ES-401 PWR Examination Outline Form ES-401-2 Facility: Palo Verde Printed: 06/02/2010 Date Of Exam: 11/05/2010 RO K/A Category Points SRO-Only Points Tier Group K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G* Total A2 G* Total
- 1. 1 3 3 3 3 3 3 18 0 0 0 Emergency 2 2 1 2 N/A 1 1 2 9 0 0 0
& N/A Abnormal Tier Plant Totals 5 4 5 4 4 5 27 0 0 0 Evolutions 1 2 2 4 3 2 2 3 3 2 2 3 28 0 0 0 2.
2 1 1 1 1 1 1 1 1 1 1 0 10 0 0 0 0 Plant Systems Tier 0 0 0 3 3 5 4 3 3 4 4 3 3 3 38 Totals 1 2 3 4 1 2 3 4
- 3. Generic Knowledge And 10 0 Abilities Categories 2 3 2 3 0 0 0 0 Note:
- 1. Ensure that at least two topics from every applicable K/A category are sampled within each tier of the RO and SRO-only outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each K/A category shall not be less than two).
- 2. The point total for each group and tier in the proposed outline must match that specified in the table.
The final point total for each group and tier may deviate by +/-1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.
- 3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems/evolutions that are not included on the outline should be added. Refer to Section D.1.b of ES-401 for guidance regarding the elimination of inappropriate K/A statements.
- 4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
- 5. Absent a plant-specific priority, only those K/As having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively.
- 6. Select SRO topics for Tiers 1 and 2 from the shaded systems and K/A categories.
7.* The generic (G) K/As in Tiers 1 and 2 shall be selected from Section 2 of the K/A Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable K/As.
- 8. On the following pages, enter the K/A numbers, a brief description of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than Category A2 or G* on the SRO-only exam, enter it on the left side of Column A2 for Tier 2, Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.
- 9. For Tier 3, select topics from Section 2 of the K/A catalog, and enter the K/A numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to K/As that are linked to 10 CFR 55.43.
06/02/2010 7:10:13 am 1
PWR RO Examination Outline Printed: 06/02/2010 Facility: Palo Verde ES - 401 Emergency and Abnormal Plant Evolutions - Tier 1 / Group 1 Form ES-401-2 E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G KA Topic Imp. Points 000008 Pressurizer Vapor Space Accident / X 2.1.27 - Knowledge of system purpose 3.9 1 3 and/or function.
000009 Small Break LOCA / 3 X EK3.10 - Observation of PZR level 3.4 1 000011 Large Break LOCA / 3 X EK2.02 - Pumps 2.6* 1 000015/000017 RCP Malfunctions / 4 X 2.4.11 - Knowledge of abnormal 4.0 1 condition procedures.
000022 Loss of Rx Coolant Makeup / 2 X AA2.02 - Charging pump problems 3.2 1 000025 Loss of RHR System / 4 X AA1.22 - Obtaining of water from 2.9* 1 BWST for LPI system 000027 Pressurizer Pressure Control System X AK2.03 - Controllers and positioners 2.6 1 Malfunction / 3 000029 ATWS / 1 X EA1.11 - Manual opening of the CRDS 3.9* 1 breakers 000038 Steam Gen. Tube Rupture / 3 X EA2.01 - When to isolate one or more 4.1 1 S/Gs 000055 Station Blackout / 6 X EK1.02 - Natural circulation cooling 4.1 1 000056 Loss of Off-site Power / 6 X 2.4.31 - Knowledge of annunciator 4.2 1 alarms, indications, or response procedures.
000057 Loss of Vital AC Inst. Bus / 6 X AA1.01 - Manual inverter swapping 3.7* 1 000058 Loss of DC Power / 6 X AA2.01 - That a loss of dc power has 3.7 1 occurred; verification that substitute power sources have come on line 000062 Loss of Nuclear Svc Water / 4 X AK3.03 - Guidance actions contained in 4.0 1 EOP for Loss of nuclear service water 000065 Loss of Instrument Air / 8 X AK3.04 - Cross-over to backup air 3.0 1 supplies CE/E02 Reactor Trip - Stabilization - X EK1.2 - Normal, abnormal and 3.0 1 Recovery / 1 emergency operating procedures associated with Reactor Trip or Safety Injection /Rediagnosis CE/E05 Steam Line Rupture - Excessive X EK1.1 - Components, capacity, and 3.0 1 Heat Transfer / 4 function of emergency systems CE/E06 Loss of Main Feedwater / 4 X EK2.1 - Components, and functions of 3.3 1 control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features K/A Category Totals: 3 3 3 3 3 3 Group Point Total: 18 06/02/2010 7:09:45 am 1
PWR RO Examination Outline Printed: 06/02/2010 Facility: Palo Verde ES - 401 Emergency and Abnormal Plant Evolutions - Tier 1 / Group 2 Form ES-401-2 E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G KA Topic Imp. Points 000005 Inoperable/Stuck Control Rod / 1 X AK1.06 - Bases for power limit, for rod 2.9 1 misalignment 000024 Emergency Boration / 1 X AK1.02 - Relationship between boron 3.6 1 addition and reactor power 000036 Fuel Handling Accident / 8 X AK2.01 - Fuel handling equipment 2.9 1 000051 Loss of Condenser Vacuum / 4 X AK3.01 - Loss of steam dump 2.8* 1 capability upon loss of condenser vacuum 000061 ARM System Alarms / 7 X AK3.02 - Guidance contained in alarm 3.4 1 response for ARM system 000067 Plant Fire On-site / 9 X AA1.08 - Fire fighting equipment used 3.4 1 on each class of fire 000068 Control Room Evac. / 8 X 2.4.6 - Knowledge of EOP mitigation 3.7 1 strategies.
CE/A11 RCS Overcooling - PTS / 4 X 2.2.25 - Knowledge of the bases in 3.2 1 Technical Specifications for limiting conditions for operations and safety limits.
CE/A13 Natural Circ. / 4 X EA2.1 - Facility conditions and 2.7 1 selection of appropriate procedures during abnormal and emergency operations K/A Category Totals: 2 1 2 1 1 2 Group Point Total: 9 06/02/2010 7:09:51 am 1
PWR RO Examination Outline Printed: 06/02/2010 Facility: Palo Verde ES - 401 Plant Systems - Tier 2 / Group 1 Form ES-401-2 Sys/Evol # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G KA Topic Imp. Points 003 Reactor Coolant Pump X K1.04 - CVCS 2.6* 1 004 Chemical and Volume Control X K3.07 - PZR level and 3.8 1 pressure 005 Residual Heat Removal X K6.03 - RHR heat 2.5 1 exchanger 005 Residual Heat Removal X K2.01 - RHR pumps 3.0 1 006 Emergency Core Cooling X A2.12 - Conditions 4.5 1 requiring actuation of ECCS 006 Emergency Core Cooling X K4.06 - Recirculation of 2.7 1 minimum flow through pumps 007 Pressurizer Relief /Quench X A1.01 - Maintaining quench 2.9 1 Tank tank water level within limits 008 Component Cooling Water X A2.04 - PRMS alarm 3.3 1 008 Component Cooling Water X K3.01 - Loads cooled by 3.4 1 CCWS 010 Pressurizer Pressure Control X K4.03 - Over pressure 3.8 1 control 012 Reactor Protection X K5.02 - Power density 3.1* 1 012 Reactor Protection X A4.07 - M/G set breakers 3.9* 1 013 Engineered Safety Features X A3.02 - Operation of 4.1 1 Actuation actuated equipment 013 Engineered Safety Features X K2.01 - ESFAS/safeguards 3.6* 1 Actuation equipment control 022 Containment Cooling X A1.04 - Cooling water flow 3.2 1 026 Containment Spray X 2.2.42 - Ability to recognize 3.9 1 system parameters that are entry-level conditions for Technical Specifications.
039 Main and Reheat Steam X K1.02 - Atmospheric relief 3.3 1 dump valves 059 Main Feedwater X K3.02 - AFW System 3.6 1 061 Auxiliary/Emergency X K4.06 - AFW startup 4.0* 1 Feedwater permissives 062 AC Electrical Distribution X 2.1.19 - Ability to use plant 3.9 1 computers to evaluate system or component status.
062 AC Electrical Distribution X A1.01 - Significance of D/G 3.4 1 load limits 063 DC Electrical Distribution X 2.4.34 - Knowledge of RO 4.2 1 tasks performed outside the main control room during an emergency and the resultant operational effects.
063 DC Electrical Distribution X K3.01 - ED/G 3.7* 1 06/02/2010 7:09:57 am 1
PWR RO Examination Outline Printed: 06/02/2010 Facility: Palo Verde ES - 401 Plant Systems - Tier 2 / Group 1 Form ES-401-2 Sys/Evol # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G KA Topic Imp. Points 064 Emergency Diesel Generator X K6.08 - Fuel oil storage 3.2 1 tanks 073 Process Radiation Monitoring X K5.03 - Relationship 2.9* 1 between radiation intensity and exposure limits 076 Service Water X A4.01 - SWS pumps 2.9 1 078 Instrument Air X A3.01 - Air pressure 3.1 1 103 Containment X A2.05 - Emergency 2.9 1 containment entry K/A Category Totals: 2 2 4 3 2 2 3 3 2 2 3 Group Point Total: 28 06/02/2010 7:09:57 am 2
PWR RO Examination Outline Printed: 06/02/2010 Facility: Palo Verde ES - 401 Plant Systems - Tier 2 / Group 2 Form ES-401-2 Sys/Evol # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G KA Topic Imp. Points 002 Reactor Coolant X K6.02 - RCP 3.6 1 014 Rod Position Indication X A1.04 - Axial and radial 3.5 1 power distribution 015 Nuclear Instrumentation X A4.03 - Trip bypasses 3.8 1 017 In-core Temperature Monitor X K1.01 - Plant computer 3.2* 1 028 Hydrogen Recombiner and X K2.01 - Hydrogen 2.5* 1 Purge Control recombiners 035 Steam Generator X A3.01 - S/G water level 4.0 1 control 041 Steam Dump/Turbine Bypass X A2.02 - Steam valve stuck 3.6 1 Control open 068 Liquid Radwaste X K5.03 - Units of radiation, 2.6 1 dose, and dose rate 072 Area Radiation Monitoring X K3.02 - Fuel handling 3.1 1 operations 075 Circulating Water X K4.01 - Heat sink 2.5 1 K/A Category Totals: 1 1 1 1 1 1 1 1 1 1 0 Group Point Total: 10 06/02/2010 7:10:03 am 1
Generic Knowledge and Abilities Outline (Tier 3)
PWR RO Examination Outline Printed: 06/02/2010 Facility: Palo Verde Form ES-401-3 Generic Category KA KA Topic Imp. Points Conduct of Operations 2.1.15 Knowledge of administrative requirements for 2.7 1 temporary management directives, such as standing orders, night orders, Operations memos, etc.
2.1.30 Ability to locate and operate components, 4.4 1 including local controls.
Category Total: 2 Equipment Control 2.2.1 Ability to perform pre-startup procedures for the 4.5 1 facility, including operating those controls associated with plant equipment that could affect reactivity.
2.2.22 Knowledge of limiting conditions for operations 4.0 1 and safety limits.
2.2.39 Knowledge of less than or equal to one hour 3.9 1 Technical Specification action statements for systems.
Category Total: 3 Radiation Control 2.3.5 Ability to use radiation monitoring systems, such 2.9 1 as fixed radiation monitors and alarms, portable survey instruments, personal monitoring equipment, etc.
2.3.14 Knowledge of radiation or contamination hazards 3.4 1 that may arise during normal, abnormal, or emergency conditions or activities.
Category Total: 2 Emergency Procedures/Plan 2.4.3 Ability to identify post-accident instrumentation. 3.7 1 2.4.30 Knowledge of events related to system 2.7 1 operation/status that must be reported to internal organizations or external agencies, such as the State, the NRC, or the transmission system operator.
2.4.37 Knowledge of the lines of authority during 3.0 1 implementation of the emergency plan.
Category Total: 3 Generic Total: 10 06/02/2010 7:10:08 am 1
PVNGS License Examination Record of Rejected K/As (06/04/10)
Exam Date 11/05/10 PVNGS Form ES-401-4 Tier / Randomly Reason for Rejection Group Selected K/As RO Exam 1/1 2.1.45 Not on ES-401 4.D.1.b paragraph for acceptable generic T1 or T2 generic KAs. Replaced with 2.1.27.
2/1 2.2.41 Not on ES-401 4.D.1.b paragraph for acceptable generic T1 or T2 generic KAs. Replaced with 2.4.34.
ES-401 PWR Examination Outline Form ES-401-2 Facility: Palo Verde Printed: 06/02/2010 Date Of Exam: 11/05/2010 RO K/A Category Points SRO-Only Points Tier Group K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G* Total A2 G* Total
- 1. 1 0 0 0 0 0 0 0 3 3 6 Emergency 2 0 0 0 N/A 0 0 0 0 2 2 4
& N/A Abnormal Tier Plant Totals 0 0 0 0 0 0 0 5 5 10 Evolutions 1 0 0 0 0 0 0 0 0 0 0 0 0 3 2 5 2.
2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 1 3 Plant Systems Tier 5 3 8 0 0 0 0 0 0 0 0 0 0 0 0 Totals 1 2 3 4 1 2 3 4
- 3. Generic Knowledge And 0 7 Abilities Categories 0 0 0 0 2 1 2 2 Note:
- 1. Ensure that at least two topics from every applicable K/A category are sampled within each tier of the RO and SRO-only outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each K/A category shall not be less than two).
- 2. The point total for each group and tier in the proposed outline must match that specified in the table.
The final point total for each group and tier may deviate by +/-1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.
- 3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems/evolutions that are not included on the outline should be added. Refer to Section D.1.b of ES-401 for guidance regarding the elimination of inappropriate K/A statements.
- 4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
- 5. Absent a plant-specific priority, only those K/As having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively.
- 6. Select SRO topics for Tiers 1 and 2 from the shaded systems and K/A categories.
7.* The generic (G) K/As in Tiers 1 and 2 shall be selected from Section 2 of the K/A Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable K/As.
- 8. On the following pages, enter the K/A numbers, a brief description of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than Category A2 or G* on the SRO-only exam, enter it on the left side of Column A2 for Tier 2, Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.
- 9. For Tier 3, select topics from Section 2 of the K/A catalog, and enter the K/A numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to K/As that are linked to 10 CFR 55.43.
06/02/2010 8:19:50 am 1
PWR SRO Examination Outline Printed: 06/02/2010 Facility: Palo Verde ES - 401 Emergency and Abnormal Plant Evolutions - Tier 1 / Group 1 Form ES-401-2 E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G KA Topic Imp. Points 000009 Small Break LOCA / 3 X 2.2.44 - Ability to interpret control 4.4 1 room indications to verify the status and operation of a system, and understand how operator actions and directives affect plant and system conditions.
000015/000017 RCP Malfunctions / 4 X AA2.01 - Cause of RCP failure 3.5* 1 000027 Pressurizer Pressure Control System X AA2.02 - Normal values for RCS 3.9 1 Malfunction / 3 pressure 000040 Steam Line Rupture - Excessive X 2.2.23 - Ability to track Technical 4.6 1 Heat Transfer / 4 Specification limiting conditions for operations.
000058 Loss of DC Power / 6 X 2.1.20 - Ability to interpret and execute 4.6 1 procedure steps.
CE/E02 Reactor Trip - Stabilization - X EA2.1 - Facility conditions and 3.7 1 Recovery / 1 selection of appropriate procedures during abnormal and emergency operations K/A Category Totals: 0 0 0 0 3 3 Group Point Total: 6 06/02/2010 8:19:24 am 1
PWR SRO Examination Outline Printed: 06/02/2010 Facility: Palo Verde ES - 401 Emergency and Abnormal Plant Evolutions - Tier 1 / Group 2 Form ES-401-2 E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G KA Topic Imp. Points 000005 Inoperable/Stuck Control Rod / 1 X AA2.01 - Stuck or inoperable rod from 4.1 1 in-core and ex-core NIS, in-core or loop temperature measurements 000028 Pressurizer Level Malfunction / 2 X AA2.10 - Whether the automatic mode 3.4 1 for PZR level control is functioning improperly, necessity of shift to manual modes 000037 Steam Generator Tube Leak / 3 X 2.1.6 - Ability to manage the control 4.8 1 room crew during plant transients.
000076 High Reactor Coolant Activity / 9 X 2.3.5 - Ability to use radiation 2.9 1 monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personal monitoring equipment, etc.
K/A Category Totals: 0 0 0 0 2 2 Group Point Total: 4 06/02/2010 8:19:30 am 1
PWR SRO Examination Outline Printed: 06/02/2010 Facility: Palo Verde ES - 401 Plant Systems - Tier 2 / Group 1 Form ES-401-2 Sys/Evol # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G KA Topic Imp. Points 004 Chemical and Volume Control X A2.06 - Inadvertent 4.3 1 boration/dilution 013 Engineered Safety Features X A2.03 - Rapid 4.7 1 Actuation depressurization 039 Main and Reheat Steam X A2.05 - Increasing steam 3.6 1 demand, its relationship to increases in reactor power 059 Main Feedwater X 2.4.4 - Ability to recognize 4.7 1 abnormal indications for system operating parameters that are entry-level conditions for emergency and abnormal operating procedures.
073 Process Radiation Monitoring X 2.4.4 - Ability to recognize 4.7 1 abnormal indications for system operating parameters that are entry-level conditions for emergency and abnormal operating procedures.
K/A Category Totals: 0 0 0 0 0 0 0 3 0 0 2 Group Point Total: 5 06/02/2010 8:19:35 am 1
PWR SRO Examination Outline Printed: 06/02/2010 Facility: Palo Verde ES - 401 Plant Systems - Tier 2 / Group 2 Form ES-401-2 Sys/Evol # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G KA Topic Imp. Points 001 Control Rod Drive X A2.13 - ATWS 4.6 1 015 Nuclear Instrumentation X A2.03 - Xenon oscillations 3.5* 1 029 Containment Purge X 2.2.21 - Knowledge of pre- 4.1 1 and post-maintenance operability requirements.
K/A Category Totals: 0 0 0 0 0 0 0 2 0 0 1 Group Point Total: 3 06/02/2010 8:19:40 am 1
Generic Knowledge and Abilities Outline (Tier 3)
PWR SRO Examination Outline Printed: 06/02/2010 Facility: Palo Verde Form ES-401-3 Generic Category KA KA Topic Imp. Points Conduct of Operations 2.1.5 Ability to use procedures related to shift staffing, 3.9 1 such as minimum crew complement, overtime limitations, etc.
2.1.45 Ability to identify and interpret diverse 4.3 1 indications to validate the response of another indication.
Category Total: 2 Equipment Control 2.2.6 Knowledge of the process for making changes to 3.6 1 procedures.
Category Total: 1 Radiation Control 2.3.11 Ability to control radiation releases. 4.3 1 2.3.15 Knowledge of radiation monitoring systems, such 3.1 1 as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.
Category Total: 2 Emergency Procedures/Plan 2.4.6 Knowledge of EOP mitigation strategies. 4.7 1 2.4.8 Knowledge of how abnormal operating 4.5 1 procedures are used in conjunction with EOPs.
Category Total: 2 Generic Total: 7 06/02/2010 8:19:45 am 1
PVNGS License Examination Record of Rejected K/As Exam Date 11/05/10 PVNGS Form ES-401-4 Tier / Randomly Reason for Rejection Group Selected K/As SRO Exam 1/1 4.2 062 AA2.04 PVNGS Loss of Cooling Water Procedure does not address temperatures, it only addresses flow. Replaced with 4.2 015 AA2.01 2/2 2.4.28 PVNGS does not have a CTMT Iodine Removal system.
Replaced with 2.2.21
ES-301 Administrative Topics Outline Form ES-301-1 Palo Verde Facility: _______________________________ 11/08/10 Date of Examination: _____________
Examination Level: RO SRO Operating Test Number: __________
Administrative Topic Type Describe activity to be performed (see Note) Code*
Shutdown Margin Calculation Conduct of Operations R, M Complete PDIL entry logs for the Regulating Group and Part Strength CEAs Conduct of Operations R,D Perform 40ST-9RC08, Backup RCS leakrate calculation Equipment Control R,N Calculate dose , whose permission is needed to complete the task and the required area posting.
R,N Radiation Control l Emergency Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301, Page 22 of 27
ES-301 Administrative Topics Outline Form ES-301-1 Palo Verde Facility: _______________________________ 11/08/10 Date of Examination: _____________
Examination Level: RO SRO Operating Test Number: __________
Administrative Topic Type Describe activity to be performed (see Note) Code*
Review a Shutdown Margin Calculation, identify 3 errors and determine required action(s).
Conduct of Operations R, M Call in an RO (Fatigue Rule)
Conduct of Operations R,N Determine status of Main Steam Safety valves (LCO) and any required actions.
Equipment Control R,D Determine dose, hold points and permission to exceed those hold points.
R,P Radiation Control Classify an event C, N l Emergency Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301, Page 22 of 27
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Palo Verde Facility: _____________________________ 11/08/10 Date of Examination: ______________
Exam Level: RO SRO-I SRO-U Operating Test No.: _______________
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code* Safety Function
- a. Respond to a RU-4 alarm S,N 4S
- b. Borate the RCS S,A,D 1
- d. Restore Containment cooling S, D,L 5
- e. Isolate a ruptured SG S,D,A,L,P 4P
- f. Perform BDAS checks S,D, L 7
- h. Respond to a Pressurizer pressure instrument failure S,D,P 3 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. Perform Appendix E for Control Room Fire A,M,E 6
- j. Perform Appendix H for Control Room Fire R, N, E 8
- k. Local Operation of AFA-P01 for security event N, E, A 4S
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U l (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature - / - / 1 (control room system) l (L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1/1/1 (S)imulator ES-301, Page 23 of 27
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Palo Verde Facility: _____________________________ 11/08/10 Date of Examination: ______________
Exam Level: RO SRO-I SRO-U Operating Test No.: _______________
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code* Safety Function
- a. Respond to a RU-4 alarm S,N 4S
- b. Borate the RCS S,A,D 1
- d. Restore Containment cooling S, D,L 5
- e. Isolate a ruptured SG S,D,A,L,P 4P
- f. Perform BDAS checks S,D, L 7
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. Perform Appendix E for Control Room Fire A,M,E 6
- j. Perform Appendix H for Control Room Fire R, N, E 8
- k. Local Operation of AFA-P01 for security event N, E, A 4S
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U l (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature - / - / 1 (control room system) l (L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1/1/1 (S)imulator ES-301, Page 23 of 27
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Palo Verde Facility: _____________________________ 11/08/10 Date of Examination: ______________
Exam Level: RO SRO-I SRO-U Operating Test No.: _______________
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code* Safety Function
- a. Respond to a RU-4 alarm S,N 4S
- b. Borate the RCS S,A,D 1
e.
f.
g.
h.
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. Perform Appendix E for Control Room Fire A,M,E 6
- j. Perform Appendix H for Control Room Fire R, N, E 8 k.
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U l (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature - / - / 1 (control room system) l (L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1/1/1 (S)imulator ES-301, Page 23 of 27
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Palo Verde Date of Exam: Operating Test No.:
A E Scenarios P V P E 1 2 3 4 T M O I L N CREW CREW CREW CREW N
I T POSITION POSITION POSITION POSITION T I C
A T S A B S A B S A B S A B A M R T O R T O R T O R T O L U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 0 1 1 2 1 1 0 R-1, R-5 NOR 0 0 0 0 1 1 1 R-7, R-9 I/C 5 3 4 12 4 4 2 MAJ 1 1 1 3 2 2 1 RO RX 0 1 1 1 1 0 R-3 NOR 0 0 0 1 1 1 R-11 I/C 5 3 8 4 4 2 MAJ 1 1 2 2 2 1 RO RX 1 1 2 1 1 0 R-13 NOR 1 0 1 1 1 1 I/C 4 4 8 4 4 2 MAJ 1 1 2 2 2 1 RO RX 0 1 1 1 1 0 NOR 0 1 1 1 1 1 R-2, R-6 R-10 I/C 4 3 7 4 4 2 R-12 MAJ 1 1 2 2 2 1 RX 0 1 1 2 1 1 0 RO NOR 0 1 0 1 1 1 1 R-4 I/C 4 4 4 12 4 4 2 R-8 MAJ 1 1 1 3 2 2 1 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
Page 1 of 2
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Palo Verde Date of Exam: Operating Test No.:
A E Scenarios P V 1 2 3 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U SRO-I RX 1 1 1 3 1 1 0 I-2 NOR 0 1 1 2 1 1 1 I-4 I/C 8 6 3 17 4 4 2 I-6 MAJ 1 1 1 3 2 2 1 TS 3 2 0 5 0 2 2 SRO-I RX 1 1 1 3 1 1 0 NOR 0 1 1 2 1 1 1 I-1 I-3 I/C 8 4 7 19 4 4 2 I-5 MAJ 1 1 1 3 2 2 1 TS 3 0 2 5 0 2 2 SRO-U RX 1 1 2 1 1 0 U-1 NOR 1 1 2 1 1 1 U-2 I/C 6 7 13 4 4 2 U-3 MAJ 1 1 2 2 2 1 TS 2 2 4 0 2 2 Scenario RX 1 1 1 1 1 0 4 totals NOR 1 1 0 1 1 1 I/C 7 4 3 4 4 2 MAJ 1 1 1 2 2 1 TS 2 0 0 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
Page 2 of 2
Appendix D Scenario Outline Form ES-D-1 Facility: PVNGS Scenario No.: __1 Op-Test No: 2010 Examiners: Operators:
Initial Conditions: (2% power, BOC).
Turnover: Unit 1 is at 2% power (10 EFPD) following a Short notice outage of 10 days. Power is being held steady while waiting for the Mode 2 to 1 Mode Change checklist to be completed.
Event Malf. No. Event Type* Event Description No.
1 Imf C Charging Header DP controller fails in the AUTO mode cmCNCV01CHEPDIC240_2 RO/SRO 2 Imf mfSB01C I Core Protection Calculator failure CO/SRO 3 Imf cmTRCV19RCALT110X_4 I RCA-LT-110X Pressurizer level transmitter fails low.
RO/SRO 4 Imf mfCPTP04RCNP01A_6 C TC pump trip (Standby fails to auto start)
(In setup) Imf CO/SRO cmCPTP04RCNP01B_5 5 Imf mfRP06H1 C Inadvertent CSAS Train B Imf mfRP06H2 RO/SRO 6 Imf cmCNMS19SGNPIC1010_1 C Steam Bypass controller fails to 100% and SBCV 1001 sticks at Imf MS12A 60%. (Trip Initiator)
CO/SRO 7 (In setup) Imf C B Train AF valve to SG 1 fails to open.
CMMVFw08AFBUV34_6 CO/SRO 8 Imf mfTH01B M LOCA (after Reactor Trip procedure entered)
ALL 9 Scenario file noSICI C SIAS fails to initiate CO/SRO CRITCAL TASK - Initiate SI flow when the SIAS setpoint has been exceeded.
10 Imf cmMVRH03SIAUV672_6 C CS A header isolation fails to open (B CS pump stopped due to Inadvertent CSAS earlier)
RO/SRO CRITCAL TASK - Initiate CS flow when the CSAS setpoint has been exceeded.
End The scenario will end when CS and SI is established.
point
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor NUREG-1021, Revision 9 1 of 3
Appendix D Scenario Outline Form ES-D-1 Facility: PVNGS Scenario No.: __2 Op-Test No: 2010 Examiners: Operators:
Initial Conditions: (100% power, MOC).
Turnover: Unit 1 is at 100% power (250 EFPD). Stator Cooling Pump A is tagged out for schedule maintenance.
Event Malf. No. Event Type* Event Description No.
1 In setup Imf N Pump the RDT, CH-UV-560 fails to close when securing lineup cmAVCV11CHAUV560_4 RO/SRO (TS) 2 Imf mfNI02A I Control Channel #1 fails low CO/SRO 3 Imf cmCPHV12HJNA02_2 C Control Room Normal AHU Trips RO/SRO 4 Imf RD02D R Slipped CEA ALL CRITICAL TASK - Commence a power reduction within 15 minutes when any CEA is deviating > 6.6 inches.
(TS) 5 Imf RD02J M Other CEA slips (ATWS)
Scenario file atws ALL CRITICAL TASK - Ensure SPTA Reactivity control contingency actions are taken 6 Imf ED02 C On the Trip a Loss of Offsite power occurs ALL 7 (In setup) Imf EG05A C DG A fails to come up to speed requiring the RO to override and attempt to raise speed.
RO/SRO 8 (In setup) Imf mfFW22 C AFA-P01 overspeeds and AFB-P01 trips on an 86 lockout Imf FW21B CO/SRO End CRS enters the FRP to restore power to PBA-S03 from DG B point to allow starting AFN-P01 CRITICAL TASK - Establish a feed source to at least one Steam Generator
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor NUREG-1021, Revision 9 1 of 3
Appendix D Scenario Outline Form ES-D-1 Facility: PVNGS Scenario No.: __3 Op-Test No: 2010 Examiners: Operators:
Initial Conditions: (100% power, MOC).
Turnover: Unit 1 is at 100% power (250 EFPD). Stator Cooling Pump A is tagged out for schedule maintenance.
Event Malf. No. Event Type* Event Description No.
1 None N Shift Charging Pumps to 2-3-1.
RO/SRO 2 Imf I RCBPDT125B fails low requiring the crew to address Tech mfCMTRRX09RCBPDT125B_ Specs and bypass the parameter on the Plant Protection System 4 CO/SRO (TS) 3 (In setup) imf C Loss of PBB-S04 - DG breaker fails to auto close requiring the mfBKEG03PBBS04B_2 crew to enter the Degraded Electrical AOP to manually close RO/SRO the DG breaker (TS) 4 Imf mfEG04 C Main Generator Regulator failure requiring a shift to the DC control CO/SRO 5 Imf cmBKED05NANS02H_5 R Degraded vacuum caused by loss of one cooling tower fans requiring the crew to lower power ALL 6 IMF mfMS01A M Steam Line Leak (ESD) inside containment (Trip Initiator)
ALL 7 Scenario file noMSIS C MSIS fails to automatically initiate requiring the crew to manually initiate the actuation CO/SRO CRITICAL TASK - Ensure MSIS is actuated when the MSIS setpoint has been exceeded.
8 Imf cmCC08SPAP01_5 C Spray Pond A pump fails to auto start requiring the RO to manually start the Spray Pond Pump RO/SRO 9 (In setup) C HPSI A Trips and the B BOP/ESFAS sequencer fails requiring the RO to start all B train pumps Imf mfSI01A RO/SRO CRITICAL TASK - Ensure SI flow when SIAS setpoint has Imf cmCPSI02SIBP02_5 been exceeded 10 Scenario file noDP1SG C SG DP Lockout fails requiring the CO to manually stop feeding the SG that is faulted inside containment.
CO/SRO CRITICAL TASK - Ensure SG isolated when AFAS DP lockout has been exceeded.
End Scenario ends when crew has caught RCS rebound and a HPSI point pump is running
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Supplemental Turnover NUREG-1021, Revision 9 1 of 3
Appendix D Scenario Outline Form ES-D-1 Facility: PVNGS Scenario No.: __4 Op-Test No: 2010 Examiners: Operators:
Initial Conditions: (50% power, MOC).
Turnover: Unit 1 is at 50% power (250 EFPD). Stator Cooling Pump A is tagged out for schedule maintenance.
Event Malf. No. Event Type* Event Description No.
1 None N Shift house loads from the Startup Transformers to the Unit Aux Transformer RO/SRO 2 IMF mfRM01A C RU-29 fails resulting in a CREFAS requiring the crew to address Tech Specs and place CREFAS A in bypass on the CO/SRO BOP/ESFAS Panel (TS) 3 IMF cmTRMC04CTBLT36_4 SRO CST Level transmitter fails low (Tech Spec call only)
(TS) 4 IMF cmTRFW04SGNLT1122_1 I DFWCS level transmitter failure to 53% requiring the crew to place the transmitter in the maintenance mode CO/SRO 5 IMF C Loss of Letdown caused by a failure of the Letdown Heat cmAVCV02CHEPV201P_2 Exchanger temperature controller in auto mode RO/SRO 6 None (initiated by a report from R Control Oil Leak requiring the crew to downpower to remove the field) the Main Turbine from service ALL 7 IMF mfED13C M Loss of NNN-D15 causing a loss of the only running Main Feedwater Pump (Trip Initiator)
ALL 8 In setup (IMF RD03G, H, M C Four CEAs stick out on the trip requiring a boration and N) RO/SRO CRITICAL TASK - Ensure SPTA Reactivity control contingency actions are taken 9 In setup C Failure of the SBCS to respond in automatic (cmCNMS19SGNPIC1010_2 CO/SRO 10 IMF mfED02 C Loss of Offsite Power with a failure of Aux Feed to automatically initiate.
ALL CRITICAL TASK - Establish a feed source to at least one SG End Scenario ends when crew restores feedwater to the SGs and point controls primary plant pressure with Aux Sprays and/or secondary Heat Removal.
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor NUREG-1021, Revision 9 1 of 3