Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09002001522 December 2008Contesting NCV 07200063/2008001-002, Failure to Conduct an Adequate Dry Run
L-2008-265, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums19 December 200810 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
ML08347005819 December 2008Project Manager Assignment
SBK-L-08216, Submittal of Changes to Technical Specification Bases16 December 2008Submittal of Changes to Technical Specification BasesStroke time
Anticipated operational occurrence
Time to boil
Tornado Generated Missile
Power-Operated Valves
Fuel cladding
Pressure Boundary Leakage
SBK-L-08204, CFR 50-55a Request for Alternative Requirements for ASME Class 1 Upper Level Instrumentation Lines on the Pressurizer11 December 2008CFR 50-55a Request for Alternative Requirements for ASME Class 1 Upper Level Instrumentation Lines on the PressurizerHigh Radiation Area
Scaffolding
ML0834001855 December 2008Requalification Program Inspection - (Seabrook Station)
IR 05000443/20085024 December 2008IR 05000443-08-502; FPL Energy Seabrook, LLC; 11/3-6/2008; Seabrook Station Unit 1, NRC Evaluated Emergency Preparedness Exercise
IR 05000443/20080063 December 2008IR 05000443-08-006 and 07200063-08-001; on 07/07/2008 B 10/22/2008; FPL Energy Seabrook, LLC; Seabrook Station; Spent Fuel Pre-loading Demonstration and Initial Loading
ML0929303642 December 2008Drawing 1-RH-D20663, Revision 17, Residual Heat Removal Sys. Train B Cross-Tie Detail.
IR 05000443/200800726 November 2008IR 05000443-08-007; on 10/20/2008 - 10/23/2008; Seabrook Station; Temporary Instruction 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies. (Letter Only)B.5.b Mitigating Strategies
ML08323009620 November 2008Draft Request for Additional InformationVT-2
ML08323077419 November 2008Acceptance of Requested Licensing Action Relief Request for Alternative Depth Sizing QualificationDissimilar Metal Weld
IR 05000443/200820114 November 2008IR 05000443-08-201, 07/24/2008, Seabrook Nuclear Station - Security Inspection. Cover Letter Only
IR 05000443/200800412 November 2008IR 05000443-08-004; FPL Energy Seabrook, LLC; on 07-01-08 to 09-30-08; Seabrook Station, Unit No. 1, Integrated Inspection Report
SBK-L-08190, Supplement to a Request for Use of an Alternate Depth Sizing Qualification12 November 2008Supplement to a Request for Use of an Alternate Depth Sizing QualificationDissimilar Metal Weld
DM weld
ML0829106235 November 2008Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients
TAC:MD43795 November 2008
ML16117A5543 November 2008Updated Final Safety Analysis Report, Revision 12, Chapter 3, Drawings, Part 3 of 3 - Redacted
ML0913304113 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 3, Design of Structures, Components, Equipment and SystemsSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Non-Destructive Examination
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Finite Element Analysis
Tornado-Generated Missile
Tornado Generated Missile
Earthquake
Turbine Missile
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Through-Wall Leakage
Power change
GOTHIC
ML0913304283 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2A, Onsite Meteorological Data Summaries, November 1971-March 1973
ML0913304293 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2B, Onsite Meteorological Data Summaries, April 1979-March 1980
ML0913304483 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 3A, Pipe Break Analysis Summary Through Figure 3.F-3Safe Shutdown
Finite Element Analysis
Earthquake
SBK-L-08172, Evaluation and Comparison to BTP Apcsb 9.5-1, Appendix a Revision 10 - Redacted3 November 2008Evaluation and Comparison to BTP Apcsb 9.5-1, Appendix a Revision 10 - Redacted
ML16195A4543 November 2008Updated Final Safety Analysis Report, Revision 12, Chapter 1, Drawings, Part 1 of 6 - Redacted
ML16117A5593 November 2008Updated Final Safety Analysis Report, Revision 12, Chapter 3, Drawings, Part 2 of 3 - Redacted
ML0913304353 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Introduction Through Chapter 1, Introduction and General Description of PlantSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Emergency Lighting
Incorporated by reference
Tornado Generated Missile
Earthquake
Turbine Missile
Pressure Boundary Leakage
Fire Protection Program
Siren
ML0913304303 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2C, Geologic Investigations of the Scotland Road Fault (Clinton - Newbury Fault), Newbury, Massachusetts, and Portsmouth Fault Investigations
ML0913304313 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2D, Geologic Bedrock Logs of Boring in the Site Area
ML0913304783 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 4, ReactorBoric Acid
Shutdown Margin
Reactor Vessel Water Level
Safe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Fuel cladding
Power change
Flow Induced Vibration
ML0913304763 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 5, Reactor Coolant System and Connected SystemsSafe Shutdown
Boric Acid
Shutdown Margin
Non-Destructive Examination
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
VT-2
Power-Operated Valves
Liquid penetrant
Power change
Flow Induced Vibration
ML0913304323 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2E, Historical Earthquakes in the Site VicinityEarthquake
ML0913304333 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 3, Design of Structures, Components, Equipment and Systems, FiguresTurbine Missile
ML0913304613 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 6, Engineered Safety FeaturesSafe Shutdown
Boric Acid
Shutdown Margin
Packing leak
Ultimate heat sink
Stroke time
Tornado Missile
Safe Shutdown Earthquake
Weld Overlay
Post Accident Monitoring
Hydrostatic
Coatings
Nondestructive Examination
Emergency Lighting
Tornado-Generated Missile
Design basis earthquake
Fuel cladding
Liquid penetrant
Scaffolding
GOTHIC
Exclusive Use
ML0913304503 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 3G, Containment Liner Anchor Load Tests and 3H
ML16195A4043 November 2008Updated Final Safety Analysis Report, Revision 12, Chapter 2, Figures 2.-5-50, Sheet 1 of 2 Through 2.5-71 - Redacted
ML0912802413 November 2008Seabrook - Rev. 12 to Updated Final Safety Analysis Report, Revision 9 to Appendix R, Fire Protection Safe Shutdown Capability, Revision 10 to Appendix a, Evaluation & Comparison to BTP Apcsb 9.5-1, & Revision 112 to Technical RequirementsSafe Shutdown
Temporary Modification
Time Critical Operator Action
Fire Protection Program
ML0913305423 November 2008Seabrook - Fire Protection of Safe Shutdown Capability (10CFR50, Appendix R, Revision 9Hot Short
Safe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Fire Barrier
Emergency Lighting
B.5.b
Thermoset
Time Critical Operator Action
Fire Protection Program
Power change
ML0913304393 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 10, Steam and Power Conversion SystemSafe Shutdown
Boric Acid
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Stroke time
Hydrostatic
Nondestructive Examination
Turbine Missile
ML16195A3753 November 2008Updated Final Safety Analysis Report, Revision 12, Chapter 2, Site Characteristics - Redacted
ML0913304413 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 12, Radiation ProtectionBoric Acid
High Radiation Area
Grab sample
Anticipated operational occurrence
Scaffolding
ML16195A3823 November 2008Updated Final Safety Analysis Report, Revision 12, Chapter 2, Site Characteristics, Figures 2.1-1 Through Figure 2.1-32 - Redacted
ML0913304433 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 13, Conduct of OperationsSafe Shutdown
Boric Acid
Nondestructive Examination
Emergency Lighting
License Renewal
Fire Protection Program
ML16195A3883 November 2008Updated Final Safety Analysis Report, Revision 12, Chapter 2, Figures 2.-4-1 Through 2.4-32 - Redacted
ML0913304453 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 15, Accident AnalysesBoric Acid
Shutdown Margin
Loop seal
Stroke time
Anticipated operational occurrence
Earthquake
Fuel cladding
Power change
Coast down
Power Uprate
Stretch Power Uprate
ML0913304953 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 11, Drawings
ML0913304563 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 16, Technical Specifications and Chapter 17, Quality AssuranceSafe Shutdown
Boric Acid
Offsite Dose Calculation Manual
Condition Adverse to Quality
ML16195A4263 November 2008Updated Final Safety Analysis Report, Revision 12, Chapter 8, Electric Power - Redacted
ML16195A4313 November 2008Updated Final Safety Analysis Report, Revision 12, Chapter 8, Drawings, Part 1 of 3 - Redacted
ML0913304833 November 2008Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 7, Drawings
ML16195A4333 November 2008Updated Final Safety Analysis Report, Revision 12, Chapter 8, Drawings, Part 3 of 3 - Redacted