MONTHYEARML20214J9231986-08-0808 August 1986 Forwards Response to Item in Technical Evaluation Rept Re Testing Program,Per SER Open Item 9 Project stage: Other ML20206C0511987-04-0606 April 1987 Forwards Revised FSAR Section 14.2.12.8.13, Pressurizer Heater Spray Capability Test (Ist), Scheduled to Be Included in FSAR Amend 17 (May 1987).Rev Describes Contents of IST-2.06.2 & Incorporates Previous Ref Commitment Project stage: Other ML20213G3841987-05-12012 May 1987 Advises That Exception on FSAR Table 1.8-1,Amend 5,revised in Amend 10 to Resolve NRC Question 640.10 Requesting List of air-operated Valves to Be Excluded from Loss of Instrument Air Test Project stage: Other ML20213G4431987-05-12012 May 1987 Submits Resolution of NRC Comments on Changes Made to FSAR Section 14.2, Initial Test Program, in Amend 13 Project stage: Other ML20214M1471987-05-21021 May 1987 Informs That Util Will Amend FSAR Section 14.2.12.66.2, Containment Air Recirculation Sys Test, to State That Containment Air Temp Will Be Recorded at 5%,50% & 100% Reactor Power Levels Using Installed Sensor Sys Project stage: Other ML20214L9621987-05-21021 May 1987 Informs That SER Confirmatory Item 52C Re Plant Performance Following MSIV Closure Will Be Completed W/Reactor Producing 30% Rather than 100% Power Due to Possibility of High Power Level Leading to Unnecessary Sys Conditions Project stage: Other ML20214K7341987-05-21021 May 1987 Provides Clarification of Util 870512 Response to NRC 870311 Questions Re Changes to FSAR Section 14.2 on Initial Test Program.Table 1, Equivalent Tests, Encl Project stage: Other ML20214J0581987-05-25025 May 1987 Advises That Util Does Not Consider NRC Concern Re Cycling Open Safety Injection Accumulator Isolation Valves,Valid Per Reg Guide 1.79.Util Administrative Controls Require Valves to Be Open W/Power Removed from Control Circuit Project stage: Other ML20214J0301987-05-25025 May 1987 Submits Supplemental Info to Items 4 & 8 of Util 870521 Response to NRC Comments Re Changes Made in FSAR Section 14.2, Initial Test Program. Air Receiver Vol Test Not Required Since Instrument Air Sys Not safety-related Project stage: Supplement ML20214K3981987-05-26026 May 1987 Informs of Tests to Be Performed After Core Loading Prior to Criticality in Order to Resolve Preoperational Testing Issues Project stage: Other ML20216C5551987-06-23023 June 1987 Informs That Util Completed Test STP-2.11.01 Which Verified That Accumulator Isolation Valves Open Against Max Differential Pressure (SER Confirmatory Item 51A) Project stage: Other ML20235R5911987-07-14014 July 1987 Forwards Status Rept Identifying Changes to Initial Test Program as Described in FSAR Chapter 14,per 10CFR50.59 Project stage: Other ML20238A1521987-08-17017 August 1987 Forwards Second Status Rept Identifying Changes to Initial Test Program Described in Chapter 14 of Fsar.Changes Made in Accordance W/Provisions of 10CFR50.59 Project stage: Other ML20204J3111987-08-28028 August 1987 Discusses Request for NRC Approval of Revised Power Ascension Test Schedule,Per 870825,26 & 27 Discussions.Rev Required Temporary Deferral of IST 2.21.A.02, MSIV & IST 2.04.03, Turbine Trip W/Loss of Offsite.. Project stage: Request ML20234C2371987-09-15015 September 1987 Forwards Third Status Rept Identifying Changes to Initial Test Program as Described in FSAR Chapter 14.Changes Made Per Provisions of 10CFR50.59(b) Project stage: Other ML20236H2131987-10-27027 October 1987 Forwards Fourth Status Rept,Identifying Changes to Initial Test Program Described in Fsar,Chapter 14,per 10CFR50.59(b) Project stage: Other ML20195H5931988-01-0707 January 1988 Forwards Sixth Status Rept Identifying Changes to Initial Test Program as Described in Chapter 14 of FSAR Project stage: Other ML20196A7911988-01-29029 January 1988 Fowards Seventh Status Rept Identifying Changes to Initial Test Program Described in Chapter 14 of Fsar.Changes Made in Accordance w/10CFR50.59 within 1 Month of Initiating Changes Per OL Condition C.(3) Project stage: Other 1987-05-26
[Table View] |
Text
-
'A@
M 2NRC-7-115 (412)393 7546 Beaver Valley No 2 Unit Project Organuation Telecopy(412) 393-7889 NO 8[$",9 May l'2, 1987 g
shippingport PA 15077 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
Beaver Valley Power Station Unit No. 2 Docket No. 50-412 Response to NRC Comments to Changes Made to FSAR Section 14.2, Initial Test Program
REFERENCE:
Letter from P. Tam, NRC to J. J. Carey, DLC; BVPS Unit 2 Interim Review Results of FSAR Amendment No.13 on Initial Test Program; March 11, 1987; with enclosure Gentlemen:
The enclosure to the referenced letter provides NRC comments to changes made to the Initial Test Program (ITP) by FSAR, Amendment 13.
Enclosure parts b, g, h and j contained comments to changes that the staff found unacceptable.
Resolution of these parts of the enclosure are contained here:
1.
Part b, the system test supervisor can only approve the substitution of data that has been collected during a completed test; 2.
Items 1, 2 and 3 of Part g, According to RG 1.68 the purpose of these tests is ".
to verify calculational models and accident analysis assumptions.
The same calculational models and computer codes have been used for numerous 3-loop plants including BVPS-2.
These tests have been deleted because the models and assumptions have been verified by tests at other 3-loop plants; 3.
Item 4 of Part 9, Computer Input and Printout Data Test, 50V-2.05A.01 has been deleted because documenting and testing of all computer points was completed within the Startup Proof Test Group Testing Pro-gram; 4.
Item 5 of Part g, Containment _ Instrument Air System Design Verifica-tion Test, S0V-2.34.04, has been deleted because the intent of Reg.
Hiifde G has been met by completing S0V-2.34.03, Containment Instru-ment Air System Test and SOV-2.34.05, Response of Plant Air-Operated Valves to Loss of Instrument Air Test; 8705180291 870512
\\
PDR ADOCK 05000412 A
PDR T
' United States Nuclear Regulatory -Commission Response To NRC Comments..... Section 14.2, Initial Test Program Page 2-
.5.
Item 6.of Part g,
Normal AC Power Distribution System Test, SOV-2.36A.01, has been deleted because this test is redundant to test--
ing already completed by the Startup Proof Test Section;
- 6.. Item 7 of Part g, Seismic Instrumentation Test, SOV-2.458.01, has been deleted because it is redundant = to Startup - Proof Test Procedure 2T-SRM-458.2.0,1; -Initial Startup Test of_ the Strong Motion Seismic Instrumentation System, which has been completed; 7.
Part h, RCCA Bank and Boron Worth Measurement, IST-2.01A.04, has been deleted because rod worth measurement will be taken using the Rod Swap Method. Rod worth measurements will be taken by incorporating the Rod Swap Measurements _ into IST-2.02.03, Low Power Physics Test.
Reference WCAP-11384, The' Nuclear Design and Core Physics Characteristics of the
~
~
BVPS Unit 2 Nuclear Power Plant TycTET; and 8.
Part j, Transformer Cooling Systems have been removed from the Main Generator Tests becuase pertinent data will be taken during operation at full load as part of the maintenance / surveillance program.
Note that all of these' changes to the Initial Test Program have been made after discussion and approval by the Joint Test Group.
If you should have any questions, please call Mr. A. N. DiCesaro at (412) 393-7742.
DUQUESNE LIGHT COMPANY By s
J. 'J.
Carey //
Senior Vice PresidYnt AND/ijr NR/AND/FSAR/142 AR/NAR cc: Mr. P. Tam, Project Manager Mr. J. Beall, NRC Sr. Resident Inspector Mr. L. Prividy, NRC Resident Inspector INP0 Records Center 4