Provides Clarification of Util 870512 Response to NRC 870311 Questions Re Changes to FSAR Section 14.2 on Initial Test Program.Table 1, Equivalent Tests, Encl
ML20214K734
Person / Time
Site: Beaver Valley
Issue date: 05/21/1987
From: Carey J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TAC-63534, NUDOCS 8705290043
Download: ML20214K734 (5)


Text

__ __ _ _ _ _ _ _ _ _ _ _

o M

TA@

2NRC-7-139 (412)393 7546 Beaver Valley No 2 Unit Project Organization Telecopy (412) 393-7889 May 21, 1987 N. sox $",8 Shippingport PA 15077 United States Nuclear Regulatory Commission ,

ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Beaver Valley Power Station Unit No. 2

' Docket No. 50-412 Response to NRC Comments to Changes Made to FSAR Section 14.2 Initial Test Program

REFERENCE:

(1) Letter from P. Tam, NRC to J . J. Carey, DLC: BVPS Unit 2 Interim Review Results of FSAR Amendment No.13 on Initial Test Program; March 11, 1987; with enclosure (2) Letter 2NRC-7-115 from J. J. Carey, DLC to USNRC; Response to NRC Comments to Changes Made to FSAR Section 14.2, Initial Test Program; May 12, 1987 Gentlemen:

DLC's letter of May 12, 1987 (Reference 2) responded to NRC questions documented in the enclosure of Reference 1. In the interim a teleconference with the NRC has made it necessary to expand / clarify our response. This letter provides the expansions / clarifications and supercedes Reference 2.

Reference 1 enclosure parts b, g, h and j contained comments to changes made by FSAR Amendment 13 that the staff found unacceptable. Resolution of these parts is contained here:

1) Part b, the system test supervisor can approve the substitution of data collected during another test if the acceptance criteria are equal;
2) Items 1, 2 and 3 of Part g, According to RG 1.68 the purpose of these tests is to verify calculational models and computer codes.

These tests have been deleted because the models and assumptions have been verified by tests at other 3-loop plants; AD 5 g k2

1 .

4 United States Nuclear Regulatory Commission Response to NRC Comments to Changes Made to FSAR Section 14.2 Initial Test Program '

Page 2 i

3) Item 4 of Part g, Computer Input and Printout Data Test, 50V-2.05A.01 has been deleted because documenting and, testing of all computer points is being completed with the BVPS-2 Startup l Program.

Computer input and output data is collecte_d during individual sys-i tem tests. Collected data is tracked for its. completion by the BVPS-2 Computer Integration Group. Testing performed on the plant computer systems consisted of 22 IOP's (27-IHC-5A-2.01 through 2.22) wnich verify proper operation of system hardware, i 4) Item 5 of Part g, Containment Instrument Air System Design Verifi-

. cation Test, 50V-2.34.04, has been deleted because the intent of Reg. GuiHe l.68 has been met by completing S0V-2.34.03, Containment

. Instrumentation Air System Test and 50V-2.34.05, Response of Plant

.i Air-Operated Valve to Loss o M strument Air Test; f 5) Item 6 of Part g, Normal AC Power Di_stribution System Test, S0V-2.36A.01, has been deleteTsince this 50V would be redundant to Phase 1 testing. The Phase 1 testing of this system was comprised of 20 IOP's and several hundred component tests. The 10P's, 27-GMS-

, 358-2.01 through 2.06 and 27-NNS-36A-2.01 through 2.15 included initial energization, relay verification and operability tests of the Main, Unit Station Service and System Station Service trans-i formers along with 4KV busses 2A, 28, 2C, 20, 2AE and 2DF. The
component tests included relay acceptance test and calibrations, j CT, PT, ACB and meter testing along with functional tests of 2 control and protection circuits.

F

{t

6) Item 7 of Part g, Seismic Instrumentation Test, S0V-2.458.01, has 4 been deleted because Startup Proof Test Procedure 2T-SRM-458.2.01, Initial Startup Test of the Strong Motion, Seismic Instrumentation 1 System, which has been completed. This Test Procedure verified 1

that Station seismic instrumentation senses and records seismic activity;

7) Part h, RCCA Bank and Boron Worth Measure _ ment, IST-2.01 A.04, has been deleted because rod worth measurements will be obtained by the Low Power Rod Swap Physics method Test. and incorporated The resulting Rod Worthinto IST-2.02.03, El be used to Measurement

)'

verify the acceptability of WCAP-11384, The Nuclear Design and Core Physics Characteristics of the BVPS-2 Nuclear Power Pl_ ant Cycle 1,

~ ~~

and its shutdown margin calculations; and

)

United States Nuclear Regulatory Commission Response to NRC Comments to Changes Made to FSAR Section 14.2 Initial Test Program Page 3

8) Part j, Transformer Cooling Systems have been removed from the Main Generator Tests because 1) these systems received a simulated full load test by the manufacturer, 2) testing performed during installation indicated the transformer cooling systems were fully operable, and 3) it is impractical to perform a transformer cooling system full load test until the plant is at 100% power. Note that Operations periodically checks the transformers cooling systems performance.

Note that all of these changes to Initial Test Program have been made after the Joint Test Group determines that the substituted tests / data meet the objectives of the original test and . the intent of RG 1.68. For your conven-ience, we are attaching Table 1, Equivalent Tests.

Appropriate revisions to the BV-2 FSAR will be made to indicate the substitution of equivalent tests for those indicated as deleted in amendment #

13.

If you should have any questions, please call Mr. A. N. Dicesaro at (412) 393-7742.

DUQUESNE LIGHT COMPANY J. J. Carey ~

Senior Vice President AND/ijr NR/AND/FS/142 AR/NAR cc: Mr. P. Tam, Project Manager Mr. J. Beall, NRC Sr. Resident Inspector Mr. L. Prividy, NRC Resident Inspector INP0 Records Center

e United States Nuclear Regulatory Commiss' ion Response to NRC Comments to Changes Made to FSAR Section 14.2 Initial Test

/ Program Page 4 COMMONWEALTH OF PENNSYLVANIA )

) SS:

COUNTY OF BEAVER )

On this M//]f day of NzAd/ ,.

/M[, before me, a Notary Public in and ~ for said .Commonwe/th and County, personally appeared J.

J. Carey, who being duly sworn, deposed and said that (1) he is Senior Vice President of Duquesne Light, (2) he is duly authorized, to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best. of his knowledge.

/

ll{h k (W Notary Public

. . .t we Nrt %F04f 30%, se ola Ct WRT

, y aptus ecT.23.1980

% w e m atIlsewho

" SMULA B. (AITO:it. 20lAkt NkuG

,y' Sit!PP!NPoti50f$, BFAYER CtUETT NT C05Wisstos EIPIREs GCT. 23.1989 De*. Panasyfrasat bseeistice of fiscshe g

}

s

-A J

F ATTACHMENT TABLE 1 EQUIVALENT TESTS FSAR DELETED SUBSTITUTE SECTION TEST NO. TEST N0.

14.2.12.7.1 S0V-2.05A.01 IOP-2T-IHC-5A-2.01 thru 2.2.2 14.2.12.52.4 S0V-2.34.04 SOV-2.34.03 &

2.34.05 14.2.12.54.1 S0V-2.36A.01 IOP-2T-GMS-358-2.01 thru 2.06 IOP-2T-NNS-36A-2.01 thru 2.15 14.2.12.72.1 SOV-2.458.01 IOP-2T-SRM-458-2.01 e

- +