'Af Duquestie Lidit 2NRC-6-070 Beaver Valley No. 2 Unit Project Organization SEG Building (412) 643-5200 P.O. Box 328 Telecopy (412) 643-5200 Shippingport, PA 15077 Ext. 160 June 27, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Mr. Peter Tam, Project Manager Division of PWR Licensing - A Office of Nuclear Reactor Regulation

SUBJECT:

Beaver Valley Power Station - Unit No. 2 D :ket No. 50-412 Response to Open Issue' 9 (7)

Gentlemen:

The staff has questioned the reason fo r deletion of test abstract 14.2.12.9.4, "Demonstraton of Design Capability of the Chemic al and Volume Control System",

from the FSAR.

This abstract was deleted to eliminate duplication of other tests.

The various aspects of the deleted test description are addressed as follows:

1.

The ability to adjust boric acid concentration in the makeup system is tested as de sc ribed in FSAR 14.2.12.9.2, " Boric Acid Trans fe r System Test".

2.

Capabilities with regard to plant chemistry will be demonstrated through use of the normal plant chemistry program.

3.

Integrated control operations during steady state and transient conditions are verified as de sc ribed in FSAR 14.2.12.9.3, " Chemical and Volume Control System Test", 14. 2.12. 6. 6, " Load Swing Te s t", and 14.2.12.6.7, "Large Load Reduction Test for Turbine Runback".

8607070291 860627 i

PDR ADOCK 05000412 A

PDR I!

Boo t tb

h i

Mr. Harold R. Denton, Director UNITED STATES NUCLEAR REGULATORY COMMISSION Response to Open Issue 9 (7)

Page 2 t

1 i

Therefore, we feel that this'provides justification for deletion of the subject test description.

DUQUESNE LIGHT COMPANY 1

By J. J. Carey Vice President GLB/ijr NR/0 PEN / ISSUE cc:

Mr. W. Troskoski, NRC Sr. Resident Inspector Mr. L. Prividy, NRC Resident Inspector i

i 4

4 a

k i

I i

N United States Nucleer Rsguistory Commission Mr. Harold R. Denton, Director Response to Open Issue 9 (7)

Page 3 COMMONWEALTH OF PENNSYLVANIA )

)

SS:

COUNTY OF BEAVER

)

On this

[g day of

/6 M

/

, be fo re me, a Notary Public in and for said Cbmonwealth and County, personally appeared J.

J.

Carey, who being duly sworn, deposed and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge.

I L2/ h Notary Public SHEllA 1!. FATTCRE. tiOTA.tY PUBLit

$NIPPINGPORT D090. BEAVER COUNTY DY C058tS$10ft EIPIRES OCf. 23.1989 thmber. Pennsyhesis Association of N%

__