ML101740110

From kanterella
Jump to navigation Jump to search
June 16, 2010 Palo Verde License Renewal - Summary of Fire Protection Conference Calls, Held Between the U.S. Nuclear Regulatory Commission and Arizona Public Service Company, Concerning Draft Request for Additional Information
ML101740110
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/18/2010
From: Lisa Regner
License Renewal Projects Branch 2
To:
Lisa Regner, 415-1906
References
Download: ML101740110 (6)


Text

\.f-",II REGv<., UNITED STATES

<!!~v .....o?' NUCLEAR REGULATORY COMMISSION

g

<<

~

0 WASHINGTON, D.C. 20555-0001

.~

.J October 18,2010 1-" ..,.0~

        • -..

LICENSEE: Arizona Public Service Company FACILITY: Palo Verde Nuclear Generating Station, Units 1, 2, and 3

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JUNE 16,2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (the staff) and representatives of Arizona Public Service Company (the applicant) held a telephone conference call on June 16, 2010, to discuss and clarify the staff's draft request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, license renewal application. The telephone conference call was useful in clarifying the intent of the staff's draft RAI.

Enclosure 1 provides a listing of the participants and Enclosure 2 contains a listing of the draft RAI discussed with the applicant, including a brief description on the status of the items.

The applicant had an opportunity to comment on this s mmary.

Lisa M. Regner, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530

Enclosures:

As stated cc w/encls: Distribution via Listserv

TELEPHONE CONFERENCE CALL PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JUNE 16,2010 PARTICIPANTS AFFILIATIONS Lisa Regner U.S. Nuclear Regulatory Commission (NRC)

Naeem Iqbal NRC Phil Quais NRC Neil O'Keefe NRC Angela Krainik Arizona Public Service Company (APS)

Glenn Michael APS David Crane APS Gregory Cameron APS Rob Roehler APS Eric Blocher Strategic Teaming and Resource Sharing (STARS) Alliance ENCLOSURE 1

DRAFT REQUESTS FOR ADDITIONAL INFORMATION PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION JUNE 16, 2010 The U.S. Nuclear Regulatory Commission (the staff) and representatives of Arizona Public Service Company (APS or the applicant) held a telephone conference call on June 16,2010, to discuss and clarify the following draft request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, license renewal application (LRA).

DRAFT Follow Up RAI 82.1.12

Background:

LRA Section B2.1.12, "Fire Protection," takes exception to the GALL Report regarding visual inspection and functional testing of the halon and carbon dioxide (C02 ) fire suppression systems. The "parameters monitored/inspected" and "detection of aging effects" program elements of the GALL Report Fire Protection program recommend that periodic visual inspection and functional testing should be performed at least once every 6 months to examine for signs of degradation of the halon and CO2 fire suppression systems.

LRA Section B2.1.12 states an exception to the "parameters monitored/inspected" and "detection of aging effects" elements of the fire protection program, which requires visual inspections and functional testing of the halon and CO2 fire suppression systems every 18 months per Technical Requirements Manual Surveillance Requirements.

By letter dated December 7,2009, the applicant submitted an annual update of the LRA, including an amendment to the LRA as required by 10 CFR 54.21 (b) to identify any change to the current licensing basis of the facility that materially affects the contents, including UFSAR supplements. As part of its annual update, APS revised the above exception and stated that halon and CO2 system damper integrity will be validated every 54 months, a change from once every 18 months as defined in the exception in the LRA. While this change applies only to the dampers, the dampers are an integral part of both fire protection systems such that a change to this one inspection and testing aspect constitutes a change to each entire system.

Concern:

The applicant has not adequately justified increasing the visual inspection and functional testing interval to ensure the functioning of these systems though the period of extended operation.

ENCLOSURE 2

-2 Discussion: The applicant understands the staffs concem and has agreed to submit a commitment to follow the current licensing basis at the time of entering the period of extended operation or to follow an 18 month testing frequency.

October 18,2010 LICENSEE: Arizona Public Service Company FACILITY: Palo Verde Nuclear Generating Station, Units 1, 2, and 3

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JUNE 16, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1,2, AND 3, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (the staff) and representatives of Arizona Public Service Company (the applicant) held a telephone conference call on June 16,2010, to discuss and clarify the staff's draft request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, license renewal application. The telephone conference call was useful in clarifying the intent of the staff's draft RAI. provides a listing of the participants and Enclosure 2 contains a listing of the D-RAI discussed with the applicant, including a brief description on the status of the items.

The applicant had an opportunity to comment on this summary.

IRA!

Lisa M. Regner, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530

Enclosures:

As stated ee wieners: Distribution via Listserv DISTRIBUTION:

See next page ADAMS Accession No'.. ML101740110 OFFICE LA: RPOB: DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME YEdmonds LRegner DWrona LRegner 09/29/10 10/4/10 10/15/10 10/18/10 DATE il OFFICIAL RECORD COpy

Memorandum to Arizona Public Service Company from Lisa M. Regner dated October 182010

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JUNE 16,2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1,2, AND 3, LICENSE RENEWAL APPLICATION DISTRIBUTION:

HARDCOPY:

DLR RF E*MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDIrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsOpaMail L. Regner B. Mizuno R. Treadway, RIV G. Pick, RIV