Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML10356021723 December 2010Correction to Withdrawal Letter Dated 12/21/10 Regarding License Amendment Request to Revise Technical Specification 3.7.4, Atmospheric Dump Valves
ML10356079222 December 2010Notification of Inspection (NRC Inspection Report IR 05000528-11-002, IR 05000529-11-002, and IR 05000530-11-002) and Request for Information
IR 05000528/201030122 December 2010Er 05000528-10-301; 05000529-10-301; 05000530-10-301; November 5-17, 2010; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report
ML10344028221 December 2010Withdrawal of Requested Licensing Action, License Amendment Request to Revise Technical Specification 3.7.4, Atmospheric Dump Valves
ML10350051021 December 2010Request for Additional Information, License Amendment Request to Revise Updated Final Safety Analysis Report, Feedwater Line Break Analysis with LOOP and Single Failure Analysis
ML11003001620 December 2010Exemption for 10 CFR 73.55 Implementation - Completion
ML10363042216 December 2010Correction to License Renewal Application Section B2.1.10, Closed-Cycle Cooling Water SystemAging Management
ML10344057116 December 2010Request for Additional Information License Amendment Request Related to Approval of Cyber Security PlanCyber Security
ML10271030124 November 2010Issuance of Amendment Nos. 182, 182, and 182, Revise TS Table 3.3.5-1, Engineered Safety Features Actuation System, and Figure 3.5-1, Minimum Refueling Water Tank VolumeSafe Shutdown
Anticipated operational occurrence
Operator Manual Action
Time Critical Operator Action
Fire Protection Program
ML10340008623 November 2010Submittal of Amendment No. 15 to the Arizona Nuclear Power Project Participation Agreement
ML10342010123 November 2010Response to Draft Request for Additional Information for the Review of the PVNGS License Renewal Application (Lra), and LRA Amendment No. 27Aging Management
ML10340008522 November 2010LER Palo Verde, Unit 3 - Submittal of Special Report 3-SR-2010-001-00, Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor InoperableOffsite Dose Calculation Manual
IR 05000528/201040319 November 2010IR 05000528-10-403, 05000529-10-403 and 05000530-10-403, on 11/05/10, Palo Verde Nuclear Generating Station, Units 1, 2, and 3Affidavit
ML10328002217 November 2010Provided Prior Written Notification to the Nuclear Regulatory Commission of the Proposed Transfer of an Equity Interest in a Sale and Leaseback Transaction
ML10335061716 November 2010Technical Specification Bases Revision 53 and Technical Requirements Manual Revision 53
ML10299053016 November 2010Summary of Telephone Conference Call Held on October 22, 2010, Btw the USNRC and Arizona Public Service Company, Concerning D-RAI Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, LRA
ML10301052316 November 2010Summary of Teleconference Held on Between the U.S. NRC and Arizona Public Service Company, Concerning Draft Follow-Up Request for Additional Information Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3, LRA
ML10335064610 November 2010Technical Specification Bases, Revision 53Safe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Missed surveillance
Pressure and Temperature Limits Report
Operability Determination
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage
Power Uprate
ML10328005810 November 2010Response to Draft Request for Additional Information for the Review of License Renewal Application and LRA Amendment No. 26Safe Shutdown
Boric Acid
Grab sample
Coatings
Nondestructive Examination
Aging Management
Fire Protection Program
ML10335064510 November 2010Technical Requirements Manual, Revision 53Safe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Pressure and Temperature Limits Report
Annual Radioactive Effluent Release Report
Process Control Program
Operability Determination
Earthquake
Offsite Circuit
Fire Protection Program
Fire Watch
Power change
TAC:ME62448 November 2010
ML1032102088 November 2010Submittal of 15th Refueling Outage Tube Inspection Report
ML1034302005 November 2010PV-2010-11-Post Exam Analysis
ML1034301155 November 2010PV-2010-11-Delayed Release - Final Written ExamShutdown Margin
High Radiation Area
Grab sample
Locked High Radiation Area
Scaffolding
Power change
ML1034300845 November 2010PV-2010-11-Final Operating TestSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Packing leak
High Radiation Area
Contraband
Internal Flooding
Operating Basis Earthquake
Locked High Radiation Area
Job Performance Measure
Earthquake
Deep Dose Equivalent
Pressure Boundary Leakage
Offsite Circuit
Power change
Downpower
Unidentified leakage
Unidentified leak
ML1030900185 November 2010Notice of Meeting with Arizona Public Service Company to Discuss Palo Verde, Units 1, 2, and 3 License Amendment Request to Revise Technical Specification 3.7.4, Atmospheric Dump Valves.
ML1034003625 November 2010PV-2010-11-Final OutlinesShutdown Margin
ML1034003495 November 2010PV-2010-11-Draft Operating Test CommentsShutdown Margin
ML1034003405 November 2010PV-2010-11-Draft Operating TestBoric Acid
Shutdown Margin
Packing leak
High Radiation Area
Locked High Radiation Area
Job Performance Measure
Offsite Circuit
Power change
Downpower
Unidentified leak
ML1034002805 November 2010PV-2010-11-Draft Written Exam Comments
ML1034002745 November 2010PV-2010-11-DELAYED Release -DRAFT Written ExamShutdown Margin
High Radiation Area
Grab sample
Locked High Radiation Area
Scaffolding
Power change
ML1034002605 November 2010PV-2010-11-DRAFT OutlinesShutdown Margin
Fatigue Rule
Downpower
ML1034002515 November 2010PV-2010-11-Draft Outline CommentsPower change
ML1102700465 November 2010PV-2010-11, Exam Assignment Tickler
ML1030809464 November 2010PV - 2010-11 - Examination Approval Letter
IR 05000528/20100043 November 2010IR 05000528-10-004, 05000529-10-004, 05000530-10-004; 07/01/10 - 09/30/10; Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Integrated Resident and Regional Report; Maintenance Effectiveness; Maintenance Risk Assessment and EmergenFitness for Duty
High winds
Ultimate heat sink
Coatings
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Fire Protection Program
ML10313004429 October 2010Arizona Public Service Company'S Comment on the Draft Supplemental Environmental Impact Statement Related to the License Renewal
ML10306010229 October 2010Notification of Potential Part 21 Transfer of Information Concerning Control Components Inc. (CCI) Drag ValvesBoric Acid
ML10313004329 October 2010Revised Core Operating Limits Report (COLR)Shutdown Margin
ML10312054929 October 2010Comment (1) of Kathleen M. Goforth, on Behalf of Us Environmental Protection Agency, on Plant-Specific Supplement 43 to Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Palo Verde Draft Report for ...License Renewal
ML10301017220 October 2010Supplementary Information Concerning Request for Amendment to Technical Specification 3.7.4, Atmospheric Dump Valves (Advs).
TAC:ME656620 October 2010
ML10174011018 October 2010June 16, 2010 Palo Verde License Renewal - Summary of Fire Protection Conference Calls, Held Between the U.S. Nuclear Regulatory Commission and Arizona Public Service Company, Concerning Draft Request for Additional InformationFire Protection Program
ML10266006715 October 20109/22/10 Summary of Teleconference Held Between U.S. NRC and Arizona Public Service Company, Concerning Draft Request for Additional Information Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, LRA
ML10203050015 October 2010Summary of Tele Conf Call Held on 7/21/10, Btw the USNRC and Arizona Public Service Company, Concerning Draft Request for Additional Information Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal AppAging Management
Pressure boundary leak
ML10194014215 October 2010July 8, 2010, Summary of Telephone Conference Call Held Between USNRC and Arizona Public Service Company Concerning D-RAI Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal ApplicationNondestructive Examination
Aging Management
ML10267008014 October 2010Relief Request No. 47, from Certain ASME Code Requirements for Reactor Vessel Nozzle to Vessel Welds for Second 10-Year Inservice Inspection IntervalIncorporated by reference
ML10278016213 October 20109/15/10 Summary of Public Meeting to Discuss the Draft Supplemental Environmental Impact Statement for Palo Verde Nuclear Generating StationOpen House
License Renewal
ML10293003213 October 2010Responses to Requests for Additional Information for the Review of the PVNGS License Renewal Application (Lra), and LRA Amendment No. 25Coatings
Aging Management
Flow Induced Vibration
ML10277017613 October 2010Slides from Public Meeting to Discuss the Draft Supplemental Environmental Impact Statement (Dseis) for Palo Verde Nuclear Generating Station