Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-2017-149, Updated Final Response to NRC Generic Letter 2004-0229 December 2017Updated Final Response to NRC Generic Letter 2004-02Safe Shutdown
Boric Acid
Reactor Vessel Water Level
Mission time
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Design basis earthquake
Foreign Material Exclusion
Exemption Request
Earthquake
Fuel cladding
L-2017-156, License Amendment Request 254, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors.22 December 2017License Amendment Request 254, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors.Hot Short
Safe Shutdown
Unanalyzed Condition
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Large early release frequency
Earthquake
Fire Protection Program
L-2017-198, License Amendment Request 235, Technical Specifications Changes to Address Non-Conservative Actions for Containment and Control Room Ventilation Isolation Functions21 December 2017License Amendment Request 235, Technical Specifications Changes to Address Non-Conservative Actions for Containment and Control Room Ventilation Isolation Functions
L-2017-212, Anchor Darling Double Disc Gate Valve Information and Status21 December 2017Anchor Darling Double Disc Gate Valve Information and StatusAnchor Darling
L-2017-217, Combined License Application Submittal 17 Annual Update of the COL Application for 201720 December 2017Combined License Application Submittal 17 Annual Update of the COL Application for 2017Exemption Request
ML17320A81219 December 2017Reminder-Information on Additional Protocol to Licensees and Manufacturers to Assist in Meeting the International Atomic Energy Agency Treaty Obligations
L-2017-213, License Amendment Request 256, One-Time Extension of 3A Containment Spray (CS) Pump Completion Time18 December 2017License Amendment Request 256, One-Time Extension of 3A Containment Spray (CS) Pump Completion TimeInternal Flooding
Probabilistic Risk Assessment
Large early release frequency
Fuel cladding
Scaffolding
ML17349A17215 December 201705000250,251/2017-301 Final RO Written Exam - Delay Release 2 YrsShutdown Margin
ML17349A18815 December 201705000250/2017301 and 05000251/2017301 Final SRO Written Exam - Delay Release 2 YrsShutdown Margin
ML17349A20915 December 2017251/2017-301 Post-Exam CommentsUltimate heat sink
Surveillance Frequency Control Program
L-2017-200, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums13 December 201710 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
ML17320A6405 December 2017Revised Draft - Combined License for Turkey Point Unit 6Time of Discovery
Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Squib
Incorporated by reference
Process Control Program
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Pressure boundary leak
Fire Protection Program
ML17320A6485 December 2017Revised Draft - Combined License for Turkey Point Unit 7Time of Discovery
Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Squib
Incorporated by reference
Process Control Program
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Pressure boundary leak
Fire Protection Program
ML18239A45129 November 2017Attachment 1 to Applicant'S Answer Opposing Southern Alliance for Clean Energy'S Request for Hearing and Petition to Intervene
ML17332A63728 November 2017Single Positive Test Form Collected on 03/14/2017
ML17332A63928 November 2017Single Positive Test Form Collected on 03/14/2017
ML17332A63428 November 2017Single Positive Test Form Collected on 03/13/2017
ML17332A63228 November 2017Single Positive Test Form Collected on 03/13/2017
ML17332A62628 November 2017Single Positive Test Form Collected on 02/28/2017
ML17332A62528 November 2017Single Positive Test Form Collected on 02/22/2017
ML17332A62428 November 2017Single Positive Test Form Collected on 07/03/2017
ML17332A62328 November 2017Single Positive Test Form Collected on 01/25/2017
ML17332A62228 November 2017Single Positive Test Form Collected on 01/19/2017
ML17332A62128 November 2017Single Positive Test Form Collected on 10/11/2017
ML17332A62028 November 2017Single Positive Test Form Collected on 02/02/2017
ML17332A61928 November 2017Single Positive Test Form Collected on 03/29/2017
Press Release-17-048, NRC to Hold Mandatory Hearing on Turkey Point New Reactor Application28 November 2017Press Release-17-048: NRC to Hold Mandatory Hearing on Turkey Point New Reactor Application
ML17332A64028 November 2017Single Positive Test Form Collected on 03/28/2017
ML17332A64228 November 2017Single Positive Test Form Collected on 03/28/2017
ML17332A64328 November 2017Single Positive Test Form Collected on 03/29/2017
ML17332A64628 November 2017Single Positive Test Form Collected on 08/16/2017
ML17332A65428 November 2017Single Positive Test Form Collected on 09/06/2017
ML17332A65528 November 2017Single Positive Test Form Collected on 09/18/2017
ML17332A65628 November 2017Single Positive Test Form Collected on 09/20/2017
ML17332A65728 November 2017Single Positive Test Form Collected on 09/22/2017
ML17326A48021 November 2017Investigation Summary, Office of Investigations Case Number 2-2016-025
ML17310B20620 November 2017Summary of September 20, 2017, Meeting with Florida Power & Light Company and NextEra Energy Regarding Closure of NRC Generic Safety Issue 191/NRC Generic Letter 2004-02
ML18312A21720 November 2017FAQ 18-05: Turkey Point U3 SCRAM - Proposed NRC ResponsePower change
Downpower
ML19024A50020 November 2017FAQ 18-05 Turkey Point U3 SCRAM Rev 1 - Final ApprovedPower change
Downpower
IR 05000250/20170039 November 2017Inspection Report 05000250/2017003 and 05000251/2017003Non-Destructive Examination
Fire Barrier
Past operability
Enforcement Discretion
Coatings
Fire impairment
Temporary Modification
Functionality Assessment
Significance Determination Process
Job Performance Measure
Operability Determination
Maintenance Rule Program
Through-Wall Leak
Through Wall Leak
Incremental Core Damage Probability Deficit
Unidentified leakage
Press Release-II-17-050, NRC Cites Former Turkey Point Nuclear Plant Reactor Operator for Violation of Agency Regulations9 November 2017Press Release-II-17-050: NRC Cites Former Turkey Point Nuclear Plant Reactor Operator for Violation of Agency Regulations
ML17313A2428 November 2017IA-17-030, Caraza, Notice of Violation, Nuclear Regulatory Commission Office of Investigations Report No. 2-2016-025
05000251/LER-2017-0017 November 2017Manual Reactor Trip Due to Lowering Steam Generator Level Caused by Loss of Flow Regulating Valve Positioner Control
LER 17-001-00 for Turkey Point, Unit 4, Regarding Manual Reactor Trip Due to Lowering Steam Generator Level Caused by Loss of Flow Regulating Valve Positioner Control
High winds
ML17310B2327 November 2017Presentation Slides - NextEra Energy/Fpl - GSI-191 Issue Resolution, Pre-submittal Meeting, September 20, 2017Coatings
FLEX
ML20311A3406 November 20172017 Q1-Q4 ROP Inspection FindingsSafe Shutdown
Unanalyzed Condition
Boric Acid
Time of Discovery
Shutdown Margin
High Radiation Area
Mission time
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Internal Flooding
Temporary Modification
Arc flash
Emergency Lighting
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Time Critical Operator Action
Rod Drop Event
Reasonable doubt of operability
Maintenance Rule Program
Fuel cladding
Pressure Boundary Leakage
Through Wall Leak
Fire Protection Program
Fire Watch
Hourly Fire Watch
Scaffolding
Substantial potential for overexposure
Flow Induced Vibration
ML20311A3456 November 20172017 Q1-Q4 ROP Performance Summary
ML20311A3476 November 20172017 Q1-Q4 ROP Inspection FindingsSafe Shutdown
Unanalyzed Condition
Boric Acid
Time of Discovery
Shutdown Margin
High Radiation Area
Mission time
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Internal Flooding
Arc flash
Emergency Lighting
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Time Critical Operator Action
Rod Drop Event
Moisture barrier
Maintenance Rule Program
Pressure Boundary Leakage
Pressure boundary leak
Through Wall Leak
Fire Protection Program
Fire Watch
Hourly Fire Watch
Scaffolding
Substantial potential for overexposure
Substantial potential for an overexposure
ML17291A0456 November 2017Summary of Meeting with Florida Power and Light Company, Regarding Planned License Amendment Requests for St. Lucie Plants, Units 1 and 2 and Turkey Point Nuclear Generating Unit Nos. 3 and 4Safe Shutdown
Probabilistic Risk Assessment
Fukushima Dai-Ichi
ML20311A3596 November 20172017 Q1-Q4 ROP Performance Summary
ML18023B5833 November 2017NRC-005-R - NRC Staff Responses to Commission Prehearing Questions (November 3, 2017) ADAMS Accession No. ML17338A728High winds
FLEX
Fukushima Dai-Ichi
Environmental Justice