Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML090020015 | 22 December 2008 | Contesting NCV 07200063/2008001-002, Failure to Conduct an Adequate Dry Run | |
L-2008-265, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | 19 December 2008 | 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | |
ML083470058 | 19 December 2008 | Project Manager Assignment | |
SBK-L-08216, Submittal of Changes to Technical Specification Bases | 16 December 2008 | Submittal of Changes to Technical Specification Bases | Stroke time Anticipated operational occurrence Time to boil Tornado Generated Missile Power-Operated Valves Fuel cladding Pressure Boundary Leakage |
SBK-L-08204, CFR 50-55a Request for Alternative Requirements for ASME Class 1 Upper Level Instrumentation Lines on the Pressurizer | 11 December 2008 | CFR 50-55a Request for Alternative Requirements for ASME Class 1 Upper Level Instrumentation Lines on the Pressurizer | High Radiation Area Scaffolding |
ML083400185 | 5 December 2008 | Requalification Program Inspection - (Seabrook Station) | |
IR 05000443/2008502 | 4 December 2008 | IR 05000443-08-502; FPL Energy Seabrook, LLC; 11/3-6/2008; Seabrook Station Unit 1, NRC Evaluated Emergency Preparedness Exercise | |
IR 05000443/2008006 | 3 December 2008 | IR 05000443-08-006 and 07200063-08-001; on 07/07/2008 B 10/22/2008; FPL Energy Seabrook, LLC; Seabrook Station; Spent Fuel Pre-loading Demonstration and Initial Loading | |
ML092930364 | 2 December 2008 | Drawing 1-RH-D20663, Revision 17, Residual Heat Removal Sys. Train B Cross-Tie Detail. | |
IR 05000443/2008007 | 26 November 2008 | IR 05000443-08-007; on 10/20/2008 - 10/23/2008; Seabrook Station; Temporary Instruction 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies. (Letter Only) | B.5.b Mitigating Strategies |
ML083230096 | 20 November 2008 | Draft Request for Additional Information | VT-2 |
ML083230774 | 19 November 2008 | Acceptance of Requested Licensing Action Relief Request for Alternative Depth Sizing Qualification | Dissimilar Metal Weld |
IR 05000443/2008201 | 14 November 2008 | IR 05000443-08-201, 07/24/2008, Seabrook Nuclear Station - Security Inspection. Cover Letter Only | |
IR 05000443/2008004 | 12 November 2008 | IR 05000443-08-004; FPL Energy Seabrook, LLC; on 07-01-08 to 09-30-08; Seabrook Station, Unit No. 1, Integrated Inspection Report | |
SBK-L-08190, Supplement to a Request for Use of an Alternate Depth Sizing Qualification | 12 November 2008 | Supplement to a Request for Use of an Alternate Depth Sizing Qualification | Dissimilar Metal Weld DM weld |
ML082910623 | 5 November 2008 | Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients | |
TAC:MD4379 | 5 November 2008 | ||
ML16117A554 | 3 November 2008 | Updated Final Safety Analysis Report, Revision 12, Chapter 3, Drawings, Part 3 of 3 - Redacted | |
ML091330411 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 3, Design of Structures, Components, Equipment and Systems | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Non-Destructive Examination Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Tornado-Generated Missile Tornado Generated Missile Earthquake Turbine Missile Fuel cladding Liquid penetrant Pressure Boundary Leakage Through-Wall Leakage Power change GOTHIC |
ML091330428 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2A, Onsite Meteorological Data Summaries, November 1971-March 1973 | |
ML091330429 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2B, Onsite Meteorological Data Summaries, April 1979-March 1980 | |
ML091330448 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 3A, Pipe Break Analysis Summary Through Figure 3.F-3 | Safe Shutdown Finite Element Analysis Earthquake |
SBK-L-08172, Evaluation and Comparison to BTP Apcsb 9.5-1, Appendix a Revision 10 - Redacted | 3 November 2008 | Evaluation and Comparison to BTP Apcsb 9.5-1, Appendix a Revision 10 - Redacted | |
ML16195A454 | 3 November 2008 | Updated Final Safety Analysis Report, Revision 12, Chapter 1, Drawings, Part 1 of 6 - Redacted | |
ML16117A559 | 3 November 2008 | Updated Final Safety Analysis Report, Revision 12, Chapter 3, Drawings, Part 2 of 3 - Redacted | |
ML091330435 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Introduction Through Chapter 1, Introduction and General Description of Plant | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Offsite Dose Calculation Manual Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination Emergency Lighting Incorporated by reference Tornado Generated Missile Earthquake Turbine Missile Pressure Boundary Leakage Fire Protection Program Siren |
ML091330430 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2C, Geologic Investigations of the Scotland Road Fault (Clinton - Newbury Fault), Newbury, Massachusetts, and Portsmouth Fault Investigations | |
ML091330431 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2D, Geologic Bedrock Logs of Boring in the Site Area | |
ML091330478 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 4, Reactor | Boric Acid Shutdown Margin Reactor Vessel Water Level Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination Fuel cladding Power change Flow Induced Vibration |
ML091330476 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 5, Reactor Coolant System and Connected Systems | Safe Shutdown Boric Acid Shutdown Margin Non-Destructive Examination Safe Shutdown Earthquake Weld Overlay Hydrostatic Operating Basis Earthquake Nondestructive Examination VT-2 Power-Operated Valves Liquid penetrant Power change Flow Induced Vibration |
ML091330432 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2E, Historical Earthquakes in the Site Vicinity | Earthquake |
ML091330433 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 3, Design of Structures, Components, Equipment and Systems, Figures | Turbine Missile |
ML091330461 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 6, Engineered Safety Features | Safe Shutdown Boric Acid Shutdown Margin Packing leak Ultimate heat sink Stroke time Tornado Missile Safe Shutdown Earthquake Weld Overlay Post Accident Monitoring Hydrostatic Coatings Nondestructive Examination Emergency Lighting Tornado-Generated Missile Design basis earthquake Fuel cladding Liquid penetrant Scaffolding GOTHIC Exclusive Use |
ML091330450 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 3G, Containment Liner Anchor Load Tests and 3H | |
ML16195A404 | 3 November 2008 | Updated Final Safety Analysis Report, Revision 12, Chapter 2, Figures 2.-5-50, Sheet 1 of 2 Through 2.5-71 - Redacted | |
ML091280241 | 3 November 2008 | Seabrook - Rev. 12 to Updated Final Safety Analysis Report, Revision 9 to Appendix R, Fire Protection Safe Shutdown Capability, Revision 10 to Appendix a, Evaluation & Comparison to BTP Apcsb 9.5-1, & Revision 112 to Technical Requirements | Safe Shutdown Temporary Modification Time Critical Operator Action Fire Protection Program |
ML091330542 | 3 November 2008 | Seabrook - Fire Protection of Safe Shutdown Capability (10CFR50, Appendix R, Revision 9 | Hot Short Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Fire Barrier Emergency Lighting B.5.b Thermoset Time Critical Operator Action Fire Protection Program Power change |
ML091330439 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 10, Steam and Power Conversion System | Safe Shutdown Boric Acid Ultimate heat sink Grab sample Offsite Dose Calculation Manual Stroke time Hydrostatic Nondestructive Examination Turbine Missile |
ML16195A375 | 3 November 2008 | Updated Final Safety Analysis Report, Revision 12, Chapter 2, Site Characteristics - Redacted | |
ML091330441 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 12, Radiation Protection | Boric Acid High Radiation Area Grab sample Anticipated operational occurrence Scaffolding |
ML16195A382 | 3 November 2008 | Updated Final Safety Analysis Report, Revision 12, Chapter 2, Site Characteristics, Figures 2.1-1 Through Figure 2.1-32 - Redacted | |
ML091330443 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 13, Conduct of Operations | Safe Shutdown Boric Acid Nondestructive Examination Emergency Lighting License Renewal Fire Protection Program |
ML16195A388 | 3 November 2008 | Updated Final Safety Analysis Report, Revision 12, Chapter 2, Figures 2.-4-1 Through 2.4-32 - Redacted | |
ML091330445 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 15, Accident Analyses | Boric Acid Shutdown Margin Loop seal Stroke time Anticipated operational occurrence Earthquake Fuel cladding Power change Coast down Power Uprate Stretch Power Uprate |
ML091330495 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 11, Drawings | |
ML091330456 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 16, Technical Specifications and Chapter 17, Quality Assurance | Safe Shutdown Boric Acid Offsite Dose Calculation Manual Condition Adverse to Quality |
ML16195A426 | 3 November 2008 | Updated Final Safety Analysis Report, Revision 12, Chapter 8, Electric Power - Redacted | |
ML16195A431 | 3 November 2008 | Updated Final Safety Analysis Report, Revision 12, Chapter 8, Drawings, Part 1 of 3 - Redacted | |
ML091330483 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 7, Drawings | |
ML16195A433 | 3 November 2008 | Updated Final Safety Analysis Report, Revision 12, Chapter 8, Drawings, Part 3 of 3 - Redacted |