Appendix A Appendix B Appendix C Appendix D.

Appendix E Appendix F -

Appendix G Appendix H Appendix I.-

Appendix J Cover Sheet Rev. Log I of 17 2 of 17 3 of 17 4 of 17 5 of 17 6 of 17 7 of 17 8 of 17 9 of 17 10 of 17 11 of 17 12 of 17 13 of 17 14 of 17 15 of 17 16 of 17 17 of 17 Cover Sheet Rev. Log 1 of 19 2 of 19 3 of 19 4 of 19 5 of 19 6 of 19 7 of 19 8 of 19 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 19 19 19 19 19 19 19 19 19 19 EPIP-12

I CECC-EPIP EPL Page 6 of 9 02/26/04 List of Effective Pages (Continued)

Procedure No.

EPIP-12 (Continued)

Subdivision 0 0 Page No.

9 of 19 10 of 19 11 of 19 12 of 19 13 of 19 14 of 19 15 of 19 16 of 19 17 of 19 18 of 19 19 of 19 Rev. No.

19 19 19 19 19 19 19 19 19 19 19 EPIP-14 Appendix A Appendix B Appendix C Appendix D Cover Sheet Rev. Log 1 of 21 2 of 21 3 of 21 4 of 21 5 of 21 6 of 21 7 of 21 8 of 21 9 of 21 10 of 21 11 of 21 12 of 21 13 of 21 14 of 21 15 of 21 16 of 21 17 of 21 18 of 21 19 of 21 20 of 21 21 of 21 Cover Sheet Rev. Log 1 of 5 2 of 5 3 of 5 4 of 5 5 of 5 26 26 26 26 26 26.

26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 0

0 0

0 0

0 0

EPIP-15 Appendix A Appendix B I

CECC-EPIP EPL Page 7 of 9 02/26/04 List of Effective Pages (Continued)

Procedure NO.

Subdivision -:

EPIP-16 A-Page No.

Cover Sheet Rev. Log 1 of 15 2 of 15 3 of 15 4 of 15 5 of 15 6 of -15 7 of 15 8 of 15 9 of 15 10 of 15 11 of 15 12 of 15 13 of 15 14 of 15 15 of 15 Rev. No.

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 Appendix A Appendix B Appendix C Appendix D EPIP-17 Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F.

Appendix G I

Cover Sheet Rev. Log I of 27 2 of 27 3 of 27 4 of 27 5 of 27 6 of 27 7 of 27 8 of 27 9 of 27 10 of 27 11 of 27 12 of 27 13 of 27 14 of 27 15 of 27 16 of 27 17 of 27 18 of 27 19 of 27 20 of 27 21 of 27 22 of 27 23 of 27 24 of 27 25 of 27 26 of 27 27 of 27 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 Appendix H Appendix I Appendix J -

Appendix K,*

Appendix L Appendix M:

A n N

Appendix N

I CECC-EPIP EPL Page 8 of 9 02/26/04 List of Effective Pages (Continued)

Procedure No.

Subdivision Page No.

Rev. No.

EPIP-18 Cover Sheet 9

Rev. Log 1 of 6 2 of 6 3of6 4 of 6 5 of 6 6 of 6 9

9 9

9 9

9 9

Appendix A Appendix B EPIP-19 Cover Sheet Rev. Log 1 of 11 2 of 11 3 of 11 4 of 11 5 of 11 6 of 11 7 of 11 8 of 11 9 of 11 10 of 11 11 of 11 12 12 12 12 12 12 12 12 12 12 12 12 12 Appendix A Appendix B EPIP-21 Appendix A Appendix B EPIP-22 Cover Sheet Rev. Log 1 of 4 2 of 4 3 of 4 4 of 4 Cover Sheet Rev. Log 1 of 7 2 of 7 3 of 7 4 of 7 5 of 7 6 of 7 7 of 7 13 13 13 13 13 13 19 19 19 19 19 19 19 19 19 Attachment A Attachment B EPIP-23 Cover Sheet Rev. Log 1 of 24 2 of 24 3 of 24 4 of 24 5 of 24 6 of 24 7 of 24 8 of 24 9 of 24 19 19 19 19 19 19 19 19 19 19 19 Attachment A Attachment B

CECC-EPIP EPL Page 9 of 9 02/26104 List of Effective Pages (Continued) no Ale Z._!__

Procedure NO.

suoaivision EPIP-23 (Continued)

Attachment C Attachment D Attachment E Attachment F Attachment G Attachment H Attachment I Page No.

10 of 24 11 of 24 12 of 24 13 of 24 14 of 24 15 of 24 16 of 24 17 of 24 18 of 24 19 of 24 20 of 24 21 of 24 22 of 24 23 of 24 24 of 24 Rev. No.

19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 I

CECC EPIP Coversheet Title CECC EPIP-12 Tennessee' REV. 19 Valley Authority CENTRAL EMERGENCY OPERATIONAL READINESS CHECK OF CONTROL CENTER THE CECC EMERGENCY PLAN AND THE FIELD COORDINATION IMPLEMENTING CENTERS FOR SQN,.BFN, & WBN Effective Date:

PROCEDURES and JOINT INFORMATION CENTERS (JIC) o/6/o y

WRITTEN BY:

g o,

5 w

REVIEWED BY:

(~a cZ d

Z /I3/z-cy Signature Signature Date PLAN EFFECTIVENESS DETERMINATION: *

/fLI Signature Date CONCURRENCES Concurrence Signiturel Date Il Manag

2 .ATTACHMENT 9 .JOINT INFORMATION CENTER QUARTERLY INVENTORY AND OPERABILITY CHECKS M.R. BASEMENT JlC STORAGE - COC: Located in Missionary Ridge Place (Chattanooga Office Complex) Basement. Lock maintained on door to the storage cage. If lock are not intact, verify contents as follows: (Page 1 of 2) JIC Item Item Status Notes: -TVNCR COMBINATION 13-0 OK -- OOS -- TVNCR COMBINATION 13' OK 0 OOS TVNCR COMBINATION 13 0 OK - 0 OOS-TVNCR COMBINATION 13' a OK -O OOS SONY RADIO/CASSETTE PLAYER 0 OK 0 OOS SONY RADIO/CASSETTE PLAYER O OK OOOS SONY RADIO/CASSETTE PLAYER 0 OK 0 OOS SONY RADIO/CASSETTE PLAYER 0 OK 0 OOS PANASONIC KX FP250 FAXES 0 OK 0 OOS PANASONIC KXFP250 FAXES 0OK OOOS PANASONIC KX FP250 FAXES 0 OK O OOS PANASONIC KX FP250 FAXES OOK 0 OOS PANASONIC KXFP250 FAXES 0 OK O OOS PANASONIC KX FP250 FAXES 0 OK O OOS PANASONIC KXFP250 FAXES 0 OK O OOS PANASONIC KX FP250 FAXES 0 OK 0 OOS FOUR LARGE GRAY PHONE BOXES 0 OK - OOS (MULTIPLE PHONES) MULTIPLE HEAD SETS& BLANK 0 OK 0 OOS TAPES STORAGE BLACK BOX (BB) - JIC 0 OK O OOS SIGNAGE STORAGE BB - FACILITY SIGNAGE 0 OK O OOS STORAGE BB - TVA POLICE 0 OK O OOS SUPPLIES STORAGE BB - BULKIOFFICE 0 OK O OOS SUPPLIESO STORAGE BB - FILE TRAYS/OFFICE 0 OK O OOS SUPPLIES STORAGE BB - UPDATE DESK 0 OK O OOS SUPPLIES STORAGE BB - EXTENSION CORDS, 0 OK O OOS MISC. STORAGE BB - EXTENSION 0 OK O OOS CORDSIAV CABLESO STORAGE BB - CLOCKS 0 OK O OOS STORAGE BB - PUBLIC INF. FORMS, OK O OOS MAJOR EVENT FORMS, LOGS, BROCHURES MULTIPLE EASEL STANDS (approx. 0 OK O OOS 10) MULTIPLE SIGN POST/HOLDERS OK 00 OS (approx. 7) MULTIPLE REBOXES (approx. 4) OOK O OOS I OPERATIONAL READINESS CHECK OF THE CECC AND THE FIELD COORDINATION Page 17 of 19 CENTERS FOR SQN, BFN, & WBN and C EPIP-1o2 ReviIion 1 JOINT INFORMATION CENTERSajlL C C EPIP-12 Revision 19 l ATTACHMENT 9 JOINT INFORMATION CENTER QUARTERLY INVENTORY AND OPERABILITY CHECKS (Page _2 of2) JIC Item Item Status Notes: SIGN IN BOARD OK Q OOS FACILITIES DIRECTIONAL SIGNS OK 0 OOS (approx. 8) BULLETIN BOARDS OK 0 OOS MULTIPLE VARIOUS MAPS, SIGNS, OK 0 OOS

DIAGRAMS, (primarily back up for to software)

Multiple copies of Agricultural 0 OK 0 OOS Brochures Major Event Board (primary backup) 0 OK 0 OOS Black phones (approx. 5 ) in cardboard 0 OK 0 OCS box Note: Other computers and related computer equipment to be used in the JIC's are located in CECC EP storage room. VERIFIED INDICATES EQUIPMENT IS PHYSICALLY BEHIND LOCKED ACCESS Verified Date: _ Supervisory Review. Date: t

  • Revision

OPERATIONAL READINESS CHECK OF THE CECC AND THE FIELD COORDINATION P 18of19 CENTERS FOR SON, BFN, & WBN and, I8 of 1 JOINT INFORMATION CENTERS(JIC) "-C C ErPIP-1 Revision 19 ATTACHMENT 10 JOINT INFORMATION CENTER QUARTERLY INVENTORY AND OPERABILITY CHECKS. CECC STORAGE ROOM - 6TH FLOOR. LOOKOUT PLACE.- COC Check that the following Items are present and functional In the storage area. (Page 1 of 2) JIC Item Item Status Notes: DESKTOP COMPUTER SYSTEM (Projector) I Projector Desktop PC 0 OK 0 OOS Projector monitor -MultiSync - OOK OOS Projector monitor video splitter 0 OK 0 OOS HP Deskjet 895 Cxi Printer 0 OK 0 OOS DESKTOP COMPUTER SYSTEM (Graphics) Graphics Desktop PC OOK OOS Graphics Multisync Monitor O OK 0 OOS Graphics SCANNER 0 OK Q OOS Software installed on Desktop Operational and Software CD's for Desktop Operational: A. ArcView-using

1. BFN GIS Graphic Display Files(1 0 OK 0 OOS copy) 0 OK 0 OOS-

.2.. SQN GIS Graphic Display 0 OK 0 0OS Files(1 copy)

3. WBN GIS Graphic Display Files(1 0 OK 0 OOS copy)

B. Snag It 0K00 C. Evacuation Map

1. Print an Evacuation Map using HP 0 OK

.0008 Network printer. 00 K 0008S Software CD available for use if needed: A ArcView (1 copy) 0 Ability to Access Microsoft OUTLOOK. Ability to Access CECC NT Server A. Icon: CECC PUBLIC INFORMATION DESKTOP COMPUTER SYSTEM (Clerk) Clerk Desktop PC 0 OK OOS Clerk MultiSync Monitor 0 OK 0 OOS Ability to Access Microsoft OUTLOOK. C] OK 0 OOS Ability to Access CECC NT Server: A. Icon: CECC PUBLIC INFORMATION;. 0 OK 0 OOS

  • JIC Internet Monitor

,7

  • A. Dial up to TVA Network OOK 000S
  • B. Log in to TVA network via 0 OK 0 OOS Ethernet C. Activate Internet Explorer OK 0 OOS
  • RMCC Field Coordinator
  • A-Dial up to TVA Network-0 OK 0 OOS
  • B. ERN Web site access -

0 OK 0 OOS

  • C. Print ERN Web site main OK 0 OOS page to local printer. <

Revision ATTACHMENT 10 JOINT INFORMATION CENTER QUARTERLY INVENTORY AND OPERABILITY CHECKS (Page 2 of 2) JIC Item Item Status Notes: TRAVEL SET OF EQUIPMENT IS MAINTAINED IN A STATE OF READINESS FOR TRANSPORTATION TO BFN JIC CONTAINING: Briefcase with the following contents: A. Software CD's for Laptop

1. BFN GIS Graphic Display Files(2 O OK o OOS copies)

Q OK 0 COS

2. SQN GIS Graphic Display Files(1 0 OK Q OOS copy)
3. WBN GIS Graphic Display Files(1 U OK C OOS copy)

OK COS B. Software CD available for use if needed O OK 0 COS

1. ArcView (1 copy)
2. Evacuation Map (1 copy) 0 OK 0 005 C. Software Manual
1.

ArcView GIS U OK 0 OOS D. Projector Items 0 OK 0 OOS

l.

Monitor cable (2 - VGA & 5BNC) C OK 0 OOS

2.

Power cord OK 0 OOS

3. Remote control
4.

Projector Manual Software installed on Laptop Computer for State Technical Advisor: A. Dial-up to TVA Network l OK 0 OOS B. ERN Web site access 0 OK 0 OOS Software installation on Laptop Computer for Technical Advisor for TVA Spokesperson: A. Dial-up to TVA Network l OK 0 OOS B. ERN Web site access O OK 0 OOS Software installed on Graphics Laptop Operational and Software CD's for Laptop Operational: A. ArcView - using

1. BFN GIS Graphic Display Files(2 0 OK O OOS copy)

) OK 0 OOS

2.

SQN GIS Graphic Display 0 OK O 0OS Files(1copy) C OK O OOS

3. WBN GIS Graphic Display Files(1 copy)

C)0K Q OOS B. Snag It C. Evacuation Map

1. Print an Evacuation Map using HP 0 OK 0 OOS Network printer.

D. Ability to Access Microsoft OUTLOOK 0 OK O OOS E. Ability to Access CECC NT Server:

1.

Icon: CECC PUBLIC INFORMe: :DN_ Projector C OK 0 OOS_.- VERIFIED INDICATES EQUIPMENT IS PHYSICALLY BEHIND LOCKED ACCESS AND/OR INTACT PROTECTED SEAL, OR IN DAY TO DAY USE Verified Date: Supervisory Review: Date: CECC EPIP Coversheet

_i/'_'__

Title CECC EPIP-14 Tennessee REV. 26 Valley Authority CENTRAL EMERGENCY NUCLEAR EMERGENCY PUBLIC CONTROL CENTER INFORMATION ORGANIZATION AND EMERGENCY PLAN OPERATIONS IMPLEMENTING Effective Date: PROCEDURES WRITTEN BY: g s f6 iV2o REVIEWED BY: 4 0 Signature Signature Date PLAN EFFECTIVENESS DETERMINATION: H) _1A //3/0-Signature Oate .CONCURRENCES Concurrence Signature Date 12 Manager, EPfgram Planning and Implementation 1 Manager,,rmergency Prepare ness 0 Ma'nager, adiological an Chemistry Services .,II~ 2 "W 0 CECC-EPIP-14 NUCLEAR EMERGENCY PUBLIC INFORMATION ORGANIZATION AND OPERATIONS REVISION LOG Rev. No. 0 Date 3/22/88 Revised Pages All (Formerly IP-21: changed from IPD to EPIP) 1 2 3 7/8/88 12/12/88 7/13/89 Page 1 All All 4 5 6/20/90 9/14190 All--(*Formerly EPIP-13) (Former EPIP-14 transferred to EPIP-1 5) Page 9 (only) 6 5/21/91 All-combined with EPIP-15 (CANCELLED) and EPIP-16 (CANCELLED). Title changed. 7 8 05/15/92 07/02193 App.C, Pgs.1-6 revised. New coversheet & rev. log added. All pages issued. Pgs. 2-5; App. A, pgs. 1-3; App. B. pg. 2; App. C, pg. 1; App. D, pg. 1. App. E, pg. 1; App. G, pg. 1 added. All pages issued. 9 10 11 09/30/93 11/09/93 11/30/94 Pgs. 1-5; App. A, pgs. 1-3; App. B, pgs. 1-2, 4-5; All pages issued. App. C, pgs. 1-5; all pages issued. Pgs. 2-5; App. A, pgs. 1-3; all pages issued. 12 11101/95 Revised to indicate current layout of the SQN/VBN JIC; all pages issued. 13 14 5/30/96 11/5/96 App. A, App. B, App. C, App. H; annual review, telephone numbers removed because they are contained in the REND, add FFD Call-in Form: all pages issued. I Add duties for Site Specialist and Site VP, instructions for JIC setup, staffing and activation/deactivation, organization and title changes, update JIC drawings, add telephone numbers to SQN JIC App., editorial changes; all pages issued. 15 16 12/20/96 5/30/97 Page 4, add statement to functional test electronic equipment after JIC setup; editorial and organizational changes; all pages issued. I t Page 3, add CECC Liaison duty to coordinate with employee communication; page 4 clarify sources of clerical support; App. A update call tree; App. C update BFN JIC drawings and telephone numbers; all pages issued. I CECC-EPIP-14 NUCLEAR EMERGENCY PUBLIC INFORMATION ORGANIZATION AND OPERATIONS REVISION LOG (Continued) Revised Pages Rev. No. Date 17 10-6-97 Update organization titles, add information about SQNIWBN JIC activation, update JIC drawings and telephone numbers; all pages issued. 18 6/9198 689 RR Annual review. Organization changes, editorial changes, update JIC activation instructions, add instruction to include dated material to inventory process, update call tree, update JIC layout drawings. All pages issued. 19 2/22/99 Annual review. Organizational changes, editorial changes, SQNIWBN JIC drawing update. All pages issued. 20 5/20/99 Update contents for BFN Security and add contacts for video support. All pages issued. 21 11/15/99 Update instructions for set up of the BFN and SQN/WBN JlCs, update BFN JIC diagrams. All pages issued. 22 9/8/00 Annual review. Editorial changes. All pages issued. 23 2/5/01 Annual review. Editorial changes, organizational change updates. All pages issued. 24 25 2113/02 04/24/03 Annual review. Organizational change update, editorial changes. Annual review. All pages issued. 26 2/26/04 Annual review. All pages issued. I I Nuclear Emergency Public f Information Organization and CECC EPIPI 4 Revision26 Operations NUCLEAR EMERGENCY PUBLIC INFORMATION ORGANIZATION AND OPERATIONS 1.0 PURPOSE This implementing procedure describes the public information responsibilities of emergency -response personnel located at the plant site, the Central Emergency Control Center (CECC), and the Joint Information Center (JIC).. It also describes how the JIC will be setup, staffed and activated/deactivated when it is determined such a facility is justified. 2.0 SCOPE This implementing procedure applies to all nuclear'emergency public information response staff and activities during a declared emergency at any TVA nuclear plant.

3.0 REFERENCES

3.1 10 CFR 50, Appendix E 3.2 NUREG-0654; FEMA REP-1, Rev. 1 3.3 Radiological Emergency Plan (REP) 4.0 DEFINITIONS 4.1 CECC - Central Emergency Control Center 4.2 JIC - Joint Information Center 4.3 EDO - Emergency Duty Officer 4.4 TVAN - TVA Nuclear 4.5 NEPIT - Nuclear Emergency Public Information Team 5.0- RESPONSIBILITIES 5.1 The EVP, Communications and Govemment Relations, or designee is responsible for directing TVA's overall public information activities and ensuring that the TVA Board of Directors are informed of public information activities relating to a declared emergency at any TVA nuclear plant.

5.2 The Senior Manager, Business Communications is responsible for coordinating the activation and deactivation of the JIC with the CECC Director.

Nuclear Emergency Public ia.eofl Information Organization and gRev 26 l

5.3 The CECC Director is responsible for approving emergency news statements after the CECC is activated and for coordinating JIC deactivation with the Senior Manager, Business Communications.

5.4 The Site Communications Consultant is responsible for coordinating near-site media and public information activities.

5.5 The Site Vice President is the information contact for the Site Communications Consultant and serves as the spokesperson for media briefings at or near the site.

6.0 ORGANIZATION 6.1 When an emergency is declared, members of the Nuclear Emergency Public Information Team will staff positions at the site, the CECC, and the JIC, as necessary, to provide information to the media and public.

6.2 The JIC for Sequoyah Nuclear Plant and Watts Bar Nuclear Plant is located in the Missionary Ridge Building at the TVA Chattanooga Office Complex. The JIC for Browns Ferry Nuclear Plant is located in the Fine Arts Building at the J.C. Calhoun Jr. College which is south of Athens, Alabama on U.S. Highway 31.

7.0 NOTIFICATION 7.1 The Operations Duty Specialist notifies the Nuclear Emergency Public Information Duty Officer whenever an event at one of the TVA Nuclear plants is classified as Notification of Unusual Event, Alert, Site Area Emergency, or General Emergency.

7.2 The Nuclear Emergency Public Information Duty Officer will notify the appropriate Site Communications Consultant, the Senior Manager, Business Communications, and TVA News Bureau.

8.0 ACTIVATION AND COORDINATION 8.1 The NEPIT will provide personnel who have met their fitness-for-duty requirements and whose training is current to staff the CECC at an Alert or higher emergency classification.

8.2 Upon notification of an Alert or higher emergency classification, the Nuclear Emergency Public Information Duty Officer will notify the CECC Information Manager.

8.3 In close coordination with the CECC Director, the Senior Manager, Business Communications, will determine, based on news media and public interest, and the severity of the incident if and when the JIC should be activated. This decision will be coordinated with the State Emergency Management Agency.

8.4 The Senior Manager, Business Communications, will notify the JIC Director of the decision to activate the JIC.

Nuclear Emergency Public Information Organization and CEOC.EPIP-14 Revision 26 1 Operations 8.5 The JIC Director will implement JIC activation by contacting the JIC Activation Manager and the key JIC staff members in accordance to Appendix A.

9.0 CECC STAFFING RESPONSIBILITIES 9.1 The CECC Public Information Manager will coordinate the overall public information response to an emergency when the CECC is operational and will keep the CECC Director and staff informed of related public information activities.

9.2 The CECC Writer prepares news statements on the declared emergency.

9.3 Technical Advisors will be provided to assist the CECC Public Information Manager and staff in understanding technical information and plant conditions and will assist in the coordination of information with the TVA Spokesperson and JIC technical advisors.

9.4 The CECC Liaison coordinates information with the appropriate Site Communications Consultant and with State and Federal agencies until the JIC is operational.

9.5 The CECC Liaison coordinates information with employee communications. -

9.6 The CECC Clerical staff is responsible for clerical support to the CECC Public Information work area.

10.0 JIC SETUP, STAFFING AND ACTIVATION RESPONSIBILITIES 10.1 JIC Director is responsible for implementing JIC activation, declaring the TVA part of the JIC operational, and managing the overall operation of the JIC and all TVA public information activities near the site after JIC activation. The JIC Director will coordinate the decision to deactivate the JIC with the Senior Manager, Business Communications, the CECC Director, and offsite agencies.

10.2 TVA Chief Spokesperson, designated by the CECC Director, represents TVA at news conferences and JIC coordination meetings during declared nuclear emergencies.

10.3 Technical Advisors will be provided to the JIC to assist the TVA Chief Spokesperson in obtaining and understanding plant conditions and conduct informal technical briefings at the JIC..

10.4 The JIC Information Manager directs the activities of the media, public information, broadcast, and media monitoring teams; and coordinates the exchange of information with Federal, State, and local public information officers in the JIC and with the CECC.

Nuclear Emergency Public Page 4 of 21 Information Organization and CECC EPIP-14 Revision 26 Operations 10.5 Representatives from the WTCI-TV45 JIC Audio-visual team will be responsible for setting up and operating broadcast equipment. They will store, transport and set up table skirts for both the Calhoun College and the Chattanooga Office Complex stages. They will be responsible for videotaping news briefings, and for assisting news media with broadcast-related requests.

10.6 Public Information Representatives are responsible for communicating with members of the public requesting information on the emergency and coordinating information with State representatives.

10.7 Media Representatives assist the news media at the JIC and those contacting the JIC for information.

10.8 Personnel assigned to the Media Monitoring team will monitor media broadcasts for information on a declared emergency and will report rumors and misinformation to the JIC Information Manager.

10.9 The JIC Graphic Artist provides graphics for use in news briefings.

10.10 JIC Clerical personnel are responsible for providing support to the JIC staff.

10.11 The JIC Activation Manager will organize the Setup Team, ensure leased or otherwise available copy machines are obtained, transport designated equipment to the JIC, and will be responsible for the physical setup of the JIC using Appendix B or C (which describes the layout of the JIC to be activated). These layout drawings will be used to position the telephones, fax machines, copy machines, personal computers, video monitors, tables and chairs within the rooms. The Activation Manager or his designee shall be responsible for physical adjustment within the JIC should it be determined necessary during operations. All electronic equipment will be functionally tested upon setup.

The Setup Team is responsible for the correction of equipment problems during setup and JIC operations, should that be necessary. The Team will also provide any additional supplies, equipment or materials needed for operations either from TVA or commercial resources.

Activation of the JIC is neither as automatic nor as time sensitive as the CECC since it is based on a judgment of media interest and plant conditions by the Senior Manager, Business Communications. With staff members coming from various areas, time is available to procure needed supplies, equipment, or materials from the considerable resources of TVA or from commercial sources. Therefore, it is not the planning intent to maintain every possible needed item in storage. Supplies that deteriorate with time will be stored at minimum levels and supplemented locally in the event of JIC activation.

Nuclear Emergency Public Page of21 Information Organization and CECC EPIPP-14 Revision 26 Operations 10.11.1 Much of the equipment for setup of the SQNIWBN JIC is located in the Missionary Ridge Place building of the Chattanooga Office Complex in a basement storage cage along the east wall of the Mechanical/Electrical Room 7 (MER-7). Keys to this storage are located with the Chattanooga Office Complex Facilities JIC Activation Manager, and the Corporate Emergency Preparedness State and Local Program Office. Facilities or Security personnel can direct personnel unfamiliar with this location. Personal computer(s) and printer(s) for the SQN/WBN JIC will be supplied

- from the Emergency Preparedness office/storage on LP6 'or from other TVA computer sources as needed. Set up of the computers will be provided by Nuclear computer staff personnel.

10.11.2 Some materials and equipment for setup of the BFN JIC at Calhoun Community College is located in a storeroom behind the audio booth of the Bamwood Studio in the Fine'Arts Building. 'Keys to this storage is located with the Activation Manager, Site Communications consultant and EP State and Local Program Staff. Mounted charts, graphics and maps are'located in this location. 'The majority of the supplies and equipment such as fax machines, telephones, back up PC system, and media

.monitoring devices will be stored on the BFN site in the Equipment Storage room for JIC which is located at the BFN Facilities Complex. Keys to this storage are located with the BFN Facilities Managers Office, the BFN Emergency Preparedness Office and the Communications and Government Relations Site Office. The necessary JIC equipment stored at this location will be transported to the JIC by the Activation Manager's team. Additional commercial sources will be used as needed.

10.11.3 A personal computer/printer for the BFN JIC will be maintained in a state of readiness at the IS office located in the BFN Training Center by the BFN IS Manager or representative, who will also set up and test the personal computer equipment as part of the JIC activation.

10.11.4 Media work room equipment for the BFN JIC will be stored in the BFN onsite equipment storage room. Work room equipment for the SQN/WBN JIC will be stored in the basement storage cage along the east wall of the Mechanical/Electrical Room 7 (MER-7) and the Emergency Preparedness office/storage on the 6th floor, Lookout Place.

10.11.5 If the BFN JIC is activated, the BFN JIC Activation manager and/or team is responsible for the transportation of the fax machines, telephones, media monitoring equipment, PC systems, copiers, and other stored JIC equipment and materials to the JIC at Calhoun'Community College. Audio/visual equipment and Stage Table skirt is transported by WTCI-TV45.

The following equipment and software:

  • Briefcase with software, manual and projector items (JIC)
  • Laptop computer for Spokesperson Technical Advisor (JIC)
  • Laptop computer for Graphic use (JIC)
  • Laptop computer for State Technical Advisor (SRMAC) from the EP office/storage utilized for JIC graphic displays is picked up at the EP office/storage and transported by the Chattanooga Communications and Govemment Relations personnel to the JIC. They will also return it to the EP office/storage when the JIC is deactivated.

If the SQN/WBN JIC is activated, the COC Facilities JIC Activation manager and/or team is responsible for the transfer of the fax machines, telephones, media monitoring equipment, copiers, and other stored JIC equipment and materials to the JIC in the COC.

Audio/visual equipment is transported by WTCI-TV45. Equipment and software utilized from the Emergency Preparedness office/storage for the JIC graphic displays is transported to the JIC and set up by Nuclear Computer Staff personnel.

  • Revision

Nuclear Emergency Public Page6of21 Information Organization and CECC EPIP-14 Revision 26 I

!I Operations 11.0 SHIFT CHANGES 11.1 All personnel assigned to the TVAN emergency facilities are responsible for signing in, notifying their supervisors, receiving status briefings and assignments, and logging in the time that their positions are operational.

11.2 All personnel departing TVAN emergency facilities are responsible for briefing their replacements on emergency status and tasks, turning in logs, notifying their supervisors prior to leaving the facility, and verifying the time they are to report for the next shift.

12.0 DEACTIVATION OF JIC 12.1 The Senior Manager, Business Communications, will determine, based on news media and public interest, when the JIC should be deactivated. This decision will be closely coordinated with the CECC Director and the State Emergency Management Agency.

12.2 All personnel are responsible for ensuring that equipment and work areas are returned to non-emergency status, for turning in emergency logs, and notifying supervisor when work areas are deactivated.

12.3 Communications and Government Relations is responsible for ensuring that office supplies are restocked in storage boxes and that contents of each box are ready for future use. Dated material, such as calendars and maps, will be removed if found in the storage boxes.

12.4 The JIC Activation Manager will oversee the deactivation of the JIC, to include the disconnection of the telephones, fax machines, computers, printers and other equipment transported from the site and storage rooms. All equipment and office supplies in storage boxes will be returned to its designated storage place by the involved Setup Teams, or designated group/agency.

APPENDICES Appendix A - Nuclear Emergency Public Information Call Tree Appendix B - JIC Layout for Sequoyah and Watts Bar Appendix C - JIC Layout for Browns Ferry Appendix D - Fitness for Duty Program Administration

Nuclear Emergency Public Page 7 of 21 Information Organization and CECII-4Reiin2 Operations I

APPENDIX A Page 1 of 3 NUCLEAR EMERGENCY PUBLIC INFORMATION CALL TREE NOTIFICATION OF UNUSUAL EVENT Operations Duty Specialist......

notifies Nuclear Emergency Public Information Duty Officer..-. -notifies Nuclear Emergency Public Information Duty Officer Appropriate Site Communications Consultant Senior Manager, Business Communications TVA News Bureau (Knoxville)

ALERT, SITE AREA EMERGENCY, GENERAL EMERGENCY Operations Duty Specialist.;..... notifies Nuclear Emergency Public

.Information Duty Officer...... notifies -':

Nuclear Emergency Public Information Duty Officer Appropriate Site Communications Consultant CECC Information Manager to be selected from the staffing list in the Radiological Emergency Notification Directory to begin activating the CECC staff.

Senior Manager, Business Communications TVA News Bureau (Knoxville)

CECC Information Manager..... notifies CECC Writer CECC Liaison

Nuclear Emergency Public Page 8 of 21 Information Organization and CECC EPIP-14 Revision 26 Operations APPENDIX A Page 2 of 3 NOTE:

The Senior Manager, Business Communications or designee, shall make the decision to activate the Joint Information Center based on the conditions at the plant and the level of media interest.

The decision to activate the JIC shall be coordinated with the CECC Director (if the facility is activated) and the appropriate State Emergency Management Agency.

CECC Director-751-1614 or 751-1680 Tennessee Emergency Management Agency Alabama Emergency Management Agency State Trooper (After Hours) 615-741-0001 or 1-800-262-3300 205-280-2200 (8 am - 5 pm weekdays) or:

334-242-4378 (ask to page AEMA Duty Officer)

Following decision for activation of the JIC, the Senior Manager, Business Communications, shall notify the JIC Director (to be selected from staffing list in the Radiological Emergency Notification Directory) to begin activation and staffing of the center.

Nuclear Emergency Public Page 9 of 21 Information Organization and CECC EPIP-14 Revision 26 Operations APPENDIX A Page 3 of 3 NUCLEAR EMERGENCY PUBLIC INFORMATION CALL TREE WHEN NOTIFIED TO ACTIVATE THE JIC JIC Director.......

notifies Appropriate JIC Activation Manager, as identified in the Radiological Emergency Notification Directory.

JIC Activation Manager......

notifies JIC Information Manager CECC Public Information Manager to obtain JIC Technical Advisors and TVA Spokesperson Media Representatives JIC Graphic Artist TVA Police, Muscle Shoals (BFN) or TVA Police, Chatt.

(SQNIVBN)

Receptionist from TVAP staff (SQNIVBN)

Telecommunications BFN IS Manager For BFN, Contact Calhoun College (256) 306-2545 or 306-2699 during normal hours (256) 306-2574 or 2575 after hours, weekends and holidays.

JIC Lead Clerical JIC Information Manager.....

notifies Media Monitors JIC Public Information Representatives JIC Audio-Visual Representative of WTCI-TV 45 in Chattanooga, as identified in the Radiological Emergency Notification Directory JIC Lead Clerical........

notifies JIC Clerical Support (including receptionist for BFN)

  • Revision

Nuclear Emergency Public Page l 21 Information Organization and CECC EPIP-14 Revision 26 Operations APPENDIX B Page 1 of 5 Sequoyah/Watts Bar JIC Chattanooga Office Complex First Floor

Nuclear Emergency Public Page 11 of 21 Information Organization and CECC EPIP-14 Revision 26 Operations APPENDIX B Page 2 of 5 Sequoyah/Watts Bar Joint Information Center Chattanooga Office Complex Lower Level I

l Nuclear Emergency Public P

.l,.fll lInformationOrganizationand CECC EPIP-14 Revision 26 I

Operations APPENDIX B - Page 3 of 5 TEMAITVA Work Area & Citizens Information/Rumor Control and Media Monitoring

Nuclear Emergency Public Information Organization and CPage 13 of 21 nfmainOprgaiations ad CECC EPIP-1 4 Revision 26I APPENDIX B Page 4 of 5 NRCIFEMA Work Areas in Tennessee River Room 60 59 58 57 56 55 54 61 62 63 64

(

)Y (

I u/users/aft ins/rrevjic. dew

Nuclear Emergency Public P

1 Information Organization and C4Revision 26 IOperations CC PP1 eiin2 Area Code for all numbers is (423)

TEMA\\TVA WORK ROOM

1. 751-1579, TEMAJIC Director
2.

751-1585, Recorder

3. 751-1583, TEMA JIC Ops Officer
4.

751-1586, State PIO

5.

751-1584, State Assist. Officer

6.

751-1557, Spare

7.

751-1550, TVA Rad. Tech. Adv.

8. 751-1549, TVA Plant Tech Adv.
9.

751-1548, TVA Spokesperson

10. 751-1551, TVA JIC Director
11. 751-1555, TVA Information Mgr.
12. 751-1556, TVA Rep. Media
13. 751-1558, TVA Media Rep.
14. 751-1560, TVA Media Rep.
15. 751-1582, Bradley Co. PIO Meigs Co. PIO
16. 751-1581, County Coordinator
17. 751-1580, Hamilton Co. PIO McMinn Co. PIO
18. 751-1596, Rhea Co. PIO
19. 634-3174, Conference Bridge
20. 634-3151, TEMA Ring down
21. 751-1591, State Rad. Health PIO
22. 751-1590, State Communication
23. 751-1589, State Assist. PIO
90. 751-1603, Tech Advisor Analog Line
24. 634-3163, TEMA Modem
25. 634-3164, TEMA Modem
26. 751-1588, State Assist. PIO
27. 751-1595, State Fax Verify
28. 751-1594, State Fax
29. 751-1593, State Fax
30. 751-1592, State Fax
31. 751-1524, State Fax
32. 751-1523, State Fax
33. 751-1587, Graphic Support
34. 751-1552, Spare
35. 751-1567, TVA Fax
36. 751-1566, TVA Fax
37. 751-1553, TVA PC/Printer Op.
38. 751-1554, TVA Clerical
39. 751-1562, Activation Manager CITIZENS INFORMATION CENTER/

RUMOR CONTROL

40. 751-1599, TEMA
41. 751-1546, TEMA
42. 751-1545, TEMA
43. 751-1544, TEMA
44. 751-1547, TEMA
45. 751-1542, WVA
46. 751-1543, TVA
47. 751-1541, TVA
48. 751-1597, TVA
49. 751-1598, TVA MEDIA MONITORING
50. 751-1568, Media Monitors APPENDIX B Page 5 of 5 JIC TELEPHONE LIST JIC SECURITY
51.

751-1569, Primary Security/Staff register

52.

751-1559, Security MEDIA REGISTRATIONIRECEPTION DESK

53.

751-1564 NRC/FEMA WORK AREA

54.

751-1748, Analog line

55.

751-1540, NRC

56.

751-1575, NRC

57.

751-1574, NRC

58.

751-1573, NRC

59.

751-1572, NRC

60.

751-1571, NRC

61.

751-1576, FEMA

62.

751-1615, FEMA

63.

751-1669, FEMA

64.

751-1678, FEMA UPDATE/MEDIA SERVICE DESK

65.

751-1578

66.

751-1577 AUDITORIUM MEDIA BRIEFING

67.

751-3612, (Rear)

68.

751-8616, Backstage

69.

751-2376, Backstage MEDIA WORK AREA

70.

265-0300 - Lead Billing for 5 Lines

71.

265-0312

72.

265-0314

73.

265-0319

74.

265-0325

75.

265-0333 - Lead Billing for 15 Lines

76.

265-0336

77.

265-0345

78.

265-0350

79.

265-0370

80.

265-0400

81.

265-0401

82.

265-0418

83.

265-0611

84.

265-0613

85.

265-0642

86.

265-0645

87.

265-0650

88.

265-0652

89.

265-0655

Nuclear Emergency Public Page 15 of 21 Information Organization and CECC EPIP-14 Revision 26 Operations APPENDIX C Page 1 of 6 Browns Ferry Joint Information Center J.C. Calhoun College Decatur, Alabama -

Fine Arts Building L

. 1 Second Floor Above Theater e uny -Receptionist

!t Registation) SNe Media Regstration)

Restroons Theater (Room 144A) -

1. 350.5941 Security.
2. 355-2712 Update Desk
3. 355-8043 Telecornmuicaton troubleshooting Security 0 I

I Note: All telephone area codes are 256 I

Nuclear Emergency Public Page 16 of 21 Information Organization and CECC EPIP-14 Revision 26 Operations APPENDIX C Page 2 of 6 Browns Ferry Joint Information Center TVA Staff Room I

1. 350-5943 Spokesperson
2. 350-5942 Director
3. 355-7643 Plant Tech. Advisor
4. 355-2783 Plant Tech Adv. Modem
5. 350-5956 Info Manager
6. 350-5957 Spare
7. 355-B073 Media Rep
8. Used elsewhere (AEMA)
9. 350-5953 Media Rep
10. 355-8041 Telecopy
11. Used elsewhere (AEMA) 12.355-8055 Telecopy Operator
13. Used elsewhere (AEMA) 14.350-6089 Computer modem 15.350-5952 Lead Clerical
16. 350-3895 Activation Mgr.

17.340-0092

18. 340-0093 19.340-0094 20.340-0096
21. 355-2782 22.353-8347

}

Public Info Reps.

Rad Tech Computer Modem Rad Tech Advisor

  • Renvion

Nuclear Emergency Public

_Page 17 of21 Information Organization and CECC EPIP-14 Revision 26 Operations APPENDIX C - Page 3 of 6 Browns Ferry Joint Information Center M o S r

Media Work Spacee - First Floor' I I l

m M

I I

T h. 6 I

-A dtr12 Auditorium Media Work Space - Second Floor (Above Theater) 1.35523

2. 355-429 3 3554041
4. 55-4942
5. 55-4043 L 355-4944 7.355-4951 a 354952
9. 355-43
10. 3554954
11. 355-408 12.355-770
13. 355-77c 14~

355-7013 15.355-7914 I

I

  • Revision

Nuclear Emergency Public Page18of21 Information Organization and CECC EPIP-14 Revision 26 Operations 26 APPENDIX C Page 4 of 6 Browns Ferry Joint Information Center NRC/FEMA Staff Room FEMA I

NRC

1. 355-8002
2. 350-3893
3. 353-1033
4. 353-1049 I

Nuclear Emergency Public

.age 19 of 21 Information Organization and CECC EPIP-14 Revision 26 Operations APPENDIX C.,Page 5 of 6 Browns Ferry Joint Information Center AEMA Staff Room E3.N J""f

1. 350-5958 (telecopy) 2.355-8036 (telecopy) 3.355-0730 AEMA PIO 4.355-8012 ARC P1O
5. 350-5128 Lauderdale Co. Coordinator 6.350.6129 Umestone Co. Coordinator 7.355-0713 Lawrence Co. Coordinator
8. 355-0714 Madison Co.

Coordinator

9. 355-0705 Morgan Co.

Coordinator

10. 350-6124 Media Coordinator.

11.350-6125 Media Coordiantor

12. 350-6126 Media Coordinator 13.350-6127 Media Coordantor 14.350-6120 Public Inquiry.

15.350-6121 Public Inquiry 16.350-6122 Public Inquiry 17.350-6123 Public Inquiry

18. 350-5941 Security/Staff Registration 19.353-1059 (relecopy)
20. 350-5944 (Telecopy)
21. 350-3894 (relecopy) 22.350-5951 (relecopy)

Nuclear Emergency Public Page 20 of 21 Information Organization and CECC EPIP-14 Revision 26 Operations APPENDIX C Page 6 of 6 BROWNS FERRY JOINT INFORMATION CENTER TVA MEDIA MONITORING AND BROADCAST SPACE IIH+

Restrooms Update F] El IDesk I

I Media Workspcel Briefing Auditorium (Room 110)

Local b

stations I

Radios 2

IVA Media Monitor &

Broadcast Equip. Room (Room 123)

BARNWOOD STUDIO

~ a(IU r

a 0 I

I I

Stage I

Loading Dock

1. 355-7644 Media Monitoring/Broadcast Equipment
2. 350-6481 Media Monitoring/Broadcast Equipment
3. 355-8043 Telecommunication Troubleshooting
  • Rcvision

Nuclear Emergency Public Page21of21 Information Organization and CECP EPIP-14 Revision 26 Operations APPENDIX D Page 1 of I FITNESS FOR DUTY PROGRAM ADMINISTRATION TVA NUCLEAR POWER CALL-IN SHEET Person Calling: