ML20197A461 | 6 May 1986 | Duquesne Light Company Carey J | Forwards Supplemental Response to SER Open Issue 9(d) Re Relief Valve Testing,Per 860206 & 0428 Requests.Flow Rate Assumed in Accidental Analysis Far Exceeds Critical Flow Rate | Supplement |
ML20206S108 | 27 June 1986 | Duquesne Light Company Carey J | Responds to Open Issue 9 (7) Re Reason for Deletion of Test Abstract 14.2.12.9.4, Demonstration of Design Capability of Chemical & Vol Control Sys from Fsar.Abstract Deleted to Eliminate Duplication of Other Tests | Other |
ML20214J923 | 8 August 1986 | Duquesne Light Company Carey J | Forwards Response to Item in Technical Evaluation Rept Re Testing Program,Per SER Open Item 9 | Other |
ML20206C051 | 6 April 1987 | Duquesne Light Company Carey J | Forwards Revised FSAR Section 14.2.12.8.13, Pressurizer Heater Spray Capability Test (Ist), Scheduled to Be Included in FSAR Amend 17 (May 1987).Rev Describes Contents of IST-2.06.2 & Incorporates Previous Ref Commitment | Other |
ML20213G384 | 12 May 1987 | Duquesne Light Company Carey J | Advises That Exception on FSAR Table 1.8-1,Amend 5,revised in Amend 10 to Resolve NRC Question 640.10 Requesting List of air-operated Valves to Be Excluded from Loss of Instrument Air Test | Other |
ML20213G443 | 12 May 1987 | Duquesne Light Company Carey J | Submits Resolution of NRC Comments on Changes Made to FSAR Section 14.2, Initial Test Program, in Amend 13 | Other |
ML20214M147 | 21 May 1987 | Duquesne Light Company Carey J | Informs That Util Will Amend FSAR Section 14.2.12.66.2, Containment Air Recirculation Sys Test, to State That Containment Air Temp Will Be Recorded at 5%,50% & 100% Reactor Power Levels Using Installed Sensor Sys | Other |
ML20214L962 | 21 May 1987 | Duquesne Light Company Carey J | Informs That SER Confirmatory Item 52C Re Plant Performance Following MSIV Closure Will Be Completed W/Reactor Producing 30% Rather than 100% Power Due to Possibility of High Power Level Leading to Unnecessary Sys Conditions | Other |
ML20214K734 | 21 May 1987 | Duquesne Light Company Carey J | Provides Clarification of Util 870512 Response to NRC 870311 Questions Re Changes to FSAR Section 14.2 on Initial Test Program.Table 1, Equivalent Tests, Encl | Other |
ML20214J030 | 25 May 1987 | Duquesne Light Company Carey J | Submits Supplemental Info to Items 4 & 8 of Util 870521 Response to NRC Comments Re Changes Made in FSAR Section 14.2, Initial Test Program. Air Receiver Vol Test Not Required Since Instrument Air Sys Not safety-related | Supplement |
ML20214J058 | 25 May 1987 | Duquesne Light Company Carey J | Advises That Util Does Not Consider NRC Concern Re Cycling Open Safety Injection Accumulator Isolation Valves,Valid Per Reg Guide 1.79.Util Administrative Controls Require Valves to Be Open W/Power Removed from Control Circuit | Other |
ML20214K398 | 26 May 1987 | Duquesne Light Company Carey J | Informs of Tests to Be Performed After Core Loading Prior to Criticality in Order to Resolve Preoperational Testing Issues | Other |
ML20216C555 | 23 June 1987 | Duquesne Light Company Carey J | Informs That Util Completed Test STP-2.11.01 Which Verified That Accumulator Isolation Valves Open Against Max Differential Pressure (SER Confirmatory Item 51A) | Other |
ML20235R591 | 14 July 1987 | Duquesne Light Company Carey J | Forwards Status Rept Identifying Changes to Initial Test Program as Described in FSAR Chapter 14,per 10CFR50.59 | Other |
ML20238A152 | 17 August 1987 | Duquesne Light Company Carey J | Forwards Second Status Rept Identifying Changes to Initial Test Program Described in Chapter 14 of Fsar.Changes Made in Accordance W/Provisions of 10CFR50.59 | Other |
ML20204J311 | 28 August 1987 | Duquesne Light Company Carey J | Discusses Request for NRC Approval of Revised Power Ascension Test Schedule,Per 870825,26 & 27 Discussions.Rev Required Temporary Deferral of IST 2.21.A.02, MSIV & IST 2.04.03, Turbine Trip W/Loss of Offsite.. | Request |
ML20234C237 | 15 September 1987 | Duquesne Light Company Carey J | Forwards Third Status Rept Identifying Changes to Initial Test Program as Described in FSAR Chapter 14.Changes Made Per Provisions of 10CFR50.59(b) | Other |
ML20236H213 | 27 October 1987 | Duquesne Light Company Carey J | Forwards Fourth Status Rept,Identifying Changes to Initial Test Program Described in Fsar,Chapter 14,per 10CFR50.59(b) | Other |
ML20195H593 | 7 January 1988 | Duquesne Light Company Carey J | Forwards Sixth Status Rept Identifying Changes to Initial Test Program as Described in Chapter 14 of FSAR | Other |
ML20196A791 | 29 January 1988 | Duquesne Light Company Carey J | Fowards Seventh Status Rept Identifying Changes to Initial Test Program Described in Chapter 14 of Fsar.Changes Made in Accordance w/10CFR50.59 within 1 Month of Initiating Changes Per OL Condition C.(3) | Other |