S EABROOK S TATION U PDATED F INAL S AFETY A NALYSIS R EPORT Revision 12
SEABROOK STATION UFSAR Revision 12 LIST OF EFFECTIVE PAGES Page 1 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. CHAPTER 1 Section 1.1 1 12 2 12 3 12 Section 1.2 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 18 12 19 12 20 12 21 12 22 12 Section 1.3 1 8 Section 1.4 1 9 2 9 3 9 Section 1.5 1 8 2 8 3 8 Section 1.6 1 8 Section 1.7 1 9 2 9 Section 1.8 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 18 12 19 12 20 12 21 12 22 12 23 12 24 12 25 12 26 12 27 12 28 12 29 12 30 12 31 12 32 12 33 12 34 12 35 12 36 12 37 12 38 12 39 12 40 12 41 12 42 12 43 12 44 12 45 12 46 12 47 12 48 12 49 12 50 12 51 12 52 12 53 12 54 12 55 12 56 12 57 12 58 12 59 12 60 12 61 12 62 12 63 12 64 12 65 12 66 12 67 12 68 12 69 12 70 12 71 12 72 12 73 12 74 12 Section 1.9 1 11 2 11 3 11 4 11 5 11 6 11 7 11 8 11 9 11 10 11 11 11 12 11 13 11 14 11 15 11 16 11 17 11 18 11 19 11 20 11 21 11 22 11 23 11 24 11 25 11 26 11 27 11 28 11 29 11 30 11 31 11 32 11 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 2 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. Chapter 1 Tables 1.1-1 12 1.3-1 8 1.3-2 10 1.5-1 8 1.5-2 8 1.6-1 10 1.8-1 8 1.8-2 8 Chapter 1 Figures 1.1-1 8 1.1-2 8 1.2-1 12 1.2-2 8 1.2-3 8 1.2-4 8 1.2-5 8 1.2-6 8 1.2-6A 8 1.2-7 8 1.2-8 8 1.2-9 8 1.2-10 8 1.2-11 8 1.2-12 8 1.2-13 8 1.2-14 8 1.2-15 8 1.2-16 8 1.2-17 8 1.2-18 8 1.2-19 8 1.2-20 8 1.2-21 8 1.2-22 8 1.2.23 8 1.2.24 8 1.2.25 8 1.2.26 8 1.2.27 8 1.2.28 8 1.2.29 8 1.2.30 8 1.2.31 8 1.2.32 8 1.2.33 8 1.2.34 8 1.2.35 8 1.2.36 8 1.2.37 8 1.2.38 8 1.2.39 8 1.2.40 8 1.2.41 8 1.2.42 8 1.2.43 8 1.2.44 8 1.2.45 8 1.2.46 8 1.2.47 8 1.2.48 8 1.2.49 8 1.2.50 8 1.2.51 8 1.2.52 8 1.2.53 8 1.2.54 8 1.2.55 8 1.2.56 8 1.2.57 8 1.2.58 8 1.2.59 8 1.8-1 8 CHAPTER 2 Section 2.1 1 10 2 10 3 10 4 10 5 10 6 10 7 10 8 10 9 10 10 10 11 10 12 10 13 10 14 10 15 10 16 10 17 10 18 10 19 10 20 10 21 10 22 10 23 10 24 10 25 10 26 10 27 10 28 10 29 10 30 10 Section 2.2 1 9 2 9 3 9 4 9 5 9 6 9 7 9 8 9 9 9 10 9 11 9 12 9 13 9 14 9 15 9 16 9 17 9 18 9 19 9 20 9 21 9 22 9 23 9 24 9 25 9 26 9 27 9 28 9 29 9 30 9 31 9 32 9 33 9 34 9 35 9 36 9 37 9 38 9 39 9 Section 2.3 1 12 2 12 3 12 4 12 5 12 6 12 7 12 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 3 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 18 12 19 12 20 12 21 12 22 12 23 12 24 12 25 12 26 12 27 12 28 12 29 12 30 12 31 12 32 12 33 12 34 12 35 12 36 12 37 12 38 12 39 12 40 12 41 12 42 12 43 12 44 12 45 12 46 12 47 12 Section 2.4 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 8 10 8 11 8 12 8 13 8 14 8 15 8 16 8 17 8 18 8 19 8 20 8 21 8 22 8 23 8 24 8 25 8 26 8 27 8 28 8 29 8 30 8 31 8 32 8 33 8 34 8 35 8 36 8 37 8 38 8 39 8 40 8 41 8 42 8 43 8 44 8 45 8 46 8 47 8 48 8 49 8 50 8 51 8 52 8 53 8 54 8 55 8 56 8 57 8 Section 2.5 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 8 10 8 11 8 12 8 13 8 14 8 15 8 16 8 17 8 18 8 19 8 20 8 21 8 22 8 23 8 24 8 25 8 26 8 27 8 28 8 29 8 30 8 31 8 32 8 33 8 34 8 35 8 36 8 37 8 38 8 39 8 40 8 41 8 42 8 43 8 44 8 45 8 46 8 47 8 48 8 49 8 50 8 51 8 52 8 53 8 54 8 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 4 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 55 8 56 8 57 8 58 8 59 8 60 8 61 8 62 8 63 8 64 8 65 8 66 8 67 8 68 8 69 8 70 8 71 8 72 8 73 8 74 8 75 8 76 8 77 8 78 8 79 8 80 8 81 8 82 8 83 8 84 8 85 8 86 8 87 8 88 8 89 8 90 8 91 8 92 8 93 8 94 8 95 8 96 8 97 8 98 8 99 8 100 8 101 8 102 8 103 8 104 8 105 8 106 8 107 8 108 8 109 8 110 8 111 8 112 8 113 8 114 8 115 8 116 8 117 8 118 8 119 8 120 8 121 8 122 8 123 8 124 8 125 8 126 8 127 8 128 8 129 8 130 8 131 8 132 8 133 8 134 8 135 8 136 8 137 8 138 8 139 8 140 8 141 8 142 8 143 8 144 8 145 8 146 8 147 8 148 8 149 8 150 8 151 8 152 8 153 8 154 8 155 8 156 8 157 8 158 8 159 8 160 8 161 8 162 8 163 8 164 8 165 8 166 8 167 8 168 8 169 8 170 8 171 8 172 8 173 8 174 8 175 8 176 8 177 8 178 8 179 8 180 8 181 8 182 8 183 8 184 8 185 8 186 8 187 8 188 8 189 8 Chapter 2 Appendices 2A - Historical Only, Not Revised 2B - Historical Only, Not Revised 2C - Historical Only, Not Revised 2D - Historical Only, Not Revised 2E - Historical Only, Not Revised 2F - Historical Only, Not Revised 2G - Historical Only, Not Revised 2H - Historical Only, Not Revised SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 5 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 2I - Historical Only, Not Revised 2J - Historical Only, Not Revised 2K - Historical Only, Not Revised 2L - Historical Only, Not Revised 2M - Historical Only, Not Revised 2N - Historical Only, Not Revised 2O - Historical Only, Not Revised 2P - Historical Only, Not Revised 2Q-1 10 2Q-2 10 2R-1 10 2R-2 10 2R-3 10 Chapter 2 Tables 2.1-1 8 2.1-2 8 2.1-3 8 2.1-4 8 2.1-5 8 2.1-6 8 2.1-7 8 2.1-8 8 2.1-9 8 2.1-10 8 2.1-11 8 2.1-12 8 2.1-13 8 2.1-14 8 2.1-15 8 2.1-16 8 2.1-17 8 2.1-18 8 2.1-19 8 2.1-20 8 2.1-21 8 2.2-1 8 2.2-2 8 2.2-3 8 2.2-4 8 2.2-5 8 2.2-6 8 2.2-7 8 2.2-8 8 2.2-9 8 2.2-10 8 2.2-11 8 2.2-12 8 2.2-13 8 2.2-14 8 2.2-15 8 2.2-16 8 2.2-17 8 2.3-1 8 2.3-2 8 2.3-3 8 2.3-4 8 2.3-5 8 2.3-6 8 2.3-7 8 2.3-8 8 2.3-9 8 2.3-10 8 2.3-11 8 2.3-12 8 2.3-13 8 2.3-14 8 2.3-15 8 2.3-16 8 2.3-17 8 2.3-18 8 2.3-19 8 2.3-20 8 2.3-21 8 2.3-22 8 2.3-23 8 2.3-24 8 2.3-25 8 2.3-26 8 2.3-27 8 2.3-28 8 2.3-29 8 2.3-30 8 2.3-31 8 2.3-32 8 2.3-33 8 2.3-34 8 2.3-35 8 2.3-36 12 2.3-37 8 2.3-38 8 2.3-39 8 2.3-40 8 2.3-41 8 2.3-42 8 2.3-43 8 2.3-44 8 2.3-45 8 2.3-46 8 2.3-47 8 2.3-48 8 2.3-49 8 2.3-50 8 2.3-51 8 2.3-52 8 2.3-53 8 2.3-54 8 2.3-55 8 2.3-56 8 2.3-57 8 2.3-58 8 2.3-59 8 2.3-60 8 2.3-61 8 2.3-62 8 2.4-1 8 2.4-2 8 2.4-3 8 2.4-4 8 2.4-5 8 2.4-6 8 2.4-7 8 2.4-8 8 2.4-9 8 2.4-10 8 2.4-11 8 2.4-12 8 2.4-13 8 2.4-14 8 2.4-15 8 2.4-16 8 2.4-17 8 2.4-18 8 2.4-19 8 2.4-20 8 2.4-21 8 2.4-22 8 2.4-23 8 2.5-1 8 2.5-2 8 2.5-3 8 2.5-4 8 2.5-5 8 2.5-6 8 2.5-7 8 2.5-8 8 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 6 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 2.5-9 8 2.5-10 8 2.5-11 8 2.5-12 8 2.5-13 8 2.5-14 8 2.5-15 8 2.5-16 8 2.5-17 8 2.5-18 8 2.5-19 8 2.5-20 8 2.5-21 8 2R-1 10 2R-2 10 2R-3 10 Chapter 2 Figures 2.1-1 8 2.1-2 8 2.1-3 8 2.1-4 12 2.1-5 12 2.1-6 8 2.1-7 8 2.1-8 8 2.1-9 8 2.1-10 8 2.1-11 8 2.1-12 8 2.1-13 8 2.1-14 8 2.1-15 8 2.1-16 8 2.1-17 8 2.1-18 8 2.1-19 8 2.1-20 8 2.1-21 8 2.1-22 8 2.1-23 8 2.1-24 8 2.1-25 8 2.1-26 8 2.1-27 8 2.1-28 8 2.1-29 8 2.1-30 8 2.1-31 8 2.1-32 8 2.2-1 8 2.2-2 9 2.2-3 8 2.2-4 8 2.2-5 9 2.2-6 8 2.2-7 8 2.2-8 8 2.2-9 8 2.2-10 8 2.2-11 8 2.2-12 8 2.2-13 8 2.2-14 8 2.2-15 8 2.3-1 8 2.3-2 8 2.3-3 8 2.3-4 8 2.3-5 8 2.3-6 8 2.3-7 8 2.3-8 8 2.3-9 8 2.3-10 8 2.3-11 8 2.4-1 12 2.4-2 8 2.4-3 8 2.4-4 8 2.4-5 8 2.4-6 8 2.4-7 8 2.4-8 8 2.4-9 8 2.4-10 8 2.4-11 8 2.4-12 8 2.4-13 8 2.4-14 8 2.4-15 8 2.4-16 8 2.4-17 8 2.4-18 8 2.4-19 8 2.4-20 8 2.4-21 8 2.4-22 8 2.4-23 8 2.4-24 8 2.4-25 8 2.4-26 8 2.4-27 8 2.4-28 8 2.4-29 8 2.4-30 8 2.4-31 8 2.4-32 8 2.5-1 8 2.5-2 8 2.5-3 8 2.5-4 8 2.5-5 8 2.5-6 8 2.5-7 8 2.5-8 8 2.5-9 8 2.5-10 8 2.5-11 8 2.5-12 8 2.5-13 8 2.5-14 8 2.5-15 8 2.5-16 8 2.5-17 8 2.5-18 8 2.5-19 8 2.5-20 8 2.5-21 8 2.5-22 8 2.5-23 8 2.5-24 8 2.5-25 8 2.5-26 8 2.5-27 8 2.5-28 8 2.5-29 8 2.5-30 8 2.5-31 8 2.5-32 8 2.5-33 8 2.5-34 8 2.5-35 8 2.5-36 8 2.5-37 8 2.5-38 8 2.5-39 8 2.5-40 8 2.5-41 8 2.5-42 8 2.5-43 8 2.5-44 8 2.5-45 8 2.5-46 8 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 7 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 2.5-47 8 2.5-48 8 2.5-49 8 2.5-50 8 2.5-51 8 2.5-52 8 2.5-53 8 2.5-54 8 2.5-55 8 2.5-56 8 2.5-57 8 2.5-58 8 2.5-59 8 2.5-60 8 2.5-61 8 2.5-62 8 2.5-63 8 2.5-64 8 2.5-65 8 2.5-66 8 2.5-67 8 2.5-68 8 2.5-69 8 2.5-70 8 2.5-71 8 CHAPTER 3 Section 3.1 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 18 12 19 12 20 12 21 12 22 12 23 12 24 12 25 12 26 12 27 12 28 12 29 12 30 12 31 12 32 12 33 12 34 12 35 12 36 12 37 12 Section 3.2 1 8 2 8 3 8 4 8 Section 3.3 1 8 2 8 3 8 4 8 5 8 6 8 7 8 Section 3.4 1 12 2 12 3 12 Section 3.5 1 10 2 10 3 10 4 10 5 10 6 10 7 10 8 10 9 10 10 10 11 10 12 10 13 10 14 10 15 10 16 10 17 10 18 10 19 10 20 10 21 10 22 10 23 10 24 10 25 10 26 10 27 10 28 10 29 10 30 10 31 10 32 10 33 10 34 10 35 10 36 10 37 10 38 10 Section 3.6(B) 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 8 10 8 11 8 12 8 13 8 14 8 15 8 16 8 17 8 18 8 19 8 20 8 21 8 22 8 23 8 24 8 25 8 26 8 Section 3.6(N) 1 10 2 10 3 10 4 10 5 10 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 8 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 6 10 7 10 8 10 9 10 Section 3.7(B) 1 11 2 11 3 11 4 11 5 11 6 11 7 11 8 11 9 11 10 11 11 11 12 11 13 11 14 11 15 11 16 11 17 11 18 11 19 11 20 11 21 11 22 11 23 11 24 11 25 11 26 11 27 11 28 11 Section 3.7(N) 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 8 10 8 11 8 12 8 13 8 14 8 15 8 16 8 17 8 18 8 19 8 20 8 21 8 22 8 23 8 24 8 Section 3.8 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 18 12 19 12 20 12 21 12 22 12 23 12 24 12 25 12 26 12 27 12 28 12 29 12 30 12 31 12 32 12 33 12 34 12 35 12 36 12 37 12 38 12 39 12 40 12 41 12 42 12 43 12 44 12 45 12 46 12 47 12 48 12 49 12 50 12 51 12 52 12 53 12 54 12 55 12 56 12 57 12 58 12 59 12 60 12 61 12 62 12 63 12 64 12 65 12 66 12 67 12 68 12 69 12 70 12 71 12 72 12 73 12 74 12 75 12 76 12 77 12 78 12 79 12 80 12 81 12 82 12 83 12 84 12 85 12 86 12 87 12 88 12 89 12 90 12 91 12 92 12 93 12 94 12 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 9 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 95 12 96 12 97 12 98 12 99 12 100 12 101 12 102 12 103 12 104 12 105 12 106 12 107 12 108 12 109 12 110 12 111 12 112 12 113 12 114 12 115 12 116 12 117 12 118 12 119 12 120 12 121 12 122 12 123 12 124 12 125 12 126 12 127 12 128 12 129 12 130 12 131 12 132 12 133 12 134 12 135 12 136 12 137 12 138 12 139 12 140 12 141 12 142 12 143 12 144 12 145 12 146 12 147 12 148 12 149 12 150 12 151 12 152 12 153 12 154 12 155 12 156 12 157 12 158 12 Section 3.9(B) 1 9 2 9 3 9 4 9 5 9 6 9 7 9 8 9 9 9 10 9 11 9 12 9 13 9 14 9 15 9 16 9 17 9 18 9 19 9 20 9 21 9 22 9 23 9 24 9 25 9 26 9 27 9 28 9 29 9 30 9 31 9 32 9 33 9 34 9 35 9 36 9 37 9 38 9 39 9 40 9 41 9 42 9 43 9 44 9 45 9 46 9 47 9 48 9 49 9 50 9 51 9 52 9 Section 3.9(N) 1 10 2 10 3 10 4 10 5 10 6 10 7 10 8 10 9 10 10 10 11 10 12 10 13 10 14 10 15 10 16 10 17 10 18 10 19 10 20 10 21 10 22 10 23 10 24 10 25 10 26 10 27 10 28 10 29 10 30 10 31 10 32 10 33 10 34 10 35 10 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 10 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 36 10 37 10 38 10 39 10 40 10 41 10 42 10 43 10 44 10 45 10 46 10 47 10 48 10 49 10 50 10 51 10 52 10 53 10 54 10 55 10 56 10 57 10 58 10 59 10 60 10 61 10 62 10 63 10 64 10 65 10 66 10 67 10 68 10 69 10 70 10 71 10 72 10 73 10 74 10 75 10 76 10 77 10 78 10 79 10 80 10 81 10 82 10 83 10 84 10 85 10 86 10 87 10 88 10 89 10 90 10 91 10 92 10 Section 3.10(B) 1 8 2 8 3 8 4 8 5 8 Section 3.10(N) 1 8 2 8 3 8 4 8 5 8 Section 3.11 1 10 2 10 3 10 4 10 5 10 6 10 7 10 Chapter 3 Appendices 3A 3A-1 12 3A-2 12 3A-3 12 3A-4 12 3A-5 12 3A-6 12 3B 3B-1 8 3C - Historical Only, Not Revised 3D - Historical Only, Not Revised 3E - Historical Only, Not Revised 3F - Historical Only, Not Revised 3G - Historical Only, Not Revised 3H 3H-1 8 3I - Historical Only, Not Revised Chapter 3 Tables 3.2-1 12 3.2-2 8 3.2-3 8 3.2-4 8 3.3-1 8 3.3-2 8 3.3-3 8 3.3-4 8 3.5-1 8 3.5-2 8 3.5-3 8 3.5-4 8 3.5-5 8 3.5-6 8 3.5-7 8 3.5-8 8 3.5-9 10 3.5-10 10 3.5-11 8 3.5-12 8 3.5-13 8 3.6(B)-1 8 3.6(B)-2 10 3.6(N)-1 8 3.7(B)-1 8 3.7(B)-2 8 3.7(B)-3 8 3.7(B)-4 8 3.7(B)-5 8 3.7(B)-6 8 3.7(B)-7 8 3.7(B)-8 8 3.7(B)-9 8 3.7(B)-10 8 3.7(B)-11 8 3.7(B)-12 8 3.7(B)-13 8 3.7(B)-14 8 3.7(B)-15 8 3.7(B)-16 8 3.7(B)-17 8 3.7(B)-18 8 3.7(B)-19 8 3.7(B)-20 8 3.7(B)-21 8 3.7(B)-22 8 3.7(B)-23 8 3.7(B)-24 8 3.7(N)-1 8 3.8-1 8 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 11 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 3.8-2 8 3.8-3 8 3.8-4 8 3.8-5 8 3.8-6 8 3.8-7 8 3.8-8 8 3.8-9 8 3.8-10 8 3.8-11 8 3.8-12 8 3.8-13 8 3.8-14 8 3.8-15 8 3.8-16 8 3.8-17 8 3.9(B)-1 8 3.9(B)-2 8 3.9(B)-3 8 3.9(B)-4 8 3.9(B)-5 8 3.9(B)-6 8 3.9(B)-7 8 3.9(B)-8 8 3.9(B)-9 8 3.9(B)-10 8 3.9(B)-11 8 3.9(B)-12 8 3.9(B)-13 8 3.9(B)-14 8 3.9(B)-15 8 3.9(B)-16 8 3.9(B)-17 9 3.9(B)-18 8 3.9(B)-19 8 3.9(B)-20 8 3.9(B)-21 8 3.9(B)-22 8 3.9(B)-23 8 3.9(B)-24 8 3.9(B)-25 8 3.9(B)-26 9 3.9(B)-27 12 3.9(B)-28 9 3.9(B)-29 9 3.9(N)-1 10 3.9(N)-2 8 3.9(N)-3 8 3.9(N)-4 8 3.9(N)-5 8 3.9(N)-6 8 3.9(N)-7 8 3.9(N)-8 8 3.9(N)-9 8 3.9(N)-10 8 3.9(N)-11 9 3.9(N)-12 8 3.10(B)-1 8 3.10(N)-1 8 Chapter 3 Figures 3.3-1 8 3.3-2 8 3.4-1 8 3.5-1 8 3.5-2 8 3.5-3 8 3.5-4 8 3.5-5 8 3.6(B)-1 8 3.6(B)-2 8 3.6(B)-3 8 3.6(B)-4 8 3.6(B)-5 8 3.6(B)-6 8 3.6(B)-7 8 3.6(B)-8 8 3.6(B)-9 8 3.6(B)-10 8 3.6(B)-11 8 3.6(B)-12 8 3.6(B)-13 8 3.6(B)-14 8 3.6(B)-15 8 3.6(B)-16 8 3.6(B)-17 8 3.6(B)-18 8 3.6(B)-19 8 3.6(B)-20 8 3.6(B)-21 8 3.6(B)-22 8 3.6(B)-23 8 3.6(B)-24 8 3.6(B)-25 8 3.6(B)-26 8 3.6(B)-27 8 3.6(B)-28 8 3.6(B)-29 8 3.6(B)-30 8 3.6(B)-31 8 3.6(B)-32 8 3.6(B)-33 8 3.6(B)-34 8 3.6(N)-1 8 3.6(N)-2 8 3.7(B)-1 8 3.7(B)-2 8 3.7(B)-3 8 3.7(B)-4 8 3.7(B)-5 8 3.7(B)-6 8 3.7(B)-7 8 3.7(B)-8 8 3.7(B)-9 8 3.7(B)-10 8 3.7(B)-11 8 3.7(B)-12 8 3.7(B)-13 8 3.7(B)-14 8 3.7(B)-15 8 3.7(B)-16 8 3.7(B)-17 8 3.7(B)-18 8 3.7(B)-19 8 3.7(B)-20 8 3.7(B)-21 8 3.7(B)-22 8 3.7(B)-23 8 3.7(B)-24 8 3.7(B)-25 8 3.7(B)-26 8 3.7(B)-27 8 3.7(B)-28 8 3.7(B)-29 8 3.7(B)-30 8 3.7(B)-31 8 3.7(B)-32 8 3.7(B)-33 8 3.7(B)-34 8 3.7(B)-35 8 3.7(B)-36 8 3.7(B)-37 8 3.7(B)-38 8 3.7(N)-1 8 3.8-1 8 3.8-2 8 3.8-3 8 3.8-4 8 3.8-5 8 3.8-6 8 3.8-7 8 3.8-8 8 3.8-9 8 3.8-10 8 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 12 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 3.8-11 8 3.8-12 8 3.8-13 8 3.8-14 8 3.8-15 8 3.8-16 8 3.8-17 8 3.8-18 8 3.8-19 8 3.8-20 8 3.8-21 8 3.8-22 8 3.8-23 8 3.8-24 8 3.8-25 8 3.8-26 8 3.8-27 8 3.8-28 8 3.8-29 8 3.8-30 8 3.8-31 8 3.8-32 8 3.8-33 8 3.8-34 8 3.8-35 8 3.8-36 8 3.8-37 8 3.9(N)-1 8 3.9(N)-2 8 3.9(N)-3 8 3.9(N)-4 8 3.9(N)-5 8 3.9(N)-6 8 3.9(N)-7 8 3.9(N)-8 8 3.9(N)-9 8 3.11-1 9 3A-1 8 3A-2 8 3A-3 8 CHAPTER 4 Section 4.1 1 10 2 10 3 10 Section 4.2 1 10 2 10 3 10 4 10 5 10 6 10 7 10 8 10 9 10 10 10 11 10 12 10 13 10 14 10 15 10 16 10 17 10 18 10 19 10 20 10 21 10 22 10 23 10 24 10 25 10 26 10 27 10 28 10 29 10 30 10 31 10 32 10 33 10 34 10 35 10 36 10 37 10 38 10 39 10 Section 4.3 1 10 2 10 3 10 4 10 5 10 6 10 7 10 8 10 9 10 10 10 11 10 12 10 13 10 14 10 15 10 16 10 17 10 18 10 19 10 20 10 21 10 22 10 23 10 24 10 25 10 26 10 27 10 28 10 29 10 30 10 31 10 32 10 33 10 34 10 35 10 36 10 37 10 38 10 39 10 40 10 41 10 Section 4.4 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 18 12 19 12 20 12 21 12 22 12 23 12 24 12 25 12 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 13 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 26 12 27 12 28 12 29 12 30 12 31 12 32 12 33 12 34 12 35 12 36 12 37 12 38 12 39 12 40 12 41 12 42 12 43 12 44 12 45 12 46 12 47 12 Section 4.5 1 8 2 8 Section 4.6 1 8 2 8 3 8 Chapter 4 Tables 4.1-1 8 4.1-2 10 4.1-3 8 4.3-1 10 4.3-2 10 4.3-3 8 4.3-4 8 4.3-5 10 4.3.6 8 4.3.7 8 4.3.8 8 4.3.9 8 4.3.10 8 4.4-1 10 4.4-2 10 Chapter 4 Figures 4.2-1 8 4.2-2 8 4.2-2A 8 4.2-2B 8 4.2-3 9 4.2-3A 8 4.2-3B 11 4.2-4 8 4.2-5 8 4.2-6 8 4.2-6A 8 4.2-6B 8 4.2-7 8 4.2-8 8 4.2-9 8 4.2-9A 8 4.2-9B 8 4.2-10 8 4.2-10A 8 4.2-10B 8 4.2-11 8 4.2-12 8 4.2-13 8 4.2-14 8 4.2-14A 8 4.2-14B D 4.2-15 8 4.3-1 8 4.3-2 8 4.3-3 8 4.3-4 8 4.3-5 8 4.3-6 8 4.3-7 8 4.3-8 8 4.3-9 8 4.3-10 8 4.3-11 8 4.3-12 8 4.3-13 8 4.3-14 8 4.3-15 8 4.3-16 8 4.3-17 8 4.3-18 D 4.3-19 D 4.3-20 D 4.3-21 8 4.3-22 8 4.3-23 8 4.3-24 8 4.3-25 8 4.3-26 8 4.3-27 8 4.3-28 8 4.3-29 8 4.3-30 8 4.3-31 8 4.3-32 8 4.3-33 8 4.3-34 8 4.3-35 8 4.3-36 8 4.3-37 8 4.3-38 8 4.3-39 8 4.3-40 8 4.3-41 8 4.3-42 8 4.3-43 8 4.3-44 D 4.3-45 D 4.4-1 8 4.4-2 8 4.4-3 8 4.4-4 8 4.4-5 D 4.4-6 8 4.4-7 8 4.4-8 D 4.4-9 D 4.4-10 D 4.4-11 D 4.4-12 D CHAPTER 5 Section 5.1 1 10 2 10 3 10 4 10 5 10 6 10 Section 5.2 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 14 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 15 12 16 12 17 12 18 12 19 12 20 12 21 12 22 12 23 12 24 12 25 12 26 12 27 12 28 12 29 12 30 12 31 12 32 12 33 12 34 12 35 12 36 12 37 12 38 12 39 12 Section 5.3 1 11 2 11 3 11 4 11 5 11 6 11 7 11 8 11 9 11 10 11 11 11 12 11 13 11 14 11 15 11 16 11 17 11 18 11 19 11 20 11 Section 5.4 1 11 2 11 3 11 4 11 5 11 6 11 7 11 8 11 9 11 10 11 11 11 12 11 13 11 14 11 15 11 16 11 17 11 18 11 19 11 20 11 21 11 22 11 23 11 24 11 25 11 26 11 27 11 28 11 29 11 30 11 31 11 32 11 33 11 34 11 35 11 36 11 37 11 38 11 39 11 40 11 41 11 42 11 43 11 44 11 45 11 46 11 47 11 48 11 49 11 50 11 51 11 52 11 53 11 54 11 55 11 56 11 57 11 58 11 59 11 60 11 61 11 62 11 63 11 64 11 65 11 66 11 67 11 68 11 69 11 70 11 71 11 72 11 73 11 Chapter 5 Tables 5.1-1 12 5.2-1 8 5.2-2 12 5.2-3 8 5.2-4 8 5.2.5 8 5.2-6 8 5.2-7 8 5.2-8 8 5.3-1 8 5.3-2 8 5.3-3 11 5.3-4 8 5.3-5 11 5.3-6 11 5.4-1 10 5.4-2 8 5.4-3 10 5.4-4 8 5.4-5 8 5.4-6 8 5.4-7 10 5.4-8 8 5.4-9 8 5.4-10 8 5.4-11 8 5.4-12 8 5.4-13 8 5.4-14 8 5.4-15 8 5.4-16 8 5.4-17 9 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 15 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. Chapter 5 Figures 5.1-1 8 5.1-2 11 5.1-3 11 5.1-4 11 5.1-5 8 5.2-1 8 5.2-2 11 5.3-1 8 5.4-1 8 5.4-2 8 5.4-3 8 5.4-4 8 5.4-5 8 5.4-6 8 5.4-7 8 5.4-8 8 5.4-9 8 5.4-10 11 5.4-11 8 5.4-12 8 5.4-13 8 5.4-14 8 5.4-15 8 5.4-16 8 5.4-17 8 5.4-18 8 5.4-19 8 CHAPTER 6 Section 6.1(B) 1 8 2 8 3 8 Section 6.1(N) 1 8 2 8 3 8 Section 6.2 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 18 12 19 12 20 12 21 12 22 12 23 12 24 12 25 12 26 12 27 12 28 12 29 12 30 12 31 12 32 12 33 12 34 12 35 12 36 12 37 12 38 12 39 12 40 12 41 12 42 12 43 12 44 12 45 12 46 12 47 12 48 12 49 12 50 12 51 12 52 12 53 12 54 12 55 12 56 12 57 12 58 12 59 12 60 12 61 12 62 12 63 12 64 12 65 12 66 12 67 12 68 12 69 12 70 12 71 12 72 12 73 12 74 12 75 12 76 12 77 12 78 12 79 12 80 12 81 12 82 12 83 12 84 12 85 12 86 12 87 12 88 12 89 12 90 12 91 12 92 12 93 12 94 12 95 12 96 12 97 12 98 12 Section 6.3 1 11 2 11 3 11 4 11 5 11 6 11 7 11 9 11 10 11 11 11 12 11 13 11 14 11 15 11 16 11 17 11 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 16 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 18 11 19 11 20 11 21 11 22 11 23 11 24 11 25 11 26 11 27 11 28 11 29 11 30 11 31 11 32 11 33 11 34 11 35 11 36 11 37 11 38 11 Section 6.4 1 10 2 10 3 10 4 10 5 10 6 10 7 10 8 10 9 10 10 10 11 10 12 10 13 10 14 10 15 10 16 10 17 10 18 10 Section 6.5 1 10 2 10 3 10 4 10 5 10 6 10 7 10 8 10 9 10 10 10 11 10 12 10 13 10 14 10 15 10 16 10 17 10 18 10 19 10 20 10 21 10 22 10 23 10 Section 6.6 1 9 2 9 3 9 4 9 Section 6.7 1 8 Section 6.8 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 Appendix 6A 6A-1 8 6A-2 8 6A-3 8 6A-4 8 Chapter 6 Tables 6.1(B)-1 8 6.1(B)-2 8 6.1(B)-3 8 6.1(B)-4 8 6.1(N)-1 8 6.1(N)-2 8 6.2-1 8 6.2-2 8 6.2-3 8 6.2-4 10 6.2-5 8 6.2-6 8 6.2-7 8 6.2-8 10 6.2-9 10 6.2-10 8 6.2-11 8 6.2-12 9 6.2-13 10 6.2-14 10 6.2-15 10 6.2-16 8 6.2-17 8 6.2-18 8 6.2-19 8 6.2-20 8 6.2-21 8 6.2-22 8 6.2-23 8 6.2-24 8 6.2-25 8 6.2-26 8 6.2-27 8 6.2-28 8 6.2-29 8 6.2-30 8 6.2-31 8 6.2-32 8 6.2-33 8 6.2-34 8 6.2-35 8 6.2-36 8 6.2-37 10 6.2-38 10 6.2-39 10 6.2-40 10 6.2-41 10 6.2-42 10 6.2-43 10 6.2-44 10 6.2-45 10 6.2-46 10 6.2-47 10 6.2-48 10 6.2-49 10 6.2-50 10 6.2-51 10 6.2-52 10 6.2-53 10 6.2-54 10 6.2-55 10 6.2-56 10 6.2-57 10 6.2-58 10 6.2-59 10 6.2-60 10 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 17 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 6.2-61 10 6.2-62 10 6.2-63 10 6.2-64 10 6.2-65 10 6.2-66 10 6.2-67 10 6.2-68 10 6.2-69 10 6.2-69a 10 6.2-69b 10 6.2-70 8 6.2-71 8 6.2-72 8 6.2-73 8 6.2-74 8 6.2-75 12 6.2-76 8 6.2-77 12 6.2-78 12 6.2-79 12 6.2-80 8 6.2-81 8 6.2-82 10 6.2-83 12 6.2-84 8 6.2-85 8 6.2-86 8 6.2-87 12 6.2-88 11 6.2-89 10 6.2-90 8 6.2-91 8 6.2-92 8 6.3-1 12 6.3-2 8 6.3-3 8 6.3-4 8 6.3-5 8 6.3-6 8 6.3-7 10 6.3-8 8 6.3-9 10 6.3-10 8 6.4-1 10 6.5-1 8 6.5-2 8 6.5-3 8 6.5-4 8 6.5-5 8 6.5-6 8 6.5-7 8 6.5-8 8 6.8-1 8 6.8-2 8 Chapter 6 Figures 6.2-1 8 6.2-2 8 6.2-3 8 6.2-4 8 6.2-5 8 6.2-6 8 6.2-7 8 6.2-8 8 6.2-9 8 6.2-10 8 6.2-11 8 6.2-12 8 6.2-13 8 6.2-14 8 6.2-15 8 6.2-16 8 6.2-17 8 6.2-18 8 6.2-19 8 6.2-20 8 6.2-21 8 6.2-22 8 6.2-23 8 6.2-24 8 6.2-25 8 6.2-26 8 6.2-27 8 6.2-28 8 6.2-29 8 6.2-30 8 6.2-31 8 6.2-32 8 6.2-33 8 6.2-34 8 6.2-35 8 6.2-36 8 6.2-37 8 6.2-38 8 6.2-39 8 6.2-40 8 6.2-41 8 6.2-42 8 6.2-54 8 6.2-55 8 6.2-56 8 6.2-57 8 6.2-58 8 6.2-59 8 6.2-60 8 6.2-69 8 6.2-70 8 6.2-71 8 6.2-72 8 6.2-73 8 6.2-74 11 6.2-75 8 6.2-76 8 6.2-77 8 6.2-78 12 6.2-79 12 6.2-80 8 6.2-81 8 6.2-82 8 6.2-83 8 6.2-84 8 6.2-85 8 6.2-86 8 6.2-87 8 6.2-88 8 6.2-89 10 6.2-90 8 6.2-91 9 6.2-92 8 6.2-93 9 6.2-94 8 6.2-95 8 6.2-96 8 6.2-97 8 6.3-1 8 6.3-2 8 6.3-3 11 6.3-4 11 6.3-5 8 6.3-6 8 6.3-7 8 6.3-8 8 6.3-9 8 6.3-10 8 6.4-1 8 6.4-2 8 6.5-1 9 6.5-2 9 6.5-3 9 6.8-1 11 6.8-2 9 6.8-3 8 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 18 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. CHAPTER 7 Section 7.1 1 11 2 11 3 11 4 11 5 11 6 11 7 11 8 11 9 11 10 11 11 11 12 11 13 11 14 11 15 11 16 11 17 11 18 11 19 11 20 11 21 11 22 11 23 11 24 11 25 11 26 11 27 11 28 11 29 11 30 11 31 11 32 11 33 11 34 11 Section 7.2 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 18 12 19 12 20 12 21 12 22 12 23 12 24 12 25 12 26 12 27 12 28 12 29 12 30 12 31 12 32 12 33 12 34 12 35 12 36 12 37 12 38 12 39 12 40 12 41 12 42 12 Section 7.3 1 9 2 9 3 9 4 9 5 9 6 9 7 9 8 9 9 9 10 9 11 9 12 9 13 9 14 9 15 9 16 9 17 9 18 9 19 9 20 9 21 9 22 9 23 9 24 9 25 9 26 9 27 9 28 9 29 9 30 9 31 9 Section 7.4 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 Section 7.5 1 9 2 9 3 9 4 9 5 9 6 9 7 9 8 9 9 9 10 9 11 9 12 9 Section 7.6 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 Section 7.7 1 12 2 12 3 12 4 12 5 12 6 12 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 19 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 18 12 19 12 20 12 21 12 22 12 23 12 24 12 25 12 26 12 27 12 28 12 29 12 Appendix 7A 7A-1 10 7A-2 10 7A-3 10 7A-4 10 7A-5 10 7A-6 10 7A-7 10 7A-8 10 7A-9 10 7A-10 10 7A-11 10 7A-12 10 7A-13 10 7A-14 10 7A-15 10 7A-16 10 7A-17 10 7A-18 10 7A-19 10 7A-20 10 7A-21 10 7A-22 10 7A-23 10 7A-24 10 7A-25 10 7A-26 10 7A-27 10 7A-28 10 7A-29 10 7A-30 10 7A-31 10 7A-32 10 Chapter 7 Tables 7.1-1 8 7.2-1 9 7.2-2 8 7.2-3 10 7.2-4 9 7.3-1 8 7.3-2 8 7.4-1 12 7.5-1 10 7.5-2 10 7.7-1 12 7.7-2 8 Chapter 7 Figures 7.1-1 8 7.1-2 8 7.2-1 8 7.2-2 8 7.2-3 9 7.2-4 8 7.2-5 12 7.2-6 8 7.2-7 8 7.2-8 8 7.2-9 11 7.2-10 8 7.2-11 9 7.2-12 8 7.2-13 8 7.2-14 8 7.2-15 12 7.2-16 8 7.3-1 8 7.3-2 8 7.6-1 8 7.6-2 8 7.6-3 8 7.6-4 8 7.6-5 8 7.6-6 8 7.6-7 8 7.7-1 8 7.7-2 12 7.7-3 8 7.7-4 8 7.7-5 8 7.7-6 8 7.7-7 12 7.7-8 8 7.7-9 8 7.7-10 D 7.7-11 D 7.7-12 D 7.7-13 D 7.7-14 8 7.7-15 9 CHAPTER 8 Section 8.1 1 11 2 11 3 11 4 11 5 11 6 11 7 11 8 11 9 11 10 11 11 11 12 11 13 11 14 11 15 11 16 11 17 11 18 11 19 11 20 11 21 11 Section 8.2 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 20 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 18 12 19 12 20 12 21 12 22 12 23 12 24 12 Section 8.3 1 10 2 10 3 10 4 10 5 10 6 10 7 10 8 10 9 10 10 10 11 10 12 10 13 10 14 10 15 10 16 10 17 10 18 10 19 10 20 10 21 10 22 10 23 10 24 10 25 10 26 10 27 10 28 10 29 10 30 10 31 10 32 10 33 10 34 10 35 10 36 10 37 10 38 10 39 10 40 10 41 10 42 10 43 10 44 10 45 10 46 10 47 10 48 10 49 10 50 10 51 10 52 10 53 10 54 10 55 10 56 10 57 10 58 10 59 10 60 10 61 10 62 10 63 10 64 10 65 10 66 10 67 10 68 10 69 10 70 10 71 10 72 10 73 10 74 10 75 10 76 10 77 10 78 10 79 10 Section 8.4 1 10 2 10 3 10 Appendix 8A 8A-1 8 8A-2 8 8A-3 8 8A-4 8 8A-5 8 8A-6 8 8A-7 8 8A-8 8 Chapter 8 Tables 8.1-1 8 8.2-1 11 8.3-1 12 8.3-2 12 8.3-3 10 8.3-4 8 8.3-5 10 8.3-6 8 8.3-7 8 8.3-8 8 8.3-9 8 8.3-10 8 Chapter 8 Figures 8.1-1 11 8.2-1 8 8.2-2 8 8.2-3 8 8.2-4 8 8.2-5 8 8.2-6 8 8.2-7 8 8.2-8 8 8.2-9 8 8.2-10 8 8.2-11 9 8.3-1 11 8.3-2 8 8.3-3 8 8.3-4 8 8.3-5 8 8.3-6 8 8.3-7 11 8.3-8 9 8.3-9 8 8.3-10 9 8.3-11 8 8.3-12 8 8.3-13 8 8.3-14 8 8.3-15 8 8.3-16 11 8.3-17 11 8.3-18 8 8.3-19 8 8.3-20 11 8.3-21 8 8.3-22 11 8.3-23 8 8.3-24 8 8.3-25 11 8.3-26 8 8.3-27 8 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 21 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 8.3-28 8 8.3-29 8 8.3-30 8 8.3-31 8 8.3-32 8 8.3-33 8 8.3-34 8 8.3-35 8 8.3-36 8 8.3-37 8 8.3-38 8 8.3-39 8 8.3-40 11 8.3-41 8 8.3-42 8 8.3-43 8 8.3-44 8 8.3-45 8 8.3-46 8 8.3-47 8 8.3-48 8 8.3-49 8 8.3-50 8 8.3-51 8 8.3-52 11 8.3-53 8 8.3-54 9 8.3-55 8 8.3-56 8 8.3-57 8 8.3-58 8 8.3-59 8 8.3-60 11 8.3-61 8 8A-4.0 8 8A-5.1 8 8A-5.2 8 8A-5.3 8 8A-5.4 8 CHAPTER 9 Section 9.1 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 18 12 19 12 20 12 21 12 22 12 23 12 24 12 25 12 26 12 27 12 28 12 29 12 30 12 31 12 32 12 33 12 34 12 35 12 36 12 37 12 38 12 39 12 40 12 41 12 42 12 43 12 44 12 45 12 46 12 47 12 48 12 49 12 50 12 51 12 52 12 53 12 54 12 55 12 56 12 57 12 58 12 Section 9.2 1 11 2 11 3 11 4 11 5 11 6 11 7 11 8 11 9 11 10 11 11 11 12 11 13 11 14 11 15 11 16 11 17 11 18 11 19 11 20 11 21 11 22 11 23 11 24 11 25 11 26 11 27 11 28 11 29 11 30 11 31 11 32 11 33 11 34 11 35 11 36 11 37 11 38 11 39 11 40 11 41 11 42 11 43 11 44 11 45 11 46 11 47 11 48 11 49 11 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 22 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. Section 9.3 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 18 12 19 12 20 12 21 12 22 12 23 12 24 12 25 12 26 12 27 12 28 12 29 12 30 12 31 12 32 12 33 12 34 12 35 12 36 12 37 12 38 12 39 12 40 12 41 12 42 12 43 12 44 12 45 12 46 12 47 12 48 12 49 12 50 12 51 12 52 12 53 12 54 12 55 12 56 12 57 12 58 12 59 12 60 12 61 12 62 12 63 12 64 12 65 12 66 12 67 12 68 12 69 12 70 12 71 12 72 12 73 12 74 12 75 12 76 12 77 12 78 12 79 12 80 12 81 12 82 12 83 12 84 12 85 12 86 12 87 12 Section 9.4 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 18 12 19 12 20 12 21 12 22 12 23 12 24 12 25 12 26 12 27 12 28 12 29 12 30 12 31 12 32 12 33 12 34 12 35 12 36 12 37 12 38 12 39 12 40 12 41 12 42 12 43 12 44 12 45 12 46 12 47 12 48 12 49 12 50 12 51 12 52 12 53 12 54 12 55 12 56 12 57 12 58 12 59 12 60 12 61 12 62 12 63 12 64 12 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 23 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 65 12 66 12 67 12 68 12 69 12 70 12 71 12 72 12 73 12 Section 9.5 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 18 12 19 12 20 12 21 12 22 12 23 12 24 12 25 12 26 12 27 12 28 12 29 12 30 12 31 12 32 12 33 12 34 12 35 12 36 12 37 12 38 12 39 12 40 12 41 12 42 12 43 12 44 12 45 12 46 12 47 12 48 12 49 12 50 12 51 12 52 12 53 12 54 12 55 12 Chapter 9 Tables 9.1-1 10 9.1-2 10 9.1-3 10 9.1-4 8 9.1-5 8 9.1-6 8 9.2-1 10 9.2-2 8 9.2-3 8 9.2-4 10 9.2-5 10 9.2-6 10 9.2-7 8 9.2-8 8 9.2-9 8 9.2-10 10 9.2-11 8 9.2-12 8 9.2-13 10 9.2-14 8 9.2-15 8 9.2-16 8 9.2-17 8 9.3-1 8 9.3-2 8 9.3-3 12 9.3-4 8 9.3-5 8 9.3-6 12 9.3-7 12 9.3-8 8 9.3-9 8 9.3-10 8 9.3-11 8 9.4-1 8 9.4-1A 8 9.4-2 8 9.4-3 8 9.4-4 8 9.4-5 8 9.4-6 8 9.4-7 8 9.4-8 8 9.4-9 8 9.4-10 8 9.4-11 8 9.4-12 8 9.4-13 8 9.4-14 8 9.4-15 8 9.4-16 8 9.4-17 8 9.4-17A 8 9.4-18 8 9.4-19 12 9.4-20 8 9.4-21 8 9.4-22 8 9.4-23 8 9.5-1 10 9.5-2 12 9.5-3 8 9.5-4 8 9.5-5 8 9.5-6 8 9.5-7 8 9.5-8 8 9.5-9 8 Chapter 9 Figures 9.1-1 8 9.1-2 8 9.1-3 8 9.1-4 8 9.1-5 8 9.1-6 8 9.1-7 12 9.1-8 8 9.1-9 8 9.1-10 8 9.1-11 8 9.1-12 8 9.1-13 8 9.1-14 8 9.1-15 8 9.1-16 8 9.1-17 8 9.1-18 8 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 24 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 9.1-19 8 9.1-20 8 9.1-21 8 9.1-22 8 9.1-23 D 9.1-24 D 9.1-25 D 9.1-26 D 9.1-27 D 9.1-28 D 9.2-1 8 9.2-2 11 9.2-3 8 9.2-4 11 9.2-5 8 9.2-6 11 9.2-7 8 9.2-8 9 9.2-9 8 9.2-10 8 9.2-11 8 9.2-12 9 9.2-13 11 9.2-14 8 9.2-15 11 9.3-1 9 9.3-2 11 9.3-3 8 9.3-4 8 9.3-5 9 9.3-6 11 9.3-7 8 9.3-8 11 9.3-9 11 9.3-10 8 9.3-11 8 9.3-12 8 9.3-13 8 9.3-14 8 9.3-15 11 9.3-16 8 9.3-17 8 9.3-18 8 9.3-19 8 9.3-20 8 9.3-21 11 9.3-22 8 9.3-23 9 9.3-24 11 9.3-25 11 9.3-26 8 9.3-27 11 9.3-28 11 9.3-29 11 9.3-30 9 9.3-31 8 9.3-32 11 9.3-33 11 9.3-34 8 9.3-35 8 9.3-36 11 9.3-37 11 9.3-38 11 9.3-39 8 9.3-40 8 9.3-41 8 9.3-42 8 9.4-1 8 9.4-2 11 9.4-3 8 9.4-4 8 9.4-5 8 9.4-6 8 9.4-7 11 9.4-8 9 9.4-9 8 9.4-10 8 9.4-11 8 9.4-12 8 9.4-13 8 9.4-14 9 9.4-15 9 9.4-16 11 9.4-17 8 9.4-18 8 9.4-19 11 9.4-20 8 9.4-21 9 9.4-22 8 9.4-23 9 9.4-24 11 9.4-25 8 9.5-1 9 9.5-2 11 9.5-3 11 9.5-4 8 9.5-5 9 9.5-6 11 9.5-7 11 9.5-8 11 9.5-9 9 9.5-10 8 9.5-11 11 9.5-12 11 9.5-13 11 9.5-14 11 CHAPTER 10 Section 10.1 1 11 2 11 Section 10.2 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 Section 10.3 1 11 2 11 3 11 4 11 5 11 6 11 7 11 8 11 9 11 10 11 11 11 12 11 Section 10.4 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 25 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 18 12 19 12 20 12 21 12 22 12 23 12 24 12 25 12 26 12 27 12 28 12 29 12 30 12 31 12 32 12 33 12 34 12 35 12 36 12 37 12 38 12 39 12 40 12 41 12 42 12 43 12 44 12 45 12 46 12 47 12 48 12 49 12 50 12 51 12 52 12 53 12 54 12 55 12 Chapter 10 Tables 10.3-1 8 10.4-1 11 10.4-2 8 10.4-3 8 10.4-4 11 Chapter 10 Figures 10.1-1 11 10.1-2 11 10.2-1 8 10.3-1 8 10.3-2 11 10.3-3 11 10.3-4 11 10.3-5 9 10.3-6 11 10.3-7 8 10.3-8 11 10.3-9 9 10.3-10 8 10.3-11 8 10.4-1 9 10.4-2 9 10.4-3 8 10.4-4 11 10.4-5 8 10.4-6 8 10.4-7 11 10.4-8 11 10.4-9 11 10.4-10 9 10.4-11 8 10.4-12 8 10.4-13 9 10.4-14 11 10.4-15 8 10.4-16 8 10.4-17 8 10.4-18 11 10.4-19 11 CHAPTER 11 Section 11.1 1 11 2 11 3 11 4 11 5 11 6 11 7 11 8 11 9 11 Section 11.2 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 Section 11.3 1 10 2 10 3 10 4 10 5 10 6 10 7 10 8 10 9 10 10 10 11 10 12 10 Section 11.4 1 11 2 11 3 11 4 11 5 11 6 11 7 11 8 11 9 11 10 11 11 11 12 11 13 11 14 11 15 11 16 11 17 11 18 11 19 11 20 11 Section 11.5 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 Appendix 11A 1 10 2 10 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 26 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 3 10 4 10 5 10 6 10 7 10 8 10 9 10 10 10 11 10 12 10 Chapter 11 Tables 11.1-1 10 11.1-2 10 11.1-3 10 11.1-4 10 11.1-5 10 11.2-1 8 11.2-2 10 11.2-3 10 11.2-4 10 11.2-5 10 11.2-6 10 11.2-7 10 11.2-8 10 11.2-9 10 11.2-10 10 11.2-11 10 11.3-1 8 11.3-2 10 11.3-3 10 11.3-4 10 11.3-5 10 11.3-6 10 11.3-7 10 11.3-8 10 11.3-9 10 11.4-1 8 11.4-2 8 11.4-3 10 11.4-4 10 11.4-5 10 11.4-6 10 11.4-7 10 11.4-8 8 11.4-9 8 11.4-10 10 11.5-1 11 11.5-2 11 11.5-3 11 11A-1 11 11A-2 8 11A-3 8 11A-4 8 Chapter 11 Figures 11.2-1 8 11.2-2 11 11.2-3 8 11.2-4 8 11.2-5 11 11.3-1 8 11.3-2 11 11.3-3 8 11.3-4 8 11.3-5 8 11.4-1 8 11.4-2 8 11.4-3 8 11.4-4 8 11.4-5 8 11.4-6 9 11.4-7 8 11.4-8 8 11.4-9 8 11.4-10 9 11.4-11 8 11.5-1 9 11A-1 8 11A-2 8 11A-3 8 11A-4 8 CHAPTER 12 Section 12.1 1 9 2 9 3 9 4 9 5 9 6 9 7 9 8 9 9 9 10 9 11 9 12 9 13 9 14 9 15 9 16 9 Section 12.2 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 18 12 19 12 20 12 21 12 22 12 23 12 24 12 Section 12.3 1 10 2 10 3 10 4 10 5 10 6 10 7 10 8 10 9 10 10 10 11 10 12 10 13 10 14 10 15 10 16 10 17 10 18 10 19 10 20 10 21 10 22 10 23 10 24 10 25 10 26 10 27 10 28 10 29 10 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 27 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. Section 12.4 1 10 2 10 3 10 4 10 5 10 6 10 Section 12.5 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 Chapter 12 Tables 12.2-1 10 12.2-2 10 12.2-3 10 12.2-4 10 12.2-5 12 12.2-6 8 12.2-7 10 12.2-8 8 12.2-9 10 12.2-10 8 12.2-11 10 12.2-12 8 12.2-13 10 12.2-14 8 12.2-15 10 12.2-16 8 12.2-17 10 12.2-18 8 12.2-19 10 12.2-20 8 12.2-21 10 12.2-22 10 12.2-23 8 12.2-24 10 12.2-25 8 12.2-26 10 12.2-27 10 12.2-28 8 12.2-29 10 12.2-30 8 12.2-31 10 12.2-32 10 12.2-33 10 12.2-34 10 12.2-35 10 12.2-36 10 12.2-37 10 12.3-1 8 12.3-2 8 12.3-3 8 12.3-4 8 12.3-5 8 12.3-6 8 12.3-7 8 12.3-8 8 12.3-9 8 12.3-10 8 12.3-11 8 12.3-12 8 12.3-13 8 12.3-14 8 12.3-15 12 12.3-16 8 12.4-1 8 12.4-2 8 12.4-3 8 12.4-4 8 12.4-5 8 12.4-6 8 12.4-7 8 12.5-1 8 12.5-2 10 Chapter 12 Figures 12.3-1 8 12.3-2 8 12.3-3 8 12.3-4 8 12.3-5 8 12.3-6 8 12.3-7 8 12.3-8 8 12.3-9 8 12.3-10 8 12.3-11 8 12.3-12 8 12.3-13 8 12.3-14 8 12.3-15 8 12.3-16 8 12.3-17 8 12.3-18 8 12.3-19 9 12.3-20 8 12.5-1 9 CHAPTER 13 Section 13.1 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 Section 13.2 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 Section 13.3 1 12 Section 13.4 1 11 Section 13.5 1 12 Section 13.6 1 8 Appendix 13A 13A-1 8 13A-2 8 Chapter 13 Tables 13.5-1 8 13.5-2 9 Chapter 13 Figures 13.1-1 9 13.1-2 9 13.1-3 12 13.1-4 12 13.5-1 8 13A-1 8 13A-2 8 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 28 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. CHAPTER 14 Section 14.1 1 8 Section 14.2 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 8 10 8 11 8 12 8 13 8 14 8 15 8 Chapter 14 Tables 14.2-1 8 14.2-2 8 14.2-3 8 14.2-4 8 14.2-5 8 CHAPTER 15 Section 15.0 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 Section 15.1 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 18 12 19 12 20 12 21 12 Section 15.2 1 10 2 10 3 10 4 10 5 10 6 10 7 10 8 10 9 10 10 10 11 10 12 10 13 10 14 10 15 10 16 10 17 10 18 10 19 10 20 10 21 10 22 10 Section 15.3 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 Section 15.4 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 18 12 19 12 20 12 21 12 22 12 23 12 24 12 25 12 26 12 27 12 28 12 29 12 30 12 31 12 32 12 33 12 34 12 35 12 36 12 37 12 38 12 39 12 40 12 41 12 42 12 43 12 44 12 45 12 46 12 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 29 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. Section 15.5 1 11 2 11 3 11 4 11 5 11 6 11 7 11 8 11 Section 15.6 1 12 2 12 3 12 4 12 5 12 6 12 7 12 8 12 9 12 10 12 11 12 12 12 13 12 14 12 15 12 16 12 17 12 18 12 19 12 20 12 21 12 22 12 23 12 24 12 25 12 26 12 27 12 28 12 29 12 30 12 31 12 32 12 33 12 34 12 35 12 36 12 37 12 38 12 39 12 40 12 41 12 42 12 43 12 44 12 45 12 46 12 47 12 48 12 Section 15.7 1 10 2 10 3 10 4 10 5 10 6 10 7 10 8 10 9 10 10 10 11 10 12 10 13 10 14 10 15 10 16 10 17 10 18 10 19 10 20 10 Section 15.8 1 11 2 11 Section 15.9 1 8 Appendix 15A 15A-1 10 15A-2 10 15A-3 10 Appendix 15B 15B-1 10 15B-2 10 15B-3 10 15B-4 10 15B-5 10 15B-6 10 15B-7 10 15B-8 10 15B-9 10 15B-10 10 15B-11 10 15B-12 10 Appendix 15C 15C-1 10 15C-2 10 15C-3 10 15C-4 10 15C-5 10 15C-6 10 15C-7 10 15C-8 10 15C-9 10 Chapter 15 Tables 15.0-1 10 15.0-2 10 15.0-3 10 15.0-4 10 15.0-5 9 15.0-6 10 15.0-7 10 15.0-8 10 15.1-1 10 15.1-2 10 15.1-3 10 15.1-4 10 15.1-5 10 15.1-6 10 15.1-7 10 15.2-1 10 15.2-2 8 15.2-3 8 15.2-4 8 15.3-1 12 15.3-2 12 15.3-3 10 15.3-4 10 15.3-5 10 15.3-6 10 15.3-7 8 15.3-8 10 15.3-9 8 15.4-1 12 15.4-2 10 15.4-3 10 15.4-4 10 15.4-5 10 15.4-6 10 15.4-7 10 15.4-8 10 15.4-9 10 15.4-10 10 15.4-11 10 15.4-12 10 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 30 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 15.5-1 11 15.5-2 10 15.5-3 8 15.5-4 8 15.5-5 8 15.6-1 10 15.6-2 10 15.6-3 10 15.6-4 10 15.6-5 10 15.6-6 10 15.6-7 10 15.6-8 10 15.6-9 10 15.6-10 10 15.6-11 10 15.6-12 10 15.6-13 10 15.6-14 10 15.6-15 10 15.6-16 10 15.6-17 10 15.6-18 10 15.6-19 10 15.6-20 10 15.6-21 10 15.6-22 10 15.6-23 10 15.6-24 10 15.6-25 10 15.6-26 10 15.6-27 10 15.6-28 10 15.6-29 10 15.6-30 10 15.6-31 10 15.6-32 11 15.6-33 10 15.6-34 10 15.6-35 10 15.7-1 8 15.7-2 10 15.7-3 10 15.7-4 10 15.7-5 10 15.7-6 10 15.7-7 10 15.7-8 10 15.7-9 10 15.7-10 10 15.7-11 10 15.7-12 10 15.7-13 10 15.7-14 10 15.7-15 10 15.7-16 8 15.7-17 8 15.7-18 10 15.7-19 10 15.7-20 10 15.7-21 10 15.7-22 10 15.7-23 10 15.7-24 10 15.7-24a 10 15.7-25 10 15.7-25a 10 15.7-26 10 15.7-27 10 15.7-28 10 15A-1 10 15B-1 10 15B-2 10 15B-3 10 15B-4 10 15B-5 10 15B-6 10 15C-1 10 15C-2 10 15C-2-1 10 15C-2-2 10 15C-3 10 15C-4 10 15C-5 10 15C-6 10 Chapter 15 Figures 15.0-1 8 15.0-2 8 15.0-3 8 15.0-4 8 15.0-5 8 15.0-6 8 15.0-7 8 15.0-8 8 15.0-9 8 15.0-10 8 15.0-11 8 15.0-12 8 15.0-13 8 15.0-14 8 15.0-15 8 15.0-16 8 15.0-17 9 15.0-18 8 15.0-20 8 15.0-21 8 15.0-22 8 15.0-23 8 15.0-24 8 15.0-25 8 15.0-26 8 15.0-27 8 15.0-28 8 15.0-29 8 15.0-30 8 15.0-31 8 15.0-32 8 15.1-1 12 15.1-2 9 15.1-3 9 15.1-4 9 15.1-5 9 15.1-6 9 15.1-7 D 15.1-8 D 15.1-9 D 15.1-10 D 15.1-11 D 15.2-1 9 15.2-2 D 15.2-3 D 15.2-4 D 15.2-5 9 15.2-6 9 15.2-7 9 15.2-8 D 15.2-9 D 15.2-10 D 15.2-11 D 15.2-12 D 15.2-13 D 15.2-14 D 15.2-15 D 15.2-16 D 15.2-17 D 15.2-18 D 15.2-19 D 15.2-20 D 15.2-21 D 15.2-22 D 15.2-23 D 15.2-24 D 15.2-25 D SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 31 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 15.3-1 12 15.3-2 12 15.3-3 12 15.3-4 12 15.3-5 12 15.3-6 12 15.3-7 D 15.3-8 D 15.3-9 D 15.3-10 D 15.3-11 D 15.3-12 D 15.3-13 D 15.3-14 D 15.3-15 D 15.4-1 8 15.4-2 8 15.4-3 8 15.4-4 12 15.4-5 12 15.4-6 12 15.4-7 12 15.4-8 12 15.4-9 9 15.4-10 9 15.4-11 9 15.4-12 D 15.4-13 D 15.4-14 D 15.4-15 D 15.4-16 D 15.4-17 D 15.4-18 D 15.4-19 D 15.4-20 D 15.4-21 D 15.4-22 D 15.5-1 11 15.5-2 8 15.5-3 8 15.5-4 8 15.5-5 D 15.6-1 8 15.6-2 8 15.6-3 8 15.6-4 8 15.6-5 8 15.6-6 8 15.6-7 8 15.6-8 8 15.6-9 8 15.6-10 8 15.6-11 8 15.6-12 8 15.6-13 8 15.6-14 8 15.6-15 8 15.6-16 8 15.6-17 8 15.6-18 8 15.6-19 8 15.6-20 8 15.6-21 8 15.6-22 8 15.6-23 8 15.6-24 8 15.6-25 8 15.6-26 8 15.6-27 8 15.6-28 8 15.6-29 8 15.6-30 8 15.6-31 8 15.6-32 8 15.6-33 8 15.6-34 8 15.6-35 8 15.6-36 8 15.6-37 8 15.6-38 8 15.6-39 8 15.6-40 8 15.6-41 8 15.6-42 8 15.6-43 8 15.6-44 8 15.6-45 8 15.6-46 8 15.6-47 8 15.6-48 8 15.6-49 8 15.6-50 12 15.6-51 12 15.6-52 12 15.6-53 12 15.6-54 12 15.6-55 12 15.6-56 12 15.6-57 12 15.6-58 12 15.6-59 12 15.6-60 12 CHAPTER 16 Section 16.1 1 8 Section 16.2 1 8 Section 16.3 1 11 CHAPTER 17 Section 17.1 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 8 10 8 11 8 12 8 13 8 14 8 15 8 16 8 17 8 18 8 19 8 20 8 21 8 22 8 23 8 24 8 25 8 26 8 27 8 28 8 29 8 30 8 31 8 32 8 33 8 34 8 35 8 36 8 37 8 38 8 39 8 40 8 41 8 42 8 SEABROOK STATION UFSAR LIST OF EFFECTIVE PAGES Revision 12 Page 32 Page No. Rev. No. Page No. Rev. No. Page No. Rev. No. 43 8 44 8 Section 17.2 1 11 Appendix 17A 1 11 Appendix 17B 1 8 Appendix 17C 1 11 Appendix 17D 1 11 Chapter 17 Tables 17.1-1 8 17.1-2 8 17.1-3 8 17.1-4 8 17.1-5 8 Chapter 17 Figures 17.1-1 8 17.1-2 8 17.2-1 11
S EABROOK S TATION U PDATED F INAL S AFETY A NALYSIS R EPORT C HAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT Introduction Revision 12 Section 1.1 Page 1
1.1 INTRODUCTION
1.1.1 Project
Identification The Updated Final Safety Analysis Report (UFSAR) for Seabrook Station is submitted to the U.S. Nuclear Regulatory Commission (NRC) pursuant to 10 CFR 50.71(e). The original FSAR (as amended through Amendment 63, April 11, 1990) submitted in support of the operating license application documents the licensing basis for Seabrook Station and has been archived. A full power operating license for NPF-86 was issued by the NRC on March 15, 1990. The NRC previously issued a low power license, N PF-67, on May 26, 1989, and a fuel load license, NPF-56, on October 17, 1986. The Updated FSAR submittal date was based on the date of issuance of low power license NPF-67. The Upda ted FSAR is revised annually (per refueling cycle), pursuant to 10 CFR 50.71(e). On January 10, 2007, the NRC issued Certificate of Compliance No. 1030 for Spent Fuel Storage Casks, which allows Seabrook Station to operate an Independent Spent Fuel Storage Installation (ISFSI) utilizing the HUHOMS HD System.
The HUHOMS HD System Updated Final Safety Analysis Report for the 32PTH Cask is updated annually under 10 CFR 72.
70 by the certificate holder. Seabrook Station is located approximately eight miles southeast of the county seat of Exeter and five miles northeast of Amesbury, Massachusetts. The center of the Bost on metropolitan area is approximately 40 miles to the southeast of the site. Seabrook Station employs a four-loop, pressurized water reactor and support auxiliary systems designed by Westinghouse Electric Company. It is similar in design to Duke Power Company's W.B. McGuire Nuclear Station, Texas Utility Generating Company's Comanc he Peak Station, and Commonwealth Edison Company's Byron-Braidwood Nuclear Plants. Seabrook Station's reactor is housed in a steel-lin ed reinforced concrete containment structure and a concrete containment enclosure structure. These structures were designed by United Engineers and Constructors Inc. The operating license application and original FSAR for Seabrook Station contemplated two identical units on a single site. Construction on Seabrook Station Unit 2 was effectively terminated in 1984 and its construction permit was allowed to expire in October 19
- 88. The Updated FSAR eliminates all references to Unit 2, except for a few cases where it was necessary to maintain a Unit 2 reference to provide an accurate description of a plant feature (i.e., the Exclusion Area Boundary is based on two units as the Updated FSAR description so states). NPF-86 authorizes Seabrook Station operation at reactor core power levels not in excess of 3648 megawatts thermal (MWt). This corresponds to a nuclear steam supply system thermal output of 3664.1 MWt and a corresponding gross turbine generator output of 1305.6 MWe. Seabrook Station commenced regular full powe r operation on August 19 , 1990, upon completion of the Power Ascension Test Program.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT Introduction Revision 12 Section 1.1 Page 2 1.1.2 Organization of Contents The Updated Final Safety Analysis Report (UFSAR) provides the information required by Revision 3 to the "Standard Form at and Content of Safety Analysis Reports for Nuclear Power Plants," Regulatory Guide 1.70, dated November , 1978. The Updated FSAR is divided into 17 chapters, using substantially the same format as NUREG-75/094. In 2002, the UFSAR was converted to a computer based living document, periodically updated throughout the reporting cycle. Available on the Seabrook Station Home Page in Portable Document Format (PDF), the UFSAR is viewed using computer software and is available in CD-ROM for distribution to offsite agencies. Changes to the living UFSAR will be identified with a revision bar and the associated UFSAR change number. Sections are numerically identified by representing their order of appearance in a chapter by two numbers separated by a decimal point, e.g., 3.4, the fourth section of Chapter 3. Subsections are further identified by numbers separated by decimal points (3.4.1, 3.4.1.1., etc.). Pages within each section are consecutively numbered (3.4-1, 3.4-2, etc.). Tabulations of data are designated "Tables," and are identified by the section number followed by a hyphen and the number of the table according to its order of mention in the test, e.g., Table 3.4-5 is the fifth table of Section 3.4.
Drawings, pictures, sketches, curves, graphs and engineering diagrams are identified as "Figures," and are numbered in the same manner as tables.
The symbols applicable to the piping and instrumentation diagrams (P&IDs) and logic diagrams throughout this report are presented in Figure 1.1-1 and Figure 1.1-2.
A cross-reference tabulation, Table 1.1-1 is provided to help the reader establish correspondence between Updated FSAR figure numbers, original FSAR figure numbers, and design drawing numbers. Those UFSAR Figures listed in Table 1.1-1 as historical were accurate at the time Seabrook Station was originally licensed, but were not intended or expected to be updated for the life of the plant. The information contained in historical UFSAR figures does not directly affect Seabrook Station operations, but design changes are tracked to support design control and configuration management activities. Use of this cross-reference will facilitate the tracing of piping and cabling between different P&IDs. Design drawing numbers are used in the UFSAR in lieu of copies of the actual drawing to ensure the us er will use the latest drawing. Figures that were prepared specifically for the Updated FSAR have not been included in this table. Where information has been presented that is not specifically requested by the standard format, the information is presented in the appropriate chapter as a section or subsection, and follows the information specifically requested by the standard format. For example, this Subsection 1.1.2 is not requested by the standard format. Since it apparently belongs in Section 1.1, it has been placed after the subsection containing the information specifically requested by the standard format.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT Introduction Revision 12 Section 1.1 Page 3 When it becomes necessary to submit additional information, or revise information presently contained in the Updated FSAR, the following procedures will be followed:
- a. When a change is made to the Updated FSAR text, those page sections affected will be marked with the revision number in the upper right-hand corner and a revision bar added in the margin next to the material affected. b. When figures are revised, the Updated FSAR revision number is added to the list of effective pages prior to submittal to the NRC. For those sections where both the AE and the NSSS supplier have provided separate discussions on similar subject matter, e.g., Section 3.9, the discussion prepared by the AE is identified by a "(B)" directly after the 2-digit subsection number, e.g., 3.9(B), whereas the discussion provided by the NSSS supplier is identified with an "(N)" following the number, e.g., 3.9(N). 1.1.3 Transition of Information from th e Original FSAR to the Updated FSAR The Final Safety Analysis Report (FSAR) for Seabrook Station was revised pursuant to the requirements of 10 CFR 50.71(e). Development of the Updated FSAR was completed in accordance with guidance provided in Generic Letter 81-06, dated February 26, 1981 and information provided in the statements of Consideration for Final Rule Making of 10 CFR Part 50, titled "Periodic Updating of Final Safety An alysis Reports", da ted September 1, 1982. The format of the Updated FSAR is consistent with the original FS AR with the following exceptions: The original FSAR contained two volumes of Requests for Additional Information (RAIs) and their subsequent re sponses. The RAIs were the result of the Commission's questions pertaining to New Hampshire Yankee's (NHY) application for an Operating License. Information from the RAIs has been incorporated into the Updated FSAR, as applicable, and thus will not be a part of
the Updated FSAR. In response to guidance given in Gene ric Letter 81-06 and the statements of Consideration, certain populati on tables contained in Chapter 2 were not updated. These tables are presented with existing information from the original FSAR
because the most current population figures are provided in the Seabrook Station Evacuation Study transmitted as a supporting document to New Hampshire Radiological Emergency Re sponse Plan (NHRERP). Additionally, certain appendices, identified by asterisks, on the List of Effective Pages were not revised, but have been extracted from the original FSAR and are provided in the Updated FSAR for historical information.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 1 1.2 GENERAL PLANT DESCRIPTION 1.2.1 Site Characteristics 1.2.1.1 Location Seabrook Station is located on the western shore of Hampton Harbor in Rockingham County, in the township of Seabrook, New Hampshire. It is approximately 11 air miles south of Portsmouth, New Hampshire and 2 miles west of the Atlantic Ocean. The site coordinates are 70 degrees, 51 minutes, 05 seconds west longitude , and 42 degrees, 53 minut es, 53 seconds north latitude. The Universal Transverse Mercator Coordinates of the site are 348,970 meters east and 4,751,090 meters north. Figure 2.1-4 shows the plant arrangement and its surroundings. 1.2.1.2 Size and Ownership Seabrook Station is owned by a gr oup of utilities that are signatories to the Joint Ownership Agreement and that are hereafter referred to collectively as the Joint Owners. Public Service Company of New Hampshire (PSNH) was formerly the principal owner of Seabrook Station and, through its New Hampshire Yankee Division, was responsible for the managing agent functions in accordance with the Operating License. Howe ver, pursuant to a plan of reorganization for PSNH approved by the United States Bankruptcy Court, PSNH became a wholly-owned subsidiary of Northeast Utilities (NU) on June 5, 1992. On that same date, PSNH's ownership share of Seabrook Station was tr ansferred to another subsidiary of NU, the North Atlantic Energy Corporation (NAEC). As part of that plan of reorganization, and in accordance with the approval granted by the NRC in Amendment 10 to the Operating License, PSNH's managing agent responsibilities were transferred to the North Atlantic Energy Service Corporation (North Atlantic), another w holly-owned subsidiary of NU, on June 29, 1992. In 1996, the New Hampshire Legislature adopted the Electric Utility Restructuring Act ("EURA"), RSA 374-F with the overall public policy goal of developing a more efficient industry structure and regulatory framework. In accordance with EURA, the New Hampshire Public Utilities Commission ("NHPUC") required NAEC to sell its ownership shares in Seabrook Station through a public auction. Seven other Joint Owners joined NAEC in the auction process. Through the auction process, the Selling Owners transferred their respective operating and ownership shares to FPL Energy Seabrook, LLC ("FPLE Seabrook"). As part of the transfer of ownership, and in accordance with the approval granted by the NRC in Amendment 86 to the Operating License, North Atlantic's managing agen t responsibilities were transferred to FPLE Seabrook on November 1 , 2002. The Seabrook Station site includes as a minimum the land within a 3000-foot radius of the two reactor building centerlines. The site, for purposes of ownership, is described as two lots. Lot 1 includes the land for the station buildings of Units 1 and 2 and the No rth Access Road. It corresponds closely with the controlled area boundary except for the access road. Lot 1 is owned by the Joint Owners in proportion to their ownership shares in the project as a whole.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 2 The remainder of the site, Lot 2, is owned by FPLE Seabrook. Ce rtain station structures and facilities are located on Lot 2. Easements for access, construction, operation and maintenance of the station facilities on Lot 2 are granted to the Joint Owners by FPLE Seabrook. Covenants and easements, including all rights and authority to determine activities as necessary to qualify the site as an "exclusion area" as defined in 10 CFR 100, have been assigned by NAEC and North Atlantic to FPLE Seabrook. Figure 1.2-1, Sheet 2 shows the ownership boundaries for lots 1 and 2. The dry fuel storage site is located to the west of Unit 2 and consists of a large concrete pad containing horizontal storage modules which house spent fuel, a security system, and an electrical enclosure supporting the dry fuel storage site. The "exclusion area" as defined by 10 CFR 100 includes the dry fuel storage site.
1.2.1.3 Access The site is bounded on the north, east and south by marshland. The only access to the site is from the west via two roads, both entering from U.S. Route 1. A railroad spur enters the site from the Boston and Maine Railroad track, located west of the station (see Figure 1.2-1, Sheet 1). All access to the site is under the control of FPLE Seabrook.
1.2.1.4 Geology The site area is characterized by broad open areas of level tidal marsh, dissected by numerous tidal creeks and man-made linear drainage ditche s, interrupted locally by wooded "islands" or peninsulas which rise to elevations of 20 to 30 feet above sea level. The station buildings are placed on or in a gneissoid phase of the Newburyport quartz diorite intrusive. Newburyport is a hard, strong crystalline igneous rock consisting of a medium-to-course-grained quartz diorite matrix intimately enclos ing inclusions of dark gray, fine-grained diorite.
A detailed discussion is presented in Section 2.5.
1.2.1.5 Seismology The most severe earthquakes effects experienced by the site were Intensity VI (MM), as estimated by isoseismal lines from two of fshore earthquakes in 1727 and 1755. The ground acceleration associated with the Safe Shutdown Earthquake was selected as 0.25 g.
A detailed discussion is presented in Section 2.5.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 3 1.2.1.6 Meteorology The site is located about two miles from the open Atlantic Ocean resulting in a definite maritime influence on the general climate. Winter temperature extremes are tempered by the relatively warmer water, and summer temperatures are moderated by a sea breeze. Precipitation amounts are uniform throughout the year, with an occasional heavy rainfall during a northeast storm. The site is not usually subjected to the full strength of east coast hurricanes. Such storms usually move either offshore or inland before they reach the Seabrook latitude.
A detailed discussion is presented in Section 2.3.
1.2.1.7 Hydrology The site is located on the western side of the Hampton Harbor estuary on a peninsula of land which is bordered on the north by the Browns River and on the south by Hunts Island Creek. Surface drainage of natural precipitation from the peninsula is into these two tidal streams. The mean tidal range of Hampton Harbor is about 8.6 feet, varying from 4 feet below to 4.6 feet above mean sea level. The critical flood elevations at the site result from the probable maximum hurricane occurring simultaneously with the standard project storm. All safety-related systems and components are protected by structures which surround them, or by being located above the maximum stillwater level on the plant grade. Structures and components subject to wave runup are adequately protected to maintain the integrity of their functions.
A detailed discussion is presented in Section 2.4. 1.2.2 Facility Arrangement 1.2.2.1 General Arrangement The arrangement of the major structures on the site is shown on Figure 1.2-1. The general arrangements of the individual structures shown in Figures 1.2-2 thr ough 1.2-59 are provided for historical purposes only. The major structures associated with Seab rook Station are the containment structure, containment enclosure, Primary Auxiliary Building, Fuel Storage Building, Waste Processing Building, Control Building, Diesel Generator Building, Turbine Building, Circulating Water Pumphouse, Service Water Pumphouse, Administration and Service Building, Emergency Feedwater Pump Building, cooling water tunnels, ocean intake structures, ocean discharge nozzles, Ultimate Heat Sink Cooling Tower, Chlorination Building, Fire Pumphouse, Steam Generator Blowdown Recovery Building, and a Dry Fuel Storage Facility.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 4 1.2.2.2 Containment Structure The containment structure, Figure 1.2-2, Figure 1.2-3, Figure 1.2-4, Figure 1.2-5, Figure 1.2-6, completely encloses a Reactor Coolant System, and is a seismic Category I reinforced concrete structure in the form of a right vertical cylinder with a hemispherical dome and flat foundation mat founded on bedrock. The inside face is lined with a welded carbon steel plate, providing a high degree of leak tightness. A protective 4-ft thick concrete mat that forms the floor of the Containment protects the liner over the foundation mat. The containment structure provides biological shielding for normal and accident conditions. The approximate dimensions of the Containment are: Inside diameter 140 ft Inside height 219 ft Vertical wall thickness 4 ft 6 in. and 4 ft 7 1/2 in. Dome thickness 3 ft 6 1/8 in.
Foundation mat thickness 10 ft Containment penetrations are provided in the lo wer portion of the structure, and consist of a personnel lock and an equipment hatch/personnel lo ck, a fuel transfer tube and piping, electrical, instrumentation, and ven tilation penetrations. The Containment is designed to withstand all credible conditions of loading, including normal loads, construction loads, test loads, severe environmental loads and extreme environmental and abnormal loads. The maximum design pressure is 52 psig. The maximum liner temperature associated with the design pressure response is 271 F.
Detailed discussions are presen ted in Subsections 3.8.1, 3.8.2 and 6.2.1.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 5 1.2.2.3 Containment Enclosure The containment enclosure, Figure 1.2-2 Figure 1.2-3, Figure 1.2-4, Figure 1.2-5, Figure 1.2-6, surrounds the containment structure and is designed in a similar c onfiguration as a vertical right cylindrical seismic Category I, reinforced concrete structure with dome and ring base. The approximate dimensions of the structure are: inside diameter, 158 ft; vertical wall thickness, varies from 1 ft, 3 in. to 3 ft; and dome thickness, 1 ft, 3 in. The containment enclosure is designed to entrap, filter and then discharge any leakage from the containment structure. To accomplish this, the space between the containment enclosure and the containment structure, as well as the penetration and safety-related pump areas, are maintained at a negative pressure following a loss-of-coolant accident by fans which take suction from the containment enclosure and exhaust to atmosphere through charcoal filters. To ensure air tightness for the negative pressure, leakage th rough all joints and penetrations has been minimized. Additional information is presented in Subsections 3.8.4 and 6.2.3. 1.2.2.4 Primary Auxiliary Building The Primary Auxiliary Building, Figure 1.2-7, Figure 1.2-8, Figure 1.2-9, Figure 1.2-10, Figure 1.2-11, Figure 1.2-12, Figure 1.2-13, Figure 1.2-14, is a seismic Category I, reinforced concrete structure which is located adjacent to the containment structure, and contains most of the auxiliary systems for the Reactor Coolant System. Those systems whose major components are in the Primary Auxiliary Building include the Chemical and Volume Control, Primary Component Cooling, Sample, Low Pressure Safety Injection, Residual Heat Removal and Containment Spray Systems. The residual heat removal and containment spray pumps and their associated heat exchangers are located in water tight compartments in the northern part of the Primary Auxiliary Building. The compartments are isolated from the rest of the Primary Auxiliary Building by concrete walls to preclude flooding the pumps due to a rupture anywhere else in the building. The containment spray pumps are located below grade to satisfy net positive suction head requirements. Additional information is presented in Subsection 3.8.4. 1.2.2.5 Fuel Storage Building The Fuel Storage Building, Figure 1.2-15 and Figure 1.2-21, is a seismic Category I reinforced concrete structure which houses a new fuel vault and a spent fuel pool. The new or unused fuel is stored in the new fuel vault prior to its use in the core. It is transported into the Containment by an underwater conveyor system. The spent fuel is transferred back from the Containment in the same manner, and is stored in the spent fu el pool where the pool wa ter provides cooling and shielding.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 6 Additional information is presented in Subsection 3.8.4. 1.2.2.6 Waste Processing Building The Waste Processing Building, Figure 1.2-22, Figure 1.2-23, Figure 1.2-24, Figure 1.2-25, Figure 1.2-26, Figure 1.2-27, Figur e 1.2-28, Figure 1.2-29 and Figure 1.2-30, is seismic Category I, reinforced concrete and structural steel. It houses the Liqu id and Gas Waste Processing, Boron Recovery and Solid Waste Systems. The building contains systems to process radioactive gases, liquids and solids. The gases are processed through charcoal delay beds to provide for iodine removal and radioactive decay of the noble gases. Liquids are processed in demineraliz er skids, and can be recycled back into the plant or released if low enough in activity. Eva porators, installed as plant design, are available as an alternate method of processing liquids. Solids are norm ally stored in various containers and stored on site prior to shipment offsite for burial. The plant contains equipment designed to solidify waste which may be used to process solid waste prior to shipment off site. Additional information is presented is Subsection 3.8.4. 1.2.2.7 Control Building The Control Building, Figure 1.2-31, Figure 1.2-32 and Figure 1.2-33, is a seismic Category I, reinforced concrete structure which includes an electrical equipment room which houses the switchgear, batteries, rod drive co ntrols, and rod drive M-G sets, a cable spreading room and a control room. Additional information is presented in Subsection 3.8.4. 1.2.2.8 Diesel Generator Building The Diesel Generator Building, Figure 1.2-34, Figure 1.2-35 and Figure 1.2-36, is a seismic Category I, reinforced concrete structure which houses two diesel generators together with their auxiliary equipment and two diesel generator fuel oil storage tanks. Additional information is presented in Subsection 3.8.4. 1.2.2.9 Turbine Building The Turbine Building, Figure 1.2-37, Figure 1.2-38, Figure 1.2-39, Figure 1.2-40, Figure 1.2-41, Figure 1.2-42, Figure 1.2-43, Figure 1.2-44, and Figure 1.2-45, is a nonseismic Category I structure which houses a turbin e generator and associated condensers, pumps and feedwater heaters. The lube oil, seconda ry component cooling and service and instrument air systems are also located in the Turbine Building.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 7 1.2.2.10 Circulating Water Pumphouse The Circulating Water Pumphouse, Figure 1.2-46, Figure 1.2-47 and Figure 1.2-48, is a non-seismic Category I structure located approximately 160 feet east of the containment structure. It is composed of a forebay and three bays with a circulating water pump in each. Each pump bay also has one traveling screen. The three pumps supply cooling water to the condensers. Additional information is presented in Subsection 10.4.5. 1.2.2.11 Service Water Pumphouse The Service Water Pumphouse, Figure 1.2-46, Figure 1.2-47, and Figure 1.2-48, is a seismic Category I structure which is adjacent to the Circulating Water Pumphouse. It contains the four service water pumps which are available for normal operation and for post-accident cooldown. Additional information is presented in Subsection 3.8.4. 1.2.2.12 Administration and Service Building The Administration and Service Building, Figure 1.2-49 and Figure 1.2-50, is a non-seismic Category I structure which is located adjacent to the Turbine Building. It houses the administrative offices, store room, water treatme nt plant, auxiliary boilers, health physics checkpoint, chemistry laboratories, locker rooms, machine shops and other service areas. The access to the radiologically controlled area (RCA) is made through the health physics checkpoint. 1.2.2.13 Emergency Feedwater Pump Building The Emergency Feedwater Pump Building, Figure 1.2-51, is a seismic Category I structure which is located adjacent to the containment st ructure, and contains the emergency feedwater pumps and emergency feedwater control valves. Additional information is presented in Subsection 3.8.4. 1.2.2.14 Cooling Water Tunnels The Heat Dissipation System uses once-through ocean water cooling, and is designed to provide all heat removal requirements. The cooling water is obtained from the Atlantic Ocean and is carried to the power plant through a 17,000 - foot long intake t unnel in the under lying bedrock, and is returned to the ocean through a similar discharge tunnel, approximately 16,500 feet long. The tunnels, which are nonseismic Category I, are lined with a permanent lining of cast-in-place concrete to a 19'-0" finished inside diameter. Figure 1.2-52 and Figure 1.2-53 show the plan and profile of the circulating water tunnels.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 8 Additional information is presented in Subsections 9.2.5 and 10.4.5. 1.2.2.15 Ocean Intake Structures The intake tunnel is connected to the ocean by means of three, nonseismic Category I, 9'-101/2" finished inside diameter shafts, spaced between 103 and 110 feet apart. These shafts are located approximately 7000 feet off the Hampton Beach shoreline in 60 feet of water. A submerged 30'-6" diameter 19' high reinforced concrete stru cture ("velocity cap"), Figure 1.2-54, is mounted on top of each structure. Additional information is presented in Subsection 10.4.5. 1.2.2.16 Ocean Discharge Nozzles The discharge tunnel is connect ed to the ocean by means of eleven, non-seismic Category I, 5'-1" finished inside diameter shafts, spaced approximately 100 feet apart, located approximately 5000 feet off the Seabrook Beach shoreline in water up to 70 feet deep. A double discharge nozzle, Figure 1.2-55, is attached to the top of each shaf t to increase the discharge velocity and diffuse the heated water. Additional information is presented in Subsection 10.4.5. 1.2.2.17 Ultimate Heat Sink Cooling Tower The cooling tower, Figure 1.2-56, is a seismic Category I structure that is composed of a concrete basin, pump rooms, electrical switchgear rooms and mechanical equipment rooms. The pump rooms house vertical centrifugal pumps. Additional information is presented in Subsection 9.2-5.
1.2.2.18 Chlorination Building The Chlorination Building, Figure 1.2-57 and Figure 1.2-58, is a nonseismic Category I structure which houses sodium hypochlorite storage tanks , storage tanks and related equipment for chlorination of circulating water piping, cooling tower and condensers. It is located south of the discharge transition structure.
Part of the building on the west end houses electrical substations, and the east side of the building also houses a maintenance machine shop. 1.2.2.19 Fire Pumphouse The Fire Pumphouse is a nonseismic Category I structure which hous es electric and diesel-driven fire pumps and associated controls for use in extinguishing any fire that may occur on the site.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 9 1.2.2.20 Steam Generator Blowdown Recovery Building The Steam Generator Blowdown Recovery Building, Figure 1.2-59, is located on the south side of the Waste Processing Building and tank farm area, and houses the Steam Generator Blowdown Recovery System. 1.2.2.21 SEPS Equipment Enclosures The Supplemental Emergency Power System (SEPS) equipment enclosures, Figure 1.2-1, are located on the south side of the Cooling Tower. These enclosures house the SEPS diesel generators and para lleling switchgear. 1.2.2.22 Dry Fuel Storage Facility The Dry Fuel Storage Facility is located to the west of Unit 2 and consists of a large concrete pad containing horizontal storage modules which house spent fuel, a security system, and an electrical enclosure supporting th e Dry Fuel Storage Facility. Th e site is surr ounded by a vehicle barrier system. The site is a radiological restricted area (RA). 1.2.3 Reactor Systems A detailed discussion of the various reactor systems is presented in Chapter 4.
1.2.3.1 Reactor Core The reactor core is a multi-region cycled core. The fuel rods are slightly cold worked Zircaloy-4 or ZirloŽ tubes containing slightly enriched uranium dioxide fuel. The fuel rods are supported by spring clip grids in a 17x17 array to form fuel assemblies. There are 193 fuel assemblies in the core.
1.2.3.2 Reactor Vessel Internals The reactor internals are comprise d of a lower core support struct ure (including the entire core barrel and neutron shield pad assembly), th e upper core support structure, and the core instrumentation support structure. The reactor internals support the core, maintain fuel alignment, limit fuel assembly movement, maintain alignment between fuel assemblies and control rods, direct coolant flow to the pressure vessel head, provide gamma and neutron shielding and guide the incore instrumentation.
A detailed discussion is presented in Subsection 3.9.5.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 10 1.2.3.3 Reactivity Control Systems Full-length control rod assemblies and burnable neutron absorber rods are inserted into guide thimbles of fuel assemblies for neutron control. The absorber se ctions of the control rods are composed of silver-indium-cadmi um cylinders encapsulated in 304 stainless steel cladding. Within the cladding, the silver alloy rods are stacked to provide an absorber column of 142 inches. The absorber material in the fixed bur nable neutron absorber rods is in the form of borosilicate glass sealed in stainless steel tubes. Boric acid in solution in the coolant is also used for neutron control dur ing slow transients. The control rod drive mechanisms are equipped with magnetic latches, which are controlled by three magnetic coils. The latches are designed so that upon a loss of power to the coils, the Rod Cluster Control Assembly is releas ed and falls by gravity into the core to shut down the reactor. Additional information is presented in Chapter 4. 1.2.3.4 Nuclear Instrumentation The reactor is provided with two types of monitoring systems: a system of fixed ion chambers located symmetrically around the core outside of the reactor pressure vessel, a system of fixed-moveable incore instrumentation and a system of safety grade excore fixed fission chambers located symmetrically ar ound the reactor vessel. The incore detection devices consist of fixed self-powered platinum detectors and moveable neutron detectors. The fixed self-powered detectors are distributed along the part of each detector assembly in the active length of the fuel assembly. Their continuous signals, when processed, provide an ongoing flux map. The moveable flux detectors can traverse the entire length of the instrumented fuel assemblies to provide data from which a finely defined three-dimensional map of the neutron flux distribution can be determined.
The Safety Grade Excore Neutron Flux Monitoring System measures thermal neutron flux and boron dilution of the reactor vesse l during operation and during and after remote safe shutdown. This meets requirements of RG 1.97 and NUREG-0737.
Additional information is presente d in Section 7.7 and Subsection 4.4.6. 1.2.4 Reactor Coolant Sy s tem and Connected Systems 1.2.4.1 Reactor Coolant System The Reactor Coolant System is composed of four steam generators, four reactor coolant pumps, a pressurizer, reactor vessel, and pressurizer relief tank. The system is designed to transfer a maximum thermal output of 3678 MWt (including pump heat) from the core to the steam generators where the heat is transferred to the Secondary Steam System that drives the turbine generator.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 11 The Reactor Coolant System is arranged in four parallel loops, each cons isting of a single steam generator and reactor coolant pump. Water is pumped under pressure through the reactor vessel where it picks up the thermal output of the core and to the steam generator where it gives up the core heat. It is then recirculated by the pumps back into the reactor vessel. The pressurizer is used to pressurize the water to 2250 psia to inhibit any boiling in the core. The core cooling water also acts as a neutron moderator, a reflector and a solvent for a chemical neutron absorber. A detailed discussion on this system is presented in Chapter 5. 1.2.4.2 Reactor Vessel The reactor vessel is a cylindrical structure with a hemispherical bottom head and a flanged and gasketed removable upper head, which houses th e core, core support structures, control rod clusters, thermal shield and other parts associated with the core. The outlet and inlet nozzles which provide the exit of the heated coolant and its return to the vessel interior for recirculation through the core, are located at an elevati on between the head flange and the core.
A detailed discussion is presented in Section 5.3.
1.2.4.3 Residual Heat Removal System The Residual Heat Removal System is used to reduce the temperature of the reactor coolant at a controlled rate from 350 F to 125F, within 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> after shutdown (with all equipment operating), and to maintain the proper reactor coolant temperature during refueling. The residual heat removal pumps circulate re actor coolant through tw o residual heat remova l heat exchangers, and return it to the Reactor Coolant System th rough the low-pressure safety injection header.
A detailed discussion on this system is presented in Subsection 5.4.7. 1.2.5 Engineered Safety Features The Engineered Safety Features serve to limit th e potential radiation ex posure to the public and to plant personnel following an accidental release of radioactive fission products from the Reactor Coolant System, particularly as the result of a loss-of-coolant accident (LOCA). These safety features function to localize, control, mitigate and terminate such accidents, ensuring that 10 CFR 100 limits are not exceeded. The safety features consist of the following: a. Containment Systems 1. Containment structure (including compartments) 2. Containment enclosure
- 3. Containment Heat Removal System (Containment Spray System)
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 12 4. Containment Isolation System 5. Combustible Gas Control System b. Emergency Core Cooling System
- c. Control room habitability systems
- d. Fission Product Removal and Control Systems (Containment Enclosure and Fuel Storage Building ESF filter systems) e. Emergency Feedwater System. The above systems include those portions of the Instrumentation and Protection System and electrical power distribution system necessary for operation. 1.2.5.1 Containment Structure The containment structure is described in Subsection 1.2.2.2. 1.2.5.2 Containment Enclosure The containment enclosure is described in Subsection 1.2.2.3.
1.2.5.3 Containment Heat Removal System A Containment Spray System is utilized for post-accident containment heat removal. The Containment Spray System is designed to sp ray water containing boron and sodium hydroxide into the Containment atmosphere after a LOCA to cool it and remove iodine. The pumps initially take suction from the refueling water storage tank and pump its contents into the Containment atmosphere through the spray header s located in the Containment dome. After a prescribed amount of water is removed from the tank, the pump suction is transferred to the Containment sump, and cooling is continued by recirculating sump water through the spray heat exchangers and back through the spray headers.
The spray is actuated by a Contai nment spray actuation signal that is generated at a designated containment pressure. The system is completely redundant and can withstand any single failure.
A detailed discussion on this system is presented in Subsection 6.2.2.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 13 1.2.5.4 Containment Isolation System The Containment Isolation System establishes and/or maintains isolation of the containment from the outside environment in order to preven t the release of fission products. Containment isolation signals actuate the appropriate valves to a closed position whenever automatic safety injection occurs or high containment pressure is experienced. Doubl e barrier protection is provided for all lines that penetrate the Containment boundary.
A detailed discussion on this system is presented in Subsection 6.2.4. 1.2.5.5 Combustible Gas Control System Thermal electric hydrogen recombiners reduce th e concentration of hydr ogen in the post-LOCA Containment atmosphere. A purge feature is also provided for backup control of hydrogen. A detailed discussion of this system is presented in Subsection 6.2.5. 1.2.5.6 Emergency Core Cooling System The Emergency Core Cooling System (ECCS) inj ects borated water into the Reactor Coolant System following a LOCA to limit core damage, metal-water reactions and fission product release, and to assure adequate shutdown margin. The ECCS also provides c ontinuous long-term post-accident cooling of the core , by recirculating borated water between the containment sump and the reactor core. The system consists of two centrifugal charging pumps, two low pressure safety injection pumps, two residual heat removal pumps and heat exchange rs, and four safety injection accumulators. The system is completely redundant, and will assure flow to the core in the event of any single failure.
A detailed discussion on this system is presented in Section 6.3. 1.2.5.7 Control Room Habitability Systems The Control Building contains the building servi ces necessary for continuous occupancy of the control room complex by operating personnel during all operating conditions. These building services include: HVAC services, air purification and iodine removal, fresh air intakes, fire protection, emergency breathing apparatus, communications and meteorological equipment, lighting, and housekeeping facilities.
A detailed discussion on this system is presented in Section 6.4.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 14 1.2.5.8 Engineered Safety Features (ESF) Filter Systems ESF filter systems required to perform a safety-related function following a design basis accident are discussed below: a. The Containment Enclosure Exhaust Filter System collects, filters and discharges most airborne containment leakage (exc luding noble gases). The system is not normally in operation, but in the event of a LOCA, it is placed in operation and keeps the containment enclosure (as defined in Subsection 6.2.3.2a) at negative pressure to ensure most airborne leakage (excluding noble gases) from the containment structure is collected and filtered before discharge to the plant vent. b. One of two redundant charcoal filter exha ust trains is placed in operation in the Fuel Storage Building whenever irradiation fuel not in a cask is being handled. These filter units together with dampers and controls will maintain the building at a negative pressure.
Detailed discussions on these systems are presented in Subsection 6.5.1. 1.2.5.9 Emergency Feedwater System The Emergency Feedwater System supplies demineralized water from the condensate water storage tank to the four steam generators upon loss of normal feedwater flow to remove heat from the Reactor Coolant System. Operation of the system will continue until the reactor coolant system pressure is reduced to a value below which the Residual Heat Removal System can be operated. The combination of one turbine-driven and one motor-driven emergency feedwater pump provides a diversity of power sources to assure delivery of condensate under emergency conditions.
A detailed discussion of the system is presented in Section 6.8. 1.2.6 Instrumentation and Controls 1.2.6.1 Reactor Trip System The Reactor Trip System automatically initiates a reactor trip when any monitored variable or combination of variables approaches pre-established limits. Suffi cient redundancy is provided to permit periodic testing while maintaining capability to meet single failure criteria. The Reactor Protection System acts to shut down the reactor, close isolation valves, and initiate operation of the Engineered Safety Features should a ny or all of these actions be required.
A detailed discussion on this system is presented in Section 7.2.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 15 1.2.6.2 Engineered Safety Features Systems This system provides the instrumentation and controls required to sense accident situations and initiate the operation of necessary Engineered Safety Features. The system is designed to ensure adequate redundancy and separation to provide reliable system initiation and meets single failure criteria.
A detailed discussion on this system is presented in Section 7.3. 1.2.6.3 Other Safety Significant Systems Instrumentation and controls are provided to actuate, control and monitor systems required for safe shutdown. The instrumentation and controls are designed to ensure reliable operation and meet single failure criteria.
The accident monitoring instrumentation (AMI) displays provide the information necessary for the operators to monitor plant variables and systems during and following postulated accidents. The AMI provides the operators the information nece ssary to assist in evaluating the nature of the accident, the functioning of engineered safety features actuation systems, the plant response to safety measures in operation and the need for additional manual action. Detailed discussions on these systems are presented in Sections 7.4 and 7.5. 1.2.7 Electric Power The facility is interconnected to offsite power via three 345 kilovolt lines of the transmission system for the New England states. The normal pr eferred source of power for the unit is its own main turbine generator. The redundant safety feature buses of the un it are powered by two unit auxiliary transformers. A highly reliable generator breaker is pr ovided to isolate the generator from the unit auxiliary transformers in the event of a genera tor trip, thereby obviating the need for a bus transfer upon loss of turbine generator power. In the event that the unit auxiliary transformers are not available, the redundant safe ty feature buses of th e unit are powered by two reserve auxiliary transformers.
Upon loss of offsite power, the unit is supplied with adequate power by either of two fast-star ting, diesel-engine genera tors. Either diesel-engine generator and its associated safety feature bus is capable of providing adequate power for a safe shutdown under accident conditions with a concurrent loss of offsite power. A non-safety related supplemental emergency power system (SEPS) is available as a backup power source to either safety feature bus when the emergency diesel generators fail to start and load. SEPS is capable of providing adequate power for a safe shutdown under loss of offsite power condition. A constant supply of power to vital instruments and controls of each unit is assured through the redundant 125 volt direct current buses and their as sociated battery banks, battery chargers and inverters.
A detailed discussion on this system is presented in Chapter 8.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 16 1.2.8 Auxiliary Systems 1.2.8.1 Fuel Storage and Handling The reactor is refueled with equipment designed to handle spent fuel under water from the time it leaves the reactor vessel until it is transferred into the spent fuel pool for storage. Transfer of spent fuel under water enables the use of an optically transparent radiation shield, and provides a reliable source of coolant for removal of residual heat. The system includes a manipulator crane located inside the Containment above the refu eling cavity, fuel transf er carriage, upending devices, fuel transfer tube, spent fuel pool crane in the spent fuel pool area, and various devices used for handling new fuel assemblies. New fuel is taken from the new fuel storage vault and transferred to the Containment using the upending devices and transfer carriage. It is then put into the core using the manipulator crane. Spent fuel is taken out in the same manner and transferred back into the spent fuel pool for storage.
The new fuel is stored dry on 21-inch centers in the new fuel va ult. The new fuel vault is designed to assure a k eff 0.98 even if optimum neutron moderation is assumed. The spent fuel racks are designed for high density fuel storage and contain neutron absorbing material to assure a keff 0.95, even if no credit is taken for the sol uble boron present in the water where the spent fuel is immersed.
Detailed discussion on these systems ar e presented in Subsections 9.1.1, 9.1.2 and 9.1.4. 1.2.8.2 Station Service Water System The Service Water System consists of two comp letely independent and redundant parallel flow trains, each supplying cooling water to a primary component cooling water heat exchanger, a diesel generator water jacket water cooler, the secondary component cooling water heat exchangers and the condenser water box priming pump seal water heat exchangers. Under normal conditions, flow is supplied by pumps taking suction from a common bay of the Service Water Pumphouse; when transfer to the Ultimate Heat Sink Cooling Tower occurs, service water is obtained from the cooling tower basin using the cooling tower pumps. A detailed discussion of this system is presented in Subsection 9.2.1.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 17 1.2.8.3 Cooling System for Reactor Auxiliaries The Primary Component Cooling Water System consists of two independent trains of pumps and heat exchangers to remove heat from the various auxiliary systems. During normal operation, the system circulates corrosion-inhibited demineralized water through all the heat loads associated with primary systems. Some of these loads are the letdown heat exchanger, sample heat exchangers, spent fuel pool heat exchanger, boric acid and waste evaporators. For a LOCA, the system automatically isolates nonsafety-re lated loads and provides cooling for the residual heat exchangers, the containment spray heat exchangers, and other safety-related loads. A detailed discussion of this system is presented in Subsection 9.2.2. 1.2.8.4 Makeup Water System Makeup water is processed in the water treatment plant located in the Administration and Service Building. The water treatment plant can process water at a design flow of 150 gpm for use in both the primary and secondary systems. A detailed discussion of this system is presented in Subsection 9.2.3. 1.2.8.5 Compressed Air System The Compressed Air System consists of two separate subsystems: plant compressed air system and containment compressed air system. The Plant Compressed Air System consists of three compressors, intake filters, aftercooler/moisture separators, four air receivers, two instrument air dryers, associated instruments/controls, piping and valves. The above equipment is located in the south end of the Turbine Building. The Containment Compressed Air System consists of two package compressor units (including intake filter, after cooler/moisture-separator and receiver) that discharge compressed air either to a service air header or to an independent air dryer.
A detailed discussion on this system is presented in Subsection 9.3.1. 1.2.8.6 Ultimate Heat Sink The ultimate heat sink is normally the Atlantic Ocean. Ocean water is supplied to the Service Water System during normal operating and accident conditions through one of two tunnels. The heated water is then returned to the ocean through the other tunnel. In the unlikely event that the tunnels are unavailable, the ultimate heat sink is transferred to a mechanical draft cooling tower. The cooling water is supplied by cooling tower pumps to the primary component cooling water and diesel generator heat exchangers.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 18 A detailed discussion of this system is presented of Subsection 9.2.5. 1.2.8.7 Chemical and Volume Control System The Chemical and Volume Control System functions to control reactivity in the core by boron addition or dilution; purify the reactor coolant by filtering, demineralizing and injecting clean water; add chemicals for corrosion control of the reactor coolant, and supply purified water to the reactor coolant pump seals.
The purity level in the Reactor Coolant System is controlled by continuous purification of a letdown stream of reactor coolant. Water letdown from the Reactor Coolant System is first cooled in two heat exchangers. It is then filtered, demineralized and degassed to remove corrosion and fission products and is sp rayed into the volume control tank. The Chemical and Volume Control System automatically adjusts the amount of reactor coolant to compensate for changes in specific volume due to coolant temperature changes and reactor coolant pump shaft seal leakage in order to maintain a constant level in the pressurizer.
A detailed discussion on this system is presented in Subsection 9.3.4. 1.2.8.8 Boron Recovery System The Boron Recovery System stores and processe s reactor coolant effluent and reactor coolant grade drainage for reuse in the reactor plant or for disposal offsite. The system maximizes recycling of effluent back to the reactor plant and minimizes the release of radioactive material to the environment by proper cleanup and volume reduction methods. The system process is a combination of degassification, demineralization, filtration and evaporation.
A detailed discussion on this system is presented in Subsection 9.3.5. 1.2.8.9 Air Conditioning, Heating, Cooling and Ventilating Systems The Ventilation and Air Conditioning Systems for Engineered Safety Features and other essential equipment rooms provide an adequate supply of tempered air to safety-related and emergency equipment areas during accident and post-accident conditions. These Ventilation and Air Conditioning Systems are redundant and seismically designed. The Ventilation and Air Conditioning Systems also provide clean ventilating air, heat ed or cooled when required, to all plant areas during normal operating conditions.
Flow patterns have been esta blished so that air in areas of low potential radioactive contamination progress toward areas of higher potential radioactive contamination.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 19 A Containment Recirculating Filter System provides atmospheric mixing following a LOCA, to prevent excessive hydrogen concentrations in the dome portion of the Containment which also provides for containment cleanup during normal plant operation. A Containment Purge System permits purging of the Containm ent prior to personne l entry, after reactor shutdown, and during refueling. An Online Purge System permits purging of the Containment periodically during normal plant operation.
Detailed discussions on these systems are presented in Section 9.4. 1.2.8.10 Plant Fire Protection System The Fire Protection System contains two diesel-driven and one electric motor-driven fire pumps which supply the various hydrants, hose stations and sprinkler and spray systems. The pumps take suction from two 500,000-gallon storage ta nks. Three hundred thousand gallons of water from each tank is dedicated for fire protection; the remainder is available for other plant use.
Standpipes and hose stations in areas containing safe shutdown equipment are also capable of being fed from the Service Water System.
Fire detection is provided at locations determined by the fire hazard analysis as having significant fire hazards resulting from the presence of combustible liquids, solids or other flammable materials. Detection is also provided in other areas on a case basis.
Portable hand-held extinguishers, primarily dry chemical, CO 2, Halon 1211 and water, are provided at strategic locations thro ughout the various plant buildings.
A detailed discussion on this system is presented in Subsection 9.5.1. 1.2.8.11 Lighting Systems The lighting systems provide the illumination required for plant operation and maintenance, and for personnel safety and convenience. Upon loss of offsite power, AC emergency lighting is powered by the diesel generators to provide c ontinued onsite lighting. Upon loss of all AC power, DC lighting is provided for immediate short-term illumination. A detailed discussion on these systems is presented in Subsection 9.5.3. 1.2.8.12 Communication System The communications system provides for intraplant and offsite communications. The system consists of telephone, public address, sound-powered telephone, plant radio system and microwave link. The five subsystems are totally in dependent of each other so that a failure in one does not affect the others. A detailed discussion on this system in Subsection 9.5.2.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 20 1.2.8.13 Radiation Data Management System The Radiation Data Management System consists of three subsystems: process and effluent radiation monitoring system, area radiation monitoring system, airborne and particulate radioactivity monitoring system.
A detailed discussion on this system is presented in Sections 11.5 and 12.3. 1.2.9 Steam and Power Conversion System 1.2.9.1 Main Steam Supply System Steam is supplied from the outlet of four steam generators, taking heat from the Pressurized Water Reactor Coolant System to drive the turbine. Each steam line includes a flow restrictor, power-operated atmospheric relief valve, safety valves and isolation valve. The Main Steam System also provides primary steam to the reheaters, steam generator feed pumps and the seal system.
A detailed discussion on this system is presented in Section 10.3. 1.2.9.2 Turbine Generator The turbine generator nameplate output is 1,304,003 kW at rated conditions. The turbines are six flow tandem compound 1800 rpm machines with 43-inch last stage buckets. The throttle steam conditions are 960 psig, 1192H with one stage of re heat. The unit has six stages of feedwater heating fed by extraction steam from the turbines. Steam from the moisture separator/reheaters is used to supply two turbine-driven steam generator feed pumps during normal operation. The rating of the generator output is 1,373,100 kVA at 1800 rpm, 3-phase 60 Hz, 0.94 power factor, 0.52 short circuit ratio and a rate d hydrogen pressure of 75 psig.
A detailed discussion is presented in Section 10.2. 1.2.9.3 Main Condensers/Condenser Evacuation System The condenser system consists of three deaerating, double-pass, single pressure, radial flow-type surface condensers, having titanium tubes. A condenser air evacuation system removes noncondensible gases from the main condensers of the unit and delivers these gases to the atmosphere after monitoring for radioactivity. A detailed discussion on this system is presented in Subsections 10.4.1 and 10.4.2.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 21 1.2.9.4 Condensate and Feedwater System The Condensate and Feedwater System takes suction from the main condenser hotwell and heater drain tank and delivers feedwater to the steam generators at increased temperature and pressure. A startup feedwater pump is provided to deliver the required flow of water to the steam generators during star tup, hot standby and shutdown.
A detailed discussion on this system is presented in Section 10.4. 1.2.9.5 Secondary Component Cooling Water System The Secondary Component Cooling Water System removes heat from the turbine accessories and auxiliary equipment and transfers the heat to the Service Water System.
A detailed discussion on this system is presented in Subsection 10.4.10. 1.2.9.6 Steam Generator Blowdown System The Steam Generator Blowdown System receives, processes and recycles water from the secondary side of the steam generators. The blow down from each of the four steam generators is routed to a flash tank where the flashed steam is removed and routed to the main condenser. Residual liquid from the flash tank may be further processed through the Waste Liquid System if found to be radioactive; otherwise, it is recycled back to the pl ant for storage and/or use, or discharged to the Circulating Water System.
A detailed discussion on this system is presented in Subsection 10.4.8. 1.2.9.7 Circulating Water System Cooling of the Main Condenser System is via water taken from the Atla ntic Ocean through one 19-foot diameter tunnel which is pumped through the three condenser shells.
The heated water is returned to the ocean through one 19-foot diameter tunnel with diffusers.
A detailed discussion is pres ented in Subsections 9.2.5 and 10.4.5. 1.2.10 Radioactive Waste Management 1.2.10.1 Liquid Waste Management System The Liquid Waste System stores and processe s nonrecoverable radioac tive liquid waste from various sources throughout the plant. The system normally uses a combination of filtration and demineralization to convert the waste into a liquid acceptable for discharge to the environment and a concentrate suitable for solidification. Permanently installed evaporators ma y be used as an alternate method for processing liquids.
A detailed discussion on this system is presented in Section 11.2.
S EABROOK S TATION UFSAR INTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT General Plant Description Revision 12 Section 1.2 Page 22 1.2.10.2 Gaseous Waste Management System The Radioactive Gaseous Waste System is desi gned to collect and process fission product gases from the reactor coolant letdown stream and from the liquids collected in the reactor coolant drain tank and primary drain tank. This system is also used to recycle hydrogen as well as introduce makeup hydrogen from the storage system.
A detailed discussion on this system is presented in Section 11.3. 1.2.10.3 Solid Waste Management System The Solid Waste Management System consists of the following subsystems: spent resin sluicing, Dry Active Waste (DAW) volume reduction, altern ate solidification, and volume reduction and solidification in asphalt. Volume reduction and solidification is further broken down to waste concentrates handling, spent resin handling, liquid waste volume reduction, and material handling.
A detailed discussion on the Solid Waste Management System is presented in Section 11.4.
S EABROOK S TATION UFSAR I NTRODUCTION AND G ENERAL D ESCRIPTION OF P LANT Comparison Tables Revision 8 Section 1.3 Page 1 1.3 COMPARISON TABLES Comparison Table 1.3-1 and Table 1.3-2 are provide d in the Updated FSAR for continuity with the original FSAR. These tables have not been revised for the Updated FSAR.
1.3.1 Comparisons
with Similar Facility Designs Table 1.3-1 provides a summary of principal design similarities and differences between Seabrook Station and other nuclear power plants using the same NSSS supplier. The comparison covers the reactor design, the engineered safety features, containment concept, the instrumentation and electrical systems, the Radioactive Waste Management System, and other principal systems. The plants selected for the comparison were W. B. McGuire Nuclear Station (Duke Power Company), Comanche Peak Steam Electric Station (Texas Utilities Generating Company), and Byron/Braidwood Station (Commonwealth Edison Company). A detailed comparison of principal nuclear, thermal-hydraulic, and mechanical design parameters between the Seabrook and W. B. McGuire reactors is presented in Table 4.1-1.
1.3.2 Comparison
of Final and Preliminary Information Table 1.3-2 outlines the significant design changes that have been made since the submittal of the Preliminary Safety Analysis Report (PSAR).
S EABROOK S TATION UFSA R I NTRODUCTION AND GENERAL D ESCRIPTION OF P LANT Identification of Agents and Contractors Revision 9 Section 1.4 Page 1 1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS
1.4.1 Applicants
Public Service Company of New Hampshire (PSNH), the former principal owner, was responsible for the design, construction, and st artup of Seabrook Station. FPLE Seabrook is currently responsible for the operation of S eabrook Station. The following contractors and service organizations were engaged to perform engineering, design, procurement, construction and technical support services for the cons truction and operation of Seabrook Station.
1.4.2 Yankee
Atomic Electric Company PSNH contracted with Yankee Atomic Electric Company (YAEC) for the services of certain personnel involved in project engineering, li censing, and fuel supply. In addition, PSNH contracted with YAEC for establishing and implementing the Quality Assurance Program for design and construction. 1.4.3 Westinghouse Electric Corporation Westinghouse Electric Corporation was contracted to design, fabricate and deliver the Nuclear Steam Supply System (NSSS) and nuclear fuel for the plant. Westinghouse also provided technical assistance for installation and startup of their supplied equipment. NSSS equipment is listed in Table 3.2-2. 1.4.4 United Engineers & Constructors Inc.
United Engineers & Constructors (Philadelphia, Pennsylvania) provided engineering, design and procurement services for the balance of plant.
As Construction Managers, UE&C directed construction of the plant by the various subcontr actors and also provided technical assistance in the startup program when requested. In July 1984 various subcontractors were terminated and UE&C assumed responsibility for direction of the majority of the construction labor forces. Balance-of-plant equipment supplied through UE&C is listed in Table 3.2-2. 1.4.5 General Electric Company The turbine generators for Seabrook Station were supplied by General Electric Company. 1.4.6 Major Construction Contractors Other major construction contractors or subcontr actors that provided construction services are listed below:
S EABROOK S TATION UFSA R I NTRODUCTION AND GENERAL D ESCRIPTION OF P LANT Identification of Agents and Contractors Revision 9 Section 1.4 Page 2 Organization Construction Service Daniel O'Connell's Sons, Inc. Site preparation (excavation) Phillips, Getschow Co. Yard and fire pumphouse piping Pittsburgh Test Laboratory Field testing laboratory services Perini Corporation General concrete Pittsburgh-DesMoines Steel Co. Containment liner and field fabricated tanks.
Pullman Inc./J.C. Higgins Co., Inc. Piping and mechanical equipment installation Fischbach and Moore Inc.
E.S. Boulos Div.
Electrical installation Manzi Electrical Corp. Electrical installation Morrison Knudsen Tunneling and marine work Johnson Controls Inc. Instrument installation Grinnel Fire Protection Systems Fire protection systems Bisco Penetration fire seals 1.4.7 Service Organizations The services of various technical support or ganizations were used during the design and construction of Seabrook Station. A list of the major consultants includes the following: Organization Consultation Service Weston Geophysical Research Jack Rand Geology & seismology American Drilling & Boring Warren George Core Drilling Geotechnical Engineering Geotechnical & soils TRC Meteorology S EABROOK S TATION UFSA R I NTRODUCTION AND GENERAL D ESCRIPTION OF P LANT Identification of Agents and Contractors Revision 9 Section 1.4 Page 3 Organization Consultation Service Dames & Moore Hydrometeorology Alden Research Laboratories Hydraulic & model testing Environmental Research &
Technology Demography Wilbur Smith Traffic Study Marc Analysis Research Computer program analysis (containment) Wiss, Janney, Elstner & Assoc. Containment liner anchor load test Erlin-Himes Assoc.
Concrete test evaluation Construction Engineering Consultants Concrete mix design Teledyne Engineering Services Piping analysis NUCON Gaseous waste system design Applied Research Assoc., Inc. Tornado missile evaluations
Pickard, Lowe & Garrick Probabilistic risk assessment Sheridan Associates Detailed control room design review Impell Environmental qualification review Cynga Piping analysis Bechtel Cable tray analysis Ebasco General consulting services
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF PLANT Requirements for Further Technical Information Revision 8 Section 1.5 Page 1 1.5 REQUIREMENTS FOR FURTHER TECHNICAL INFORMATION Reference 1 presents descriptions of the safety-related research and development programs that have been carried out for, or by, or in conjunction with Westinghouse Nuclear Energy Systems, and which are applicable to Westinghouse pressurized water reactors. The technical information generated by these research and development programs is used either to demonstrate the safety of the design and more sharply define margins of conservatism, or leads to design improvements. Included in the overall research and development effort is the program described below that is applicable to this plant, but is not required for issuance of an Operating License.
1.5.1 Blowdown
Heat Transfer Testing 1.5.1.1 Introduction The NRC acceptance criteria for emergency core cooling systems (ECCSs) for light-water power reactors was issued in Section 50.46 of 10 CFR 50 on December 28, 1973.
It defines the basis and conservative assumptions to be used in the evaluation of the performance of ECCSs. Westinghouse believes that some of the conservatism of the criteria is associated with the manner in which transient critical heat flux (CHF) phenomena are treated in the evaluation models. Transient critical heat flux data presented at the 1972 specialists meeting of the Committee on Reactor Safety Technology (CREST) indicated that the time to CHF can be delayed under transient conditions. To demonstrate the conservatism of the ECCS evaluation models, Westinghouse initiated a program to experimentally simulate the blowdown phase of a loss-of-coolant accident (LOCA). This testing was part of the Electric Power Research Institute (EPRI) sponsored Blowdown Heat Transfer Program, that was st arted in early 1976. Testing was completed in 1979. A CHF correlation will be developed by Westinghouse from these test results for use in the ECCS analyses.
1.5.1.2 Objective The objective of the Blowdown Heat Transfer Test was to determine the time that CHF occurs under LOCA conditions. This inform ation will be used to confirm the existing, or develop a new Westinghouse transient correlation. The steady-state CHF data obtained from 15x15 and 17x17 assembly test programs can be used to assure that the geometrical differences between the two fuel arrays can be correctly treated in the transient correlations.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF PLANT Requirements for Further Technical Information Revision 8 Section 1.5 Page 2 1.5.1.3 Program The program was divided into two phases. Ph ase I tests were initiated from steady-state conditions, with sufficient power to maintain nucleate boiling throughout th e bundle. Controlled ramps of decreasing test section pressure or flow initiated CHF. By applying a series of controlled conditions, investigation of the CHF is studied over a range of qualities and flows, and at pressures relevant to a pressurized water reactor blowdown. Phase I provided separate-effects data for heat transfer correlation development. Typical parameters used for Phase I testing are shown on Table 1.5-1. Phase II simulates pressurized water reactor behavior during a LOCA to permit definition of the time delay associated with onset of CHF. Tests in this pha se covered the large double-ended guillotine cold leg break. The test in Phase II was also started after establishment of typical steady-state operating conditions. The fluid transient was then in itiated, and the rod power decay programmed to simulate the actual heat input of fuel rods. The test was terminated when the heater rod temperatures reached a predetermined limit. Typical parameters used for Phase II testing are shown on Table 1.5-2.
1.5.1.4 Test Description The experimental program was conducted in the J-Loop at the Westinghouse Forest Hills Facility with a full length 5x5 rod bundle simulating a section of a 15x15 assembly to determine CHF occurrence under LOCA conditions. The heater rod bundle used in this program consis ts of internally heated rods, capable of a maximum power of 18.8 kW/ft, with a total power of 135 kW (for extended periods) over the 12-foot heated length of the rod. Heat was generated internally by means of a varying cross-sectional resistor which approximates a chopped cosine pow er distribution. Each rod was adequately instrumented with a total of 12 clad thermocouples.
1.5.1.5 Results The experiments in the J-Loop facility resulted in cladding temperature and fluid properties measured as a function of time throughout the blowdown range from 0 to 20 seconds. Facility modifications and installa tion of the initial test bundle have been completed. A series of shakedown tests in the J-Loop have been performed. These tests provided data for instrumentation calibration and check-out, and provided information regard ing facility control and performance. Initial program tests were performed during the first half of 1975. Under the sponsorship of EPRI, testing was reinitiated during 1976 on the same test bundle. The testing was terminated in November of 1976 and furthe r testing with a new test bundle was conducted during 1978-79. A CHF correlation will be developed from these test results for use in the Westinghouse ECCS analyses.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF PLANT Requirements for Further Technical Information Revision 8 Section 1.5 Page 3 1.5.2 References
- 1. Eggleston, F.T., "Safety-Related Research and Development for Westinghouse Pressurized Water Reactors, Program Summaries," WCAP-8768, Revision 2, October, 1978.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL D ESCRIPTION OF P LANT Material Incorporated by Reference Revision 8 Section 1.6 Page 1 1.6 MATERIAL INCORPORATED BY REFERENCE Table 1.6-1 lists topical reports with information additional to that provided in the UFSAR which have been filed separately with the Nuclear Regulatory Commission (NRC) in support of this and similar applications.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Drawings and Other Detailed Information Revision 9 Section 1.7 Page 1 1.7 DRAWINGS AND OTHER DETAILED INFORMATION FPLE Seabrook maintains configuration contro l under which selected design drawings are regularly updated to reflect changes in the facility implemented under the FPLE Seabrook and previous contractor Design Control Programs. Design drawings include the following examples:
DISCIPLINE:
SYSTEMS DESCRIPTION Piping and Instrumentation Diagram, (B series)
Data sheets for motor- and air-operated valves and dampers 1-NHY-250000 Engineering Safety Features Flow Diagram 1-NHY-804979 DISCIPLINE: INSTRUMENT AND CONTROL DIAGRAMS Logic diagrams Loop diagrams Westinghouse block diagrams Safeguard information DISCIPLINE: ELECTRICAL NHY schematics Foreign prints Control wiring diagrams (CWDs)
NHY Drawings 1) Single line diagrams
- 2) Substation drawings Appendix "R" emergency lighting Bus failure analysis S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Drawings and Other Detailed Information Revision 9 Section 1.7 Page 2 Design drawing current revision status is reflected on the Document Distribution System (DDS)
Report. The original FSAR contained tables in this section which listed all design drawing numbers, drawing titles, revision numbers and dates. This listing was voluminous and the regular updating of drawings resulted in much of the listing being out of date. The Updated FSAR does not contain a complete lis t of design drawings. A cross-reference list for those figures included in the Up dated FSAR is provided in Table 1.1-1.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 1 1.8 CONFORMANCE TO NRC REGULATORY GUIDES This section addresses the degree of conformance to each of the applicable NRC Division I regulatory guides. Where strict conformance to the requirements or guidelines of Regulatory Guides or Standards would conflict with reasonable compliance to the ALARA guidelines of Regulatory Guide 8.8, the degree of such conformance will be determined by appr opriate levels of management.
Regulatory Guide 1.1 (Rev. 0, 11/70)
Net Positive Suction Head for Emergency Core Cooling and Containment Heat Removal System Pumps The BOP design complies fully with Regulatory Guide 1.1.
The NSSS is designed to an acceptable alternative method rather than Regulatory Guide 1.1. This subject is further discussed in Subsection 6.3.2.2.
Regulatory Guide 1.2 (Rev. 0, 11/70)
Thermal Shock to Reactor Pressure Vessels All the recommendations of Regulatory Guide 1.2 have been followed. For further discussion, refer to Section 5.3.
Regulatory Guide 1.3 (Rev. 2, 6/74)
Assumptions Used for Evaluating the Potential Radiological Consequences of a Loss-of-Coolant Accident for Boiling Water Reactors This regulatory guide is not applicable to Seabrook Station.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 2 Regulatory Guide 1.4 (Rev. 2, 6/74)
Assumptions Used for Evaluating the Potential Radiological Consequences of a Loss-of-Coolant Accident for Pressurized Water Reactors The requirements of Regulatory Guide 1.4, Rev. 2, have been met with the following exceptions: Section c.2.d The iodine dose conversion factors given in ICRP Publication 2, Report of Committee II, "Permissible Dose for Internal Radiation," 1959, have not been used. Instead, the iodine dose conversion factors presented in Regulatory Guide 1.109, "Calculation of Annual Doses to Man from Routine Releases of Reactor Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50, Appendix I," USNRC (October 1977), have been used. Section c.2.e The equations presented for beta dose rates and gamma dose rates from an infinite cloud have not been used. Instead, external whole body gamma doses and beta plus gamma skin doses are evaluated using a semi-infinite cloud model for atmospheric dispersion and the gamma and beta dose conversion fact ors presented in Regulatory Guide 1.109.
A discussion of dose methodology used is pr esented in Appendix 15A to Chapter 15. Section c.2.g The atmospheric diffusion model presented has not been used. Instead, the atmospheric dispersion model presented in Regulatory Guide 1.145, "Atmospheric Dispersion Models for Potential Accident Consequence Assessm ents at Nuclear Power Plants" USNRC, August 1979, has been used.
A discussion of the short-term (accident) diffusion estimates is presented in Subsection 2.3.4 and Appendix 15B to Chapter 15.
Regulatory Guide 1.5 (Rev. 0, 3/71)
Assumptions Used for Evaluating the Potential Radiological Consequences of a Steam Line Break Accident for Boiling Water Reactors This regulatory guide is not applicable to Seabrook Station.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 3 Regulatory Guide 1.6 (Rev. 0, 3/71)
Independence Between Redundant Standby (Onsite)
Power Sources and Between Their Distribution Systems The design totally conforms with the recommendations of this regulatory guide. The subject matter of this guide is discussed in Subsections 8.1.5.3.a, 8.3.1.1, 8.3.1.2 and 8.3.2.2.
Regulatory Guide 1.7 (Rev. 2, 11/78)
Control of Combustible Gas Concentrations in Containment Following a Loss-of-Coolant Accident Seabrook Station employs a large dry containment for containing fission gases and aerosols following an accident, in accordance with GDC 50. Any hydrogen generated during an accident is controlled per GDC 5, 41, 42, 43 and 10 CFR 50.44. Regulatory Guide 1.7, Rev. 3 details an acceptable method of showing compliance with the GDC. The design of the Seabrook plant, considering the Westinghouse scope of supply, was analyzed against GDC 41 and 50, using assumptions specified in Rev. 3 of this guide.
The BOP design complies fully with Regulatory Guide 1.7, Rev. 3 and provides the capability to continuously measure the concentration of hydrogen in the containment atmosphere following a beyond-design-basis accident for accident management, including emergency planning.
Refer to Subsection 6.2.5 for furthe r discussion of this subject.
Regulatory Guide 1.8 (Rev. 3, 5/00)
Qualification and Traini ng of Personnel for Nuclear Power Plants Endorses ANSI/ANS-3.1-1993 for experience requirement sections 4.4.1, "Operations Shift Supervisor," 4.4.2, "Senior Operator," 4.5.1, "Reactor Operator," and 4.6.2, "Shift Technical Advisor" with the exceptions as noted in Regulatory Guide 1.8, Revision 3.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 4 (Rev. 2, 4/87)
Qualification and Traini ng of Personnel for Nuclear Power Plants Endorses ANS 3.1/ANSI N18.1-1971 - and Section 4.4.4, "Radiation Protection" of ANSI/ANS 3.1-1981.
The personnel selection and training program meets the requirements of Regulatory Guide 1.8 (1987 edition), except that ANSI/ANS 3.1-1978 will be used as the standard rather than ANS 3.1/ANSI N18.1-1971 except as discussed in the UFSAR Sections noted below. The Nuclear Oversight Manager will meet the requirements for "Professional Technical" positions in ANSI N18.1-1971 as endorsed by Regulatory Guide 1.8, Revision 2.
With regard to Section 4 of ANS 3.1-1978, individuals other than the Nuclear Oversight Manager, who do not possess the formal requirements specified in this section shall not be automatically eliminated where other factors provide sufficient demonstrations of their abilities. The requirement in Section 4.2.2 for the Operations Manager to hold a senior reactor operator's license is modified to require this individual to hold or have held a senior reactor operator's license at Seabrook Station prior to assuming the Operations Manager position, which is consistent with ANS 3.1-1987. A retraining and replacement licensed training program for the Station Staff shall be maintained under the direction of the Training Manager in accordance with the Seabrook Station Institute of Nuclear Power Operations (INPO) Accredited Programs.
For further clarification and a lternatives, see discussion in Sections 13.1, 13.2, and in Regulatory Guide 1.58 appearing later in this section.
Regulatory Guide 1.9 (Rev. 2, 12/79)
Selection of Diesel Generator Set Capacity Standby Power Supplies The diesel generator design is in general conformance with the recommendations of Regulatory Guide 1.9. Position C.14 requires that the engine run at full load for 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />, following 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at short-time rated load. For Seabrook, a "Load Capability Qualification" test was performed per IEEE 387-1977. The engine was run at full load for 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> after reaching equilibrium temperature, followed by 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at the short-time rated load. The subject matter of this guide is discussed in Subsections 8.1.5.3.b and 8.3.1.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 5 Regulatory Guide 1.10 (Rev. 1, 1/73)
Mechanical (Cadweld) Splices in Reinforcing Bars of Category I Concrete Structures The requirements for crew qualific ation, inspection, testing and sampling of mechanical splices in reinforcing bars of concrete structures comply with the regulatory positions outlined in Regulatory Guide 1.10, Rev. 1, except that retesti ng due to the failure of production and sister mechanical splices is in accordance with ASME Section III, Division 2, 1975 edition and Article CC-4333.4.5(b) of the Winter 1979 Addenda in lieu of the corresponding article in the 1975 code. For further discussion on th is subject, refer to Subsection 3.8.1.6.
This regulatory guide was withdrawn on Ju ly 8, 1981, and superseded by Regulatory Guide 1.136, Rev. 2, 6/81.
Regulatory Guide 1.11 (Rev. 0, 3/71)
Instrument Lines Penetrating Primary Reactor Containment The design of instrument lines penetrating primary containment conforms with the intent of Regulatory Guide 1.11, except where modified by Regulatory Guide 1.141.
Additional discussion relative to containment isolation system s is provided in Subsections 6.2.4.1.d, 6.2.4.2m, 7.1.2.2a, and 7.3.1.1b.
Regulatory Guide 1.12 (Rev. 1, 4/74)
Instrumentation for Earthquakes Seismic instrumentation has been selected to provide a basis for comparing recorded response to that used as a design basis. This instrumentation is in compliance with the seismic instrumentation program described in Regulatory Guide 1.12, Rev. 1, and as applicable, ANSI 2.2, "Earthquake Instrumentation Criteria for Nuclear Power Plants." For further discussion and exceptions to Regulatory Guide 1.12, Rev. 1, see Subsections 3.7(B).4.1 and 3.7(B).4.2.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 6 Regulatory Guide 1.13 (Rev. 1, 12/75)
Spent Fuel Storage Facility Design Basis The design complies with the intent of Regulatory Guide 1.13, Rev. 1. No loss of water from the spent fuel storage area can occur as a result of cask drop [Historical Event] and liner failure, since the spent fuel storage area is isolated by a gate during cask handling operations. See Subsection 9.1.2 for a discussion on the detailed design.
Regulatory Guide 1.14 (Rev. 1, 8/75)
Reactor Coolant Pump Flywheel Integrity The NSSS design follows the recommendations of Regulatory Guide 1.14, Rev. 1, except for the following: a. Post-Spin Inspection Westinghouse has shown in Reference 1 th at the flywheel would not fail at 290 percent of normal speed for a flywheel flaw of 1.15 inches or less in length.
Results for a double-ended guillotine break at the pump discharge, with full separation of pipe ends assumed, showed the maximum overspeed to be less than 110 percent of normal speed. The maximum overspeed was calculated in Reference 1 to be about 280 percent of normal speed for the same postulated break, and an assumed instantaneous loss of power to the reactor coolant pump. In comparison with the overspeed presen ted above, the flywheel is tested at 125 percent of normal speed. Thus, the fl ywheel could withstand a speed up to 2.3 times greater than the flywheel spin test speed of 125 percent provided that no flaws greater than 1.15 inches are present. If the maximum speed were 125 percent of normal speed or less, the cr itical flaw size for failure would exceed 6 inches in length. Nondestructive tests and critical dimension examinations are all performed before the spin tests. The inspection methods employed (described in Reference 1) provide assurance that flaws significantly smaller than the critical flaw size of 1.15 inches for 290 percent of normal speed would be detected.
Flaws in the flywheel will be recorded in the pre-spin inspection program (see Reference 1). Flaw growth attributable to the spin tests (i.e., from a single reversal of stress, up to speed and back), under the most adverse conditions, is about three orders of magnitude smaller than that which nond estructive inspection techniques are capable of detecting. For these reasons, Westinghouse performs no post-spin inspections and believes that pre-spin test inspections are adequate.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 7 b. Interference-Fit Stresses and Excessive Deformation Much of Revision 1 to Regulatory Guide 1.14 deals with stresses in the flywheel resulting from the interference fit between the flywheel and the shaft. Because the NSSS design specifies a light interfer ence fit between the flywheel and the shaft, at zero speed the hoop stresses and radial stresses at the flywheel bore are negligible. Centering of the flywheel relative to the shaft is accomplished by means of keys and/or centering devices attached to the shaft, and at normal speed, the flywheel is not in contact with the shaft in the sense intended by Revision 1 of Regulatory Guide 1.14. Hence, the definition of "Excessive Deformation," as defined in Revision 1 of Regulatory Guide 1.14, is not a pplicable to this design since the enlargement of the bore and subsequent partial separation of the flywheel from the shaft does not cause unbalance of the flywheel. Extensive Westinghouse experience with reactor coolant pump flywheels installed in this fashion has verified the adequacy of the design. The combined primary stress levels, as defined in Revision 1 of Regulatory Guide 1.14 (Regulatory Positions C.2.a and C.2.c) are both conservative and proven, and no changes to these stress levels are necessary. The flywheels are designed to these stress limits and, thus, do not have permanent distortion of the flywheel bore at normal or spin test conditions. c. Discussion B, Cross-Rolling Ratio of 1 to 3 Specification of a cross-rolling ratio is considered unnecessary since past evaluations have shown that ASME SA-533, Grade B, Class 1 materials produced without this requirement have su itable toughness for typical flywheel applications. Proper material selection and specification of minimum material properties in the transverse direction adequately ensure flywheel integrity. An attempt to gain isotropy in the flywheel material by means of cross-rolling is unnecessary since adequate margins of safety are provided by both flywheel material selection (ASME SA-533, Grade B, Class 1) and by specifying minimum yield and tensile levels and toughness test values taken in the direction perpendicular to the maximum working direction of the material.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 8 Regulatory Guide 1.15 (Rev. 1, 12/18/72)
Testing of Reinforcing Bars for Category I Concrete Structures The requirements for testing and inspection of reinforcing bars for all seismic Category I concrete structures comply fully with Regulatory Guide 1.15, Rev. 1. Containment reinforcing bar testing is discussed further in Subsection 3.8.1.6.
This Regulatory Guide was withdrawn on Ju ly 8, 1981, and superseded by Regulatory Guide 1.136, Rev. 2, 6/81.
Regulatory Guide 1.16 (Rev.. 4, 8/75)
Reporting of Operating Information -Appendix A, Technical Specifications The reporting of Operating Information, as required by the Technical Specifications, meets the requirements of Regulatory Guide 1.16, Rev. 4.
Regulatory Guide 1.17 (Rev. 1, 6/73)
Protection of Nuclear Power Plants Against Industrial Sabotage A security plan has been developed and implemented for the Seabrook project which meets the intent of Regulatory Guide 1.17, Rev. 1. The plan has been submitted to the NRC in a separate topical report as a proprietary document.
Regulatory Guide 1.18 (Rev. 1, 12/28/72)
Structural Acceptance Test for Concrete Primary Reactor Containments This Regulatory Guide to be used for information only. Refer to Subsection 3.8.1.7a for detailed discussion.
This regulatory guide was withdrawn on Ju ly 8, 1981, and superseded by Regulatory Guide 1.136, Rev. 2, 6/81.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 9 Regulatory Guide 1.19 (Rev. 1, 8/72)
Nondestructive Examination of Primary Containment Liner Welds The codes and methods presented in Regulatory Guide 1.19 for nondestructive examination of primary containment welds were utilized. Inspections were performed in accordance with Article CC-5000 of Division 2 of ASME III. Refer to Subsection 3.8.1.6.
This Regulatory Guide was withdrawn on Ju ly 8, 1981, and superseded by Regulatory Guide 1.136, Rev. 2, 6/81.
Regulatory Guide 1.20 (Rev. 2, 5/76)
Comprehensive Vibration Assessment Program for Reactor Internals During Preoperational and Initial Startup Testing The recommendations of Regulatory Guide 1.20, Rev. 2, were met by conducting the confirmatory preoperational testing examination. Instrument tests are not considered necessary.
For further discussion on this su bject, refer to Subsection 3.9(N).2.4.
Regulatory Guide 1.21 (Rev. 1, 6/74)
Measuring, Evaluating, and Reporting Radioactivity in Solid Wastes and Releases of Radioactive Materials in Liquid and Gaseous Effluents from Light-Water-Cooled Nuclear Power Plants The design guidance of Regulatory Guide 1.21 for the selection of locations and type of effluent measurements to cover all major or potentially significant pathways of release of radioactive materials during normal reactor operation, incl uding anticipated operati onal occurrences, is incorporated into the station design and the requirements of the Technical Specifi cations and the Offsite Dose Calculation Manual (ODCM). UFSAR Section 11.5 describes in detail, the process and effluent monitoring system and sampling system. Technical Specifications and the Offsite Dose Calculation Manual (ODCM) delineate the radioactive liquid and gaseous waste sampling and analysis program requirements. The requirements for solid waste handling are also addressed. The instrument calibration program for instrumentation that supports the requirements of Regulatory Guide 1.21 is described in the ODCM.
The calibration of additional instrumentation described as part of the effluent monitoring systems in UFSAR Section 11.5 will be in accordance with written station procedures.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 10 The reporting of radioactivity in solid, liquid, and gaseous waste released from site, including the estimation impact on man, will be in accordance with station Technical Specifications and the ODCM which reference the use of Regulatory Guide 1.21 for reporting format.
Regulatory Guide 1.22 (Rev. 0, 2/72)
Periodic Testing of Protection System Actuation Functions NSSS systems meet the recommendations of Regulatory Guide 1.22, as discussed in Subsections 7.1.2.5, 8.1.5.3 and 8.3.1. The BOP protection system design is in conformance with IEEE Standard 279-1971. All safety actuation circuitry is provided with a capability for testing with the reactor at power. The protection system, including the engineered safety features test cabine t design, complies with Regulatory Guide 1.22. Periodic testing of protection systems associated with the diesel generators is in accordance with Regulatory Guide 1.22, as supplemented by Regulatory Guide 1.108, Rev. 1.
Regulatory Guide 1.23 (Rev. 0, 2/72) Onsite Meteorological Programs The Operational Primary Meteorological Monitoring System described in Subsection 2.3.3 conforms to Regulatory Guide 1.23 with the following exceptions: Since the base of the Primary Meteorological Tower is located approximately 10 feet (3 meters) below plant grade, the lower level sensors are placed 43 feet (13 meters) above ground level in order to be located 33 feet (10 meters) above plant grade. The Primary Meteorological Monitoring System performance requirements for wind speed, wind direction, and delta-temperature are those specified in Regulatory Guide 1.97 (Rev. 3). Complia nce with these requirements is discussed in Subsection 2.3.3.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 11 Regulatory Guide 1.24 (Rev. 0, 3/72)
Assumptions Used for Evaluating the Potential Radiological Consequences of a Pressurized Water Reactor Radioactive Gas Storage Tank Failure The design and operational bases of the Radioactive Gaseous Waste Disposal System (RGWS) preclude the unilateral assumption that the enti re noble gas inventory of the Reactor Coolant System following a cold shutdown near the end of an equilibrium core is stored in one gas decay tank. The maximum activity that could be released as a result of a gas decay tank failure is the activity stored in one gas decay tank plus associated piping during the period immediately before the tank has been isolated from the RGWS. The activity is such that the offsite dose resulting from a tank failure will be well below 10 CFR 100 guidelines. The design of the RGWS prohibits the transfer of all the gaseous radioactivity in the primary coolant immediately following a cold shutdown at the end of an equilibrium core cycle to one gas decay tank. Thus, Section C.1.a of Regulatory Guide 1.24 is not valid for the analysis of the radiological consequences of a gas decay tank failure for this plant design. For additional discussion, see Subsection 15.7.1.
Regulatory Guide 1.25 (Rev. 0, 3/72)
Assumptions Used for Evaluating the Potential Radiological Consequences of a Fuel Handling Accident in the Fuel Handling and Stor age Facility for Boiling and Pressurized Water Reactors The assumptions in Regulatory Guide 1.25 related to the release of radioactive material from the fuel and fuel storage facility as a result of a fu el handling accident are utilized in the accident analysis described in Subsection 15.7.4, except for the iodine removal efficiencies of the Engineered Safeguard Filter System. The iodine removal efficiencies for this system are assumed to be 95 percent for inorganic iodine and 90 percent for the organic form (see
Appendix 15B), based on the design of this system as described in Subsection 6.5.1. Site specific meteorological data are used to calculate the atmospheric dispersion concentrations in conjunction with the methods described in Section 2.3 in place of the default meteorology represented in Figure 1 of Regulatory Guide 1.25.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 12 Regulatory Guide 1.26 (Rev. 3, 2/76)
Quality Group, Classifications and Standards for Water-, Steam-, and Radioactive-Waste-Containing Components of Nuclear Power Plants The component classification system defined in ANSI N18.2-1973 "Nuclear Safety Criteria for the Design of Stationary Pressurized Water Re actor Plants" and ANSI N18.2a - 1975 "Revision and Addendum to Nuclear Safety Criteria for the Design of Stationary Pressurized Water Reactor Plants" has been employed as an alternate method for meeting the intent of Regulatory Guide 1.26, Rev. 3.
Refer to Section 3.2 for further discussion of this subject.
Regulatory Guide 1.27 (Rev. 2, 1/76)
Ultimate Heat Sink for Nuclear Power Plants The design is committed to the availability of sufficient cooling tower makeup water in the tower basin for seven days of operation during acciden t conditions in the event that cooling tower water is unavailable from the main circulating water tunnels. (Regulatory Guide 1.27 requires 30 days.) During this time period, provisions can be made to transport additional makeup water to the site. If necessary, salt water can be pumped into the tower basin from the nearby Brown's River or Hampton Harbor. A portable, self priming, diesel-driven pump is stored onsite along with sufficient lengths of hose for this pump. For additional discussion, refer to
Subsection 9.2.5.
Regulatory Guide 1.28 (Rev. 2, 2/79)
Quality Assurance Program Requirements (Design and Construction) Endorses ANSI N45.2-1977 The quality assurance program fo r the BOP during design and c onstruction for safety-related equipment, described in Subsections 17.1.1 and 17.1.2, complied with the requirements of ANSI N45.2 and satisfied Regulatory Guide 1.28, Rev. 2. The quality assurance program implemented for the NSSS was discussed in Subsection 17.1.3.
This guide and the standard it endorses have been superseded for operations activities by Regulatory Guide 1.33 and ANSI N18.7-1976 which it endorses. The operational phase complies with ASME NQA-1, 1994 and commitment to Regulatory Guide 1.28 (Safety Guide 28) is per the FPL Quality Assurance Topical Report section A.7.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 13 Regulatory Guide 1.29 (Rev. 3, 9/78)
Seismic Design Classification The BOP design complies fully relative to Regulatory Guide 1.29, Rev. 3. The NSSS design classifies each component important to safety as Safety Class 1, 2 or 3. These classes are qualified to remain functional in the event of the safe shutdown earthquake (SSE), except where exempted by meeting all of the below requirements. Portions of systems required to perform the same safety functi on as required of a safety Class component which is part of that system shall be likewise qualified or granted exemption. Conditions to be met for exemption are: a. Failure would not directly cause a Condition III or IV event (as defined in ANSI N18.2-1973). b. There is no safety function to mitigate, nor could failure prevent mitigation of, the consequences of a Condition III or IV event. c. Failure during or following any Condition II event would result in consequences no more severe than allowe d for a Condition III event. d. Routine post-seismic procedures would disclose loss of th e safety function.
For further discussion, refer to Section 3.2 and Subsection 10.4.7.
Regulatory Guide 1.31 (Rev. 3, 4/78)
Control of Ferrite Content in Stainless Steel Weld Metal The BOP design complies with the intent of Regulatory Guide 1.31, Rev. 3. Refer to Subsection 6.1.1.
The control of delta ferrite in stainless steel welding for NSSS equipment is discussed in Subsection 5.2.3.
Regulatory Guide 1.32 (Rev. 2, 2/77)
Criteria for Safety-Related Electric Power Systems for Nuclear Power Plants The safety-related electric power systems design conforms with the recommendations of Regulatory Guide 1.32, Rev. 2, with the following exceptions: The response to Regulatory Guide 1.75 in this UFSAR Subsection addresses conformance to Regulatory Guide 1.75 which is referenced in Regulatory Guide 1.32 Positions C.1.d and C.1.e.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 14 Regulatory Guide 1.32 states in Position C.1.c that "That battery service test described in IEEE Std 450-1975 should be performed in addition to the battery performance discharge test."
The Technical Specifications require service tests at least once per 18 months and performance discharge tests at least once per 60 months. However, the Technical Specifications allow the performance discharge test to be performed in lieu of (not in addition to) the service test once per 60 month interval. Regulatory Guide 1.32 states in Position C.1.c that "The battery service test should be performed during refueling operations or at some other outage, with the intervals between tests not to exceed 18 months."
The Technical Specifications permit the battery service test to be performed during non-outage periods. The Seabrook Station design incorporates two 100% capacity battery banks per train. Removing one of these battery banks from service for surveillance tes ting does not reduce the system capabilities. The Regulatory Guide assumes only one 100% capacity battery bank per train.
The subject matter of Regulatory Guide 1.32 is further discussed in Subsections 8.1.5.3, 8.3.1 and 8.3.2.
Regulatory Guide 1.33 (Rev. 2, 2/78)
Quality Assurance Program Requirements (Operation)
See FPL Quality Assurance Topical Report Regulatory Guide 1.34 (Rev. 0, 12/72)
Control of Electroslag Weld Properties Where electroslag welding is used in fabricating components, vendors are required to follow the recommendations of Regulatory Guide 1.34.
Regulatory Guide 1.35 (Rev. 2, 1/76 Inservice Surveillance of Ungrouted Tendons in Prestressed Concrete Containment Structures This guide is not applicable, since a steel reinforced concrete containment structure is used.
Regulatory Guide 1.36 (Rev. 0, 2/73)
Nonmetallic Thermal Insulation for Austenitic Stainless Steel The design complies with the recommendations of this guide.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 15 For further discussion, refer to Subsection 6.1.1.
Regulatory Guide 1.40 (Rev. 0, 3/73)
Qualification Tests of Continuous-Duty Motors Installed Inside the Containment of Water-Cooled Nuclear Power Plants The qualification test recommendations of Regulatory Guide 1.40 have been followed. Details of the qualification of specific motors are contained in Reference 15. Refer to Section 3.11 for additional discussion of environmental qualification.
Regulatory Guide 1.41 (Rev. 0, 3/73)
Preoperational Testing of Redundant Onsite Electrical Power Systems to Verify Proper Load Group Assignments Testing will conform with the recommendations of Regulatory Guide 1.41. The subject matter of this guide is furt her discussed in Subsections 14.2.7* and 14.2.12.
Regulatory Guide 1.42 (Rev. 1, 3/74)
Interim Licensing Policy on As Low As Practicable for Gaseous Radioiodine Releases from Light-Water-Cooled Nuclear Power Reactors This regulatory guide was withdrawn by the NRC on March 18, 1976.
Regulatory Guide 1.43 (Rev. 0, 5/73)
Control of Stainless Steel Weld Cladding of Low-Alloy Steel Components For the NSSS, the same purpose of Regulatory Guide 1.43 is achieved by requiring qualification of any high heat input process, such as the submerged-arc wide-strip welding process and the submerged-arc 6-wire process used on ASME SA-508, Class 2, material, with a performance test as described in Regulatory Position 2 of the gui de. No qualifications are required by the regulatory guide for ASME SA-533 material and equivalent chemistry for forging grade ASME SA-508, Class 3, material. The fabricator monitors and records the weld parameters to verify agreement with the parameters established by the procedure qualification as stated in Regulatory Position C.3.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 16 Production weld cladding for safety-related BOP components complies with the fabrication requirements specified in Sections III and IX of the ASME Boiler and Pressure Vessel Code. The supplementary criteria identified in Regulatory Guide 1.43 were also implemented to give reasonable assurance that underclad cracki ng was avoided in pr oduction weld cladding.
Regulatory Guide 1.44 (Rev. 0, 5/73)
Control of the Use of Sensitized Stainless Steel Compliance with the regulatory positions of Regulatory Guide 1.44 relative to the NSSS is discussed in part in Subsection 5.2.3.4. Compliance with the regulatory positions of this document is as follows: a. The use of processing, packaging a nd shipping controls, and preoperational cleaning to preclude adverse effects of exposure to cont aminants on all stainless steel materials are in accordance with Regulatory Position C.1. b. Austenitic stainless steel materials are utilized in the final heat-treated conditions required by the respective ASME Code,Section II, material specifications for the particular type or grade of alloy in accordance w ith Regulatory Position C.2. c. The position concerning material inspection programs and Regulatory Position C.3 is discussed in Subsection 5.2.3.4. d. The intent of Regulatory Position C.4 is met as discussed in detail in Subsection 5.2.3.4. Exception (b) to Regulatory Position C.4 is covered in the discussion of delta ferrite in Subsection 5.2.3.4. e. Conformance with Regulatory Position C.5 is as discussed in Subsection 5.2.3.4. Exception (a) to Regulatory Position C.5 is covered in the discussion of delta ferrite in Subsection 5.2.3.4. f. Conformance with Regulatory Position C.6 is in the manner discussed in Subsection 5.2.3.4.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 17 Conformance to Regulatory Guide 1.44 relative to the BOP is achieved by imposing detailed requirements on subcontractors and their material suppliers covering processing, welding, heat treatment, cleaning and packagi ng. Procedures covering these act ivities during fabrication and erection require engineering review. Although weld procedure qualification test assemblies will not be corrosion-tested as recommended by the gui de, sensitization during welding is minimized by prohibiting post-weld stress reli ef, and by controlling weld heat input. Welding procedures include restrictions governing voltage, amperage, interpass temperature, weaving, and travel speed for automatic process. For applicatio ns involving aggressive environments, low carbon stainless steel is specified.
Regulatory Guide 1.45 (Rev. 0, 5/73)
Reactor Coolant Pressure Boundary Leakage Detection System The design of the Reactor Coolant Pressure Boundary Leakage Detection System complies with Regulatory Guide 1.45. The regulator y position taken in the guide ha s been incorporated into the design of the Leakage Detection System.
For additional discussion on th is subject, see Subsection 5.2.5.
Regulatory Guide 1.46 (Rev. 0, 5/73)
Protection Against Pipe Whip Inside Containment This Regulatory Guide was wit hdrawn by the NRC on 3/11/85. It has been "superseded" by NUREG-0800, Section 3.6 requirements.
The design against pipe whip is discussed in Section 3.6.
Regulatory Guide 1.47 (Rev. 0, 5/73)
Bypassed and Inoperable Stat us Indication for Nuclear Power Plant Safety Systems Provisions have been made in the design of the Plant Safety Systems to meet the intent of Regulatory Guide 1.47. Automatic indication, at the system level, of bypassed and inoperable status of safety systems has been provided in the control room. Once activated, the system-level indication will remain on until the activating condition is cleared. Manual system level indication is also provided in the control room for those systems whose complexi ty increases the possibility of having frequent inoperable conditions that are not monitored by the automatic system.
Additional discussion on this subject is pr esented in Section 7.
1 and Subsection 8.1.5.3b.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 18 Regulatory Guide 1.48 (Rev. 0, 5.73)
Design Limits and Loading Combinations for Seismic Category I Fluid System Components NSSS components are designed using the stress limits and loading combinations presented in Section 5.2 and Subsection 3.9(N).1 for ASME Code Class 1 components and in Subsection 3.9(N).3 for ASME Code Class 2 and 3 components. The conservatism in these limits and the associated ASME design requirements precludes any component structural failure. The operability of active ASME Code Class 1, 2 and 3 valves and active ASME Code Class 2 and 3 pumps (there are no active Class 1 pumps) will be verified by methods detailed in Section 5.2 and Subsection 3.9(N).1 for ASME Code Class 1 components and in Subsection 3.9(N).3 for ASME Code Class 2 and 3 components. The use of the above-stated methods provides an acceptable alternate method to meeting the guidance of this regulatory guide.
The design stress limits and loading combinations for BOP seismic Category I fluid system components are presented in Subsection 3.9(B).3.1 for the various plant operating conditions, as defined by the subject regulatory guide. The structural integrity of the fluid system components is ensured by the conservatism in these stress limits which are in accordance with industry practice and ASME Section III design requirements. The assurance of operability of active ASME Code Class 2 and 3 pumps and ASME Code Class 1, 2 and 3 valves are qualified by the a pproaches delineated in Subsection 3.9(B).3.2. The methods cited above provide an acceptable program to satisfy the in tent of the subject regulatory guide.
Regulatory Guide 1.49 (Rev. 1, 12/73)
Power Levels of Nuclear Power Plants The design complies with the recommendations of Regulatory Guide 1.49, Rev. 1, since the projected initial power level is less than 3800 megawatts thermal (MWt), and analyses and evaluation consider operation at 102 percent rated core pow er level, which is less than the level in this regulatory guide.
For further discussion, refer to Section 1.1.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 19 Regulatory Guide 1.50 (Rev. 0, 5/73)
Control of Preheat Temperature for Welding of Low-Alloy Steel Relative to the NSSS, this regulatory guide is considered as applicable to ASME Code,Section III, Class 1 components. The practice for NSSS Class 1 components is in agreement with the recommendations of Regulatory Guide 1.50, except for Regulatory Positions C.1.b and C.2. For Class 2 and 3 NSSS components, the recommendations of Regulatory Guide 1.50 are not consider ed applicable. In the case of Regulatory Position C.1.b, the welding procedures are qualifie d within the preheat temperature ranges required by Section IX of the ASME Code. NSSS experience has shown excellent quality of welds using the ASME qualification procedures. In the case of Regulatory Position C.2, the NSSS position documented in Reference 6 has been found acceptable by the NRC. Weld fabrication of low alloy steel components for the BOP complies with the fabrication requirements specified in Secti ons III and IX of the ASME Bo iler and Pressure Vessel Code.
Regulatory Guide 1.51 Inservice Inspection of AS ME Code Class 2 and 3 Nuclear Power Plant Components This guide was withdrawn on July 21, 1975.
Regulatory Guide 1.52 (Rev. 2, 3/78)
Design, Testing and Maintenance Criteria for Post-Accident Engineered Safety Feature Atmosphere Cleanup System Air Filtration and Adsorption Units of Light-Water-Cooled Nuclear Power Plants The design complies with this guide, with Regulatory Guide 1.140 and/or with the exceptions discussed in Subsection 6.5.1 and Tabl e 6.5-1, Table 6.5-2 and Table 6.5-3.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 20 Regulatory Guide 1.53 (Rev. 0, 6/73)
Application of the Single-Failure Criterion to Nuclear Power Plant Protection Systems NSSS systems meet the recommendations of Regulatory Guide 1.53, in accordance with the discussion provided in Subsection 7.1.2.7. The BOP design complies with the guidance provided in Regulatory Guide 1.53. Refer to Subsection 7.1.2.7 for the discussion on Regulatory Guide 1.53 and to Chapter 7 for the definition of BOP systems and for reference to sections where pertinent discussions can be found. Regulatory Guide 1.54 (Rev. 0, 6/73)
Quality Assurance Requirements for Protective Coatings Applied to Water-Cooled Nuclear Power Plants Endorses ANSI N101.4-1972 NSSS equipment located in the Containment Build ing is separated into four categories to identify the applicability of this regulatory guide to various types of equipment. These categories of equipment are as follows: Category 1 - Large equipment Category 2 - Intermediate equipment Category 3 - Small equipment Category 4 - Insulated/stainless steel equipment. A discussion of each equipment category follows: a. Category 1 - Large Equipment The Category 1 equipment consist of the following: Reactor Coolant System supports Reactor coolant pumps (motor and motor stand) Accumulator tanks Manipulator crane.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 21 Since this equipment has a large surface area and is procured from only a few vendors, it is possible to implement tight controls over these items. Stringent requirements have been specifi ed for protective coatings on the NSSS equipment through the use of a painting specification in procurement documents. This specification defines requirements for: 1. Preparation of vendor procedures 2. Use of coating systems which are qualified to ANSI N101.2
- 3. Surface preparation
- 4. Application of the coating systems in accordance with the paint manufacturer's instructions 5. Inspections and nondestructive examinations
- 6. Exclusion of certain materials
- 7. Identification of all nonconformances
- 8. Certifications of compliance.
The vendor's procedures are subject to review by NSSS engineering personnel, and the vendor's implementation of the specification requirements is monitored during the Westinghouse quality assurance su rveillance activities relative to the NSSS. This system of controls provides assurance that the protective coatings will properly adhere to the base metal during prolonged exposure to a post-accident environment present within the Containment Building. b. Category 2 - Intermediate Equipment The Category 2 equipment consists of the following: Seismic platform and tie rods Reactor internals lifting rig Head lifting rig Electrical cabinets.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 22 Since these items are procured from a la rge number of vendors, and individually have very small surface areas, it is not practical to enforce the complete set of stringent requirements which are applied to Category 1 items. However, another specification has been implemented in the NSSS procurement documents. This specification defines to the vendors the requirements for: 1. Use of specific coating systems which are qualified to ANSI N101.2
- 2. Surface preparation
- 3. Application of the coating systems in accordance with the paint manufacturer's instructions. The vendor's compliance with the requireme nts is also checked during the NSSS quality assurance surveillance activities in the vendor's plant. These measures of control provide a high degree of assurance that the protective coatings will adhere properly to the base metal and withstand the postulated accident environment within the Containment Building. c. Category 3 - Small Equipment Category 3 equipment consists of the following: Transmitters Alarm horns Small instruments
Valves Heat exchanger supports. These items are procured from several different vendors and are painted by the
vendor in accordance with conventional industry pract ices. Because the total exposed surface area is very small, no further requirements are specified. d. Category 4 - Insulated or Stainless Steel Equipment Category 4 equipment consists of the following: Steam generators - covered with blanket insulation Pressurizer - covered w ith blanket insulation Reactor pressure vessel - covere d with rigid reflective insulation Reactor cooling piping - stainless steel Reactor coolant pump casings - stainless steel.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 23 Since Category 4 equipment is insulated or is stainless steel, no painted surface areas are exposed within the containment.
Therefore, this regulatory guide is not applicable for Category 4 equipment. Protective coatings provided for the BOP, except for acceptably limited and inventoried coatings on non-NSSS equipment, piping and structures, are in accordance with ANSI N101.4 "Quality Assurance for Protective Coatings Applied to Nuclear Facilities," used in conjunction with ANSI N45.2 "Quality Assurance Program Requirements for Nuclear Power Plants," and therefore meet Regulatory Guide 1.54. During the operations phase, compliance with th e regulatory guide also includes the following clarification: a. When the requirements of ANSI N101.4 apply, specific requirements, such as documented site meetings, field demonstrations, substrate priming, applicator reporting, inspection reporting and report forms will be considered on a job-by-job basis and invoked only where found to provide a meaningful QA contribution to that task. b. When 10 percent or less of the surface of the item requires coating, it is considered to be touch-up work and only a general conformance to these requirements will be necessary.
Regulatory Guide 1.55 (Rev. 0, 6/73)
Concrete Placement in Category I Structures The placement of concrete for seismic Category I structures complies with Regulatory Guide 1.55, Rev. 0, except that the documents refere nced in the appendix to the guide were used for guidance only, as appropriate. Use of the Maturity Method (correlating strength to integrated temperature-time history) is permitted for monitoring curing of concrete placements (except containment). When this method is implemented to determine in-place strength, curing temperatures can be reduced to 40F, as permitted by Paragraph 3.2.3 of ACI 308. Temperature control is maintained at least until the placement attains 70 percent of the design strength, in accordance with Paragraph 12.2.3 of ACI 301.
The subject is further discussed in Subsections 3.8.1.6 and 3.8.3.6.
This regulatory guide was withdrawn on July 8, 1981 and superseded by Regulatory Guides 1.136 Rev. 2, 6/81 and 1.142.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 24 Regulatory Guide 1.56 Rev. 1, 7/78)
Maintenance of Water Purity in Boiling Water Reactors This regulatory guide is not applicable to Seabrook Station.
Regulatory Guide 1.57 (Rev. 0, 6/73)
Design Limits and Loading Combinations for Metal Primary Reactor Containment System Components The design complies with Regulatory Guide 1.57, Rev. 0, requirements for the personnel lock, the equipment hatch, and the piping and electri cal penetrations inside and outside the containment which are not backed by concrete.
This guide is not considered applicable to other portions of the containment system.
The subject is further di scussed in Subsection 3.8.2.
Regulatory Guide 1.59 (Rev. 2, 8/77; Errata 7/80)
Design Basis Floods for Nuclear Power Plants The recommendations of Regulatory Guide 1.59, Rev. 2, have been followed relative to design basis flooding. The Probable Maximum Precipitation analysis indicates that the site may develop ponding, but that all safe ty-related structures are not adversely affected. A protective revetment has been designed and constructed to safeguard the site and safety-related facilities from the predicted Probable Maximum Surge level.
For further discussion, refer to Section 2.4.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 25 Regulatory Guide 1.60 (Rev. 1, 12/73)
Design Response Spectra for Seismic Design of Nuclear Power Plants The recommendations of Regulatory Guide 1.60, Rev. 1, have been followed for the BOP design with the following comments and/or exceptions: a. The vibratory ground motions represen ted by the design response spectra are assumed as free-field surface motions b ecause the design response spectra were derived from analysis of historic ground motions recorded at or near ground surface. b. Because the vertical design response spectra are presented as scaled to lg horizontal ground acceleration, it is implicitly, but inadvertently, required that the vertical peak ground acceleration equal the horizontal peak ground acceleration. The assumption of the peak vertical acceleration being two-thirds of the peak horizontal acceleration has been acceptable to the NRC. Therefore, to follow the intent of the regulatory gui de appropriately, the vertic al design response spectra are modified for frequencies greater than 33 Hz, as shown in the Figure 1.8-1.
For further discussion, refer to Subsections 2.5.2.6 and 3.7(B).1.1. The design response spectra of Regulatory Guide 1.60 are acceptable for the NSSS, with the damping values recommended and approved by the NRC in Reference 7 for use in dynamic analysis of NSSS equipment. For furt her discussion, refer to Subsection 3.7(N).1.1.
Regulatory Guide 1.61 (Rev. 0, 10.73)
Damping Values for Seismic Design of Nuclear Power Plants The damping values of Regulatory Guide 1.61 have, in general, been fully complied with in the BOP design. For further discussi on, refer to Subsection 3.7(B).1.3. Relative to the NSSS, the damping values listed in Regulatory Guide 1.61 are considered acceptable with the single exception of the large piping systems faulted condition value of 3 percent critical. Higher damping values, when justified by documented test data, have been provided for the Regulatory Position C.2. A cons ervative value of 4 percent critical has therefore been justified by te sting for the NSSS reactor coolant loop configuration in Reference 7, and has been approved by the NRC.
For pipe stress verification and for pipe support optimization, the damping values of ASME B&PV Code, Code Case N-411, may be used in lieu of the values listed in Regulatory Guide 1.61.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 26 For further discussion, refer to Subsection 3.7(N).1.3.
Regulatory Guide 1.62 (Rev. 0, 10/73)
Manual Initiation of Protective Actions The NSSS protection system meets the recommendati ons of this regulatory guide, in accordance with the comments of Subsection 7.3.2.2. The BOP portion of the protection system was designed, built and tested in accordance with IEEE Standard 279-1971, and complies with Regulatory Guide 1.22 and 1.62. The design of the protection system includes the following: a. Manual initiation of each protective action is provided at the system level, in addition to the means to initiate protective action at the component level. b. Manual initiation of the protective acti ons at the system level perform all functions carried out by the automatic initiation signal to the actuating devices, and provide the required action, such as sequencing functions and interlocks. c. The switches for manual initiation of protective actions at the system level are located in the main control room. d. The amount of equipment common to both manual and automatic initiation has been minimized. The single failu re criterion has been satisfied.
For further discussion, refer to Section 7.3.
Regulatory Guide 1.63 (Rev. 2, 7/78)
Electric Penetration Assemblies in Containment Structures for Light-Water-Cooled Nuclear Power Plants The design conforms to the recommendations of Regulatory Guide 1.63, Rev. 2, with certain clarifications which are discussed fu rther in Subsections 3.8.2, 8.1.5, 8.3.1.1 and 8.3.1.2.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 27 Regulatory Guide 1.65 (Rev. 0, 10/73)
Materials and Inspections for Reactor Vessel Closure Studs Westinghouse is in agreement with Regulatory Guide 1.65 except for material and tensile strength guidelines.
Westinghouse has specified both 45 ft-lb and 25 mils lateral expa nsion for control of fracture toughness determined by Charpy-V testing, required by the ASME Boiler and Pressure Vessel Code,Section III, Summer 1973 Addenda and 10 CFR Part 50, Appendix G (July 17, 1973, Paragraph IV.A.4). These toughness requirements assure optimization of the stud bolt material tempering operation with the accompanying reduction of the tensile level when compared with previous ASME Boiler and Pressure Vessel Code requirements. The specification of both impact and maximum tensil e strength as stated in the guide results in unnecessary hardship in procurement of material without any additional improvement in quality. The closure stud bolting material is procured to a minimum yield strength of 130,000 psi and a minimum tensile strength of 145,000 psi. This strength level is compatible with the fracture toughness requirements of 10 CFR Part 50, Appendix G (July, 1973, Paragraph 1.C), although higher strength level bolting materials are permitted by the code. Stress corrosion has not been observed in reactor vessel closure stud bolting manufactured from material of this strength level. Accelerated stress corrosion test data do exist for materials of 170,000 psi minimum yield strength exposed to marine water environments stressed to 75 percent of the yield strength (given in Reference 2 of the guide). These data are no t considered applicable to Westinghouse reactor vessel closure stud bolting because of the specified yield strength differences and a less severe environment; this has been demonstrated by years of satisfactory service experience.
The ASME Boiler and Pressure Vessel Code requirement for toughness for reactor vessel bolting has precluded the guide's additional recommendation for tensile strength limitation, since to obtain the required toughness levels , the tensile strength levels are reduced. Prior to 1972, the Code required a 35 ft-lb toughness level which provided maximum tensile strength levels ranging from approximately 155 to 178 kpsi (Westinghouse review of limited data - 25 heats). After publication of the Summer 1973 Addenda to the Code and 10 CFR Part 50, Appendix G, wherein the toughness requirements were modified to 45 ft-lb with 25 mils lateral expansion, all bolt material data reviewed on Westinghouse plan ts showed tensile st rengths of less than 170 kpsi. The in-service inspection program described in Subsection 5.2.4 provides an acceptable alternate method to following the guidan ce of this regulatory guide.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 28 Regulatory Guide 1.66 (Rev. 0, 10.73)
Nondestructive Examination of Tubular Products This regulatory guide was withdrawn by the NRC on September 28, 1977.
Regulatory Guide 1.67 (Rev. 0, 10/73)
Installation of Overpre ssure Protection Devices The design criteria for safety valve stations fully conform to the requirements of Regulatory Guide 1.67. For further discussion, refer to Subsection 3.9(B).3.3.
Regulatory Guide 1.68 (Rev. 2, 8/78)
Initial Test Programs for Water-Cooled Reactor Power Plants The initial test program was conducted in accord ance with the intent of Regulatory Guide 1.68, with the exceptions discussed in Subsection 14.2.7.
Regulatory Guide 1.68.1 (Rev. 1, 1/77)
Preoperational and Initial St artup Testing of Feedwater and Condensate Systems for Boiling Water Reactor Power Plants This regulatory guide is not applicable to Seabrook Station.
Regulatory Guide 1.68.2 (Rev. 1, 7/78)
Initial Startup Test Program to Demonstrate Remote Shutdown Capability for Water-Cooled Nuclear Power Plants The remote shutdown capability was demonstrated in accordance with the intent of Regulatory Guide 1.68.2, Rev. 1. For discussion, refer to Subsection 14.2.6.
Regulatory Guide 1.69 (Rev. 0, 12/73)
Concrete Radiation Shields for Nuclear Power Plants The design of the concrete radiation shields fully complies with Regulatory Guide 1.69, Rev. 0. The applicable documents, design loads and design approach presented in ANSI N101.6-1972 were used in the design.
For further discussion, refer to Subsections 3.8.3.1, 3.8.3.2 and 3.8.3.4.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 29 Regulatory Guide 1.70 (Rev. 3, 11/78)
Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants-LWR Edition The FSAR and Updated FSAR were prepared using the recommended format and content of Regulatory Guide 1.70, Rev. 3, with the excepti on of a listing of a ny unusually hazardous materials to be used on site that could present unexpected fire hazards or complicate firefighting activities. Regulatory Guide 1.70, Rev. 3, was issued prior to the issuance of 10 CFR 50 - Appendix R "Fire Protection Program fo r Nuclear Power Facilities Operating Prior to January 1, 1979." As such, the unexpected fire hazards, fire brigade training and the storage and/or use of combustible materi als concerns that were addressed in Regulatory Guide 1.70 have been addressed in expanded detail in 10 CFR 50 - Appendix R. 10 CFR 50 - Appendix R, by reference, is part of the UFSAR.
Regulatory Guide 1.71 (Rev. 0, 12/73)
Welder Qualification for Areas of Limited Accessibility NSSS practice does not require qualif ication or requalification of welders for areas of limited accessibility as described by Regulatory Guide 1.71. Experience shows that the current NSSS shop practice produces high quality welds. In addition, the performance of required nondestructive evaluations provides further assurance of acceptable weld quality. Limited accessibility qualification or requalification in excess of ASME Code,Section III or IX requirements is considered an unduly restrictive requirement for NSSS component fabrication, where the welders' physical position relative to the welds is controlled and does not present any significant problems. In addition, shop welds of limited accessibility are repetitive due to multiple production of similar components, and such welding is closely supervised.
For field application, the type of qualificatio n should be considered on a case-by-case basis due to the great variety of circumstances encountered.
This guide was also not followed for the BOP for the following reasons: "Limited Accessibility" welds, which we define as welds inaccessible from at least 12 inches in any direction, will be identified by contractors and would require us to provide extensive surveillance and field supervision of the affected areas.
Contract specifications require th at contractors, regardless of the code requirement, consider the necessity of special inspection techniques.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 30 Qualification alone does not ensure the integrity of welds in limited areas, nor does a continual audit of the welder for the correct application of procedure parameters and welder technique ensure the integrity of production welds.
The integrity of welds has been assured by nondestructive examination or special inspection techniques during fabrication and baseline inspections. For Operational Phase activities under the scope of the Operational QA Program, PSNH welder qualification will comply with the requirements of this regulatory guide, with the following clarifications: a. With regard to Section C.1 of the regulatory guide, selected welders may, in addition to the normal qualifications, be trained and qualified for limited access conditions. b. With regard to Section C.2.a of the regulatory guide, when a limited access weld must be performed, the judgment of experienced supervisory personnel will be used to determine whether the above noted additional qualifica tion is satisfactory for the given task, or whether additional training and qualifications for the specific configuration is required.
Regulatory Guide 1.72 (Rev. 2, 11/78)
Spray Pond Piping Made From Fiberglass-Reinforced Thermosetting Resin This guide is not applicab le to Seabrook Station.
Regulatory Guide 1.73 (Rev. 0, 1/74)
Qualification Tests of Electric Valve Operators Installed Inside the Containment of Nuclear Power Plants This regulatory guide endorses IEEE 382-1972, and provides some a dditional clarification in the area of accessories, such as solenoid valves and limit switches. Qualification of valve appurtenances, such as motor operators, solenoid valves and limit sw itches, is in accordance with this Regulatory Guide. Details of the qualification of specific motor ope rators, solenoid valves and limit switches are cont ained in Reference 15.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 31 For NSSS safety-related motor-operated valves located inside containment, environmental qualification is performed in accordance with IEEE Standards 382-1972 and 323-1974. The qualification program for valve-related equipment is described in Reference 9. Refer to Section 3.11 for additional discussion of environmental qualification.
Regulatory Guide 1.75 (Rev. 2, 9/78)
Physical Independence of Electric Systems The design is consistent with the criteria for physical independence of electrical systems established in "Attachment C" of AEC letter dated December 14, 1973 (see Updated FSAR Appendix 8A) and is in general conformance with Regulatory Guide 1.75, Rev. 2, except as follows: Battery Room Ventilation. Although the four Class 1E batteries are housed in separate safety Class structures, they represent only two redundant load groups (s ee Subsection 8.3.2). Each load group is served by a separate safety-related ventilation system. There is a cross-tie between the two ventilation systems to allow one system to serve both load groups in case the other system is inoperable. Fire dampers are provided to isolate each battery room.
The subject of this regulato ry guide is further discusse d in Subsections 8.1.5.3 and 8.3.1.2. The NSSS and BOP furnished systems comply with the recommendations of Regulatory Guide 1.75, Rev. 2, as discussed in Subsection 7.1.2.2.
The requirements of position C4, as it relates to cables for the associated circuits is clarified as follows:
Instrumentation, control and power cables used for the associated circuits will not be covered by the Operational Quality Assurance Program (OQAP). However, pragmatic controls will be applied to these items. The actual implementation of these controls will be defined by the programs manuals used to control specific activities at Seabrook Station. Implementation of these programmatic will be verified by Quality Assurance personnel to the extent necessary to insure proper application. For further details on provisions and considerations for the associated circuits, see Updated FSAR Chapter 8, Subsection 8.3.1.4b.1(d).*
The Seabrook cable and raceway separation criteria (see Updated FSAR Subsection 8.3.1.4) is a combination of the standard criteria given in Attachment C of AEC Letter dated December 14, 1973 (see Updated FSAR Appendix 8A) and IEEE 384-1974 and criteria established by analysis and testing as permitted by Attachment C and IEEE 384-1974.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 32 Regulatory Guide 1.76 (Rev. 0, 4/74)
Design Basis Tornado for Nuclear Power Plants The structural designs for withstanding the design basis tornado fully comply with the recommendations of Regulatory Guide 1.76, Rev. 0. For further discussion, refer to Section 3.5 and Subsections 3.3.2, 3.8.1 and 3.8.4.
Regulatory Guide 1.77 (Rev. 0, 5.74)
Assumptions Used for Eval uating a Control Rod Ejection Accident for Pressurized Water Reactors Methods and criteria are documented in Reference 3 and 8, which has been reviewed and accepted by the NRC. The results of analyses show agreement with Regulatory Positions C
.1 and C.3. However, exception has been taken to Regulatory Position C.2 which implies that the rod ejection accident should be considered as an emergency condition. This is considered a faulted condition as stated in ANSI N18.2. Faulted condition stress limits are applied for this accident. This is an acceptable alternate method to following the guidance of this regulatory guide. For further
discussion, refer to Subsection 15.4.8.
Regulatory Guide 1.78 (Rev. 0, 6/74)
Assumptions for Evaluating the Habitability of a Nuclear Power Plant Control Room During a Postulated Hazardous Chemical Release As explained in Section 2.2, there are no significant manufacturing plants, chemical plants, refineries, storage facilities, mining, and quarrying operations, oi l pipelines, wells or storage facilities identified within a five-mile radius of the site. Local natural gas pipelines within the five-mile radius of the site have been evaluated for potential impact to plant operation. The evaluation has concluded that there is no impact from accidental rele ase of natural gas. Section 2.2 also provides inform ation regarding transportation facilities and available data regarding the use of these transportation facilities. Also, there is no toxic or hazardous chemical (in excess of 100 lb. limit) stored on the site. Based on available information, it is concluded that the requirements of Regulatory Guide 1.78 are met.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 33 Regulatory Guide 1.79 (Rev. 1, 9/75)
Preoperational Testing of Emergency Core Cooling Systems for Pressurized Water Reactors The initial preoperational test program will be conducted in accordance with the intent of Regulatory Guide 1.79, with the excep tions discussed in Subsection 14.2.7.
For further discussion, refer to Section 14.2.
Regulatory Guide 1.80 (Rev. 0, 6/74)
Preoperational Testing of Instrument Air Systems The initial test program has been conducted in accordance with the intent of Regulatory Guide 1.80, with the exceptions discussed in Subsection 14.2.7.
For further discussion, refer to Section 14.2.
Regulatory Guide 1.81 (Rev. 1, 1/75)
Shared Emergency and Shutdown Electric Systems for Multi-Unit Nuclear Power Plants The power system design is in conformance with the recommendations of Regulatory Guide 1.81, Rev. 1. Seabrook Statio n is a single unit plant; ther efore no portion of the power system is shared.
Regulatory Guide 1.82 (Rev. 0, 6/74)
Sumps for Emergency Core Cooling and Containment Spray Systems The sump design meets the intent of the positions of Regulatory Guide 1.82. Guidance from Regulatory Guide 1.82, Revision 3, and NEI 04-07, Pressurized Water Reactor Sump Performance Evaluation Method, was used to size and evaluate the replacement ECCS/CBS sump strainers. For further discussion, refer to Subsection 6.2.2.2.
Regulatory Guide 1.83 (Rev. 1, 7/75)
Inservice Inspection of Pressurized Water Reactor Steam Generator Tubes The steam generators are designed to permit access to tubes for inspection and/or plugging. The in-service inspection program is discussed in Subsection 5.4.2.5 and in the Technical Specifications.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 34 Regulatory Guide 1.84 (all revisions) Design and Fabrication Code Case Acceptability - ASME Section III Division I This regulatory guide is used for the BOP design where applicable. The ASME Code Case interpretations were used for design and fabrication after they had been reviewed to assure that their use would not compromise the component de sign or reliability. Table 1.8-2 lists specific Code Cases, not included in this Regulatory Guid e, for which authorization to use was requested of, and granted by, the NRC. The NSSS suppliers have: a. Limited the use of Code Cases to those listed in Regulatory Position C.1 of Regulatory Guides 1.84 and 1.85, except as allowed below. b. Identified and requested permission for use of any Code Cases not listed in Regulatory Position C.1 of Regulatory Guides 1.84 and 1.85 where use of such Code Cases is needed by the supplier. c. Permitted continued use of a Code Case considered acceptable at the time of equipment order, where such Code Case was subsequently annulled or amended. NRC permission has been requested for the use of Class 1 Code Cases needed by NSSS suppliers and not then endorsed in Regulatory Position C.1 of Regulatory Guides 1.84 and 1.85, and permits supplier use only if NRC permission is obtained or is otherwise assured (e.g.; a later version of the regulatory guide includes endorsement).
Regulatory Guide 1.85 (all revisions) Materials Code Case Acceptability - ASME Section III Division I Refer to the discussion of Regulatory Guide 1.84. Regulatory Guide 1.85 requires that components a nd supports be identified that use Code Case N242-1. The code case is applied to safety relief valves, thermowells, and generically to supports. The use of the code case is documented in the data reports.
Regulatory Guide 1.86 (Rev. 0, 6/74)
Termination of Operating Licenses for Nuclear Reactors Applicability of this guide is considered premature.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 35 Regulatory Guide 1.87 (Rev. 1, 6/75)
Guidance for Construction of Class 1 Components in Elevated Temperature Reactors (Supplement to ASME Section III Code Cases 1592, 1593, 1594, 1595 and 1596) This regulatory guide is not applicable to Seabrook Station.
Regulatory Guide 1.89 (Rev. 1, 6/84)
Qualification of Class 1E Equipment for Nuclear Power Plants The guidance provided by Regulatory Guide 1.89, which endorses IEEE 323-1974 with certain exceptions, i.e., source terms and the use of IEEE 344-1971, has been followed for the BOP equipment except for those instances discussed below: a. Qualification of Class 1E electrical, instrumentation and control equipment meets the requirements of IEEE 323-1974, with exceptions. Further discussion regarding qualifica tion is provided in Sections 3.10, 3.11 and Reference 15.
Exceptions: Turbine trip-related inputs to the Reactor Trip System consist of the following: 1. Turbine stop valve position
- 2. Turbine Electro-Hydraulic System fluid pressure 3. Turbine impulse chamber pressure.
This equipment was tested in accordance with the guidelines of IEEE Standard 323-1974. b. The total integrated radiation doses to be used in qualification of the Class 1E equipment will be a combination of normal operating environment and post-accident environment, with credit taken for locations, shielding and the time for which the equipment is required to perform its function.
Values of integrated doses to be used in the qualification of Class 1E equipment are given in Reference 15.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 36 For the safety-related equipment located inside the containment and required after a LOCA, the sources used in establishing the integrated dose are consistent with Regulatory Guide 1.89, Rev. 0. Both instantaneous gamma and beta doses have been considered in establis hing the integrated doses. The seismic qualification of electrical, instrumentation and control equipment meets the requirements of IEEE 344-1975. Conformance of NSSS Class 1E equipment with IEEE Standard 323-1974 (including IEEE Standard 323A-1975 position statement of July 23, 1975) and Regulatory Guide 1.89 is being demonstrated by an appropriate combination of any or all of the following: type testing, operating experience, qualification by analysis and on-going qualification programs. This commitment is being satisfied by implementation of Reference 9.
Regulatory Guide 1.90 (Rev. 1, 8/77) Inservice Inspection of Prestressed Concrete Containment Structures with Grouted Tendons This guide is not applicable to Seabrook Station since grouted tendons are not employed.
Regulatory Guide 1.91 (Rev. 1, 2/78)
Evaluation of Explosions Postulated to Occur on Transportation Routes N ear Nuclear Power Plants The guidance provided by Regulatory Guide 1.91, Rev. 1, has been followed. For further discussion, refer to Section 2.2.
Regulatory Guide 1.92 (Rev. 1, 2/76)
Modes and Spatial Components in Seismic Response Analyses The procedure for combining modal responses for NSSS equipment is presented in Subsection 3.7(N).3.2. This procedure is considered as an alternate acceptable solution that provides a basis for findings requisite to issuance or continuance of a permit or license by the NRC. The procedure used for BOP equipment design fully conforms with the guidance of Regulatory Guide 1.92, Rev. 1, relative to seismic system analysis. The requirements for the combination of modes and spatial components in seismic subsystem analyses also complies with this guide, except that closely spaced modes for seismic analyses of components by the normal mode approach are combined in accordance with the two methods indicated in Subsection 3.7(B).3.6.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 37 Regulatory Guide 1.92 presents three other means of combining closely spaced modes. Justification for nonconformance is that the methods prescribed in the guide are not here applicable since the construction permit application docket date is before the date of issue of the guide. In addition, the method used is deemed mo re conservative. For further discussion, refer to Section 3.7(B) and Subsection 3.7(B).3.7.
Regulatory Guide 1.93 (Rev. 0, 12/74)
Availability of El ectric Power Sources The Technical Specification (T/S) ac and dc power sources allowable out-of-service times (action statements) are based on RG 1.93. Where differences exist between the T/S and RG 1.93, the T/S are the governing document. RG 1.93 does not allow out-of-service times to be used for preventative maintenance that incapacitates a power source. These activities are to be scheduled for refueling or shutdown periods. This is interpreted to also apply to surveillance activities. Preventative maintenance and surveillance activities are performed on-line when permitted by the T/S and with appropriate consideration of the effects on sa fety, reliability, and availability.
Regulatory Guide 1.95 (Rev. 1, 2/77)
Protection of Nuclear Power Plant Control Room Operators Against Accidental Chlorine Release The relevant portions of Regulatory Guide 1.95 are complied with based on the findings that the plant design does not include the storage of chlorine within 100 meters of the control room, excluding small laboratory quantities, nor is there chlorine stored in excess of the maximum allowable chlorine inventory, as given as a function of distance in Regulatory Guide 1.95 for Type I control rooms (refer to Subsection 2.2.3.1).
Regulatory Guide 1.96 (Rev. 1, 6/76)
Design of Main Steam Isolation Valve Leakage Control Systems for Boiling Water Reactor Nuclear Power Plants This regulatory guide is not applicable to Seabrook Station.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 38 Regulatory Guide 1.97 (Rev. 3, 5/83)
Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant Conditions During and Following an Accident Regulatory Guide 1.97, Revision 3 endorses ANSI/ANS-4.5-1980, "Crite ria for Accident Monitoring Functions in Light-Water-Cooled Reactors." With minor exceptions, the above guidance has been followed in providing Accident Monitoring Instrumentation (AMI). These exceptions are specif ied in Subsection 7.5.4. A complete description of the Seab rook AMI is provided in Section 7.5.
Regulatory Guide 1.98 (Rev. 0, 3/76)
Assumptions Used for Evaluating the Potential Radiological Consequences of a Radioactive Offgas System Failure in a Boiling Water Reactor This regulatory guide is not applicable to Seabrook Station.
Regulatory Guide 1.99 (Rev. 2, 5/88)
Effects of Residual Elements on Predicted The reactor vessel material meets the end-of-lif e reference criterion of Regulatory Guide 1.99, Rev. 2. Regulatory Guide 1.100 (Rev. 1, 8/77)
Seismic Qualification of Electric Equipment for Nuclear Power Plants The program for seismic qualificati on of NSSS safety-related electric equipment is delineated in Reference 9. BOP electric equipment has been seismically qualified in accordance with the intent of the guidance provided in Regulatory Guide 1.100, Rev. 1.
For further discussion, refer to Section 3.10(B).
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 39 Regulatory Guide 1.101 (Rev. 2, 10/81)
Emergency Planning for Nuclear Power Plants The Seabrook Station Radiological Emergency Plan was developed based on the requirements of Appendix E to 10 CFR 50 and Revision 1 of NUREG-0654/FEMA-REP 1; therefore, the recommendations of this regulat ory guide have been followed with the exceptions noted below: The acceptance criteria for the meteorological monitoring system meet the intent of Regulatory Guide 1.23 (Rev. 0) and Regulatory Guide 1.97 (Rev. 3).
Exceptions are discussed in Section 1.8 (see Regulatory Guides 1.23 and 1.97). The atmospheric transport and diffusion assessment capabilities are described in Section 10.1 of the Seabrook Station Radiological Emergency Plan. The capability to remote interrogate all systems producing meteorological data and effluent transport and diffusion estimates by emergency response organizations is not available. The Seabrook Station Radiological Emergency Plan complies with the requirements of 10 CFR 50, Appendix E, and is based on the criteria in NUREG-0654/REP-1, Rev. 1, with the following clarifications and exceptions: 1. 10 CFR 50, Appendix E, Section IV.D.3. requi res licensees to have the capability to notify responsible state and local governmental agencies within 15 minutes after declaring an emergency. For a radiological emergency at Seabrook Station, Massachusetts and New Hampshire state governments are responsible for deciding protective actions to be recommended to the public and for initiating public alert and notification. Therefore, Seabrook Station maintains the capability to notify Massachusetts and New Hampshire state authorities within 15 minutes after declaring an emergency. This capability does not include notification of local governmental agencies. Under the state radiological emergency response plans, the states are responsible for notifying local governmental agencies.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 40 2. NUREG-0654/FEMA-REP-1, Rev. 1, criterion B
.5 states that licensees shall have the capability to staff on-shift emergency response functions and to augment on-shift emergency response capabilities in accordance with NUREG-0654, Table B-1. The Seabrook Station On-Shift Emergency Response Organization (ERO) includes one health physics technician versus two specified by Table B-1.
The Seabrook Station Augmented ERO does not include eleven (11) 30-minute responders specified on Table B-1. It was determined th at the functions specified on Table B-1 could be addr essed by on-shift personnel or that no emergency planning related provisions or station procedures require the use of these personnel prior to activation of emergency facilities. (Ref. NRC IR 94-15 and NRC letter to T.C. Feigenbaum dated March 6, 1995.) 3. NUREG-0654/FEMA-REP-1, Rev. 1, criterio n J.7 states that licensees shall establish a mechanism for recommending protective actions to appropriate state and local authorities in accordance with the recommendations set forth in the
Manual of Protective Action Guides and Protective Actions for Nuclear Incidents (EPA-520/1-75-001). EPA-520/1-75-001 and the protective action guides therein
have been superseded by EPA 400, Ma nual of Protective Action Guides and
Protective Actions for Nuclear Incidents, 1991. The SSREP follows the protective action recommendation guidance in EPA 400 and in NUREG-0654/FEMA-REP-1, Rev. 1, S upp. 3, July 1996. NUREG-0654 Supp. 3, Figure 1, recommends prompt evacuation near the plant in the event of
actual or projected severe core damage or loss of control of the facility. NUREG-0654, Supp. 3, Figure 1, note 5, advises that shelter may be appropriate for controlled releases from containment if there is assurance that the release is short term and the area near the plant cannot be evacuated before the plume arrives. Based on Atomic Safety a nd Licensing Board decisions for Seabrook Station, the SSREP does not provide for recommending sheltering in the limited circumstance suggested in NUREG-0654, Supp. 3, Figure 1, note 5. 4. NUREG-0654/FEMA-REP-1, Rev. 1, criterio n J.10.a states that radiological emergency plans shall include maps of ev acuation areas, relocation centers in host areas and shelter areas. These details are included in the Massachusetts and New Hampshire Radiological Emergency Response Plans only. The Massachusetts and New Hampshire plans are referenced in the SSREP. 5. NUREG-0654/FEMA-REP-1, Rev. 1, criterion J.10.m states that radiological emergency plans shall include expected local protection afforded by residential units or other shelter for direct and inhalation exposure. See exception number 3 above.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 41 6. NUREG-0654/FEMA-REP-1, Rev. 1, criterion O.2 states that the training program for members of the onsite em ergency organization shall, besides classroom training, include prac tical drills. The listed at tributes of these practical drills are as follows: Each individual demonstrates his/her ability to perform his/her assigned emergency function. On-the-spot correction of erroneous performance and demonstration of proper performance by the instructor. Candidates for the Seabrook Station ERO are required to complete applicable training and a position-specific qualification guide prior to bei ng assigned to the ERO. The process of administering a qua lification guide to a candidate includes the attributes noted above, including a proficiency demonstration with applicable procedures and equipment. All such demonstrations are supervised and assessed by a qualified instructor. Where neede d, the instructor corrects erroneous performance and demonstrates proper performance. 7. NUREG-0654/FEMA-REP-1, Rev. 1, criterion P.5 states that revised pages of emergency plans shall be dated and marked to show where changes have been made. The Seabrook Station manuals and procedures administration program requires that manual (the SSREP is a ma nual) and procedure changes shall be delineated in a figure or section titled "S ummary of Changes" that is created and updated for each revision or change. This is done in lieu of revision bars and individually dated pages. The SSREP al so contains a list of effective pages (LOEP) allowing the user to identify the current revision number applicable to each page. 8. NUREG-0654/FEMA-REP-1, Rev. 1, criterion P.8 recommends that plans submitted for review should be cross-re ferenced to NUREG-0654 criteria. The
SSREP contains a cross-re ference to NUREG-0654 criter ia. The cross-reference is submitted with plan changes only if the changes cause the cross-reference to change. If the cross-reference is not submitted with a plan change, the extant cross-reference in the SSREP continues to reference correctly where the SSREP addresses NUREG-0654 criteria.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 42 9. NUREG-0654/FEMA-REP-1, Rev. 1, Appendix 1, Example Initiating Condition Alert #4 reads: "Steam line break with significant (e.g., greater than 10 gpm) primary to secondary leak rate (PWR) or MSIV malfunction causing leakage (BWR)." The Seabrook Station Emergency Classification System (SSECS) does not include an initiating condition that e xplicitly addresses this example initiating condition. The SSECS incorporates Seabrook Station specific initiating conditions that address applicable aspects of Example Initiating Condition Alert #4. 10. NUREG-0654/FEMA-REP-1, Rev. 1. Appendix 1, Example Initiating Condition Alert #9 reads: "Coolant pump seizure leading to fuel failure." The SSECS does not include this initiating condition, because this condition is subsumed under series 8 EALs in the SSECS that consider fuel failure conditions for any cause.
There are no specific diagnostics in the Seabrook Station emergency response procedures that tell Control Room operators that a coolant pump seizure has occurred. Under the SSECS, the amount of reactor coolant system activity from the failed fuel would drive the emergency classification rather than the cause of the fuel failure. This approach is consistent with guidance in NRC memorandum, Branch Position on Acceptable Deviations to Appendix 1 to
NUREG-0654/FEMA-REP-1, dated July 11, 1994. 11. NUREG-0654/FEMA-REP-1, Rev. 1, Appendix 3 states that every year, or in conjunction with an exercise, FEMA, in cooperation with th e utility operator, and/or the state and local governments will take a statistical sample of residents within about 10 miles to assess the public's ability to hear the sirens and their awareness of the meaning of the prompt notification message and availability of public information. Based on subsequent FEMA guidance, Guidance Memorandum AN-1, April 1987, FEMA ha s not conducted, nor required, an additional statistical survey for the Seabrook Station Public Alert and Notification System following the initial system acceptance test. 12. NUREG-0654/FEMA-REP-1, Rev. 1, Appendix 3 suggests the following type and frequency of siren tests: (1) silent test every two weeks; (2) growl test quarterly and when preventive maintenance is performed; and (3) a complete cycle test annually and as required for formal exercise
- s. The Seabrook Station siren system testing program does not in clude a quarterly gr owl test or annual complete cycle test, because the capability of each siren to receive an activation signal to rotate for a full cycle and to emit an alert tone is tested every two weeks using vendor designed ultra-sonic "Silent Test" circuitry.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 43 13. NUREG-0654/FEMA-REP-1, Rev. 1, Supp. 3, Figure 1, note 5, advises that shelter may be an appropriate protective ac tion for a controlled, short-term release of radioactive material from containment. The option to recommend sheltering as a protective action is not considered in Seabrook Station protective action recommendation procedures. See exception number 3 above.
Regulatory Guide 1.102 (Rev. 1, 9/76)
Flood Protection for Nuclear Power Plants The flood protection design reflects full complian ce with the guida nce presented in Regulatory Guide 1.102, Rev. 1. For further discussion, refer to Section 2.4 and Subsection 3.4.1.
Regulatory Guide 1.103 (Rev. 1, 10/76)
Post-Tensioned Prestressing Systems for Concrete Reactor Vessels and Containments This regulatory guide is not applicable to Seabrook Station. It was with-drawn on July 8, 1981 and superseded by Regulatory Guide 1.136, Rev. 2, 6/81.
Regulatory Guide 1.104 (Rev. 0, 2/76)
Overhead Crane Handling Systems for Nuclear Power Plants This regulatory guide was withdrawn by the NRC on August 16, 1979.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 44 Regulatory Guide 1.105 (Rev. 1, 11/76)
Instrument Spans and Setpoints The recommendations of this regulatory guide have been followed with the following exceptions and clarifications: The Technical Specifications for limiting safety system settings provide the margin from the nominal setpoint to the Technical Speci fication allowable value to account for drift when measured at the rack during periodi c testing. The allowances between the Technical Specification allowable value and the safety limit include the following items: (a) the inaccuracy of the instrument, (b) process measurement accuracy, (c) uncertainties
in the calibration, (d) the potential transient overshoot determined in the accident analyses (this may include compensation for the dynamic effect) and (e) environmental effects on equipment accuracy caused by postulated or limiting postulated events (only for those systems required to mitigate consequences of an accident). The setpoints were
chosen for Seabrook so that the accuracy of the instrument is adequate to meet the assumptions of the safety analysis. The range of instruments has been chosen based on the span necessary for the instrument's function. Narrow range instruments are being used where necessary. Instruments have been selected based on expected environmental and accident conditions. Qualification testing of instrumentation has been performed as necessary to verify the functionality of the instruments. Seismic qualification testing has verified that setpoint securing device s are not required to maintain accuracy or minimize setpoint changes. Integral setpoint se curing devices have not been supplied. The assumptions used in selecting the setpoint values in Regulatory Position C.1, and the minimum margin with respect to the Technical Specification limit and calibration uncertainty, are documented in the setpoint calculations. BOP safety-related setpoints have been established using the same methodology as was used for the NSSS setpoints.
Regulatory Guide 1.106 (Rev. 1, 3/77)
Thermal Overload Protection for Electric Motors on Motor-Operated Valves Overload protection is in conformance with the recommendations of Regulatory Guide 1.106, Rev. 1. The subject matter of this guide is further discussed in Subsections 8.1.5.3 and 8.3.1.1.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 45 Regulatory Guide 1.107 (Rev. 1, 2/77)
Qualifications for Cement Grouting for Prestressing Tendons in Containment Structures This guide is not applicab le to Seabrook Station.
Regulatory Guide 1.108 (Rev. 1, 8/77)
(Errata 9/77)
Periodic Testing of Diesel Generators Used As Onsite Electric Power Systems at Nuclear Power Plants The diesel generator testing is in conformance with the recommendations of Regulatory Guide 1.108 except as noted below. The requirements of position C.1.c are met with the following exception: Temporary jumpers are used on a limited basis during the performance of periodic tests for the emergency diesel generators. The above exception to Regulatory Guide 1.108 is determined to be acceptable because the NRC has previously accepted the use of temporary jump ers for testing of protection system circuits addressed in UFSAR Section 7.1.2.11.d. This position is further supported by the discussion in SER Section 7.3.2.14. The NRC based its acceptan ce on the combination of explicit test procedures and administrative controls (independent second-person verification) which met the guidelines in NRC IE Information Notice No. 84-37, Use of Lifted Leads and Jumpers During Maintenance or Surveillance Testing. These guidelines provide reasonable assurance that the instrumentation will be restored to the correct configuration following testing. The use of jumpers is minimized and is performed only where permanent hardware changes are not practical or cannot be justified. The requirements of position C.2.a(5) were met for preopera tional testing as follows: The functional capability at full load temperature was demonstrated by performing the test outlined in position C.2.a(l) and (2) immediately foll owing the full load carrying capability test described in position C.2.a(3). The full load carrying capability of position C.2.c(2) was demonstrated for greater than or equal to five minutes. The above exception to Regulatory Guide 1.108 met the intent of position C.2.a(5) by demonstrating the capability of the diesel generator to start and accept load at full load temperature.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 46 The requirements of position C.2.a(3) will be met every 18 months as follows: Full load carrying capability will be verified by operating the diesel generator at a load of greater than or equal to 5600 kW and less than or equal to 6100 kW. The 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> rating of the diesel generator will be verified by operating the diesel generator at a load of greater
than or equal to 6363 kW and less than or equal to 6700 kW. The above exception to Regulatory Guide 1.108 meets the intent of position (3) by demonstrating that the diesel generators are capable of carrying approximate full load for an interval of not less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The requirements of position C.2.a(5) will be met every 18 months as follows: The functional capability at full load temperature will be demonstrated by verifying that the diesel generator will start from a manual or automatic start signal within five minutes of shutdown following the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> surve illance run. The generator voltage and frequency shall be 4160 +/- 420 volts and 60 +/- 1.2 Hz within 10 seconds after the start signal, and the diesel generator shall be operated for at least five minutes.
- The above exception to Regulatory Guide 1.108 meets the intent of position (5) by demonstrating the capability of the diesel generator to start at normal operating temperature. The periodic testing requirements of C.2.c(2) will be met as follows: Full load carrying capability will be verified by periodically running the diesel generator at a load of greater than or equal to 5600 kW and less than or equal to 6100 kW for at least 60 minutes. The above exception to Regulatory Guide 1.108 meets the intent of position (2) by demonstrating that the diesel generators are capable of carrying approximate full load for a period of not less than 60 minutes.
- If the diesel generator fails to start during this test, then it is not necessary to repeat the preceding 24-hour test. Instead, the diesel generator may be operated at greater than or equal to 5600 kW and less than or equal to 6100 kW for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or until operating temperature has stabilized. The load range is provided to preclude routine overloading of the diesel generator. Momentary transients outside the load range, due to changing bus conditions, do not invalidate the test.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 47 The periodic testing interval requirements of position C.2.d will be met as follows: The periodic testing interval will be no more than 31 days per T/S 4.8.1.1.2.a. The corrective actions for a test failure will be determined by the maintenance rule emergency diesel generator performance criteria.
The above exception to Regulatory Guide 1.108 meets the intent of position C.2.d by maintaining the periodic test interval and ensuring that adequate corrective actions are implemented if a test failure occurs. The records and reporting requirements of position C.3.b will be met as follows: Significant emergency diesel generator failures will be reported in accordance with the provisions of 10 CFR 50.72 and 50.73. Footnote 3 in position C.3.b references Regulatory Guide 1.16. UFSAR Section 1.8 documents compliance with Regulatory Guide 1.16. The above exception to Regulatory Guide 1.108 meets the intent of position C.3.b by providing NRC notification of diesel generator failures in accordance with the licensee's reporting requirements.
For further discussion, refer to Subsec tions 8.1.5.3 and 8.3.1.1 and Regulatory Guide 1.22.
Regulatory Guide 1.109 (Rev. 1, 10/77)
Calculation of Annual Doses to Man From Routine Releases of Reactor Effl uents for the Purpose of Evaluating Compliance With 10 CFR Part 50, Appendix I This guide describes NRC-suggested models and assumptions for estimating the doses to humans from radioactivity expected to be routinely discharged from the plant to the hydrosphere and atmosphere during normal operation. To demonstrate compliance with the "As Low As Is Reasonably Achievable" dose criteria of 10 CFR 50, Appendix I, a ll dose calculations have used the suggested models and assumptions of this regulatory guide. The details of the dose evaluations are provided in Subsections 11.2.3 and 11.3.3.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 48 Regulatory Guide 1.110 (Rev. 0, 3/76)
Cost-Benefit Analysis for Radwaste Systems Systems for Light-Water-Cooled Nuclear Power Reactors This regulatory guide describes an acceptable method for performing a cost benefit analysis for liquid and gaseous radwaste system components to demonstrate compliance with Section II.D of Appendix I to 10 CFR 50. However, on September 4, 1975 (F.R.172), the Commission amended Appendix I of 10 CFR 50 to allow applicants who filed applications for construction permits for light-water-cooled nuclear power reactors which were docketed on or after January 2, 1971, and prior to June 4, 1976, the option of dispensing with the cost-b enefit analysis required by Paragraph II.D of Appendix I. This option permits an applicant to design radwaste management systems to satisfy the Guides on Design Objectives for Light-Water-Cooled Nuclear Power Reactors proposed in the Concluding Statement of Position of the Regulatory Staff in Docket RM-50-2, dated February 20, 1974. As indicated in the Statement of C onsiderations included with the amendment, the Commission noted it is unlikely that further reductions to radioactive material releases would be warranted on a cost-benefit basis for light-water-cooled nuclear power reactors having radwaste systems and equipment determined to be acceptable under the proposed staff design objectives set forth in RM-50-2. In a letter to the Commission dated October 8, 1975, Public Service Company of New Hampshire chose to comply with the Commission's September 4, 1975 amendment to Appendix I, eliminating the necessity to perf orm a cost-benefit analysis as required by Paragraph II.D of Appendix I. Therefore, Regulatory Guide 1.110 is not applicable to the Seabrook design evaluation.
Regulatory Guide 1.111 (Rev. 1, 7/77)
Methods for Estimating Atmospheric Transport and Dispersion of Gaseous Effluents in Routine Releases from Light-Water-Cooled Reactors Atmospheric dispersion of routine gaseous effluent releases are calculated using a computer code, as described in Subsection 2.3.5, which is based, in part, on Regulatory Guide 1.111 modeling methodology and a pplicable procedures.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 49 Regulatory Guide 1.112 (Rev. O-R, 4/76; Reissued 5/77) Calculation of Releases of Radioactive Materials in Gaseous and Liquid Effluents from Light-Water-Cooled Power Reactors The objective of this guide is to provide an acceptable method of calculating realistic radioactive source terms for the evaluation of radioactive waste treatment systems in determining whether the design objectives of Appendix I to 10 CFR 50 are met and in determining the impact of radioactive effluents on the environment.
The regulatory guide re ferences NUREG-0017 (PWR-GALE computer code) as an acceptable method for the calculation of radioactive source terms from PWRs. For Seabrook, expected annual average liquid and gaseous radioactive effluents have been estimated utilizing the PWR-GALE code in conformance with this regulatory guide. Subsections 11.2.3 and 11.3.3 list the calculated radioactiv e releases for liquid effluents and gaseous effluents, respectively.
Regulatory Guide 1.113 (Rev. 1, 4/77)
Estimating Aquatic Dispersion of Effluents from Accidental and Routine Reactor Releases for the Purpose of Implementing Appendix I The aquatic dispersion of effluents was estimated as recommended by Regulatory Guide 1.113, Revision 1, using results from physical model studies and an analytical dispersion model. The initial dilution (nearfield region) was estimated using results from physical model studies of the thermal discharge performed by Alden Research Laboratories (Reference 13). The model was a 1 to 115 undistorted Fronde model in which temperature rise patterns were measured. Because very little heat transfer occurs in the nearfield region of the model, the initial dilution of any effluent constituent can be determined from the temperature rise reduction as given by the physical model. The farfield concentration of effluent constituents was estimated using an analytical dispersion model developed by Brocard and Kirby (Reference 14). This model was run with zero heat transfer to simulate the release of a conservative constituent.
Regulatory Guide 1.114 (Rev. 1, 11/76)
Guidance on Being Operator at the Controls of a Nuclear Power Plant The criteria for being a control room operator comply with the requirements of NRC Regulatory Guide 1.114, Rev. 1. For further discussions, refer to Sections 13.1 and 13.2.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 50 Regulatory Guide 1.115 (Rev. 1, 7/77)
Protection Against Low-Trajectory Turbine Missiles The plant design conforms to Regulatory Guide 1.115, Rev. 1, except for Position 4. The probability of damage due to low trajectory missiles is greater than the required 10
-3. For further discussion, refer to Subsection 3.5.1.3.
Regulatory Guide 1.117 (Rev. 1, 4/78)
Tornado Design Classification The plant design complies with Regulatory Guide 1.117, Rev. 1.
Although the condensate storage tank is not designed for missiles or a pressure drop, the system will function if the tank fails because the shield wall is designed for missiles and is waterproofed to contain water from the tank.
The Ultimate Heat Sink Cooling Tower is not designed for tornado missiles. The primary source for water is the Atlantic Ocean through the underground tunnels, which will function during a tornado event.
For further discussion on this subject, refer to Section 3.5.
Regulatory Guide 1.118 (Rev. 1, 11/77; Rev. 2, 6/78 and Rev. 3, 4/95) Periodic Testing of Electric Power and Protection Systems The 1E electric power and safety system testing will comply with Regulatory Guide 1.118, Rev. 1. Detailed clarifications on the regulatory positions are presented below: a. Regulatory Position C.2 "Protective Action Systems" is interpreted to mean the electric, instrumentation and controls portions of those protection systems and equipment actuated and controlled by the protection system. b. Regulatory Position C.6 Equipment performing control functions, but actuated from protection system sensors, is not part of the safety system and will not be tested for time response.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 51 c. Regulatory Position C.10 Testing, although not tied to accident conditions, will be tied to the range of the parameter that is varied. This range is determined by expected design basis event conditions and anticipated operational occurrences. d. Regulatory Position C.11 Status, annunciating, display, and monitori ng functions, except for those related to the Post-Accident Monitoring System (PAMS), are considered to be control functions. Reasonability checks, i.e., comparison between or among similar such display functions, will be made. Otherwise, the clarification note in Item b above, pertaining to Position C.6, is observed. e. Regulatory Positions C.12 and C.13 Response time testing for control func tions operated from protection system sensors will not be performed. Nuclear Instrumentation System detectors will not be tested for time response. (See TS Technical Requirement 1 of the Technical Requirements Manual.) f. Regulatory Position C.14 Position C.14 has the same requirement as position C.6 of Regulatory Guide 1.1118, Revision 2. Refer to the discussion for position C.6 of Regulatory Guide 1.1118, Revision 2.
Additional clarifications w ith regard to IEEE 338-1975 are included in Subsection 7.1.2.11. The 1E electric power and safety system design and testing will also conform to the guidance of Regulatory Guide 1.118, Rev. 2, and the requirements of IEEE 338-1977 with the following clarifications: a. "Protective Action Systems" is defined to mean the electric, instrumentation and controls portions of those protection systems and equipment actuated and controlled by the protection system. b. Equipment performing control functions, but actuated from protection system sensors is not part of the safety system and will not be tested for time response.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 52 c. Status, annunciating, display, and monito ring functions, except those related to the Post-Accident Monitoring Systems (PAMS) are considered to be control functions. Reasonability checks, i.e., comparison between or among similar such display functions, will be made. d. Regulatory Position C.6 Position C.6 states that temporary jumpers may be used with portable test equipment where the safety system equipment to be tested is provided with facilities specifically designed for connection of this test equipment. The intention of this position is to ensure that test setups are of a quality that does not degrade the equipment and that makeshift test setups are not used. Temporary jumpers are used on a limited basis during the performance of periodic tests for various electric power and protection systems. Regulatory Guide 1.118 does not provide details on what constitutes facilities specifically designed for connection of test equipment. When temporary jumpers are used during testing, they are connected via devices that are suitable for ensuring a reliable connection to the equipment under test. Certain points of connection may not have been specifically designed for the connection of test equipm ent, but the points are evaluated for acceptability for each application. This meets the intent of the regulatory position to ensure that makeshift test setups are not used. For additional information on the use of temporary jumpers, refer to the discussion under Regulatory Guide 1.108. The 1E electric power and safety system design and testing will also conform to the guidance of Regulatory Guide 1.118, Rev. 3, specifically for excl usion of testing for process to sensor coupling (flow testing). IEEE 338-1977 stated that response time testing of the process to sensor coupling was not required. Regulatory Guide 1.118, Rev. 2 indicated that th e process to sensor coupling test was under evaluation. The Regulatory Guide 1.118, Rev. 3 now endorses the position taken in IEEE 338-1977, that response time testing of the process to sensor coupling is not required.
Regulatory Guide 1.119 (Rev. 0, 6/76)
Surveillance Program for New Fuel Assembly Designs This regulatory guide was withdrawn by the NRC on June 23, 1977.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 53 Regulatory Guide 1.120 (Rev. 1, 11/77)
Fire Protection Guidelines for Nuclear Power Plants Regulatory Guide 1.120 has been issued to provide information to applicants regarding the NRC staff's plans for using this regulatory guide and to solicit public comment. Branch Technical Position APCSB 9.5-1, which is part of the Standard Review Plan (NUREG-75/087), formed the basis for the regulatory guide. Branch Technical Position APCSB 9.5-1, has been revised to Branch Technical Position CMEB 9.5-1, which now contains provisions of Regulatory Guide 1.120; 10 CFR 50, Appendix R; and Branch Technical Position APCSB 9.5-1. This revised Branch Technical Position is now used in the evaluation of fire protection provisions of applicants currently under review for operating licenses for plants under construction. The existing plant design complies with the Branch Technical Position CMEB 9.5-1 with the exceptions as depicted in "Fire Protection System Evaluation and Comparison to Branch Technical Position APCSB 9.5-1, Appendix A," Rev. 2, and "Fire Protection of Safe Shutdown Capability (10 CFR 50, App. R)," Rev. 1, submitted to the USNRC in August 1984.
Regulatory Guide 1.121 (Rev. 0, 8/76)
Bases for Plugging Degraded PWR Steam Generator Tubes Position C.1 Westinghouse interprets the term "Unacceptable defects" to apply to those imperfections resulting from service induced mechanical or chem ical degradation of the tube walls which have penetrated to a depth in excess of the Plugging Limit.
Positions C.2a(2) and C.2.a(4)
Westinghouse will use a 200 percent margin of safety based on the following definition of tube failure. Westinghouse defines tube failure as plastic deformation of a crack to the extent that the sides of the crack open to a nonparallel, ellipti cal configuration. This 200 percent margin of safety compares favorably with the 300 percent margin requested by the NRC against gross failure.
Position C.2.b In cases where sufficient inspection data exist to establish degradation allowance, the rate used will be an average time-rate determined from the mean of the test data.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 54 Where requirements for minimum wall are markedly different for different areas of the tube bundle, e.g., U-bend area versus straight length in Westinghouse designs, two plugging limits may be established to address the varying requirements in a manner which will not require unnecessary plugging of tubes.
Positions C.3.d(l) and C.3.d(3)
The combined effect of these requirements would be to establish a maximum permissible primary-to-secondary leak rate which may be below the threshold of detection with current methods of measurement.
Westinghouse has determined the maximum accepta ble length of a throu gh-wall-crack based on secondary pipe break accident loadings which are typically twice the magnitude of normal operating pressure loads. Westinghouse will use a leak rate associated with the crack size determined on the basis of accident loadings.
Position C.3.e(6)
Westinghouse will supply computer code names and references rather than the actual codes. Position C.3.f(l)
Westinghouse will establish a minimum acceptable tube wall thickness (Plugging Limit) based on structural requirements and consideration of loadings, measuremen t accuracy and, where applicable, a degradation allowance as discussed in this position and in accordance with the general intent of this guide. Analyses to determine the maximum acceptable number of tube failures during a postulated condition are normally done to entirely different bases and criteria are not within the scope of this guide.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 55 Regulatory Guide 1.122 (Rev. 1, 2/78)
Development of Floor Response Spectra for Seismic Design of Floor-Supported Equipment or Components The plant design conforms to Regulatory Guide 1.122, Rev. 1, with the following exception: Regulatory Guide 1.122 requires peaks associat ed with structural frequencies be broadened by +/-0.15 f
- i. Seabrook Preliminary Safety Analysis Report Subsection 3.7.2.6 stated that "to account for va riations in structural para meters the peaks on the floor response spectra will be widened by +/-10 percent." The justification for this exception is that Regulatory Guide 1.122 was published after the PSAR was submitted. The "implementation" section of Regulatory Guide 1.122 states that it is presently being used "in the evaluation of submittals for construction permit applications." In addition, Regulatory Guide 1.122 states that the +0.15 f i broadening is to account for such parameters as "material properties of so il . . . and soil structure interaction techniques." Since the Seabr ook Plant is founded on rock, the uncertainties associated with soil properties and soil modeling are not of any concern, and less conservative peak broadening is justified.
Regulatory Guide 1.124 (Rev. 1, 1/78)
Service Limits and Loading Combinations for Class 1 Linear-Type Component Supports The Seabrook NSSS is in partial compliance with this regulatory guide, with the following clarifications/variations: a. The regulatory guide states in Paragraph B.1(b): "Allowable design limits for bolted connections are derived from tensile and shear stress limits and their nonlinear interaction; they also change with the size of the bolt. For this reason, the increases permitted by NF-3231.1, XVII-2110(a), and F-1370(a) of Section III are not directly applicable to allowable shear stresses and allowable stresses for bolts and bolted connections," and in Paragraph C.4: "This increase of design limits does not apply to limits for bo lted connections and shear stresses." As noted above, the increase in bolt allowable stress under emergency and faulted conditions is not permitted because: (1) the interaction between the allowable tension and shear stress in bolts is nonlinear, and (2) the allowable tension and shear stress vary with the bolt size. The NSSS supplier believes that the present ASME Code rules are adequate since they do satisfy the two objectives raised in the above quoted paragraph and hence will use the present rules without further restrictions or justification. This position is based on the following:
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 56 1. It is well recognized after extensive experimental work by seve ral researchers that the interaction curve between the shear and tension stress in bolts is more closely represented by an ellipse and not a line.
This has been clearly recognized by the ASME. Code Case 1644 has specified stress limits for bolts and represents this tension/shear relationship as a non-linear interaction equation (ellipse). This equation has since been added to the ASME Code Section III in the Winter '77 Addenda. This interaction equation has a built-in safety factor that ranges between 2 and 3 (depending on whether the bolt load is predominantly tension or shear) based on the actual strength of the bolt as determined by test (Ref: "Guide to Design Criteria for Bolted and Rivete d Joints," Fisher a nd Struik, copyright 1974, John Wiley and Sons, p. 54). Study of three interaction curves of allowable tension and shear stress based on the ASME Code (emergency condition allowables per XVII - 2110 and faulted condition allowables per F-1370) and the ultimate tensile and shear strength of bolts (obtained from experimental work published by Chesson, Faustino, and Munse in "Proceedings of ASCE:"
October 1975) indicates that there is adequate safety margin between the emergency and faulted condition allo wables and failure of the bolts. From this study it is observed that: (a) For the emergency condition, the safety factor (ratio of ultimate strength to allowable stress) varies between a minimum of 1.63 and a maximum of 2.73 depending upon the actual tensile
stress/shear stress (T/S) ratio on the bolt. (b) For the faulted condition, the safety factor varies between a minimum of 1.36 to a maximum of 2.29, again depending upon actual T/S ratio on the bolt. It is thus reasonable to allow an increase in these limits for the emergency and faulted conditions. 2. In Section III, Subsection NA, Table XVII - 2461.1, the ASME Code provides the criterion for allowable stress on bolts. According to this table, the allowa ble stress depends upon the bolt size as well as the bolt material.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 57 3. The structures designed to meet AI SC Manual of Steel Construction have been proven to be adequately designed. It is also recognized that the ASME Code requirements for Class 1 linear type supports (Appendix XVII) have been derived from AISC Manual of Steel Construction. In Paragraph 1.5.6 of Manual of Steel Construction, AISC permits the increased allowables for "occasional loads such as wind and seismic." In view of this, restrictions by NRC on not permitting increased allowables under emergency and faulted conditions which also are "infrequent incidents and limiting faults" are not justified. Based on Paragraphs 1, 2, and 3 above, for the emergency and faulted conditions, the NSSS supplier will use allowable bolt stresses based upon the equations specified in Code Case 1644-4, as increased according to the provisions of XVII-2110(a) and F-1370(a) (as amended by Regulatory Guide 1.124 Paragraph C.4), respectively. The NSSS s upplier will use the revision of Code Case 1644, as amended by Regulatory Guide 1.85, consistent with material procurement for the selection of material properties. b. Paragraph C.4 of the Regulatory Guide states: "However, all increases (i.e., those allowed by NF-3231.1(a), XVII-2110(a), and F-1370(a)) should always be limited by XVII-2110(b) of Section III." Paragraph XVII-2110(b) specifies that member compressive axial loads shall be limited to 2/3 of critical buckling. Satisfaction of this criteria for the faulted condition is met for the primary equipment supports. c. Paragraph C.6(a) of the Regulatory Guide appears to er roneously allow the use of faulted stress limits for the emergency condition. The NSSS supp lier will interpret this paragraph as follows: "The stress limits of XVII-2000 of Section III and Regulatory Position 3, increased according to the provisions of XVII-2100(a) of Section III, should not be exceeded for component supports designed by the linear elastic analysis method." This position was accepted by the NRC via the RESAR 414 Safety Evaluation Report. Regulatory Guide 1.125 (Rev. 1, 10/78)
Physical Models for Design and Operation of Hydraulic Structures and Systems for Nuclear Power Plants Seabrook does not have any safety-related hydrau lic structures which directly interface with surface waters.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 58 Some of the types of physical modeling studies included in Regulatory Guide 1.125, Rev. 1, were, however, used in the design and operation of nonsafety- related hydraulic structures and systems of the plant. A number of these studies were discussed with the NRC staff at the testing facilities. Results of these studies have been transmitted to the NRC staff. The physical modeling studies are further discussed in Section 3.4 of the Environmental Report.
Regulatory Guide 1.126 (Rev. 1, 3/78)
An Acceptable Model and Related Statistical Statistical Methods for the Analysis of Fuel Densification The fuel densification model presented in Reference 11, which has been approved by the NRC, has been utilized. This model continues to be used with the updated fuel performance models in Reference 18. Results reported in Reference 19 (which has b een approved by the NRC) show that the densification has been minimized in Westinghouse fuel through improvements in the fuel manufacturing process, and that formation of significant axial gaps in the fuel stack will not occur. Regulatory Guide 1.127 (Rev. 1, 3/78)
Inspection of Water-Control Structures Associated With Nuclear Power Plants The recommendations of Regulatory Guide 1.127, Rev. 1, will be met by developing and implementing an appropriate in-service insp ection and surveillance program for the flood protective structures. These flood protective structures consist of the stone revetments, reinforced concrete vertical seawall, and the sheet pile retaining wall.
Regulatory Guide 1.128 (Rev. 1, 10/78)
Installation Design and Installation of Large Lead Storage Batteries for Nuclear Power Plants The recommendations of Regulatory Guide 1.128 have been followed. The subject matter of this guide is discussed in Subsection 8.3.2.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 59 Regulatory Guide 1.129 (Rev. 1, 2/78)
Maintenance, Testing and Replacement of Large Lead Storage Batteries for Nuclear Power Plants The plant design conforms to Regulat ory Guide 1.129 except for the following: The Regulatory Guide states in Position C.1, "The battery service test... should be performed in addition to the battery performan ce discharge test." The Technical Specifications require service tests at least once per 18 months and performance discharge tests at least once per 60 months. However, the Technical Specifications allow the performance discharge test to be performed in lieu of (not in addition to) the service test once per 60 month interval.
The Regulatory Guide states in Position C.1, "The battery service test should be performed during refueling operations or at some other outage, with intervals between tests not to exceed 18 months." The Technical Specifications permit the battery service test to be performed during non-outage periods. The Seabrook Station design incorporates two 100% capacity battery banks per train. Removing one of these battery banks from service for surveillance tes ting does not reduce the system capabilities. The regulatory guide assumes only one 100% capacity battery bank per train. The subject matter of this regulatory guide is further discussed in Subsection 8.3.2.
Regulatory Guide 1.130 (Rev. 1, 10/78)
Service Limits and Loading Combinations for Class 1 Plate-and-Shell-Type Component Supports The Seabrook NSSS is in partial compliance with this regulatory guide, with the following exceptions: a. The regulatory guide states in Paragraph B.l: "Allowable design limits for bolted connec tions are derived on a different basis that varies with the size of the bolt. For this reason, the increases permitted by NF-3224 and F-1323.1(a) of Section III are not directly applicable to bolts and bolted connections."
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 60 This requirement is overly conservative.
The ASME Code provides stress criteria for the design of bolting for component supports. Paragraph NF-3280 of ASME III specifies the use of the S y values given in Table I-13.3 as multiplied by the applicable design factors of Table XVII-2461.1-1. Paragraph F-1323.1 specifies the use of the S m values of Table I-1.3 (NB-3230) specifically for the faulted condition. In addition, Table 4 of Code Case 1644 presents alternative bolting design requirements which may be used. In Table XVII-2461.1-1, Table I-1.3, and Table 4 of Code Case 1644, the allowable stress values (either Sy or S m) are dependent upon the size of the bolt as well as bolt material. Thus, since bolt size is already taken into consideration in the formulation of these criteria, it is reasonable to allow an increase in these limits for emergency and faulted conditions. In addition, the bolting design rules presented in Code Case 1644 (starting with Revision 4) provide an acceptable basis for design of bolts and should, therefore, be clearly noted in the regulatory
guide. The NSSS supplier will use allo wable bolt stresses specified in Table XVII-2461.1-1), Table I-1.3, and Code Case 1644 for emergency and
faulted conditions as increased accord ing to the provisions of NF-3224 and F-1323.1(a), respectively. b. In Paragraphs C.3, C.4(a), and C.6(a) of the regulatory guide, design margins of 2 for flat plates and 3 for shells are unnecessarily restrictive for normal, upset, and emergency conditions, as well as inconsistent with ASME Code requirements. For these loading conditions, the NSSS supplier will limit the allowable buckling strength to of the critical buckling strength. c. In Paragraph C.7 of the regulatory guide, inclusion of the ups et plant condition is inappropriate in the load combination under discussion. The NSSS supplier will
not include the upset plant condition in this combination. d. In Paragraphs C.7(a) a nd B.1 of the regulatory guide, the stress limits of F-1370(c) are discussed. The criterion stated in F-1370(c),"...Loads should not exceed 0.67 times the critical buckling strength of the support..," is overly restrictive for the faulted condition. The most significant faulted condition loads on equipment supports result from seismic disturbances and postulated loss-of-coolant accidents, both of which are extremely short duration, dynamic events.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 61 If it is shown that the dynamic effects of the member loading are not detrimental, the NSSS supplier will allow the compressive axial load to go to 0.9 times the critical buck ling strength. e. In Paragraph C.7(b) of the regulatory guide, the limit based on the test load given in the regulatory guide, T.L. x 0.7 S u/S u, is overly conservative and is inconsistent the ASME Code requirements. The NSSS supplier will use the lim it as calculated by T.L. x 0.8 S u/S u. This position was accepted by the NRC via the RESAR 414 Safety Evaluation Report.
Regulatory Guide 1.131 (Rev. 0, 8/77)
Qualification Tests of Electric Cables, Field Splices and Connections for Light- Water-Cooled Nuclear Power Plants The qualification test recommendations of this guide have been followed.
The subject is further discusse d in Subsections 8.1.5.3a and 8.3.1.4.
Regulatory Guide 1.132 (Rev. 1, 3/79)
Site Investigation for Foundations of Nuclear Power Plants The site investigations performed for the plant complied in part with Regulatory Guide 1.132, Rev. 1, which was issued subsequent to the performance of the site investigation. The investigation was more than adequate to determ ine the geotechnical characteristics of the site affecting the design, performance and safety of th e plant. It was perfor med under the direction, and with the advice of, experienced personnel familiar with the site and regional geology. The main exception to compliance with the guide was in meeting the general guidelines for subsurface explorations. These e xplorations were carried out to adequately assess the foundation requirements based on the complexity of the anti cipated subsurface conditions. This is further discussed in Subsection 2.5.1 a nd its associated appendices.
Regulatory Guide 1.133 (Rev. 1, 5/81)
Loose-Part Detection Program for the Primary System of Light-Water-Cooled Reactors Compliance with Regulatory Guide 1.133 is discussed in detail in Subsection 4.4.6.4.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 62 Regulatory Guide 1.134 (Rev. 2, 4/87)
Medical Evaluation of Licensed Personnel for Nuclear Power Plants Endorses ANSI/ANS-3.4-1983.
The medical evaluation of licensed operators complies with the requirements of Regulatory Guide 1.134, Rev. 2. For further discussion, refer to Seabrook Station's Medical Manual. The use of licensed/certified nurse practitioners to perform the hands-on physical examination with an evaluation and sign-off by a licensed physician who makes the final determination per Regulatory Guide 1.134 is documented in References 16 and 17.
Regulatory Guide 1.135 (Rev. 0, 9/77)
Normal Water Level and Discharge at Nuclear Power Plants The structural design criteria for normal ground a nd surface water levels comply with Regulatory Guide 1.135 by establishing the maximum ground and surface water levels at safety-related structures and facilities at +20 feet MSL (plant grade). Elevation +20 feet MSL is above both the maximum recorded ground water level and al so above the postulated probable maximum surge still water level.
Wave runup and overtopping of the protective revetment would occur during the probable maximum surge which would cause ponding on the site of approximately 0.6 feet. All safety-related structures are protected against th is site ponding level.
For further discussion, refer to Section 2.4.
Regulatory Guide 1.136 (Rev. 2, 6/81)
Materials, Construction, and Testing of Concrete Containments The requirements of this guide comply with the following exceptions: a. Paragraph B.8, CC-4333.4.2 - Splice Samples This section requires only a production-spli ce testing program. Si ster splices have also been used. Sister splices were taken in place of production Cadwelding splices in congested areas or in areas where conditions would be detrimental for providing satisfactory replacement splices.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 63 Where a total sister splice test program was implemented for a series of splices, the testing frequency was in accordance with ASME Section III, Division 2, 1975, CC-4333.4.3(b) and USNRC Regulatory Guide 1.10, Paragraph 4(b), excep t that all splices we re sister splices. Tensile testing was performed on a random selecti on basis using the testing frequency in either Paragraph (a) or (b) of ASME Section III, Division 2, 1975, CC-4333.4.3. At least one quarter of the total number of splices tested from the containment structure (ASME boundary-exterior mat, shell and dome) were production splices. At least one quarter of the total number of splices tested from all other combined safety re lated splicing were al so production splices. Prior to forming, all Cadweld splices were insp ected to assure that all preparations (e.g., cleaning, drying, aligning) require d by the designer and the splice manufacturer we re properly carried out. Quality Assurance personnel inspected a minimum of one splice connection per crew per shift, and all other splice connectio ns were inspected by Cadwelding personnel. b. Paragraph B.9, CC-4352 - Splices The requirement for staggering mechanical (Cadweld) reinforcing bar splices, as revised in the 1980 issue of ACI-349, has generally been complied with. In the limited number of cases where splices were not staggered, proper technical evaluation was performed to justify the nonstaggered arrangement. c. Paragraph C.12, CC-5210 - General All pipes used for rebar supports have not been filled with grout.
Regulatory Guide 1.137 (Rev. 1, 10/79)
Fuel Oil Systems for Standby Diesel Generators The fuel oil system design for the standby diesel generators complies with the requirements of NRC Regulatory Guide 1.137, Rev. 1. Fuel oi l testing exceptions are identified in Subsection 9.5.4.4.
For further discussion, refer to Subsection 9.5.4.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 64 Regulatory Guide 1.138 (Rev. 0, 4/78)
Laboratory Investigations of Soils for Engineering Analysis and Design of Nuclear Power Plants The laboratory investigations of soils for engineering analysis and design complied in part with Regulatory Guide 1.138, Rev. 0, dated April, 1978, which was issued subsequent to the performance of the laboratory investigations. The investigations were more than adequate to permit a realistic evaluation of soil and rock properties and subsurface conditions. They were performed under the direction of experienced engineers and geologists who have demonstrated competence in the field of soil and rock mechanics testing and are familiar with the site. Table 1.8-1 includes the actual testing procedures used in the investiga tions and identifies the procedures preferred by the NRC, as given in Regulatory Guide 1.138. Table 1.8-1 also notes exceptions taken to the preferred procedures. These exceptions were to make the test results more reliable or applicable to a wider range of soil types. The noted exceptions do not alter the engineering application of the test results.
This subject is further discussed in Subsection 2.5.1.
Regulatory Guide 1.139 (Rev. 0, 5/78)
Guidance for Residual Heat Removal Regulatory Guide 1.139 establishes specific design requirements that address the various system functions that are required to achieve and ma intain a safe hot standby and cold shutdown condition.
The NSSS supplier endorses the design objective of Regulatory Guide 1.139 to ensure systems capability for achieving and maintaining the plant in a safe shutdown condition. The NSSS supplier has implemented for Seabrook this design objective by providing systems with the capability to place and maintain the plant in a safe hot standby condition. Suitable design provisions and interface requirements have been provided to permit the plant to be maintained in the safe hot standby condition until (a) normal systems could be restored to permit either return to power operation or cooldown to cold shutdown conditions, or (b) sufficient systems capability could be restored (depending on plant condition) to permit cooldown to cold shutdown conditions under abnormal plant conditions. This design philosophy, when properly implemented, is considered to constitute a safe design, independent of the time period at which the plant is maintained at hot standby or cooled to cold shutdown conditions.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 65 The NSSS supplier's safe shutdown design does not comply in full with the specific design requirements of Regulatory Guide 1.139. However, this traditional safe shutdown design incorporates an inherent level of cold shut-down capability under accident conditions which compares favorably with the specific requirements of Regulatory Guide 1.139 (when reviewed on a case-by-case basis). For this category of plants, the case-by-case implementation requirements of Regulatory Guide 1.139 are considered an endorsement of the traditional NSSS supplier's safe shutdown design basis. For a plant in this category, ev aluation of the plant specific safe shutdown design basis against the requirements of Regulatory Guide 1.139 ensures that the system functions that are required to achieve and mainta in a safe hot standby and cold shut-down have been properly implemented. A major benefit of such an evaluation is the identification of plant specific equipment and the development of pl ant specific operating procedures for bringing the plant to cold shutdown under abnormal conditions, including natural circulation. The specific design requirements of Regulatory Guide 1.139 function as a bench mark for this evaluation and identify areas for potential upgrading based on value/impact assessment. Selective upgrading may be beneficial in providing increased operating flexibility and increased margins of safety under abnormal plant conditions. For plants which must comply with Regulatory Guide 1.139 on a case-by-case basis, the following compliance exemption is identified: The systems for bringing the plant from norma l operating conditions to cold shutdown should not be required to achieve cold shutdown conditions within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> if it can be demonstrated that the plant can be maintained for longer periods of time in a safe hot standby or hot shutdown condition with adequate heat removal via the Auxiliary Feedwater System or Residual Heat Removal System, respectively.
The portions of BOP systems that are utilized to achieve and maintain a safe hot standby, or take the plant from hot standby to the condition where the RHR system can be cut in, are designed and fabricated to safety Class standards, a nd are provided with appr opriate redundancy and remote operability to meet the requirements of this Regulatory Guide. These systems and components are described in detail in Section 10.3, "Main Steam System," and in Section 6.8, "Emergency Feedwater System."
With regard to plant cooldown capability, either emergency feedwater pump is designed in conjunction with all four atmosphe ric relief valves to be able to maintain hot standby for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> followed by a cooldown period of 5-hou r duration. The co ndensate storage tank (Subsection 9.2.6.3) has sufficient cap acity to support the above. For situations where all four atmospheric relief valves are not available, there exists sufficient time for the operators to take corrective action.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 66 This corrective action could be the re-establishment of all four atmospheric relief valves to operable, or the line-up of additional water supplies such as water treatment, demineralized water storage tank or fire protection to supplem ent the condensate storage tank in a prolonged cooldown.
Regulatory Guide 1.140 (Rev. 1, 10/79)
Design, Testing and Maintenance Criteria for Normal Ventilation Exhaust System Air Filtration and Adsorption Units of Light Water-Cooled Nuclear Power Plants The requirements of this guide have been met, with the exceptions discussed in Subsection 9.4, Table 9.4-20, Table 9.4-21, Table 9.4-22, Table 9.4-23. Section C.5.c requires HEPA filter banks, located upstream of the adsorber section, and Section C.5.d.(4) requir es activated carbon adsorb ers to be tested following painting, fire, or chemical release in any ventilation zone communicating with the system in such a manner that the HEPA filter or the charcoal adsorbers could become adversely affected by the fumes, chemicals, or foreign material. Painting is administratively controlled to protect the HEPA filters and the charcoal adsorbers from the adverse effects of the fumes.
Regulatory Guide 1.141 (Rev. 0, 4/78)
Containment Isolation Provisions for Fluid Systems The recommendations of Regulatory Guide 1.141 have been followed with the exceptions listed in Subsection 6.2.4.2m.
For further discussion, refer to Subsection 6.2.4 and 7.1.2.2a.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 67 Regulatory Guide 1.142 (Rev. 1, 10/81)
Safety-Related Concrete Structures for Nuclear Power Plants (Other Than Reactor Vessels and Containments)
According to the "Implementation" section of this guide, compliance by Seabrook Station to this guide is not required. ACI-349-76, "Code Requirements for Safety Related Structures," however, wa s not directly used as a design and construction standard, although th e design and construction of the structures do fulfill the intent of the requirements set forth in the publication and in this regulatory guide. By the time this regulatory guide was issued, much of the design and fabrication were completed, and construction was also in progress. Cons equently, the work was based on appropriate, corresponding standards, as follows: a. Loads and load combinations were taken directly from the USNRC Standard Review Plan and ACI-318. b. Structural analysis and design were consistent with the requirements of the Standard Review Plan and ACI-318. c. Acceptance criteria were taken directly from the Standard Review Plan and ACI-318. d. The requirement for staggering mechanical (Cadweld) reinforcing bar splices, as revised in the 1980 issue of ACI-349, has generally been complied with. In the limited number of cases where splices were not staggered, proper technical evaluation was performed to justify the nonstaggered arrangement. Thus, through the use of the above described, judiciously selected standards, the safety-related structures were designed, fabricated and erected in a manner that ensures that they will withstand the effects of postulated accidents and environmental conditions, as well as those effects associated with normal operating conditions. Additional information can be found in th e appropriate subsections of Section 3.8.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 68 Regulatory Guide 1.143 (Rev. 1, 10/79)
Design Guidance for Radioactive Waste Management Systems, Structures and Components Installed in Light-Water-Cooled Nuclear Power Plants The recommendations of Regulatory Guide 1.143 ha ve been followed. The following installed plant components are exceptions to the recommendations of Regulatory Guide 1.143:
- Chemical Drain Tank
- Chemical Drain Treatment Tanks These three tanks are made of plastic and fi berglass and are designed to Standard PS-16-69.
None of the tanks contain a high inventory of ra dioactive material. For further discussion, refer to Subsection 9.3.3.
A vendor supplied waste liquid processing system is a supplement to the station installed waste liquid (WL) system. The vendor equipment meets the intent of Regulatory Guide 1.143 and of ANSI/ANS 40.37 (1993). The vendor system may have the following components, which are exceptions to the language on Regulatory Guide 1.143, ". . .plastic pipe should not be used.":
- PVC filter housing
- Rubber Hoses for flexible connection to plant system
- Glass fiber reinforced ultra-filtration unit housing These components are nonmetallic to minimize the effect of system concentrates and cleaning chemicals, and to enhance the ability to install and remove the components for replacement. They are designed to meet the vendor system temperature, pressures and flows, and are tested to the recommendations in ANSI/ANS 40.37.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 69 The steam generator blowdown recovery acid and caustic piping and equipment that supply the resin beds and the acid/caustic drains which connect directly to the waste hold up sump, including the piping and equipment that supplies demineralized water for dilution of the chemical, are considered a maintenance sub-system for the re-generation of the resins inside the demineralizer beds. This equipment is not part of the blowdown pressu re boundary used for the treatment of effluent from the steam generators. During the re-generation process, the chemical sub-system is isolated from the inservice steam generator blowdown flow path. The piping and equipment that supply chemicals to the resin be ds do not contain, or are not subject to the ingestion of radioactive materi als. Therefore, the recommendation of Regulatory Guide 1.143 does not apply.
Regulatory Guide 1.145 (Rev. 0, 8/79)
Atmospheric Dispersion Mode ls for Potential Accident Consequence Assessments at Nuclear Power Plants The atmospheric dispersion model used to compute potential accident consequence assessments is described in Subsection 2.3.4. The modeling methodology complies with the intent of Regulatory Guide 1.145.
Regulatory Guide 1.147 (Rev. 2, 6/83)
Inservice Inspection Code Case Acceptability ASME Section XI, Division I This Regulatory Guide is subject to periodic re view and revision, and code cases referenced therein are subject to change. Code cases allo wed by this Regulatory Guide and applicable to Seabrook will be referenced in the applicable Plant Section XI Program.
Regulatory Guide 1.148 (Rev. 0, 3/81)
Functional Specification for Active Valve Assemblies in Systems Important to Safety in Nuclear Power Plants Regulatory Guide 1.148 is not applicable to Seabrook Station, with the exception of new systems important to safety and replacement valve units ordered after July 1, 1981. New systems important to safety and replacement valve units ordered after July 1, 1981 will be in compliance with Regulatory Guide 1.148.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 70 Regulatory Guide 1.149 (Rev. 3, 10/2001)
Nuclear Power Plant Simulation Facilities for Use in Operator Training and License Examinations Endorses ANSI/ANS 3.5-1998 Revision 3 of this Regulatory Guide endorses the 1998 version of ANSI/ANS 3.5 without exception. Seabrook internal instructions for simulator software configuration control and testing have been revised to reflect the guidelines of the 1998 edition of ANSI/ANS 3.5.
Regulatory Guide 1.150 (Rev. 1, 2/83)
Ultrasonic Testing of Reactor Vessel Welds During Pre-Service and Inservice Examinations FPLE Seabrook implemented Regulatory Guide 1.150, Rev. 1 at the Seabrook site for the pre-service and in-service inspection of th e reactor vessels. Specific plans for the implementation of Regulatory Guide 1.150 are cont ained in the Pre-Service Program Plan and were developed in a similar manner for the In-Service Inspection Programs.
Regulatory Guide 1.151 (Rev. 0, 7/83) Instrument Sensing Lines The recommendations of Regulatory Guide 1.151 ha ve been followed, with the exceptions as discussed in Subsections 3.2.2.2 and .1.2.12.
Regulatory Guide 1.152 (Rev. 1, 1/96)
Criteria for Programmable Digital Computer System Software in Safety-Related Systems of Nuclear Power Plants This Regulatory Guide endorses ANSI/I EEE-ANS 7-4.3.2-1993 for general guidance on stage-by-stage testing, overall performance assurance, and documentation of software for programmable digital computer systems in safety-related systems of nuclear power plants. The recommendations of Regulatory Guide 1.152 have been followed for upgrade of programmable digital computer systems used in the safety-related control room air conditioning system application at the Seabrook site. Refer to FSAR Subsection 9.4.1.1.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 71 Regulatory Guide 1.153 (Rev. 0, 6/96)
Criteria for Power, Instrume ntation and Control Portions of Safety Systems This Regulatory Guide endorses the guidanc e provided in IEEE Standard 603-1991 with appropriate supplements for the design, reliability, qualification, and testability of the power instrumentation and control portions of safety-related systems. IEEE Standard 603-1991 provides the same criteria as IEEE-279-1971 for protection systems, but is expanded in scope to provide additional guidance by including criteria for protection system actuation functions and auxiliary systems including digital systems. The recommendations of Regulatory Guide 1.153 and Guidance provided in IEEE-603-1991 have been followed for upgrade of the digital computer systems used in the safety-related control room air conditioning system application at Seabrook Station.
Regulatory Guide 1.155 (Rev. 0, 6/88)
Station Blackout The requirements of Regulatory Guide 1.155 have been met as described in UFSAR Section 8.4. As allowed by Regulatory Guide 1.155, Section B, the guidelines of NUMARC 87-00, "Guidelines and Technical Bases for NUMARC Initi atives Addressing Station Blackout at Light Water Reactors" were followed except where the Regulatory Guide took precedence.
Regulatory Guide 1.157 (Rev. 0, 5/89)
Best Estimate Calculations of Emergency Core Cooling System Performance This guide provides guidance for the use of best estimate codes for use in ECCS evaluation models. The Large Break LOCA analysis was performed using the Westinghouse Best Estimate Large Break LOCA Methodology and is discussed in Chapter 15.6.5.2.
Regulatory Guide 1.163 (Rev. 0, 9/95)
Performance-Based Containment Leak-Test Program The requirements of Regulatory Guide 1.
163 have been incorporated into UFSAR Subsection 6.2.6. The Regulatory Guide is listed in Subsection 3.8.2. As allowed by Regulatory Guide 1.163, the guidelines of NEI 94-01, dated July 26, 1995, "Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50 Appendix J" were followed except where Regulatory Guide 1.163 took precedence.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 72 Regulatory Guide 1.183 (Rev. 0 7/00)
Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors The requirements of Regulatory Guide 1.183 have been incorporated into UFSAR Chapter 15.
Regulatory Guide 1.183 is referen ced in subsections 15.1.5.3, 15.3.3.3, 15.4.8.3, 15.6.2.3, 15.6.3.3, 15.6.5.4, 15.7.1.3, 15.7.2.3, 15.7.4.3, and Appendix 15C.
Regulatory Guide 1.190 (Rev. 0, 3/01 Calculational and Dosimetry methods for Determining Pressure Vessel Neutron Fluence The methods and assumptions described in this guide are for the calculation and measurement of vessel fluence for core and vessel geometrical and material configurations that are typical of current light water reactor designs. The methodology presented is intended as a best estimate, rather than a bounding or conservative fluence determination. The determination of the pressure vessel fluence is based on both calculations and measurements; the fluence predication is made with a calculation, and the measurements are used to qualify the calculational methodology. Because of the importance and the difficulty of these calculations, the methods must be qualified by comparison to measurements to ensure a reliable and accurate vessel fluence determination. REFERENCES
- 1. "Reactor Coolant Pump Integrity in LOCA," WCAP-8163, September 1973.
- 2. Deleted 3. YAEC-1241, "Thermal-Hydraulic Analysis of PWR Fuel Elements Using the CHIC_KIN code", R. E. Helfrich, March 1981. 4. Enrietto, J. F., "Control of Delta Ferrite in Austenitic Stainless Steel Weldments," WCAP-8324-A, June 1975. 5. Enrietto, J. F., "Delta Ferrite in Production Austenitic Stainless Steel Weldments," WCAP-8693, January 1976. 6. Caplan, J. S., "The Application of Preheat Temperatures after Welding Pressure Vessel Steels," WCAP-8577, February 1976. 7. "Damping Values of Nuclear Power Plant Components," WCAP-7921-AR, May 1974.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 73 8. YAEC-1752A, "STAR Methodology Application for PWRs, Control Rod Ejection, Main Steam Line Break" Volumes 1 and 2, N. Fujita et al., September/October 1990. 9. Jordan, W. G., Lorentz, D. G. and M iller, R. B., "Method ology for Qualifying Westinghouse PWRSD Supplied NSSS Safety-Related Electrical Equipment," WCAP-8587, Revison 6, November 1983. 10. Letter NS-CE-784, dated September 22, 1975, C. Eicheldinger (Westinghouse) to the Secretary of the Nuclear Regulatory Commission. 11. Weiner, R.A., et al., "Improved Fuel Performance Models for Westinghouse Fuel Rod Design and Safety Evaluations," WCAP-10851-P-A (Proprietary) and WCAP-11873-A (Non-Proprietary), August 1988. 12. United Engineers & Constructors Inc., Specification 9763-WS-4C, "Requirements for Mechanical Splicing and Nondestructive Examination of the Reinforcing Bars Supplied by the Cadweld Method," January 8, 1975. 13. Nyquist, R., W. Durgin and G. Hecker, "Hydrothermal Studies of Bifurcated Diffuser Nozzles and Thermal Backwashi ng, Seabrook Station," Alden Research Laboratories Report No. 101-77, Holden, Mass., 1977. 14. Brocard, D. and J. Kirby, Jr., "Farfield Model for Waste Heat Discharge in the Coastal Zone," Proceedings of the Second Conference on Waste Heat Management and Utilization, Miami, Florida, 1978. 15. "Environmental Qualification of Electrical Equipment Important to Safety," Revison 2, (later). 16. Letter SBN-647, T.F.B.7.1.2, dated February 28, 1984, J. DeVincentis (PSNH) to D. Beckham, Operator Licensing Branch of the Nuclear Regulatory Commission, "Physical Examination for License Eligibility." 17. Letter, dated April 18, 1984, D. Beckham, Operator Licensing Branch of the Nuclear Regulatory Commission to J. DeVincentis (PSNH), "Response to February 28, 1984 letter." 18. Slagle, W.H., (Ed.), "Westinghouse Improved Performance Analysis and Design Model (PAD 4.0)," WCAP-15063-P-A, Rev. 1 w/errata, July 2000.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Conformance to NRC Regulatory Guides Revision 12 Section 1.8 Page 74 19. Oelrich, R.L., and Kersting, P.J., "Assessment of Clad Flattening and Densification Power Spike Factor Elimination in Westinghouse Nuclear Fuel," WCAP-13589-A, March 1995.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 1 1.9 COMPLIANCE WITH NUREG-0737: CLARIFICATION OF TMI ACTION PLAN REQUIREMENTS
1.9.1 Compliance
with Requirements On October 31, 1980, D. G. Eisenhut, Director, Divi sion of Licensing, Offi ce of Nuclear Reactor Regulation, issued a letter to "All Licensees of Operating Plants and Applicants for Operating Licenses and Holders of Construction Permits" addressing Post TMI Requirements (NUREG-0737). Enclosure 2 to this document identified TMI Action Plan Requirements for Applicants for an Operating License approved for implementation by the Commission at the time of issuance. This section addresses Seabrook Station's compliance with the positions of applicable NUREG-0737 and NUREG-0737, Supplement 1 (Generic Letter 82-33) Requirements. For each requirement, the NRC staff position, a brief summary of NHY's method for compliance and/or the appropriate Updated FSAR reference(s) where compliance is addressed are presented. It should be noted, that the responses to the various tasks below, address the NRC staff's position as well as clarifications provided in NUREG-0737, even though the clarifications were not specifically stated in the staff position quoted.
Task I.A.1.1 Shift Techni cal Advisor (NUREG-0737)
Position: Each licensee shall provide an on-shift technical advisor to the shift supervisor. The Shift Technical Advisor (STA) may serve more than one unit, at a multi-unit site, if qualified to perform the advisory function for the various units. The STA shall have a bachelor's degree, or equivalent, in a scientific or engineering discipline and have received specific training in the response and analysis of the plant for transients and accidents. The STA shall also receive training in plant design and layout, including the capabilities of instrumentation and controls in the control room. The licensee shall assign normal duties to the STAs that pertain to the e ngineering aspects of assu ring safe operations of the plant, including the review and evaluation of operating experience.
Response: See Updated FSAR Subsection 13.2.1.2.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 2 Task I.A.1.2 Shift Supervisor Administrative Duties (NUREG-0660)
Position: The objective is to increase the shift supervisor's attention to his command function by minimizing ancillary responsibilities. NRR has re quired that all operating plant licensees review the administrative duties of the shift supervisor. The review should be performed by the senior officer at each utility who is responsible for plant operations. Administ rative functions that detract from, or are subordinate to, the manageme nt responsibility for assuring the safe operation of the plant are to be delegated to other operations personnel not on duty in the control room. The same requirement will be imposed by the licensing review staff on all operating license applicants.
Response: See Updated FSAR Subsection 13.5.1.
Task I.A.1.3 Shift Manning (NUREG-0737)
Position: This position defines shift manning requirements for normal operation. The letter of July 31, 1980 from D. G. Eisenhut to all power re actor licensees and applicants sets forth the interim criteria for shift staffing (to be effective pending general criteria that will be the subject of future rulemaking). Overtime restrictions were also included in July 31, 1980 letter.
Response: See Updated FSAR Subsection 13.5.1. Task I.A.2.1 Immediate Upgrading of Reactor Operator and Senior Reactor Operator Training and Qualifications (NUREG-0737)
Position: Effective December 1, 1980, an applicant for a senior reactor operator (SRO) license will be required to have been a licensed operator for 1 year.
Response: A retraining and replacement licensed training program for the Station Staff shall be maintained under the direction of the Training Manager in accordance with the Seabrook Station's INPO Accredited Programs. NUREG-1021 Examiner Standards, ES-202, Eligibility Requirements for Reactor Operator or Senior Reactor Operator Candidates at Power Reactors, will also be used.
ES-202 provides alternativ e equivalence guidelines. In addition, see Updated FSAR Subsection 13.2.1.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 3 Task I.A.2.3 Administration of Training Programs (NUREG-0737)
Position: Pending accreditation of training institutions, licensees and applicants for operating licenses will assure that training center and facility instructors who teach systems, integrated responses, transient, and simulator courses demonstrate senior reactor operator qualifications and be enrolled in appropriate requalification programs.
Response: See Updated FSAR Subsection 13.2.1.
Task I.A.3.1 Revise Scope and Criteria for Licensing Examinations - Simulator Exams (Item 3) (NUREG-0737)
Position: Simulator examinations are included as part of the licensing examinations.
Response: See Updated FSAR Subsection 13.2.1.
Task I.B.1.2 Independent Safety Engineering Group (NUREG-0737)
Position: Each applicant for an operating license shall establish an onsite Independent Safety Engineering Group (ISEG) to perform independent reviews of plant operations. The principal function of the ISEG is to examine plant operating characteristics, NRC issuances, Licensing Information Service advisories, and ot her appropriate sources of plant design and operating experience information that may indicate areas for improving plant safety. The ISEG is to perform independent review and audits of plant activities including maintenance, modifications, operational problems, and operational analysis, and aid in the establishment of programmatic requirements for plant activities. Where useful improvements can be achieved, it is expected that this group will develop and present detailed recommendations to corporate management for such things as revised or equipment modifications. Another function of the ISEG is to maintain su rveillance of plant operations and maintenance activities to provide independent verification that these activities are performed correctly and that human errors are reduced as far as practicable. ISEG will then be in a position to advise utility management on the overall quality and safety of operations. ISEG need not perform detailed audits of plant operations and shall not be responsible for sign-off functions such that it becomes
involved in the operating organization.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 4 Response: FPLE Seabrook ensures that the reviews addressed in Task I.B.1.2 are performed as required.
See FPL Quality Assurance T opical Report for details. Task I.C.1 Guidance for the Evaluation & Development of Procedures for Transients and Accidents (NUREG-0737)
Position: In letters of September 13 and 27, October 10 and 30, and November 9, 1979, the Office of Nuclear Reactor Regulation required licensees of operating plants, applicants for operating licenses, and licensees of plants under construction to perform analyses of transients and accidents, prepare emergency procedure guidelines, upgrade emergency procedures (including
procedures for operating with natural circulat ion conditions), and to conduct operator retraining (see also Item I.A.2.1). Emergenc y procedures are required to be consistent with the actions necessary to cope with the transients and acci dents analyzed. Analyses of transients and accidents were to be completed in early 1980 and implementation of proce dures and retraining were to be completed 3 months after emergency procedure guidelines were established; however, some difficulty in completing these requirements has been experienced. Clarification of the
scope of the task and appropria te schedule revisions are being developed.
In the course of review of these matters on Babcock & Wilcox (B&W) designed plants, the staff will follow up the bulletin and orders matters relating to an alysis methods and results, as listed in NUREG-0660, Appendix C (see Table C.1, Items, 3, 4, 16, 18, 24, 25, 26, 27; Table C.2, Items 4, 12, 17, 18, 19, 20; and Table C.3; Items 6, 35, 37, 38, 39, 41, 47, 55, 57).
Response: See Updated FSAR Subsection 13.5.2.
Task I.C.2 Shift and Relief Tu rnover Procedures (NUREG-0660)
Position: Licensees are to review plant procedures for shift and relief turnover to ensure that each on-coming shift is made aware of critical plant status information and system availability.
Response: See Updated FSAR Subsection 13.5.1. Task I.C.3 Shift Supervision Responsibilities (NUREG-0660)
Position: Licensees are to review plant pro cedures to assure that duties, responsibilities and authority of the shift supervisor and control ro om operators are properly defined.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 5 Response: See Updated FSAR Subsection 13.5.1. Task I.C.4 Control Room Access (NUREG-0660)
Position: Licensees are to review procedures that establish the authority and responsibility of the person in charge of access, and that estab lish a clear line of authority and responsibility in the control room in the event of an emergency.
Response: See Updated FSAR Subsection 13.5.1.
Task I.C.5 Procedures for Feedback of Operating Experien ce to Plant Staff (NUREG-0737)
Position: In accordance with Task Action Plan I.C.5, Procedur es for Feedback of Operating Experience to Plant Staff (NUREG-0660), each applicant for an operating license shall prepare procedures to assure that operating information pertinent to plant safety originating both within and outside the utility organization is continually supplied to op erators and other personne l and is incorporated into training and retraining programs. These procedures shall: (1) Clearly identify organizati onal responsibilities for revi ew of operating experience, the feedback of pertinent information to operators and other personnel, and the incorporation of such information into training and retraining programs; (2) Identify the administrative and techni cal review steps necessary in translating recommendations by the operating experience assessment group into plant actions (e.g., changes to procedures, operating orders); (3) Identify the recipients of various categories of information from operating experience (i.e., supervisory personnel, shift technical advi sors, operators, maintenance personnel, health physics technicians), or otherwise provide means through which such information can be read ily related to the j ob functions of the recipients; (4) Provide means to assure that affected personnel become aware of and understand information of sufficient importance that should not wait for emphasis through routine training and retraining programs; (5) Assure that plant person nel do not routinely receive extraneous and unimportant information on operating experience in such volume that it woul d obscure priority information or otherwise detract from overall job performance and proficiency; S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 6 (6) Provide suitable checks to assure that conflicting or contradictory information is not conveyed to operators and other personnel until resolution is reached; and, (7) Provide periodic internal audit to assure that the feedback program functions effectively at all levels.
Response: See Updated FSAR Subsection 13.5.1. Task I.C.6 Guidance on Procedures for Verifying Correct Performance of Operating Activities (NUREG-0737)
Position: It is required (from NUREG-0660) that licensees' procedures be reviewed and revised, as necessary, to assure that an effective system of verifying the correct performance of operating activities is provided as a means of reducing human errors and improving the quality of normal operations. This will reduce the frequency of occurrence of situati ons that could result in, or contribute to, accidents. Such a verification system may include automatic system status monitoring, human verification of operations and maintenance activities independent of the people performing the activity (see NUREG-0585, Recommendation 5), or both.
Implementation of automatic monitoring, if required, will reduce the extent of human verification of operations and maintenance activities, but will not eliminate the need for such verification in all instances. The procedures adopted by the licensees ma y consist of two phases - one before and one after installation of automatic status monitoring equipment, if required, in accordance with Item I.D.3.
Response: See Updated FSAR Subsection 13.5.1.
Task I.C.7 NSSS Vendor Review of Procedures (NUREG-0660)
Position: Operating license applicants are required to obtain reactor vendor revi ew of their low-power, power-ascension, and emergency procedures as a further verification of the adequacy of the procedures.
Response: Applicable procedures were submitted to Westinghouse for its review after the procedures were approved by the Station Operation Review Committee (SORC). For additional information, see Updated FSAR Section 14.2 and Table 14.2-1.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 7 Task I.C.8 Pilot Monitoring of Selected Emergency Procedures for Near Term Operating License Applicants (NUREG-0660)
Position: Licensees will be required to correct any deficiencies identified before full power operation.
Response: Information has been provided to the N RC in Letter SBN-358 (dated November 8, 1982). Task I.D.1 Control Room Design Reviews (NUREG-0737)
Position: In accordance with Task Action Plan I.D.1, Control Room Design Reviews (NUREG-0660), all licensees and applicants for operating licenses will be required to conduct a Detailed Control Room Design Review (DCRDR) to identify and co rrect design deficiencies. This Detailed Control Room Design Review is exp ected to take about a year. Therefore, the Office of Nuclear Reactor Regulation (NRR) requires that those applicants for operating licenses who are unable to complete this review prior to issuance of a license make preliminary assessments of their control rooms to identify significant human factors and instrumentation problems and establish a schedule approved by NRC for correcting deficiencies. These applicants will be required to complete the more Detailed Control Room Reviews on the same schedule as licensees with operating plants.
Response: DCRDR information has been submitted to the NRC in the following letters:
SBN-274 (5/12/82)
SBN-499 (4/14/83)
SBN-530 (7/7/83)
SBN-544 (8/10/83)
SBN-701 (7/30/84)
SBN-748 ((1/7/85)
SBN-839 (7/17/85)
SBN-914 (12/27/85)
SBN-948 (2/20/86)
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 8 Task I.D.2 Plant Safety Parame ter Display Console (NUREG-0737)
Position: In accordance with Task Action Plan I.D.2, Plant Safety Parameter Display Console (NUREG-0660), each applicant and licensee shall install a Safety Parameter Display System (SPDS) that will display to operating personnel a minimum set of parameters which define the safety status of the plant. This can be a ttained through continuous in dication of direct and derived variables as necessary to access plant safety status.
Response: A description of the "Safety Parameter Display System" was submitted to the NRC via letter SBN-920 (dated January 6, 1986). Additional information was provided in the following letters:
SBN-499 (4/14/83)
SBN-987 (4/2/86)
NYN-87026 (3/6/87)
NYN-87049 (4/9/87) Task I.G.1 Training Requirements (NUREG-0660)
Position: Licensees will (1) define training prior to loading fuel and (2) conduct training prior to full power operation.
Response: A set of low power tests to be performed was identified three month's prior to fuel load. However, since Seabrook has a site specific simulator which is maintained current with Unit 1 design as per ANSI/ANS 3.5-1979, each operating crew performed the designated low power tests on the simulator. Therefore, only the crew on shift performed the low power testing on the actual plant. Task II.B.1 Reactor Coolant System Vents (NUREG-0737)
Position: Each applicant and licensee shall install Reactor Coolant System (RCS) and reactor vessel head high point vents, remotely operated from the control room. Although the purpose of the system is to vent noncondensible gases from the RCS which may inhibit core cooling during natural circulation, the vents must not lead to an unacceptable increase in the probability of a loss-of-coolant accident (LOCA) or a challenge to containment integrity. Since these vents form a part of the reactor coolant pressure boundary, the design of the vents shall conform to the requirements of Appendix A to 10 CFR, Part 50, "General Design Criteria." The vent system shall be designed with sufficien t redundancy that assures a low pr obability of in advertent or irreversible actuation.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 9 Each licensee shall provide the following inform ation concerning the design and operation of the high point vent system. (1) Submit a description of the design, loca tion size, and power supply for the vent system along with the results of analyses for loss-of-cool ant accidents initiated by a break in the vent pipe. The results of the analyses should demonstrate compliance with the acceptance criteria of 10 CFR 50.46. (2) Submit procedures and supporting analysis for operator use of the vents that also include the information available to the operator for initiating or terminating vent usage. Response: See Updated FSAR Subsection 5.2.6. Task II.B.2 Design Review of Plant Shielding and Environmental Qualification of Equipment for Spaces/Systems Which May Be Used in Post-Accident Operations (NUREG-0737)
Position: With the assumption of a post-accident release of the radioactivity equivalent to that described in Regulatory Guides 1.3 and 1.4 (i.e., the equivalent of 50 percent of the core radioiodine, 100 percent of the core noble gas inventory, and 1 pe rcent of the core solids are contained in the primary coolant), each licensee shall perform a radiation and shielding design review of the spaces around systems that may, as a result of an accident, contain highly radioactive materials.
The design review should identify th e location of vital areas and e quipment, such as the control room, radwaste control stations, emergency power supplies, motor control centers, and instrument areas in which personnel occupancy may be unduly limited or safety equipment may be unduly degraded by the radiati on fields during post-accident operations of these systems. Each licensee shall provide for adequate access to vital areas and protection of safety equipment by design changes, increased permanent or tem porary shielding, or post-accident procedural controls. The design review shall determine which types of corrective actions are needed for vital areas throughout the facility.
Response: A copy of Seabrook's "Post-Accident Dose Engineering Manual" was submitted to the NRC via letter SBN-425 (dated January 21, 1983).
In addition, see Updated FSAR Subsection 12.3.2.2.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 10 Task II.B.3 Post-Accident Sampling Capability (NUREG-0737)
Position: A design and operational review of the Reactor Coolant and Containment Atmosphere Sampling Line Systems shall be performed to determine the capability of personnel to promptly obtain (less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) a sample under accident conditions without incu rring a radiation exposure to any individual in excess of 3 and 18 rem to the whole body or extremities, respectively. Accident conditions should assume a Regulatory Guide 1.3 or
1.4 release
of fissi on products. If the review indicates that personnel could not promptly and safely obtain the samples, additional design features or shielding should be provided to meet the criteria.
A design and operational review of the radiological spectrum analysis facilities shall be performed to determine the capability to promptly quantify (in less than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />) certain radionuclides that are indicators of the degree of core damage. Such radionuclides are noble gases (which indicate cladding failure), iodines and cesiums (which indicate high fuel temperatures), and nonvolatile isotopes (which indicate fuel melting). The initial reactor coolant spectrum should correspond to a Regulatory Guide 1.3 or 1.4 release. The review should also consider the effects of direct radiation from piping and components in the Auxiliary Building and possible contamination and direct ra diation from airborne effluents. If the review indicates that the analyses required cannot be performed in a prompt manner with existing equipment, then design modifications or equipment procurement shall be undertaken to meet the criteria.
In addition to the radiological analyses, certain chemical analyses are necessary for monitoring reactor conditions. Procedures shall be provided to perform boron and chloride chemical analyses, assuming a highly radioactive initial sample (Regulatory Guide 1.3 or 1.4 source term). Both analyses shall be capable of being completed promptly (i.e., the boron sample analysis within an hour and the chloride sample analysis within a shift).
Response: See Updated FSAR Subsection 9.3.2.
WCAP-14986-A, "Post Accident Sampling System Requirements: A Technical Basis," provided justification for eliminating the various PASS sampling requirements. The NRC issued a Safety Evaluation dated June 14, 2000, approving this t opical report. Amendm ent 78 to Facility Operating License NPF-86 deleted the PASS Administrative Controls from the Technical Specifications, superceding the NUREG-0737 requirements. The Post Accident Sampling System, as modified, maintains the capability to obtain archive samples from the RCS and containment sump, and to sample the containment atmosphere.
Percent hydrogen in gaseous samples is analyzed by gas chromatography. The method is applicable in the range of 1%
to pure hydrogen. Hi gh concentrations are determined by varying sample injection volume.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 11 It has been determined that hydrogen is most accurately determined in the presence of helium by calibration of the gas chromatograph with standards containing equal amounts of both gases with a balance of argon. Good peak separati on is obtained with good reproducibility. The column is baked at 125°C after the peak ha s been analyzed in order to prevent xenon poisoning. Task II.B.4 Training for Mitigating Core Damage (NUREG-0737)
Position: Licensees are required to develop a training program to teach the use of installed equipment and systems to control or mitigate accidents in which the core is severely damaged. They must then implement the training program.
Response: See Updated FSAR Subsections 13.2.1 and 13.2.2.
Task II.D.1 Performance Testing of Boiling Water Reactor and Pressurized Water Reactor Relief and Safety Valves (NUREG-0737)
Position: Pressurized water reactor licens ees and applicants shall conduct testing to qualify the reactor coolant system relief and safety valves under expected operating conditions for design basis transients and accidents.
Response: Seabrook complies with Task II.D.1. Refer to SBN-969, dated March 17, 1986, NYN-87136, dated November 23, 1987 and NYN-89057, dated May 8, 1989 for a discussion of testing to qualify Seabrook's reactor coolant system relief and safety valves.
Task II.D.3 Direct Indication of Relief and Safety Valve Position (NUREG-0737)
Position: Reactor coolant system relief and safety valves shall be provided with a positive indication in the control room derived from a reliable valve positi on detection device or a reliable indication of flow in the discharge pipe.
Response: See Updated FSAR Section 7.5 and Subsection 5.2.2.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 12 Task II.E.1.1 Auxiliary Feedwater System Evaluation (NUREG-0737)
Position: The Office of Nuclear Reactor Regulation is requiring re-evaluation of the Auxiliary Feedwater (AFW) Systems for all PWR operating plant licens ees and operating license applications. This action includes: (1) Perform a simplified AFW system reliability analysis that uses event-tree and fault-tree logic techniques to determine the potential for AFW system failure under various loss of main feedwater transi ent conditions. Particular emphasis is given to determining potential failures that could result from human errors, common causes, single point vulnerabilities, and test and maintenance outages; (2) Perform a deterministic review of the AFW system using the acceptance criteria of Standard Review Plan Subsection 10.4.9 and associated Branch Technical position ASB 10-1 as principal guidance; and (3) Re-evaluate the AFW system fl owrate design bases and criteria.
Response: See Updated FSAR Sections 6.8 and 7.3. Task II.E.1.2 Auxiliary Feedwater System Automatic Initiation and Flow Indication (NUREG-0737) Part 1: Auxiliary Feedwater System Automatic Initiation Position: Consistent with satisfying the requirements of General Design Criterion 20 of Appendix A to 10 CFR, Part 50, with respect to the timely initiation of the Auxili ary Feedwater System (AFWS), the following requirements shall be implemented in the short term: (1) The design shall provide for the automatic initiation of the AFWS. (2) The automatic initiation signals and circuits shall be designed so that a single failure will not result in the loss of AFWS function. (3) Testability of the initiating signals and circuits shall be a feature of the design. (4) The initiating signals and circuits shall be provided from the emergency buses. (5) Manual capability to initiate the AFWS from the control room shall be retained and shall be implemented so that a single failure in the manual circuits will not result in the loss of system function. (6) The AC motor driven pumps and valves in the AFWS shall be included in the automatic actuation (simultaneous and/or sequential) of the loads onto the emergency buses.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 13 (7) The automatic initiating signals and circuits shall be designed so that their failure will not result in the loss of manual capability to initiate the AFWS from the control room. In the long term, the automatic initiation signals and circuits shall be upgraded, in accordance with safety grade requirements.
Response: Seabrook Station refers to its Auxiliary Feedwater System as an Emergency Feedwater System (see Updated FSAR Sections 6.8 and 7.3).
Task II.E.1.2 Part (2) Auxiliary Feedwater System Automatic Initiation and Flow Indication (NUREG-0737) Part 2: Auxiliary Feedwater System Flowrate Indication Position: Consistent with satisfying the requirements set forth in General Design Criterion 13 to provide the capability in the control room to ascertain the actual performance of the AFWS when it is called to perform its intended function, the following requirements shall be implemented: (1) Safety-grade indication of auxiliary feedwater flow to each steam generator shall be provided in the control room. (2) The auxiliary feedwater flow instrument channels shall be powered from the emergency buses, consistent with satisfying the emergency power diversity requirements of the AFWS set forth in Auxiliary System Branch Technical Position 10-1 of the Standard Review Plan, Subsection 10.4.9.
Response: The flows in all four individual emergency feedwater lines are indicated at the main control board and at the remote safe shutdown panels.
The design details of the safety-related display instrumentation are presented in Updated FSAR Sections 6.8 and 7.5.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 14 Task II.E.3.1 Emergency Power Supply for Pressurizer Heaters (NUREG-0737)
Position: Consistent with satisfying the requirements set forth in General Design Criteria 10, 14, 15, 17, and 20 of Appendix A to 10 CFR, Part 50, for the event of loss of offsite power, the following requirements shall be implemented: (1) The pressurizer heater power supply design shall provide the capability to supply, from either the offsite power source or the emergency power source (when offsite power is not available), a predetermi ned number of pressurizer heaters and associated controls necessary to establish and maintain natural circulation at hot standby conditions. The required heaters and their controls shall be connected to the emergency buses in a manner that will provide redu ndant power supply capability. (2) Procedures and training shall be established to make the operator aware of when and how the required pressurizer heaters shall be connected to the emergency buses. If required, the pro cedures shall identify under what conditions selected emergency loads can be shed from the emergency power source, to provide sufficient capacity for the connection of the pressurizer heaters. (3) The time required to accomplish the connection of the preselected pressurizer heater to the emergency buses shall be consistent with the timely initiation and maintenance of natural circulation conditions. (4) Pressurizer heater motive and control power interfaces with the emergency buses shall be accomplished through devices that have been qualified in accordance with safety grade requirements.
Response: See Updated FSAR Subsection 8.3.1. Task II.E.4.1 Dedicated Hydroge n Penetrations (NUREG-0737)
Position: Plants using external recombiners or purge systems for post-accident combustible gas control of the containment atmosphere should provide containment penetration systems for external recombiner or purge systems that are dedicated to that service only, that meet the redundancy and single failure requirements of the General Design Criteria 54 and 56 of Appendix A to 10 CFR 50, and that are sized to satisfy the flow requirements of the recombiner or purge system. The procedures for the use of combustible gas control systems following an accident that results in a degraded core and release of radioactivity to the containment must be reviewed, and revised, if necessary.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 15 Response: Seabrook Station utilizes two separate and redundant Westinghouse thermal hydrogen recombiners located on the 25'-0" elevation inside the Containment Building. Thus, no pipe
penetrations are required. The backup purge system consists of two separate and redundant pipeline/isolation valve/penetration systems sized for a normal 2 of containment volume/day (38.1 cfm) flow and a maximum of 1,000 cfm.
See Updated FSAR Subsection 6.2.5.
Task II.E.4.2 Containment Isolation Dependability (NUREG-0737)
Position: (1) Containment isolation system designs shall comply with the recommendations of Standard Review Plan Subsection 6.2.4 (i.e
., that there be diversity in the parameters sensed for the initiation of containment isolation); (2) All plant personnel shall give careful consideration to the definition of essential and nonessential systems, identify each system determined to be essential, identify each system determined to be nonessential, describe the basis for selection of each essential system, modify their containment isolation designs accordingly, and report the results of the re-evaluation to the NRC; (3) All nonessential systems shall be automatically isolated by the containment isolation signal; (4) The design of control systems for automatic containment isolation valves shall be such that resetting the isolation signal will not result in the automatic reopening of containment isolation valves. Reopening of containment isolation valves shall require deliberate operator action; (5) The containment setpoint pressure that initiates containment isolation for nonessential penetrations must be reduced to the minimum compatible with normal operating conditions; (6) Containment purge valves that do not satisfy the operability criteria set forth in Branch Technical Position CSB 6-4 or the Staff Interim Position of October 23, 1979 must be sealed closed as defined in SRP 6.2.4, item III.3.f, during operational conditions 1, 2, 3, and 4. Furthermore, these valves must be verified to be closed at least every 31 days; and (7) Containment purge and vent isolati on valves must close on a high radiation signal.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 16 Response: See Updated FSAR Section 7.3 and Subsection 6.2.4 Task II.F.1 Additional Accident Monitoring Instrumentation Task II.F.1 Attachment 1: Noble Gas Effluent Monitor (NUREG-0737)
Position: Noble gas effluent monitors shall be installed with an extended range designed to function during accident conditions as well as during normal operating conditions. Multiple monitors are considered necessary to c over the range of interest. (1) Noble gas effluent monitors w ith an upper range capability of 10 5 Ci/cc (Xe-133) are considered to be practical and should be installed in all operating plants. (2) Noble gas effluent monitoring shall be provided for the total range of concentration extending from normal condition (As Low As Reasonably Achievable - ALARA) concentrations to a maximum of 10 5 Ci/cc (Xe-133). Multiple monitors are considered to be necessary to cover the range of interest. The range capacity of individual monito rs should overlap by a factor of ten.
Response: See Updated FSAR Section 7.5, and Subsections 11.5.2.1j, 11.5.2.1k, and 12.3.4.2. Additional information on this subject was submitted to the NRC, SBN-1063, dated May 20, 1986. Task II.F.1 Attachment 2: Sampling and Analysis of Plant Effluents (NUREG-0737)
Position: Because iodine gaseous effluent monitors for the accident condition are not considered to be practical at this time, capability for effluent m onitoring of radioiodines fo r the accident condition shall be provided with sampling conducted by absorption on charcoal or other media, followed by on-site laboratory analysis.
Response: See Updated FSAR Section 7.5, and Subsections 12.3.4.2 and 12.5.2. Additional information is presented in a NHY letter to th e NRC, NYN-89068, dated May 30, 1989. Task II.F.1 Attachment 3: Containment High-Range Radiation Monitor (NUREG- 0737)
Position: In containment radiation level monitors with a maximum range of 10 8 rad/hr shall be installed. A minimum of two (2) such monitors that are physically separate d shall be provided. Monitors shall be developed and qualified to function in an accident environment.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 17 Response: See Updated FSAR Section 7.5 and Subsection 12.3.4. Task II.F.1 Attachment 4: Containm ent Pressure Monitor (NUREG-0737)
Position: A continuous indication of containm ent pressure shall be provided in the control room of each operating reactor. Measurement a nd indication capability shall include three (3) times the design pressure of the containment for concrete, four (4) times the design pressure for steel, and -5 psig for all containments.
Response: See Updated FSAR Sections 7.3 and 7.5.
Continuous indication and recording of containment pressure is provided. This indication covers the full range from -5 psig to three times design pressure, and supplements other narrow range indication provided for containment pressure. These channels fully meet the requirements for Design Category 1 instrumentation. Desi gn details are provided in Table 7.5-1.
ANSI/ANS 4.5 recommends an accuracy of +/-10 percent of span for this wide range measurement. The accuracy of this measurement has been determined and satisfies this recommendation. The response time is similar to the 0-60 psig containment pressure channels used for ESF actuation.
The operating crews will use the 0-60 psig containment pressure indication in support of the Emergency Response Procedures (ERPs). Further discussion of this indication is provided in Updated FSAR Section 7.3 and the ERP background documents.
Task II.F.1 Attachment 5: Containment Water Level Monitor (NUREG-0737)
Position: A continuous indication of containm ent level shall be provided in the control room for all plants.
A narrow range instrument shall be provided for PWRs and cover the range from the bottom, to the top of the containment sump. A wide range instrument shall also be provided for PWRs and shall cover the range from the bottom of the containment to the elevation equivalent to a 600,000 gallon capacity. For BWRs, a wide range instrument shall be provided and cover the range from the bottom to 5 feet above the normal water level of th e suppression pool.
Response: See Updated FSAR Section 7.5 and Subsection 6.2.2.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 18 Task II.F.1 Attachment 6: Containment Hydrogen Monitor (NUREG-0737)
Position: A continuous indication of hydrogen concentration in the containment atmosphere shall be provided in the control room. Measurement capability shall be provided over the range of 0 to 10 percent hydrogen concentration under both positive and negative ambient pressure.
Response: See Updated FSAR Section 7.5 and Subsections 6.2.2 and 6.2.5.2.
Task II.F.2 Instrumentation for Detection of Inadequate Core Cooling (NUREG-0737)
Position: Licensees shall provide a description of any additional instrumentation or controls (primary or backup) proposed for the plant to supplement existing instrumentation (including primary coolant saturation monitors) in order to provide an unambiguous, easy-to-i nterpret indication of Inadequate Core Cooling (ICC).
A description of the functional design requirements for the system shall also be included. A description of the procedures to be used with the proposed equipment, the analysis used in developing these procedures, and a schedule for installing the equipment shall be provided.
Response: See Updated FSAR Subsection 4.4.6.5. In addition, a complete description of Seabrook's "Instrumentation for Detection of Inadequate Core Cooling" was submitted to the NRC via letter SBN-952 (dated February 24, 1986).
Task II.G.1 Emergency Power for Pressurizer Equipment (NUREG-0737)
Position: Consistent with satisfying the requirements of General Design Criteria 10, 14, 15, 17, and 20, of Appendix A to 10 CFR, Part 50, for the event of loss of offsite power, the following positions shall be implemented. Power Supply for Pressurizer Relief and Block Valves and Pressurizer Level Indicators (1) Motive and control components of the power operated relief valves (PORVs) shall be capable of being supplied from either the offsite power source or the emergency power source when the offsite power is not available. (2) Motive and control components associated with the PORV bloc k valves shall be capable of being supplied from either th e offsite power source or the emergency power source when the offsite power is not available.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 19 (3) Motive and control power connections to the emergenc y buses for the PORVs and their associated block valves shall be th rough devices that have been qualified in accordance with safety grade requirements. (4) The pressurizer level indication instrument channels shall be powered from the vital instrument buses. The buses shall have the capability of being supplied from either the offsite power source or the emergency source when offsite power is not available.
Response: See Updated FSAR Section 7.5 and Subsection 8.3.1. Task II.K.1 IE Bulletins on Measures to Mitigate Small Break LOCAs and Loss of Feedwater Accidents (NUREG-0694)
Task II.K.1.5 Review ESF Va lves (NUREG-0660, Table C.1)
Position: Review all valve position and positioning requirements and positive controls and all related test and maintenance procedures to assure proper ESF functioning.
Response: Proper ESF functioning was verified through completi on of the applicable portions of the startup test program prior to fuel load.
Task II.K.1.10 Operability Status (NUREG-0660, Table C.1)
Position: Review and modify (as required) procedures for removing safety-related systems from service (and restoring to service) to a ssure operability status is known.
Response: See Updated FSAR Subsection 13.5.1. Task II.K.1.17 Trip Per Low-Level Bistables (NUREG-0694)
Position: For Westinghouse designed reactors, trip the pressu rizer low-level coincident signal bistables, so that safety injection would be initiated when the pressurizer low pressure setpoint is reached regardless of the pressurizer level. See Bulletin 79-06A and Revision 1, Item 3 in NUREG-0560.
Response: Reactor trip and safety injection are initiated on low pressurizer pressure without any requirement for coincident low pressurize r level. See Updated FSAR Figure 7.2-8.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 20 Task II.K.2 Commission Orders on B&W Plants These items from Task II.K.2 have been made requirements for other pressurized water reactor designs. These are discussed below. Task II.K.2.13 Thermal Mechanical Report - Effect of High Pressure Injection on Vessel Integrity for Small Break Loss-of-Coolant Accident with No Auxiliary Feedwater (NUREG-0737)
Position: A detailed analysis shall be performed of the thermal mechanical conditions in the reactor vessel during recovery from small breaks with an extended loss of all feedwater.
Response: Reference 8 describes the probabilistic methodology developed by the Westinghouse Owners Group (WOG) and Westinghouse for treating the Pressurized Thermal Shock (PTS) issue. It also documents the results of applying this methodology to Westinghouse designed PWRs such as Seabrook. It goes beyond the specific c oncern of NUREG-0737, Item II.K.2.13 and considers the risk of PWR reactor vessel failure from all PTS events. It supports the basis for the requirements of 10 CFR 50.61, "Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events." Namely, PWR pressure vessels with conservatively calculated values of RT NDT less than 270F for plate material and axial welds, and less than 300F for circumferential welds, present an acceptably low risk of vessel failure from PTS events. In Reference 9, the RT NDT value for the Seabrook reactor vessel was conservatively calculated in accordance with the requirement s of 10 CFR 50.61. The total RT NDT value at end-of-life (32 EFPY) is 126F. This value satisfies the screening criteria stated above. The results of Reference 8 are applicable if plant emergency procedures based on the Emergency Response Guidelines (ERGs) are available and th e operators are properly trained to follow the procedures. Since the Seabrook Emergency Operating Procedures (EOPs) are based on the ERGs, and the operators are trai ned in the use of the EOPs (s ee Updated FSAR Section 13.2), the Reference 8 results are applicable.
It is therefore concluded that op eration of Seabrook Station will not pose an undue risk of vessel failure from PTS events.
Task II.K.2.17 Potential for Voiding in the Reactor Coolant System During Transients Position: Analyze the potential for voiding in the Reactor Coolant System (RCS) during anticipated transients.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 21 Response: Westinghouse (in support of the Westinghouse Owners Group) has performed a study which addresses the potential for void formation in Westinghouse designed nuclear steam supply systems during natural circulati on cooldown/depressurization transients. This study has been submitted to the NRC by the Westinghouse Owners Group (Reference 1) and is applicable to
Seabrook Station. In addition, the Westinghouse Owners Group is curre ntly developing appropr iate modifications to the Westinghouse Owners Group Reference Operating Instructions to take the results of the study into account to preclude void formation in the upper head region during natural circulation cooldown/depressurization transients, and to specify those conditions under which upper head voiding may occur. NHY utilized the generic guidance developed by the Westinghouse Owners Group in the development of plant specific operating procedures. Task II.K.2.19 Sequential Auxiliary Feedwater Flow Analysis Position: Provide a benchmark analysis of sequential Auxiliary Feedwater (AFW) flow to the steam generators following a loss of feedwater.
Response: Not applicable to Westinghouse pressurized wate r reactors per NRC letter to Duquesne Light, dated June 29, 1981.
Task II.K.3 Final Recommendations of B&O Task Force (NUREG-0737)
Task II.K.3.1 Installation and Testing of Automatic Power-Operated Relief Valve Isolation System (NUREG-0737)
Position: All PWR licensees should provide a system that us es the PORV block valve to protect against a small break loss-of-coolant accident. This system will automatically cause the block valve to close when the reactor coolant system pressure decays after the PORV has opened. Justification should be provided to assume that failure of this system would not decrease overall safety by aggravating transients and accidents. Each licensee shall perform a confirmatory test of the automatic block valve closure system following installation.
Response: Westinghouse, as part of the response prepared for the Westinghouse Owners Group to address Item II.K.3.2, has evaluated the necessity of incorporating an automatic pressurizer power-operated relief valve isolation system. This evaluation is documented in Reference 2 and concluded that such a system should not be required.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 22 In addition, information has been submitted to the NRC in SBN-1038 dated May 7, 1986. Task II.K.3.2 Report on Overall Safety Effect of Power-Operated Relief Valve Isolation System (NUREG-0737)
Position: (1) The licensee should submit a report for staff review documenting the various actions taken to decrease the probability of a small break loss-of-coolant accident (LOCA) caused by a stuck-open power-operated relief valve (PORV) and show how those actions constitute sufficient improvements in reactor safety. (2) Safety valve failure rates based on past history of the operatin g plants designed by the specific Nuclear Stream Supply System (NSSS) vendor s hould be included in the report submitted in response to (1) above.
Response: As stated in the response to item II.K.3.1, the Westinghouse Owners Group has submitted a
Westinghouse prepared report (Reference 2) that provides a proba bilistic analysis to determine the probability of a PORV LOCA, estimates the effect on the post-TMI modifications, evaluates an automatic PORV isolation concept, and provid es PORV and safety valve operational data for Westinghouse plants. Because of the sensitivity analyses included in the report, the report is generic and is applicable to S eabrook Station. The re port identifies a signi ficant reduction in the PORV LOCA probability as a result of post-TMI modifications, and the calculations compare favorably with the operational data for Westinghouse plants (inc luded as an appendix to the report). In addition, information has been submitted to the NRC in SBN-1038 dated May 7, 1986.
Task II.K.3.3 Reporting SV and PORV Challenges and Failures (NUREG-0694)
Position: Assure that any failure of a PORV or safety valve to close will be reported to the NRC promptly.
All challenges to the PORVs or safety valves should be documented in the annual report.
Response: Any failure of a safety or relief valve will be reported promptly to the NRC using the established "License Event Report" (LER) System, and all challenges to such valves will be reported annually in accordance with th e Technical Specifications.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 23 Task II.K.3.5 Automatic Trip of Reactor Coolant Pumps During Loss-of-Coolant Accident (NUREG-0737)
Position: Tripping of the reactor coolant pumps in case of a loss-of-coolant accident (LOCA) is not an ideal solution. Licensees should consider other solutions to the small break LOCA problem (for example, an increase in safety injection flow rate). In the meantime, until a better solution is found, the reactor coolant pumps should be tripped automatically in case of small break LOCA.
The signals designated to initiate the pump trip are discussed in NUREG-0623.
Response: In response to IE Bulletins79-05C and 79-06C, Westinghouse (in support of the Westinghouse Owners Group) performed an analysis of delayed Reactor Coolant Pump (RCP) trip during small break LOCAs. This analysis is documented in Reference 3 and is the basis for the Westinghouse position on RCP trip (i.e., automatic RCP trip is not necessary since sufficient time is available for manual tripping of the RCPs). Westinghouse (again in support of the Westinghouse Owners Group) has performed test predictions of the LOFT Experime nt L3-6. The results of these predictions are documented in References 4, 5 and 6. The results constitute both a best estimate model prediction with the NOTRUMP computer program and an evaluation model prediction with the Westinghouse FLASH computer program using the supplied set of initial boundary assumptions. Subsequently, the NRC issued Generic Letters83-10C and 83-10D which superseded IE Bulletins79-05C and 79-06C. In response, the Westinghouse Owners Group (with assistance from Westinghouse) developed th e generic response to Generic Letters83-10C and 83-10D. This response has been submitted to the NRC (Reference 7). With regard to the plant specific requirements of Generic Letters83-10C and 83-10D, Seabrook Station has the following: The Revision 1 to the WOG Emergency Response Guidelines has been implemented into the plant specific procedures.
The training program includes instruction to operators in their responsibility for performing RCP trip in the event of a small break LOCA. In particular, the operators are trained in prioritization of actions follo wing engineered safety features actuation. The instrumentation the operators use to determine the need for RCP trip is part of the instrumentation used for ICC (see Item II.F.2). In light of the above information, Seabrook Stat ion does not consider that design modifications are necessary.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 24 Supplementary information on this subject as a result of a discussion between the NRC staff and the applicant, is summarized in an NRC letter to NHY dated May 20, 1986, and in NHY's response to the NRC submitted in SBN-1068, dated May 27, 1986. Task II.K.3.7 Evaluation of Power-Operated Relief Valve Opening Probability During Overpressure Transient (NUREG-0737)
Position: Most overpressure transients should not result in the opening of the Power-Operated Relief Valve (PORV). Therefore, licensees should document that the PORV will open in less than 5 percent of all anticipated overpressure transients using the revised setpoints and anticipatory trips for the range of plant conditions which might occur during a fuel cycle.
Response: The Westinghouse Owners Group has submitted a report (Reference 2) which provides probabilistic analysis of PORV operational data for Westinghous e plants. The report is generic and applicable to Seabrook Station. For high-head plants with post-TMI modifications (i.e.,
Seabrook Station), the report shows that a PORV will open in less than 5 percent of all anticipated overpressure transients for the range of plant conditions during a fuel cycle. Task II.K.3.9 Proportional Integral Derivative Controller Modification Position (NUREG-0737)
Position: The Westinghouse recommended modifications to the Proportional Integral Derivative (PID) controller should be implemented by affected licensees.
Response: The Seabrook design includes a Proportional Integral Derivative (P ID) controller in the power-operated relief valve control circuit (see Updated FSAR Figure 7.7-4 and Figure 7.2-11). The time derivative constant in the PID controller for the pressurizer PORV will be turned to "OFF." The appropriate plant procedure for calibrating the setpoints in this nonsafety-grade system will reflect this decision.
Setting the derivative time constant to "OFF," in effect removes the derivative action from the controller. Removal of the derivative action will decrease the likelihood of opening the pressurizer PORV since the actual signal for the va lve is then no longer sensitive to the rate of change of pressurizer pressure.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 25 Task II.K.3.10 Proposed Anticipator y Trip Modification (NUREG-0737)
Position: The anticipatory trip modification proposed by some licensees to confine th e range of use to high power levels should not be made until it has been shown on a plant-by-plant basis that the probability of a small break loss-of-coolant accident (LOCA) resulting from a stuck-open Power-Operated Relief Valve (PORV) is substantially unaffected by the modifications.
Response: The Seabrook design includes th e capability to undergo a 50 pe rcent load reduction without requiring a reactor trip. This capability is made available through the use of a nominal 40 percent steam bypass to the condenser and automatic rod control to reduce core power by 10 percent. Plant analysis show s that pressurizer power-operated relief valves (PORVs) will not be challenged by a 50 percent load reduction from full power. An evaluation of a full load reduction from 50 percent power also shows that PORVs will not be challenged even though the reactor is not tripped. The deletion of a direct (or anticipatory) reactor trip from turbine trip below 50 percent power will not cause the PORVs to be challenged. Therefore, the probability of a small break loss-of-coolant accident (LOCA) from a stuck-open PORV is substantially unaffected by the deletion of an anticipatory reactor trip from turbine trip below 50 percent power. Task II.K.3.11 Justification for Use of Certain PORVs (NUREG-0694)
Position: Demonstrate that the PORV installed in the plant ha s a failure rate equivalent to, or less than, the values for which there is an operating history.
Response: The PORVs utilized at Seabrook are a relatively new design developed by the Garrett Pneumatic Systems Division of the Garrett Corporation. Similar type valves are presently being supplied to both Combustion Engineering and Westinghouse for use in their NSSS design. At this time, there is insufficient operating data upon which to base a statistically accurate failure rate history. However, a valve of similar design to that supplied to both Combustion Engineering and Westinghouse was tested at the Wyle Laboratories as a part of the EPRI/PWR Safety and Relief Valve Test Program. In addition to the successful functional test results, the Garrett valve operated normally, with no tendency to fail to ope rate, either open or cl osed, through at least 79 cycles.
As operating history is gained on this particular valve design, and should an abnormal failure rate become apparent, appropriate corrective action will be taken.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 26 Task II.K.3.12 Confirm Existence of Anticipatory Reactor Trip Upon Turbine Trip (NUREG-0737)
Position: Licensees with Westinghouse-designed operating plants should confirm that their plants have an anticipatory reactor trip upon turbine trip. The licensee of any plant where this trip is not present should provide a conceptual design and evaluation for the installation of this trip.
Response: The Seabrook design includes an an ticipatory reactor trip upon turbine trip at power levels above P-9 (see Updated FSAR Figure 7.2-2 and Figure 7.2-15). Task II.K.3.17 Report on Outage of Emergency Core-Cooling Systems Licensee Report and Proposed Technical Specifi cation Changes (NUREG-0737 Position: Several components of the Emergency Core Cooling (ECC) Systems are permitted by technical specifications to have substantial outage times (e.g., 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for one diesel generator; 14 days for the HPCI system). In addition, there are no cumulative outage time limitations for ECC systems. Licensees should submit a report detai ling outage dates and lengths of outages for all ECC systems for the last 5 year s of operation. The report should also include the causes (i.e., controller failure, spurious isolation).
Response: Procedures for collecting and submitting information concerning the unavailability of the ECC system due to outages have been developed. Seabrook Station will submit ECC system outage information in accordance with the INPO Safety System Unavailability Monitoring program. All functional failures of ECC systems shall also be included in the Equipment Performance and Information Exchange System (EPIX). This me thod of reporting will provide for a current, on-line reporting system. See Updated FSAR Subsection 13.5.1. Task II.K.3.25 Effect of Loss of Alterna ting Current Power on Pumps Seals (NUREG-0737)
Position: The licensee should determine, on a plant-specific basis, by analysis or experiment, the consequence of a loss of cooling water to the reactor recirculation pump seal coolers. The pump seals should be designed to withstand a complete loss of alterna ting current (AC) power for at least 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Adequacy of the seal design should be demonstrated.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 27 Response: During normal operation, seal injection flow from the Chemical and Volume Control System is provided to cool the RCP seals, and the Compon ent Cooling Water System provides flow to the thermal barrier heat exchanger to limit the heat transfer from the reactor coolant to the RCP internals. In the event of loss of offsite power, the RCP motor is de-energized and both of these cooling supplies are terminated; however, the diesel generators are automatically started and either seal injection flow or component cooling water to the thermal barrier heat exchanger is automatically restored within 12 or 32 seconds, re spectively. Either of these cooling supplies is adequate to provide seal cooling and prevent seal failure due to lo ss of seal cooling during a loss of offsite power for at least 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Task II.K.3.30 Revised Small Break Loss-of-Coolant Accident Methods to Show Compliance with 10 CFR Part 50, Appendix K (NUREG-0737)
Position: The analysis methods used by Nuclear Steam Supply System (NSSS) vendors and/or fuel suppliers for small break loss-of-coolant accident (LOCA) analysis for compliance with Appendix K to 10 CFR Part 50 should be revised, documented, and submitted for approval. The revisions should account for comparisons with experimental data, including from the LOFT Test and Semiscale Test facilities.
Response: The Westinghouse small break evaluation model (NOTRUMP) used to anal yze Seabrook Station is in conformance with 10 CFR Part 50, Appendix K and was approved by the NRC on May 21, 1985. This completes the TMI Action Item II.K.3.30 for Seabrook Station.
In accordance with TMI Action Item II.K.3.31., generic analysis was submitted in June 1986 to demonstrate that the analysis performed with NOTRUMP is conservative. Task II.K.3.31 Plant Specific Calculations to Show Compliance with 10 CFR, Part 50.46 (NUREG-0737)
Position: Plant-specific calculations using NRC-approved models for small break Loss-of-Coolant Accidents (LOCAs) as described in Item II.K.3.30 to show compliance with 10 CFR 50.46 should be submitted for NRC approval by all licensees.
Response: NHY letter (SBN-1175) dated July 31, 1986, references WCAP-11145 which demonstrates, generically, the plant's compliance with 10 CFR 50.46. This completes TMI Action Item II.K.3.31 for Seabrook Station.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 28 Task III.A.1.1 Upgrade Licensee Emergency Preparedness - Short Term (NUREG-0660)
Position: Licensees will upgrade emergency preparedness in accordance with the requirements described in the NRC "Action Plan for Promptly Improving Emergency Prepar edness" (SECY 79-450), which was distributed to all licensees during regional mee tings in August, 1979, and in accordance with subsequently issued criteria (NUREG-0654).
Response: Refer to the Seabrook Station Radiological Emergency Plan. Task III.A.1.2 Upgrade Emergency Support Facilities Position: Each operating nuclear power plant shall maintain an onsite Technical Support Center (TSC) separate from, and in close proximity to, the control room that has the capability to display and transmit plant status to those individuals wh o are knowledgeable of, and responsible for, engineering and management support of reactor ope rations in the event of an accident. The center shall be habitable to the same degree as the control room for postulated accident conditions. The licensee shall revise his emergency plans, as neces sary, to incorporate the role and location of the TSC. Records that pertain to the as-built c onditions and layout of structures, systems, and components shall be readily available to personnel in the TSC.
An Operational Support Center (OSC) shall be es tablished separate from the control room and other emergency response facilities as a place where operations support personnel can assemble and report in an emergency situation to receive instructions from the station staff.
Communications shall be provided between the OSC, TSC, EOF, and control room. An Emergency Operation Facility (EOF) will be operated by a licensee for continued evaluation and coordination of all licensee activities related to an emerge ncy having, or potentially having, environmental consequences.
Response: See Section 6, "Emergency Facilities and Equipment," and Section 8, "Organization," of the Seabrook Station Radiological Emergency Plan. Task III.A.2 Improving Licensee Emergency Preparedness Long Term Position: Each nuclear facility shall upgrade its emergenc y plans to provide reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency. Specific criteria to meet this requirement is delineated in NUREG-0654 (FEMA-REP-1), "Criteria for Preparation a nd Evaluation of Radiological Emergency Response Plans and Preparation in Support of Nuclear Power Plants."
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 29 Response: Refer to the Seabrook Station Radiological Emergency Plan. Task III.D.1.1 Integrity of Systems Outside Containment Likely to Contain Radioactive Material for Pressurized Water Reactors & Boiling Water Reactors (NUREG-0737)
Position: Applicants shall implement a program to reduce leakage from systems outside containment that would, or could, contain highly radioactive fluids during a serious transient or accident to as-low-as-practical levels. This program shall include the following: (1) Immediate Leak Reduction - (a) Implement all practical leak reduction measures for all systems that could carry radioactive fluid outside the containment. (b) Measure actual leakage rates with system in operation and report them to the NRC. (2) Continuing Leak Reduction - Establish and implement a program of preventive maintenance to reduce leakage to as-low-as practical levels. This program shall include periodic integrated leak tests at intervals not to exceed each refueling cycle. Response: a. Systems The surveillance program includes the following systems: Residual Heat Removal (RHR)
Containment Spray Recirculation (CBS)
Charging System (CS) (Note 1)
Safety Injection (SI) Primary Coolant Sampling (SS) (Note 2) Hydrogen Detection (CGC) (Note 3) Systems that may contain radioactive flui ds under post-accident conditions that are not included in this surveillance are: Hydrogen recombiners (CGC) Basis: Seabrook's hydrogen recombiners are located inside the Primary Containment Building.
Waste Gas (VG)
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 30 Basis: The vent gas headers in the containment are only used during infrequent maintenance operations during refueling outages such as the fill and vent of the Reactor Coolant System. Use of the system involves containment entry to open normally closed manual valves. This system is not required for post-accident monitoring or for accident mitigation. Refer to Note 1. b. Immediate Leak Reduction Leak reduction program base line data was taken during initial plant start-up testing. The leakage found was measured and corrective action has been initiated for affected components. The leakage obt ained during preoperational surveillance and inspections is contained in the Preoperational Leakage Reduction Tracking and History Report submitted to th e NRC by letter NYN-87033, March 16, 1987. c. Continuing Leak Reduction The leakage reduction program will continue throughout the life of the plant. A periodic surveillance procedure will be conducted on an interval of once per refueling cycle. The surveillance procedure contains inspection sheets that are used to indicate systems/lines which are visually inspected. Findings will be documented. Visual inspections are performed either with the system in operation or inspected after a functional system test for leakage determination. Types of potential leakag e locations include: valv e body/bonnet joints, packing, mechanical flange connections, pump mechan ical seals, etc. Boric acid deposit locations will be documented on the data sh eets. The findings of the surveillance will be documented such that repetitive locations can be addressed for corrective actions. Corrective maintenance will be per the applicable work control documents. d. "North Anna" Concerns (Note 4)
Actions have been taken (and will continue) to reduce potential release paths due to design and operation deficiencies. Pr eoperational design reviews have been completed to ensure the best possible system configuration and leakage reduction features such as valve stem leakoff, capped drain connections, orientation for maintenance access, etc. Operational issues such as component tagging, preoperational checkout of operating pro cedures, and the corrective action/root cause features of the plant problem reporting system will ensure the highest possible degree of operator performance.
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 31 Notes: 1. The high head safety injection portion of the Chemical and Volume Control System including the suction piping us ed during ECCS actuation (injection and recirculation modes) outside containment is included in the leakage reduction program. The letdown, degasifier, and purification subsystems are isolated during an accident situation and are not required for emergency core cooling. Seal water
supply to the reactor coolant pumps does not require letdown flow and does not require makeup from the chemical and volume control tank. 2. The Post-Accident Sampling (PAS) subsystem is included in the leakage reduction surveillance test for the Primary Sample System. The gaseous post-accident samples are part of the hydrogen detection subsystem in the Combustible Gas Control System (CGC), (refer to Note 3). 3. The hydrogen detection subsystem of the Combustible Gas Control System (CGC) including the sample lines for post - accident gas samples are in the scope of the leakage reduction program. System to be tested either by a markup air local leak rate test (similar to an Appendix, J, LLRT) or by using helium detection techniques. 4. NRC letter dated October 17, 1986. Task III.D.3.3 Improved In-Plant Iodine Instrumentation Under Accident Conditions (NUREG-0737)
Position: Each licensee shall provide equipment and asso ciated training and pro cedures for accurately determining the airborne iodine concentration in areas within the facility where plant personnel may be present during an accident.
Response: See Updated FSAR Sections 7.5, 11.5, 12.5 and Subsection 12.3.4 Task III.D.3.4 Control Room Habitability Requirements (NUREG-0737)
Position: In accordance with Task Action Plan, Item III.D.3.4, and control room habitability, licensees shall assure that control room operators will be adequately protected against the effects of accidental release of toxic and radioactive gases and that the nuclear power plant can be safety operated or shut down under design basis accident conditions (Criterion 19, "Control Room," of Appendix A, "General Design Criteria for Nuclear Power Plants," to 10 CFR, Part 50).
S EABROOK S TATION UFSAR INTRODUCTION AND GENERAL DESCRIPTION OF P LANT Compliance with NUREG_0737:
Clarification of TMI Action Plan Requirements Revision 11 Section 1.9 Page 32 Response: See Updated FSAR Sections 6.4, 9.4, 9.5 and 12.3 that describe the methods employed to maintain the habitability of the control room during accident conditions.
1.9.2 References
- 1. Letter OG-57, dated April 20, 1981, R. W. Jurgensen (Chairman, Westinghouse Owners Group) to P. S. Check (NRC). 2. Wood, D. C. and Gottshall, C. L. "Probabi listic Analysis and Op erational Data in Response in NUREG-0737, Item II.K.3.2 for Westinghouse NSSS Plants," WCAP-9804, February 1981. 3. "Analysis of Delayed Reactor Coolant Pump Trip During Small Loss-of-Coolant Accidents for Westinghouse Nuclear Steam Supply Systems," WCAP-9584 (Proprietary) and WCAP-9585 (Nonproprietary), August 1979. 4. Letter OG-49, dated March 3, 1981, R. W. Jurgensen (Chairman, Westinghouse Owners Group) to D. F. Ross, Jr. (NRC). 5. Letter OG-50, dated March 13, 1981, R. W. Jurgensen (Chairman, Westinghouse Owners Group) to D. F. Ross, Jr. (NRC). 6. Letter OG-60, dated June 15, 1981, R. W. Jurgensen (Chairman, Westinghouse Owners Group) to P. S. Check (NRC). 7. Letter OG-117, dated March 9, 1984, J. J. Sheppard (Chairman, Westinghouse Owners Group) to R. J. Mattson (NRC). 8. "A Generic Assessment of Significant Flaw Extension, Including Stagnant Loop Conditions, From Pressurized Therma l Shock of Reactor Vessels on Westinghouse Nuclear Power Pl ants," WCAP-10319, October 1983. 9. "Calculation of Operating and NTOL Vessel RT NDT Values," Letter WOG-82-290, dated December 31, 1982, R. A.
Muench to WOG Representatives.
S EABROOK S TATION U PDATED F INAL S AFETY A NALYSIS R EPORT C HAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT T ABLES S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL P LANT DESCRIPTION TABLE 1.1-1 Revision:
Sheet: 12 1 of 11 TABLE 1.1-1 C ROSS R EFERENCE U PDATED FSAR F IGURE N UMBERS V S. DESIGN D RAWING N UMBERS UPDATED FSAR FIGURE NUMBER PREVIOUS FSAR FIGURE NUMBER DESIGN DRAWING NUMBER DESIGN DRAWING REVISION NUMBER HISTORICAL DESIGN DRAWING REVISION DATE 1.1-1, Sh. 1 LEGEND 1 5 X 5/10/02 1.1-1, Sh. 2 LEGEND 2 5 X 6/12/95 1.1-2 1-NHY-503100 5 X 3/25/92 1.2-2 1-NHY-805051 13 X 4/13/92 1.2-3 1-NHY-805052 13 X 9/08/97 1.2-4 1-NHY-805053 13 X 12/20/94 1.2-5 1-NHY-805055 9 X 4/30/96 1.2-6 1-NHY-805056 11 X 4/30/96 1.2-7 805061 18 X 11/19/90 1.2-8 1-NHY-805062 20 X 11/19/90 1.2-9 805063 13 X 11/19/90 1.2-10 805064 14 X 11/19/90 1.2-11 805065 16 X 11/19/90 1.2-12 805066 13 X 11/19/90 1.2-13 805060 14 X 11/19/90 1.2-14 805078 10 X 11/19/90 1.2-15 1-NHY-805058 10 X 9/08/97 1.2-16 1-NHY-805059 12 X 9/08/97 1.2-17 805084 4 X 11/19/90 1.2-18 805085 6 X 11/19/90 1.2-19 805086 4 X 11/19/90 1.2-20 805087 2 X 6/22/77 1.2-21 1-NHY-805088 6 X 4/13/92 1.2-22 805659 12 X 11/19/90 1.2-23 1-NHY-805660 15 X 4/30/96 1.2-24 805661 17 X 11/19/90 1.2-25 805662 15 X 11/19/90 1.2-26 1-NHY-805663 13 X 4/13/92 1.2-27 805664 13 X 3/29/85 1.2-28 805665 14 X 11/19/90 1.2-29 805667 9 X 10/19/83 1.2-30 805669 13 X 11/19/90 1.2-31 1-NHY-310431 30 X 9/08/97 1.2-32 1-NHY-500090 22 X 4/30/96 1.2-33 500091 8 X 11/19/90 1.2-34 202068 8 X 11/19/90 1.2-35 1-NHY-202069 13 X 9/08/97 1.2-36 202070 12 X 11/19/90 1.2-37 1-NHY-202052 15 X 9/08/97 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL P LANT DESCRIPTION TABLE 1.1-1 Revision:
Sheet: 12 2 of 11 UPDATED FSAR FIGURE NUMBER PREVIOUS FSAR FIGURE NUMBER DESIGN DRAWING NUMBER DESIGN DRAWING REVISION NUMBER HISTORICAL DESIGN DRAWING REVISION DATE 1.2-38 1-NHY-202053 18 X 9/08/97 1.2-39 1-NHY-202054 11 X 4/30/96 1.2-40 202055 6 X 8/13/82 1.2-41 202056 6 X 8/13/82 1.2-42 202057 8 X 11/19/90 1.2-43 1-NHY-202058 8 X 9/08/97 1.2-44 202059 7 X 11/19/90 1.2-45 202060 6 X 8/13/82 1.2-46 1-NHY-202476 6 X 4/30/96 1.2-47 202477 3 X 11/19/90 1.2-48 202478 5 X 11/19/90 1.2-49 1-NHY-119522-1 13 X 1/09/95 1.2-50 CIV-1-ASB-119523 1 X 11/19/90 1.2-51 202065 4 X 11/19/90 1.2-52 101112 3 X 11/28/77 1.2-56 1-NHY-805068 5 X 4/30/96 1.2-57 1-NHY-202474 4 X 9/08/97 1.2-58 1-NHY-202475 4 X 9/08/97 1.2-59 1-NHY-805657 4 X 4/30//96 3.4-1 101696 12 X 12/05/90 3.8-1, Sh. 1 101401 14 X 12/05/90 3.8-1, Sh. 2 101402 14 X 1/12/84 3.8-2 101435 7 X 12/05/90 3.8-3 101444 4 X 1/11/82 3.8-3, Sh. 1 101440 10 X 12/05/90 3.8-3, Sh. 2 101441 3 X 4/03/81 3.8-4, Sh. 1 101442 4 X 1/11/82 3.8-4, Sh. 2 101443 6 X 12/05/90 3.8-5, Sh. 1 101461 12 X 12/05/90 3.8-5, Sh. 2 101463 12 X 11/16/83 3.8-6 101438 4 X 7/31/81 3.8-7 101436 3 X 1/11/82 3.8-20 3.8-18 101496 13 X 12/05/90 3.8-21 3.8-19 101496 13 X 12/05/90 3.8-22 3.8-20 805575 21 X 12/05/90 3.8-23 3.8-21 805575 21 X 12/05/90 3.8-25 3.8-23 805573 8 X 12/05/90 3.8-29 3.8-27 101425 9 X 12/05/90 3.8-31 3.8-29 101334 7 X 11/19/03 101337 7 X 11/19/03 3.8-32 3.8-30 101327 9 X 12/05/90 3.8-33 3.8-31 101635 7 X 11/19/03 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL P LANT DESCRIPTION TABLE 1.1-1 Revision:
Sheet: 12 3 of 11 UPDATED FSAR FIGURE NUMBER PREVIOUS FSAR FIGURE NUMBER DESIGN DRAWING NUMBER DESIGN DRAWING REVISION NUMBER HISTORICAL DESIGN DRAWING REVISION DATE 3.8-34 3.8-32 101303 9 X 12/05/90 3.8-35 3.8-33 101692 1 X 12/05/90 3.8-36 3.8-34 101528 17 X 3/18/83 3.11-1, Sh. 1 1-NHY-300219, Sh. 1 of 5 27 10/29/07 3.11-1, Sh. 2 1-NHY-300219, Sh. 2 of 5 22 4/29/05 3.11-1, Sh. 3 1-NHY-300219, Sh. 3 of 5 21 4/29/05 3.11-1, Sh. 4 1-NHY-300219, Sh. 4 of 5 24 4/29/05 3.11-1, Sh. 5 1-NHY-300219, Sh. 5 of 5 21 4/29/05 3A-1 805067 4 X 5/29/85 3A-2 202117 4 X 6/16/81 3A-3 202118 1 X 2/09/78 5.1-1 5.1-1, Sh. 1 PID-1-RC-B20840 6 11/03/92 5.1-2 5.1-1, Sh. 2 PID-1-RC-B20845 14 4/4/08 5.1-3, Sh. 1 5.1-1, Sh. 3 PID-1-RC-B20841 21 4/3/08 5.1-3, Sh. 2 5.1-1, Sh. 4 PID-1-RC-B20842 12 2/26/07 5.1-3, Sh. 3 5.1-1, Sh. 5 PID-1-RC-B20843 15 2/26/07 5.1-3, Sh. 4 5.1-1, Sh. 6 PID-1-RC-B20844 18 2/26/07 5.1-4 5.1-1, Sh. 7 PID-1-RC-B20846 14 10/25/06 5.2-2, Sh. 1 1-NHY-500037-1 7 12/19/94 5.2-2, Sh. 2 1-NHY-500037-2 7 10/12/99 5.4-7, Sh. 1 5.4-7 1-NHY-503747 15 4/21/99 5.4-7, Sh. 2 5.4-8 1-NHY-503748 10 6/05/97 5.4-8 5.4-9 1-NHY-503764 9 11/10/89 5.4-9 5.4-10, Sh. 1 PID-1-RH-B20660 3 1/28/87 5.4-10 5.4-10, Sh. 2 PID-1-RH-B20662 22 5/7/08 5.4-11 5.4-10, Sh. 3 PID-1-RH-B20663 18 11/26/07 6.2-74 6.2-77 PID-1-CBS-B20233 32 5/1/08 6.2-75 6.2-78 1-NHY-804979 7 5/1/08 6.2-76 6.2-79 805146 5 X 12/14/90 6.2-77 6.2-80 805147 7 X 12/14/90 (Deleted) 6.2-92 6.2-95 PID-1-CGC-B20612 7 2/4/08 6.3-1 6.3-1, Sh. 1 PID-1-SI-B20445 4 5/1/08 6.3-2, Sh. 1 6.3-1, Sh. 2 PID-1-SI-B20448 11 5/1/08 6.3-2, Sh. 2 6.3-1, Sh. 3 PID-1-SI-B20449 9 5/4/08 6.3-3 6.3-1, Sh. 4 PID-1-SI-B20450 14 12/6/07 6.3-4 6.3-1, Sh. 5 PID-1-SI-B20446 17 2/4/08 6.3-5 6.3-1, Sh. 6 PID-1-SI-B20447 14 4/22/99 6.8-1 6.8-1, Sh. 1 PID-1-FW-B20685 4 11/22/06 6.8-2 6.8-1, Sh. 2 PID-1-FW-B20688 19 5/4/08 7.2-1 7.2-1, Sh. 1 1-NHY-509041 13 12/06/95 7.2-2 7.2-1, Sh. 2 1-NHY-509042 10 12/06/95 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL P LANT DESCRIPTION TABLE 1.1-1 Revision:
Sheet: 12 4 of 11 UPDATED FSAR FIGURE NUMBER PREVIOUS FSAR FIGURE NUMBER DESIGN DRAWING NUMBER DESIGN DRAWING REVISION NUMBER HISTORICAL DESIGN DRAWING REVISION DATE 7.2-3 7.2-1, Sh. 3 1-NHY-509043 10 10/17/03 7.2-4 7.2-1, Sh. 4 1-NHY-509044 6 12/02/95 7.2-5, Sh. 1 7.2-1, Sh. 5 1-NHY-509045 Sh. 1 13 4/18/08 7.2-5, Sh. 2 1-NHY-509045 Sh. 2 1 4/18/08 7.2-6 7.2-1, Sh. 6 1-NHY-509046 7 9/20/00 7.2-7, Sh. 1 7.2-1, Sh. 7 1-NHY-509047 Sh. 1 11 12/01/95 7.2-7, Sh. 2 1-NHY-509047 Sh. 2 1 8/14/04 7.2-8 7.2-1, Sh. 8 1-NHY-509048 17 9/20/00 7.2-9 7.2-1, Sh. 9 1-NHY-509049 8 10/21/05 7.2-10 7.2-1, Sh. 10 1-NHY-509050 4 4/26/05 7.2-11 7.2-1, Sh. 11 1-NHY-509051 7 4/26/05 7.2-12 7.2-1, Sh. 12 1-NHY-509052 5 10/25/86 7.2-13, Sh. 1 7.2-1, Sh. 13 1-NHY-509053 13 4/21/08 7.2-13, Sh. 2 7.2-1, Sh. 14 1-NHY-509054 8 4/21/08 7.2-14 7.2-1, Sh. 15 1-NHY-509055 15 5/05/99 7.2-15 7.2-1, Sh. 16 1-NHY-509056 13 4/18/08 8.2-7 309826 1 X 4/11/78 8.2-8 1-NHY-309827 2 X 4/12/93 8.2-9, Sh. 1 309830 5 X 11/21/80 8.2-9, Sh. 2 309831 3 X 12/12/79 8.2-11 FP80034 11 4/29/08 8.3-1 1-NHY-310002 40 5/5/08 8.3-2 1-NHY-310041 14 11/20/95 8.3-4, Sh. 1 1-NHY-310043, Sh. 1 11 12/12/89 8.3-4, Sh. 2 1-NHY-310043, Sh. 2 1 11/11/89 8.3-5 1-NHY-310004 16 12/04/00 8.3-6 1-NHY-310005 17 12/04/00 8.3-7, Sh. 1 1-NHY-310009, Sh. 1 14 3/25/05 8.3-7, Sh. 2 1-NHY-310009, Sh. 2 2 7/27/07 8.3-8 1-NHY-310007 20 4/27/05 8.3-9 1-NHY-310008 18 4/19/05 8.3-10, Sh. 1 1-NHY-310010, Sh. 1 15 4/27/05 8.3-10, Sh. 2 1-NHY-310010, Sh. 2 4 4/19/05 8.3-11 1-NHY-310013 21 2/10/00 8.3-12 1-NHY-310051 15 6/07/97 8.3-13 1-NHY-310014 18 8/4/08 8.3-14 1-NHY-310052 19 4/19/05 8.3-15 1-NHY-301704 11 4/03/87 8.3-16 1-NHY-310023 20 8/1/07 8.3-17, Sh. 1 1-NHY-310024 27 6/4/08 8.3-17, Sh. 2 1-NHY-310057 14 5/14/97 8.3-18 1-NHY-301705 17 8/11/00 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL P LANT DESCRIPTION TABLE 1.1-1 Revision:
Sheet: 12 5 of 11 UPDATED FSAR FIGURE NUMBER PREVIOUS FSAR FIGURE NUMBER DESIGN DRAWING NUMBER DESIGN DRAWING REVISION NUMBER HISTORICAL DESIGN DRAWING REVISION DATE 8.3-19 1-NHY-301104 15 5/30/07 8.3-20 1-NHY-310027 28 2/12/08 8.3-21 1-NHY-310028 13 1/11/88 8.3.22 1-NHY-310029 16 6/17/08 8.3-23, Sh. 1 1-NHY-310030 29 10/7/08 8.3-23, Sh. 2 1-NHY-310058 13 4/23/99 8.3-24 1-NHY-301105 10 4/15/87 8.3-25 1-NHY-310033 32 10/10/07 8.3-26 1-NHY-301706 11 4/15/88 8.3-27 1-NHY-310431 30 X 9/08/97 8.3-28 1-NHY-310105, Sh. E01a 12 9/15/99 8.3-29 1-NHY-310105, Sh. E02a 12 9/15/99 8.3-30 1-NHY-310105, Sh. E03a 12 9/15/99 8.3-31 1-NHY-310105, Sh. E04a 11 9/15/99 8.3-32 1-NHY-310105, Sh. EH9a 15 9/15/99 8.3-33 1-NHY-310105, Sh. EH0a 16 9/15/99 8.3-34 1-NHY-310105, Sh. E1Sa 17 9/08/00 8.3-35 1-NHY-310105, Sh. E1Ta 17 9/08/00 8.3-37, Sh. 1 1-NHY-310042, Sh. 1 16 2/17/98 8.3-37, Sh. 2 1-NHY-310042, Sh. 2 3 4/30/96 8.3-38, Sh. 1 1-NHY-310059, Sh. 1 10 2/17/98 8.3-38, Sh. 2 1-NHY-310059, Sh. 2 1 2/17/98 8.3-39 1-NHY-310107, Sh. E93a 12 4/01/99 8.3-40 1-NHY-310107, Sh. E87a 16 5/24/06 8.3-41 1-NHY-310107, Sh. E94a 16 4/01/99 8.3-42 1-NHY-310107, Sh. E88a 17 4/01/99 8.3-45 1-NHY-310890, Sh. B43a 11 3/19/91 8.3-46 1-NHY-310108, Sh. 5a 3 1/08/02 8.3-52, Sh. 1 8.3-54, Sh. 1 1-NHY-310032 27 6/5/07 8.3-52, Sh. 2 8.3-54, Sh. 2 1-NHY-310067 9 7/16/07 8.3-53, Sh. 1 8.3-55, Sh. 1 1-NHY-310026 32 7/12/07 8.3-53, Sh. 2 8.3-55, Sh. 2 1-NHY-310066 9 6/12/07 8.3-54 8.3-56 1-NHY-310046 23 12/18/07 8.3-56 8.3-58 1-NHY-300210 4 X 4/13/92 8.3-58 8.3-60 1-NHY-310107, Sh. EG1a 8 4/01/99 8.3-59 8.3-61 1-NHY-310107, Sh. EG2a 8 4/01/99 8.3-60 1-NHY-310107, Sh. E2Ta 12 3/27/06 8.3-61 1-NHY-310107, Sh. E2Ua 11 6/26/02 9.1-1 9.1-1, Sh. 1 PID-1-SF-B20480 6 3/27/97 9.1-2, Sh. 1 9.1-1, Sh. 2 PID-1-SF-B20482 13 8/30/99 9.1-2, Sh. 2 9.1-1, Sh. 3 PID-1-SF-B20483 13 8/16/07 9.1-2, Sh. 3 9.1-2 PID-1-SF-B20484 9 10/25/00 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL P LANT DESCRIPTION TABLE 1.1-1 Revision:
Sheet: 12 6 of 11 UPDATED FSAR FIGURE NUMBER PREVIOUS FSAR FIGURE NUMBER DESIGN DRAWING NUMBER DESIGN DRAWING REVISION NUMBER HISTORICAL DESIGN DRAWING REVISION DATE 9.1-4 FP55944-1 9 X 7/16/91 9.1-5 FP55944-2 9 X 7/16/91 9.2-1 9.2-1, Sh. 1 PID-1-SW-B20792 6 4/23/08 9.2-2, Sh. 1 9.2-1, Sh. 2 PID-1-SW-B20794 33 4/14/08 9.2-2, Sh. 2 9.2-1, Sh. 3 PID-1-SW-B20795 37 4/23/08 9.2-2, Sh. 3 PID-1-SW-B20796 5 8/08/02 9.2-3 9.2-2, Sh. 1 PID-1-CC-B20204 4 6/06/97 9.2-4, Sh. 1 9.2-2, Sh. 2 PID-1-CC-B20205 24 4/8/03 9.2-4, Sh. 2 9.2-2, Sh. 3 PID-1-CC-B20206 15 9/24/03 9.2-4, Sh. 3 9.2-2, Sh. 4 PID-1-CC-B20207 12 2/4/06 9.2-4, Sh. 4 9.2-2, Sh. 5 PID-1-CC-B20208 3 4/13/92 9.2-5 9.2-3, Sh. 1 PID-1-CC-B20210 3 6/06/97 9.2-6, Sh. 1 9.2-3, Sh. 2 PID-1-CC-B20211 21 3/22/07 9.2-6, Sh. 2 9.2-3, Sh. 3 PID-1-CC-B20212 13 10/03/06 9.2-6, Sh. 3 9.2-3, Sh. 4 PID-1-CC-B20213 14 2/4/08 9.2-6, Sh. 4 9.2-3, Sh. 5 PID-1-CC-B20214 7 6/11/97 9.2-6, Sh. 5 9.2-3, Sh. 6 PID-1-CC-B20215 6 1/31/03 9.2-7 9.2-5, Sh. 1 PID-1-DM-B20348 5 4/20/05 9.2-9, Sh. 1 9.2-6, Sh. 1 PID-1-PW-B20914 2 1/26/01 9.2-9, Sh. 2 9.2-6, Sh. 2 PID-1-PW-B20915 3 9/16/99 9.2-11 9.2-8 PID-1-RMW-B20360 13 1/15/01 9.2-12 9.2-10 1-NHY-202499 9 11/5/03 9.2-13 9.2-11 PID-1-CC-B20209 10 10/03/06 9.2-15 PID-1-DM-B20349 31 3/21/07 9.3-1 PID-1-IA-B20636 3 10/30/03 9.3-2, Sh. 1 PID-1-IA-B20637 19 6/7/08 9.3-2, Sh. 2 PID-1-IA-B20638 14 12/06/05 9.3-2, Sh. 3 PID-1-IA-B20639 14 10/18/06 9.3-3 9.3-2, Sh. 4 PID-1-IA-B20640 15 6/11/02 9.3-4 9.3-2, Sh. 5 PID-1-IA-B20641 2 1/31/96 9.3-5 9.3-2, Sh. 6 PID-1-IA-B20643 13 5/17/07 9.3-6, Sh. 1 9.3-2, Sh. 7 PID-1-IA-B20644 17 12/08/05 9.3.6, Sh. 2 9.3.2, Sh. 8 PID-1-IA-B20645 14 1/23/06 9.3-6, Sh. 3 9.3-2, Sh. 9 PID-1-IA-B20646 17 4/27/05 9.3-6, Sh. 4 PID-1-IA-B20647 13 2/21/07 9.3-7 9.3-3 PID-1-SA-B20649 3 5/29/96 9.3-8 9.3-4, Sh. 1 PID-1-SA-B20650 35 10/18/07 9.3-9, Sh. 1 9.3-4, Sh. 2 PID-1-SA-B20651 15 9/06/05 9.3-9, Sh. 2 9.3-4, Sh. 3 PID-1-SA-B20652 7 2/10/03 9.3-9, Sh. 3 9.3-4, Sh. 4 PID-1-SA-B20653 9 2/21/03 9.3-10 9.3-5, Sh. 1 PID-1-SS-B20516 5 1/11/02 9.3-11 9.3-5, Sh. 2 PID-1-SS-B20518 12 9/12/02 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL P LANT DESCRIPTION TABLE 1.1-1 Revision:
Sheet: 12 7 of 11 UPDATED FSAR FIGURE NUMBER PREVIOUS FSAR FIGURE NUMBER DESIGN DRAWING NUMBER DESIGN DRAWING REVISION NUMBER HISTORICAL DESIGN DRAWING REVISION DATE 9.3-12 9.3-5, Sh. 3 PID-1-SS-B20519 10 11/15/99 9.3-13 9.3-5, Sh. 4 PID-1-SS-B20521 15 12/06/01 9.3-14 9.3-5, Sh. 5 PID-1-SS-B20520 13 1/11/02 9.3-16 9.3-7, Sh. 1 PID-1-WLD-B20216 2 2/03/87 9.3-17 9.3-7, Sh. 2 PID-1-WLD-B20218 14 4/8/08 9.3-18 9.3-7, Sh. 3 PID-1-WLD-B20219 11 4/14/08 9.3-19 9.3-8 PID-1-WLD-B20220 6 3/27/97 9.3-20 9.3-9 PID-1-WLD-B20221 10 1/11/02 9.3-21, Sh. 1 9.3-10, Sh. 1 PID-1-WLD-B20222 18 1/11/02 9.3-21, Sh. 2 9.3-10, Sh. 2 PID-1-WLD-B20223 13 11/02/05 9.3-22 9.3-11 PID-1-WLD-B20224 6 2/11/08 9.3-23, Sh. 1 9.3-12, Sh. 1 PID-1-WLD-B20225 6 11/07/92 9.3-23, Sh. 2 9.3-12, Sh. 2 PID-1-WLD-B20226 6 7/11/00 9.3-23, Sh. 3 9.3-12, Sh. 3 PID-1-WLD-B20227 14 11/03/04 9.3-24 9.3-12, Sh. 4 PID-1-WLD-B20228 4 4/26/06 9.3-25 9.3-12, Sh. 5 PID-1-WLD-B20229 9 6/15/06 9.3-26 9.3-13, Sh. 1 PID-1-CS-B20720 4 11/2/00 9.3-27 9.3-13, Sh. 2 PID-1-CS-B20722 13 10/17/06 9.3-28 9.3-13, Sh. 3 PID-1-CS-B20723 20 8/4/08 9.3-29 9.3-13, Sh. 4 PID-1-CS-B20726 20 9/25/06 9.3-30 9.3-14 PID-1-CS-B20725 26 2/4/08 9.3-31, Sh. 1 9.3-15, Sh. 1 PID-1-CS-B20727 8 9/12/02 9.3-31, Sh. 2 9.3-15, Sh. 2 PID-1-CS-B20728 5 3/21/96 9.3-32 9.3-16 PID-1-CS-B20729 16 11/21/06 9.3-33 9.3-17 PID-1-CS-B20724 16 4/16/08 9.3-34 9.3-18, Sh. 1 PID-1-BRS-B20853 1 1/27/87 9.3-35 9.3-18, Sh. 2 PID-1-BRS-B20856 7 10/08/91 9.3-36 9.3-18, Sh. 3 PID-1-BRS-B20857 6 6/15/06 9.3-37, Sh. 1 9.3-19 PID-1-BRS-B20858 7 6/15/06 9.3-37, Sh. 2 9.3-20 PID-1-BRS-B20859 10 6/15/06 9.3-37, Sh. 3 9.3-21 PID-1-BRS-B20860 2 10/02/86 9.3-38 9.3-22 PID-1-BRS-B20861 10 6/15/06 9.3-39, Sh. 1 9.3-23 PID-1-BRS-B20854 9 9/18/07 9.3-39, Sh. 2 9.3-24 PID-1-BRS-B20855 10 12/08/04 9.3-40 9.3-25, Sh. 1 PID-1-VG-B20779 1 12/10/97 9.3-41 9.3-25, Sh. 2 PID-1-VG-B20780 20 5/30/00 9.3-42 9.3-25, Sh. 3 PID-1-VG-B20782 5 8/13/08 9.4-1 9.4-1, Sh. 1 PID-1-CBA-B20300 4 4/04/00 9.4-2 9.4-1, Sh. 2 PID-1-CBA-B20304 14 10/31/06 9.4-3 9.4-1, Sh. 3 PID-1-CBA-B20305 3 8/10/99 9.4-4 9.4-2 PID-1-MAH-B20497 9 2/04/00 9.4-5 9.4-3, Sh. 1 PID-1-MAH-B20492 2 8/06/92 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL P LANT DESCRIPTION TABLE 1.1-1 Revision:
Sheet: 12 8 of 11 UPDATED FSAR FIGURE NUMBER PREVIOUS FSAR FIGURE NUMBER DESIGN DRAWING NUMBER DESIGN DRAWING REVISION NUMBER HISTORICAL DESIGN DRAWING REVISION DATE 9.4-6 9.4-3, Sh. 2 PID-1-MAH-B20494 18 6/09/99 9.4-7 9.4-3, Sh. 3 PID-1-MAH-B20495 16 5/7/08 9.4-8 9.4-3, Sh. 4 PID-1-MAH-B20496 12 5/7/08 9.4-9 Sh. 1 PID-1-MAH-B20493 0 8/06/92 9.4-9 Sh. 2 9.4-3, Sh. 5 PID-1-MAH-B20507 5 7/24/00 9.4-10 9.4-3, Sh. 6 PID-1-MAH-B20508 4 2/6/08 9.4-11, Sh. 1 9.4-4, Sh. 1 PID-1-MAH-B20498 5 8/02/88 9.4-11, Sh. 2 9.4-4, Sh. 2 PID-1-MAH-B20499 3 8/26/98 9.4-11, Sh. 3 9.4-4, Sh. 3 PID-1-MAH-B20500 4 4/09/87 9.4-11, Sh. 4 9.4-4, Sh. 4 PID-1-MAH-B20501 4 5/26/89 9.4-12 9.4-4, Sh. 5 PID-1-MAH-B20502 4 5/11/92 9.4-13, Sh. 1 9.4-5, Sh. 1 PID-1-MAH-B20505 6 6/26/07 9.4-13, Sh. 2 9.4-5, Sh. 2 PID-1-MAH-B20506 4 6/13/96 9.4-14 9.4-6 PID-1-MAH-B20504 25 4/11/08 9.4-15 9.4-7 PID-1-MAH-B20503 14 1/26/08 9.4-16 9.4-8, Sh. 1 PID-1-DAH-B20624 6 11/21/06 9.4-17, Sh. 1 9.4-8, Sh. 2 PID-1-HW-B20048 1 1/28/87 9.4-17, Sh. 2 9.4-8, Sh. 3 PID-1-HW-B20049 1 1/21/87 9.4-18 9.4-8, Sh. 4 PID-1-HW-B20053 6 7/22/04 9.4-19 9.4-9 PID-1-CBA-B20303 19 1/09/06 9.4-20 9.4-10 PID-1-CBA-B20302 4 1/08/99 9.4-21 9.4-11 PID-1-AAH-B20001 4 1/7/03 9.4-22 9.4-12 PID-1-CWA-B20240 3 9/16/97 9.4-23 9.4-13 PID-1-SWA-B20372 7 6/3/03 9.4-24, Sh. 1 9.4-14, Sh. 1 PID-1-TAH-B20170 15 3/25/08 9.4-24, Sh. 2 9.4-14, Sh. 2 PID-1-TAH-B20171 3 12/16/05 9.4-24, Sh. 3 PID-1-TAH-B20172 5 12/13/05 9.4-25 PID-1-CBA-B20309 6 5/02/00 9.5-1 9.5-1, Sh. 1 PID-1-FP-B20264 15 1/29/08 9.5-2 9.5-1, Sh. 2 PID-1-FP-B20271 21 1/29/08 9.5-4 9.5-1, Sh. 4 PID-1-FP-B20274 15 1/29/08 9.5-5 9.5-2, Sh. 1 PID-1-FP-B20266 23 10/23/07 9.5-6 9.5-2, Sh. 2 PID-1-FO-B20938 4 4/07/00 9.5-7, Sh. 1 9.5-3, Sh. 1 PID-1-FP-B20269 15 3/16/06 9.5-7, Sh. 2 9.5-3, Sh. 2 PID-1-FP-B20270 13 11/07/06 9.5-8 9.5-3, Sh. 3 PID-1-FP-B20268 15 3/16/06 9.5-9, Sh. 1 9.5-4, Sh. 1 PID-1-DG-B20456 3 10/29/03 9.5-9, Sh. 2 9.5-4, Sh. 2 PID-1-DG-B20457 3 10/29/03 9.5-10, Sh. 1 9.5-4, Sh. 3 PID-1-DG-B20459 15 3/20/08 9.5-10, Sh. 2 9.5-4, Sh. 4 PID-1-DG-B20464 17 7/27/00 9.5-11, Sh. 1 9.5-5, Sh. 1 PID-1-DG-B20461 19 11/20/06 9.5-11, Sh. 2 9.5-5, Sh. 2 PID-1-DG-B20466 18 11/20/06 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL P LANT DESCRIPTION TABLE 1.1-1 Revision:
Sheet: 12 9 of 11 UPDATED FSAR FIGURE NUMBER PREVIOUS FSAR FIGURE NUMBER DESIGN DRAWING NUMBER DESIGN DRAWING REVISION NUMBER HISTORICAL DESIGN DRAWING REVISION DATE 9.5-12, Sh. 1 9.5-6, Sh. 1 PID-1-DG-B20460 22 3/27/07 9.5-12, Sh. 2 9.5-6, Sh. 2 PID-1-DG-B20465 23 11/04/06 9.5-13, Sh. 1 9.5-7, Sh. 1 PID-1-DG-B20458 16 11/01/06 9.5-13, Sh. 2 9.5-7, Sh. 2 PID-1-DG-B20463 19 11/20/06 9.5-14, Sh. 1 9.5-8, Sh. 1 PID-1-DG-B20462 6 11/21/06 9.5-14, Sh. 2 9.5-8, Sh. 2 PID-1-DG-B20467 8 11/21/06 10.1-1 1-NHY-202116 4 X 10/26/06 10.1-2 1-NHY-202115 2 X 10/26/06 10.2-1 PID-1-HG-B20888 13 4/30/08 10.3-1 10.3-1, Sh. 1 PID-1-MS-B20579 8 7/29/02 10.3-2, Sh. 1 10.3-1, Sh. 2 PID-1-MS-B20580 10 4/12/05 10.3-2, Sh. 2 10.3-1, Sh. 3 PID-1-MS-B20581 11 7/31/06 10.3-3 10.3-1, Sh. 4 PID-1-MS-B20582 19 8/01/06 10.3-4 10.3-1, Sh. 5 PID-1-MS-B20583 15 8/14/08 10.3-5 10.3-1, Sh. 6 PID-1-MS-B20584 8 4/28/05 10.3-6 10.3-1, Sh. 7 PID-1-MS-B20585 10 12/15/06 10.3-7 10.3-1, Sh. 8 PID-1-MS-B20586 4 12/04/95 10.3-8 10.3-2 PID-1-MS-B20587 17 11/04/06 10.3-9 10.3-3 PID-1-MS-B20588 5 10/11/03 10.3-10 10.3-4, Sh. 1 PID-1-EX-B20324 3 5/24/90 10.3-11 10.3-4, Sh. 2 PID-1-EX-B20328 6 5/28/97 10.4-1 PID-1-AR-B20744 22 3/7/03 10.4-2 PID-1-SSS-B20759 11 6/08/04 10.4-3 10.4-3, Sh. 1 PID-1-CW-B20672 4 5/17/02 10.4-4, Sh. 1 10.4-3, Sh. 2 PID-1-CW-B20673 21 10/13/04 10.4-4, Sh. 2 10.4-3, Sh. 3 PID-1-CW-B20674 6 3/27/06 10.4-5 10.4-3, Sh. 4 PID-1-CL-B20680 8 5/05/04 10.4-6 10.4-4, Sh. 1 PID-1-CO-B20420 4 4/20/05 10.4-7, Sh. 1 10.4-4, Sh. 2 PID-1-CO-B20422 18 7/12/07 10.4-7, Sh. 2 10.4-4, Sh. 3 PID-1-CO-B20423 14 8/01/06 10.4-7, Sh. 3 10.4-4, Sh. 4 PID-1-CO-B20424 5 6/09/97 10.4-7, Sh. 4 10.4-4, Sh. 5 PID-1-CO-B20425 10 11/11/00 10.4-7, Sh. 5 10.4-4, Sh. 6 PID-1-CO-B20426 30 4/25/08 10.4-8 10.4-5, Sh. 1 PID-1-FW-B20684 9 3/3/08 10.4-9, Sh. 1 10.4-5, Sh. 2 PID-1-FW-B20686 12 2/4/08 10.4-9, Sh. 2 10.4-5, Sh. 3 PID-1-FW-B20687 27 7/30/08 10.4-10 10.4-6, Sh. 1 PID-1-SB-B20625 4 10/30/03 10.4-11 10.4-6, Sh. 2 PID-1-SB-B20626 16 8/16/07 10.4-12, Sh. 1 10.4-7, Sh. 1 PID-1-SB-B20629 7 11/23/93 10.4-12, Sh. 2 10.4-7, Sh. 2 PID-1-SB-B20630 6 2/25/05 10.4-12, Sh. 3 10.4-7, Sh. 3 PID-1-SB-B20631 4 4/20/92 10.4-13, Sh. 1 10.4-8, Sh. 1 PID-1-SB-B20627 19 8/21/01 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL P LANT DESCRIPTION TABLE 1.1-1 Revision:
Sheet: 12 10 of 11 UPDATED FSAR FIGURE NUMBER PREVIOUS FSAR FIGURE NUMBER DESIGN DRAWING NUMBER DESIGN DRAWING REVISION NUMBER HISTORICAL DESIGN DRAWING REVISION DATE 10.4-13, Sh. 2 10.4-8, Sh. 2 PID-1-SB-B20628 24 9/7/07 10.4-14 10.4-9 PID-1-SCC-B20072 10 7/23/07 10.4-15 10.4-10 PID-1-AB-B20012 4 11/20/01 10.4-16 10.4-11 PID-1-AS-B20564 7 4/07/04 10.4-17, Sh. 1 10.4-12, Sh. 1 PID-1-ASC-B20900 4 9/14/99 10.4-17, Sh. 2 10.4-12, Sh. 2 PID-1-ASC-B20901 5 9/14/99 10.4-18 PID-1-CPS-B20150 0 4/30/05 10.4-19 PID-1-CPS-B20152 3 10/24/06 11.2-1 11.2-1, Sh. 1 PID-1-WL-B20828 3 12/08/94 11.2-2 11.2-1, Sh. 2 PID-1-WL-B20829 10 6/15/06 11.2-3 11.2-2 PID-1-WL-B20830 7 12/07/92 11.2-4 11.2-3 PID-1-WL-B20831 14 7/27/07 11.3-1 11.3-1, Sh. 1 PID-1-WG-B20768 3 1/18/95 11.3-2, Sh. 1 11.3-1, Sh. 2 PID-1-WG-B20770 19 2/7/03 11.3-2, Sh. 2 11.3-1, Sh. 3 PID-1-WG-B20771 9 5/17/02 11.3-2, Sh. 3 11.3-1, Sh. 4 PID-1-WG-B20772 16 9/18/07 11.3-2, Sh. 4 11.3-1, Sh. 5 PID-1-WG-B20773 13 10/13/03 11.3-3 11.3-1, Sh. 6 PID-1-NG-B20132 4 6/23/99 11.3-4 11.3-1, Sh. 7 PID-1-NG-B20135 14 9/18/07 11.4-1, Sh. 1 PID-1-WS-B20733 2 8/19/92 11.4-1, Sh. 2 PID-1-WS-B20734 1 2/02/87 11.4-2 11.4-1, Sh. 3 PID-1-WS-B20735 9 9/28/94 11.4-3 11.4-1, Sh. 4 PID-1-WS-B20736 6 4/23/92 11.4-4 11.4-1, Sh. 5 PID-1-WS-B20737 3 11/21/86 11.4-5 11.4-1, Sh. 6 PID-1-WS-B20738 3 11/06/86 11.4-6 11.4-1, Sh. 7 PID-1-WS-B20739 4 9/16/03 11.4-7 11.4-1, Sh. 8 PID-1-WS-B20740 1 11/18/86 11.4-8 11.4-1, Sh. 9 PID-1-WS-B20741 6 11/30/01 11.4-9 11.4-1, Sh. 10 PID-1-WS-B20742 3 4/23/92 11.4-10 11.4-2 PID-1-RS-B20252 13 1/14/04 11.5-1 1-NHY-500015 12 5/17/05 12.3-1 805184 0 X 8/12/82 12.3-2 805185 0 X 8/12/82 12.3-3 805186 1 X 11/19/03 12.3-4 805187 1 X 8/30/82 12.3-5 805188 0 X 8/12/82 12.3-6 805189 0 X 8/12/82 12.3-7 805190 0 X 8/12/82 12.3-8 805896 1 X 5/19/86 12.3-9 805891 2 X 9/30/02 12.3-10 1-NHY-805892 2 X 4/13/92 12.3-11 12.3-10a 805897 0 X 5/19/86 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL P LANT DESCRIPTION TABLE 1.1-1 Revision:
Sheet: 12 11 of 11 UPDATED FSAR FIGURE NUMBER PREVIOUS FSAR FIGURE NUMBER DESIGN DRAWING NUMBER DESIGN DRAWING REVISION NUMBER HISTORICAL DESIGN DRAWING REVISION DATE 12.3-12 12.3-11 1-NHY-805893 3 X 4/13/92 12.3-13 12.3-12 805894 1 X 8/30/82 12.3-14 12.3-13 805895 1 X 5/19/86 12.3-15 12.3-14 805181 0 X 8/12/82 12.3-16 12.3-15 805182 0 X 8/12/82 12.3-17 12.3-16 1-NHY-805183 1 X 4/13/92 12.3-19, Sh. 1 12.3-18, Sh. 1 1-NHY-500017, Sh. 1 15 9/30/03 12.3-19, Sh. 2 12.3-18, Sh. 2 1-NHY-500017, Sh. 2 3 9/30/03 12.3-20, Sh. 1 12.3-19, Sh. 1 1-NHY-500016, Sh. 1 12 9/9/07 12.3-20, Sh. 2 12.3-19, Sh. 2 1-NHY-500016, Sh. 2 4 4/23/96 13.5-1 1-NHY-500090 22 X 4/23/96
S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-1 Revision:
Sheet: 8 1 of 9 TABLE 1.3-1 DESIGN C OMPARISON Chapter Title System/Component FSAR Reference
Section
Significant Similarities
Significant Differences Containment 3.8, 6.2.1 Comanche Peak, Byron/Braidwood, except as noted Comanche Peak and Byron/Braidwood do not have containment enclosures. Byron/Braidwood containment has a shallow dome roof and is post-tensioned in three directions.
McGuire utilizes the ice condenser containment concept.
Reactor Vessel Internals 3.9.5 McGuire, Comanche Peak, Byron/ Braidwood, except as noted McGuire upper internals incorporate upper head injection (UHI) system.
Reactor Fuel System 4.2 McGuire, Comanche Peak, Byron/ Braidwood None Nuclear Design 4.3 McGuire, Comanche Peak, Byron/ Braidwood McGuire and Comanche Peak have OFA and B 4C control rods. Comanche Peak has a different number of rods.
Thermal and Hydraulic Design 4.4 McGuire, Comanche Peak, Byron/Braidwood, except as noted Byron/Braidwood thermal and hydraulic parameters differ due to incorporation of loop stop valves.
S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-1 Revision:
Sheet: 8 2 of 9 Chapter Title System/Component FSAR Reference
Section
Significant Similarities
Significant Differences Reactivity Control Systems 4.6 McGuire, Comanche Peak, Byron/ The McGuire system includes part-Braidwood, except as noted length control rods.
Reactor Coolant System and Connected Systems 5.1, 5.2 McGuire, Comanche Peak, Byron/ Braidwood None Reactor Vessel 5.3 McGuire, Comanche Peak, Byron/ Braidwood, except as noted McGuire vessel head incorporates UHI penetrations Reactor Coolant Pumps 5.4.1 McGuire, Comanche Peak, Byron/ Braidwood The Seabrook reactor coolant pumps have a slightly high er capacity.
Steam Generators 5.4.2 McGuire, Comanche Peak, Byron/ Braidwood, except as noted Seabrook has Westinghouse Model F steam generators. This design does not include a feedwater pre-heater section, and incorporates improved design features to mitigate steam generator tube degradation.
Reactor Coolant Piping 5.4.3 McGuire, Comanche Peak, Byron/ Braidwood, except as noted McGuire incorporates UHI piping. Byron/Braidwood has loop stop valves Residual Heat Removal System 5.4.7 McGuire, Comanche Peak, Byron/ Braidwood, except as noted McGuire has only one RHR suction line from the Reactor Coolant System. Cooldown time is longer for Seabrook due
to lower heat exchanger capacity.
Pressurizer 5.4.10 McGuire, Comanche Peak, Byron/ Braidwood None S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-1 Revision:
Sheet: 8 3 of 9 Chapter Title System/Component FSAR Reference
Section
Significant Similarities
Significant Differences Engineered Safety Features Containment Heat Removal Systems 6.2.2 Comanche Peak, Byron/Braidwood except as noted Comanche Peak and Byron/Braidwood use eductors rather than gravity feed to add containment spray additives.
Byron/Braidwood has ESF containment fan coolers.
Containment Isolation System 6.2.4 Comanche Peak, Byron/Braidwood None Combustible Gas Control in Containment
6.2.5 Comanche
Peak, Byron/Braidwood except as noted Byron/Braidwood hydrogen recombiners are shared between units and are located in the Auxiliary Building.
Emergency Core Cooling System 6.3 Comanche Peak, Byron/Braidwood None Control Room Habitability System 6.4 McGuire, Comanche Peak, Byron/ Braidwood except as noted McGuire, Comanche Peak and Byron/ Braidwood have common control rooms. Seabrook has one control room per unit.
S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-1 Revision:
Sheet: 8 4 of 9 Chapter Title System/Component FSAR Reference
Section
Significant Similarities
Significant Differences Emergency Feedwater System 6.8 McGuire, Comanche Peak, except as noted McGuire and Comanche Peak have two motor-driven pumps in their Auxiliary Feedwater System, each feeding two steam generators, and one turbine-driven pump which feeds all four steam generators. Seabrook has one motor-driven pump and one turbine-driven pump, each of which can feed all four steam generators. Instrumentation and Controls Reactor Trip System
7.2 System
functions are similar to McGuire, Comanche Peak and Byron/Braidwood None Engineered Safety Feature Systems 7.3 System functions are similar to McGuire, Comanche Peak and Byron/Braidwood, except as noted Fan coolers perform an ESF function at Byron/Braidwood Systems Required for Safe Shutdown 7.4 System functions are similar to McGuire, Comanche Peak and Byron/Braidwood None Safety-Related Display Instrumentation 7.5 Parametric display is similar to McGuire, Comanche Peak and Byron/Braidwood Actual physical configuration may differ due to applicant design philosophy.
S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-1 Revision:
Sheet: 8 5 of 9 Chapter Title System/Component FSAR Reference
Section
Significant Similarities
Significant Differences All Other Instrumentation Systems Required for
Safety 7.6 Operational functions are similar to McGuire, Comanche Peak and Byron/Braidwood Byron/Braidwood uses loop stop valve interlocks.
Control Systems Not Required for Safety
7.7 Operational
functions are similar to McGuire, Comanche Peak and Byron/Braidwood McGuire has a net load rejec tion capability of 100% rather than 50%
Seabrook has a fixed/moveable incore flux monitoring system versus a moveable system only for the other plants.
Electric Power Offsite Power System 8.2 McGuire, except as noted McGuire has an outdoor 230 kV switch- yard for Unit 1 and an outdoor 525 kV switchyard for Unit 2, with the two switchyards connected by an auto-transformer; Seabrook has a 345 kV switchyard common to both units. The switchyard is of the metal-enclosed, gas insulated type (SF6).
S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-1 Revision:
Sheet: 8 6 of 9 Chapter Title System/Component FSAR Reference
Section
Significant Similarities
Significant Differences Onsite AC Power System 8.3.1 McGuire and Comanche Peak, except as noted McGuire utilizes two full-size unit auxiliary transformers, each run t half-capacity to supply the onsite distribution system; each Seabrook unit has 2 unit auxiliary transformers and 2 reserve auxiliary transformers.
Comanche Peak has direct connection of the generator to the stepup trans-formers; Seabrook utilizes a generator breaker for this connection.
McGuire connects the ESF buses to the RATs and UATs through the 6.9 kV station buses; Seabrook has direct connections to the RAT and UAT.
McGuire's diesel generators have a rating of 4000 kW @4.16 kV; Comanche Peak's diesel generators have a rating of 7000 kW @6.9 kV; Seabrook diesel generators have a rating of 6083 kW @4.16 kV. McGuire has the capability to manually connect ESF buses between units; Seabrook does not.
McGuire has one cable spreading room for both units;
Seabrook has an independent cable spreading room for each unit.
McGuire has 18 inch horizontal and vertical separation of redundant safety-related cable; Seabrook separation is 3 feet horizontal and 5 feet vertical in general areas and 1 foot horizontal and 3 feet vertical in the cable-spreading room.
S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-1 Revision:
Sheet: 8 7 of 9 Chapter Title System/Component FSAR Reference
Section
Significant Similarities
Significant Differences Onsite DC Power System
8.3.2 McGuire
and Comanche Peak, except as noted. Seabrook uses four 1E batteries (2 for A train and 2 for B train) for safety-related loads.
The four-channel associated UPS units are powered from four separate 1E batteries.
Comanche Peak uses two 1E batteries.
McGuire and Comanche Peak use 250V DC and 125V DC Systems for nonsafety-related loads; Seabrook uses two 125V DC batteries for nonsafety-related loads.
Auxiliary Systems New Fuel Storage
9.1.1 Comanche
Peak, except as not ed. Comanche Peak has a common new fuel storage area.
Spent Fuel Storage
9.1.2 Comanche
Peak, except as noted Comanche Peak has two identical spent fuel pools which are common to both units. Seabrook has separate fuel storage
facilities for each unit.
Spent Fuel Pool Cooling and Clean-up System
9.1.3 Comanche
Peak, except as noted Comanche Peak has two cross-connected loops which service the two common spent fuel pools. Seabrook has a separate system for each unit.
S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-1 Revision:
Sheet: 8 8 of 9 Chapter Title System/Component FSAR Reference
Section
Significant Similarities
Significant Differences Station Service Water System 9.2.1 McGuire, Comanche Peak, Byron/ Braidwood, except as noted McGuire and Byron/Braidwood each have essential and non-essential loops.
Each unit of the Seabrook system is divided into two
independent flow l oops, each supplied by four 100% (for the loop) capacity pumps, as opposed to two 100% capacity pumps.
The ultimate heat sink is site-related.
Cooling System for Reactor Auxiliaries (Primary Component Cooling Water System) 9.2.2 McGuire, Comanche Peak, except as noted The Comanche Peak system is shared between units, with cross-connections between the subsystems serving each unit.
Seabrook has a separate system for each unit.
McGuire utilizes 4-50% capacity pumps supplying a single flow loop for each unit. Each unit of the Seabrook system is divided into two i ndependent flow loops , each supplied by four 100% (for the loop) capacity pumps, as opposed to two 100% capacity pumps.
Chemical and Volume Control System 9.3.4 McGuire, Comanche Peak, Byron/ Braidwood, except as noted Seabrook utilizes degassing of letdown fluid to the volume control tank (as necessary)
Boron Recovery System
9.3.5 Similar
in principle to McGuire, Comanche Peak, Byron/Braidwood The Seabrook system incorporates degassing prior to processing S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-1 Revision:
Sheet: 8 9 of 9 Chapter Title System/Component FSAR Reference
Section
Significant Similarities
Significant Differences Radioactive Waste Management Liquid Waste Management Systems 11.2 Similar in principle to McGuire, Comanche Peak Comanche Peak incorporates a reverse osmosis system to process laundry and hot shower waste.
Gaseous Waste Management System 11.3 McGuire and Comanche Peak systems incorporate hydrogen recombiners and hold wastes in gas decay tanks. Seabrook
has charcoal bed absorbers for radioactive gas decay and gas recycling.
Solid Waste Management System 11.4 Functionally similar to McGuire, Comanche Peak, Byron/Braidwood Seabrook has an asphalt encapsulation system which could be used to solidify waste prior to shipment off site for burial.
Process and Effluent Radiological Monitoring and Sampling Systems 11.5 Functionally similar to McGuire, Comanche Peak, Byron/Braidwood None S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-2 Revision:
Sheet: 10 1 of 17 TABLE 1.3-2 S IGNIFICANT DESIGN C HANGES F ROM PSAR TO FSAR Item FSAR Change Reasons For Change Reference Section Site Characteristics Snowload Basic design snowload value (on ground) decreased from 74 to 66 psf. "Unusual" snowload value increased from 108 to 126 psf. Snowload values redefined based on revised criteria for determining these values presented in Regulatory 1.70, Rev. 3.
2.3, 2.4.2.3 Groundwater Use Onsite groundwater wells are being utilized.
Town of Seabrook decided not to supply 100% of station needs.
2.4.13 Design of Structures Components, Equipment and Systems Wind Loading ANSI A58.1-1972, "Building Code Requirements for Minimum Design Loads on Buildings and Other Structures" used instead of ASCE Paper #3269, "Wind
Forces on Structures," for all structures except for Enclosure Bldg. ANSI is a complete design standard which addresses the material in greater detail than the ASCE paper.
3.3.1, 3.3.2 Design Basis Tornado Maximum tangential velocity Changed from 300 mph to 290 mph. Maximum translational velocity changed from 60 mph to 70 mph. Change was made to comply with Regulatory Guide 1.76.
3.3.2 Circulating
Water Pump House Deleted from list of Category I structures. Not safety-related. 3.2 Tornado Generated Missiles Revised penetration into 24" wall by missiles. NRC permits use of lower value of K = 0.0035 in the modified Petri formula
3.5.3 Procedure
for Combining Modal Responses in Seismic Analysis Formula shown in PSAR for closely spaced modal
changed. To conform to formula given in Regulatory Guide 1.92 3.7.3 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-2 Revision:
Sheet: 10 2 of 17 Item FSAR Change Reasons For Change Reference Section Seismic Monitoring System Location of detectors changed from bottom of reactor vessel to the reactor vessel support.
Most accessible location, removed from high temperature and measures the appropriate acceleration.
3.7.4 Containment
Structure Load table revised to incorporate design basis flood load combination and the notation and factored load conditions of ASME,Section III, Div., 2 Jan. 1975. Incorporate design basis flood effects and load combinations of ASME Sect. III, Div. 2, Jan.
1975. 3.8.1 Containment Analyses Complete fixity at base was changed to unrestrained radial displacement. The entire mat was modeled in the axisymmetric analysis, and this change allows for some mat deformation.
3.8.1.4 Range of Variation in Material Properties Variations not considered. Spreading of peaks on response spectra and use of allowables in ASME B&PV Code, Div.
2, account for uncertainties in material properties.
3.8.1.4, 3.8.3.4, 3.8.4.4, 3.8.5.4 Cadweld Splices Cadweld splices were permitted in all seismic Category I structures, instead of only the Containment.
This will reduce congestion in areas of high rebar density.
3.8.3.6, 3.8.4.6, 3.8.5.6 Reactor Cavity Neutron Shield New structure added over reactor cavity.
To reduce neutron streaming on operating floor. 3.8.3, 12.3 Support on Engineered Backfill Safety-rela ted electrical duct banks and certain manholes are supported on engineered fill instead of
rock. This was the original intent for duct banks.
Manholes on fill are located above service water pipes which are in fill.
3.8.5, 2.5.4 Radiation Dose Environment Increased environmental radiation doses inside Containment after a LOCA. Compliance with Regulatory Guide 1.89.
3.11 Containment Environmental Qualification Temperature Peak temperature and duration of the Containment temperature following a design basis event have been changed to higher values. Results from final analysis for all main steam
line break accidents.
3.11 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-2 Revision:
Sheet: 10 3 of 17 Item FSAR Change Reasons For Change Reference Section Rod Cluster Control Assemblies Increase the number of control rods from 53 to 57. Increase shutdown capability. . 4.0 Delete part length control rods, incorporate reduced
T avg control, and change D bank from 9 rods to 5 rods. Provide improved power distribution control during load follow operations; comply with regulatory restrictions on use of part length
rods 4.0,
7.7 Reactor
Coolant System Overpressure Protection Incorporate reactor coolant system cold overpressurization prevention. Provide for the mitigation of potential reactor coolant system cold overpressurization transients, utilizing existing power-operated relief valves with modification to their actuation logic.
5.2.2, 7.6 Safety Valve Flow Monitoring System Added an Acoustic Accelerometer System.
To detect flow from safety valves.
5.2.5 Containment
Drainage Sump Deleted level indication and added level recording at MCB. To meet requirements of Regulatory Guide
1.45. 5.2.5 Reactor Vessel Provided capability to vent reactor vessel.
Reduce possible H 2 concentration in RV following a LOCA.
5.3 Baffle
to barrel region configuration has been changed from downflow to upflow. Reduce baffle plate and baffle bolt loading and minimize the potential for excessive baffle joint jetting.
5.3, 15.6.5 Reactor Coolant Pump Change to Model 93A1 reactor coolant pump.
Increase th e reliability of the reactor coolant pump. 5.4.1, 5.1 Steam Generator Change from Model D to Model F. Increase the reliability of the steam generator. 5.4.2 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-2 Revision:
Sheet: 10 4 of 17 Item FSAR Change Reasons For Change Reference Section Reactor Coolant Piping Thermal sleeves in the reactor coolant loop branch nozzles have been deleted, except as noted in Subsection 5.4.3.2. Simplify the nozzle design, and show technical improvement.
5.4.3 RCS Main Loop Pipe Break
Criteria Postulated pipe breaks in the main loop piping have been deleted from the design basis when considering the dynamic effects of these breaks. RCS main loop supports and restraints are deleted. Final Rule Modifying GDC-4, issued October
27, 1987 3.1, 3.6, 3.8 3.9, 5.4, 6.2 Main Steamline Isolation Steamline to each steam generator has a single MSIV rather than a stop valve and a check valve. The MSIVs are designed for bidirectional flow; thus check valves are not required.
5.4.5, 10.3 MSIV actuation is pneumatic/hydraulic in lieu of air-piston. As purchased 5.4.5, 10.3 Residual Heat Removal System
Interlocks Interlocks have been revised to reflect an auto-closure setpoint on increasing reactor coolant system pressure greater than 750 psig. Allow full relief valve potential and preclude premature isolation of the Reactor Coolant System low pressure relief protection.
5.4.7 Engineered
Safety Features Containment Design pressure increased from 50.7 to 52 psig. Increase design margin.
6.2, Containment Spray System Increase volume of refueling water storage tank from 375,000 gal to 475,000 gal and spray additive tank from 8400 gal to 10,700 gal. Provide greater margin for manual transfer of ECCS pumps to recirculation mode.
6.2.2 Hydrogen
Recombiners Provide two thermal recombiners (100 scfm) inside each containment, instead of two catalytic-type recombiners (50 scfm) external to containment and
shared between units. Final design evaluation.
6.2.5 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-2 Revision:
Sheet: 10 5 of 17 Item FSAR Change Reasons For Change Reference Section Control Room Static Pressure Control Control room will be kept 0.25" w.g. above atmospheric pressure. The mechanical equipment room and the cable spreading area will be kept slightly above atmospheric pressure. Added protection against infiltration. 6.4.1, 9.4.1 Unit 2 Control Room Air Intake
Structure Relocated approx. 350 feet from center of Unit 2 Containment. To reposition the perimeter fence
6.4.1 Control
Room Makeup Air System Each control room draws air from either or both intakes. Allow for purging of contaminated inlet.
6.4.1 Makeup
air intake changed to vault design to house monitoring equipment. Protection against elements.
6.4.1 Unit makeup air fans controlled from unit control room only. Prevent operators from one unit controlling makeup air supply to other unit control room.
6.4.1 Control
Room HVAC System Controls for the air conditioning equipment are located in the HVAC equipment room. Allow local operation of HVAC equipment while observing performance of the equipment from the control room complex.
6.4.1 Containment
Enclosure Emergency Exhaust Filter System Both filter trains start automatically in the unlikely
event of an accident re quiring filter operation. Conform to single failure criteria.
6.5.1 Emergency
Feedwater System A run-out protection system has been added. Assure continued availability of emergency feedwater to intact steam generators, given a
single failure, following a main feedline break.
6.8 Add manual sectioning valves in common pump
discharge header. Provide capability for isolation of header sections.
6.8 Emergency
feedwater stop check valves are manually operated rather than motor-operated. Increase reliability. 6.8 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-2 Revision:
Sheet: 10 6 of 17 Item FSAR Change Reasons For Change Reference Section Instrumentation and Controls Reactor Trip System Eliminate low feedwater fl ow reactor trip.
Increas e plant availability.
7.2 Delete
reactor trip follo wing turbine trip below 20 percent power. Increase plant availability. 7.2 Deletion of reactor trip from reactor coolant pump breaker trip.
Replaced with undervoltage and underfrequency sensors on load side of breakers which are located in a seismic Category I structure.
7.2 High Energy Line Break Sensing System Added redundant safety grade instrumentation to sense and isolate high energy lines in PAB and containment
enclosure areas. To mitigate the effects of harsh environmental conditions generated by HELB on safety-related equipment.
7.7.3, 7.6.10, 9.3.4.5, 10.4.8.6a, 10.4.11.5 Reactor Vessel Level Instrumentation System Added redundant safety grade instrumentation to monitor the reactor vessel level or relative void content of the primary coolant system fluid. To meet the requirements of NUREG-0737.
1.9 ESF Actuation System An improved Steam Line Break Protection System has been incorporated. Increase plant availability by preventing spurious safety injection Actuation.
7.3 Containment
pressure setpoints for closure of main steam and feedwater isolation valves revised to
coincide with Phase A isolation. To improve station availability. 7.3 Initiation of recirculation and subsequent valve alignment for containment spray system changed from manual to automatic. To improve reliability. 7.3, 7.6 Remote Shutdown Panels Several additional instrumentation and control channels added. Expand shutdown capability from outside the control room.
7.4 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-2 Revision:
Sheet: 10 7 of 17 Item FSAR Change Reasons For Change Reference Section RWST Instrumentation Range of recirculation actuation channels has been revised. Meet accuracy requirements. 7.5, 6.3.5 Post-Accident Hydrogen Control System Added a Class 1E hydrogen analyzer on a per train
basis. To measure hydrogen concentration from 0 to 10/20 percent.
7.5 Reactor
Coolant Loops Added two temper ature differential recorders on front on MCB. To record hot-leg-minus cold-leg temperature differential on two loops.
7.5 Containment
Pressure Instrumentation Upgraded to provide redundant safety grade instrumentation from -5 psi to +5 psi and from zero to 3 times design pressure. To meet ACRS recommendations and Regulatory Guide 1.97 requirements for post-accident monitoring.
7.5 Containment
Sump Added redundant safety grade instrumentation to measure containment sump level up to 600,000 gallons. To meet TMI requireme nts for post- accident monitoring.
7.5 Reactor
Coolant Instrumentation Added a safety grade thermal margin (saturation) calculator, with indication on MCB. To show pressure temperature safety margin for alerting the operator of possible pending
reactor coolant flashing.
7.5 Steam
Dump System Reactor trip signal (P
- 4) is used instead of turbine trip signal (C8) in Steam Dump Control System. To improve system performance.
7.7, 10.4.4 Incore Flux Monitoring System Change from moveable only system to fixed/ moveable system (including incore thermocouples). Increase flux monitoring.
7.7 4.0 Electric Power In-Plant Distribution System Additions and deletions of equipment made to 13.8 kV, 4.16 kV and 480V systems. To accommodate design improvements and provide for load growth. 8.3.1 (Figure 8.3-
- 1) 120V AC Vital Instrument
Power Added two Class 1E uninterruptible power supplies. Increase diversity and reliability of the system. 8.3.1 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-2 Revision:
Sheet: 10 8 of 17 Item FSAR Change Reasons For Change Reference Section Standby Power Supply Increased diesel-generator rating from 5500 kW to 6083 kW. Provide additional margin for future load growth. 8.3.1 Standby Power Supply
Acceptance Tests Changed testing program to conform to IEEE-387. Compliance with latest requirements.
8.3.1 Excore
Flux Monitoring System Added Class 1E system for monitoring reactivity during operation and after remote safe shutdown. To meet the requirements of Regulatory Guide 1.97 and NUREG-0737. 7.4 (Table 7.4-1)
7.5 Standby
Power Supply
Protective Devices Low lube oil pressure has been added to those D-G trips which are never bypassed in any mode of operation. To minimize the possibility of a spurious trip, multiple low lube oil signals are conditioned by a logic circuit. Low lube oil pressure is alarmed prior to trip. Since loss of lube oil results in eventual major failure of the equipment, a reliable trip signal provides a means of initiating repair to the lubricating system before major failures occur.
8.3.1 Raceways
Allowable fill in raceways containing 480 volt medium and small size power cables has been increased from 30 to 40 percent by volume. Previous criteria overly conservative.
8.3.1 DC Power System Two additional station batteries added to supply the major nonvital loads, such as the turbine related DC motors. Provide increased capacity on safety- related DC buses, and eliminate large nonsafety-related motor loads from safety-related buses.
8.3.2 Auxiliary
Systems Spent Fuel Storage Storage capacity increased from 1 1/3 cores to 1236 assemblies.
Increase storage capacity.
9.1.2 Fuel Handling Fuel Storage Building maintained at a negative pressure, and all exhaust air is filtered prior to
discharge whenever irradiated fuel is handled outside the shipping cask. To meet the requirements of Regulatory Guide 1.13 and Regulatory 1.25.
9.1.2 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-2 Revision:
Sheet: 10 9 of 17 Item FSAR Change Reasons For Change Reference Section Spent Fuel Pool Cooling and Cleanup System Additional spent fuel pool heat ex- changer included in system. Increase thermal capacity to accommodate a full spent fuel pool, including a full core offload. 9.1.3 Primary Component Cooling Water (PCCW) System Delete loop cross-connection at spent fuel pool heat
exchanger. A second spent fuel pool heat ex- changer has
been added.
9.2.2 Added
redundant loop of safety class to RCP thermal
barriers. To provide more reliability with respect to RCP seal cooling.
9.2.2 PCCW Head Tank Relief and Vent Line with Automatic Isolation Replaced with an overflow to the floor drain tanks which are vented to the aerated vent system. To accommodate increases in PCCW inventory due to tube leakage into the PCCW system, while protecting against
overpressurization.
9.2.2 Demineralized
Water Makeup System Add Waste Processing Building equipment as loads for initial fill and maintenance flushing. Equipment loads transferred from Reactor Makeup Water System to reduce tritium exposure to plant personnel during maintenance.
9.2.3 Makeup
Demineralizer Train Access is provided to water from the fire water storage tanks. Backup to normal city water supply.
Potable and Sanitary Water System Potable Water System supplies makeup to fire water tanks, demineralizer system and cooling tower. Potable Water System usage expanded.
9.2.4 Added
water supply from onsite wells and offsite Hampton Falls wells.
Increase reliability of potable water supply.
9.2.4, 2.4.13 Ultimate Heat Sink Delete considerations of available time for transfer to cooling tower (manually).
Transfer to cooling tower effected automatically.
9.2.5 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-2 Revision:
Sheet: 10 10 of 17 Item FSAR Change Reasons For Change Reference Section Tower actuation channel sensors changed to measure pressure in the Service Water System instead of level in the forebay. To improve system reliability. 9.2.5 Tower missile protection. Update design to missile protect service water piping only.
9.2.5 Add changes to reflect use of tower for tunnel heat treatment. Additional function of cooling tower.
9.2.5 Condensate
Storage Tank Change material from aluminum to stainless steel and added floating cover. Reduce cost and maintain better water quality by minimizing O 2 absorption.
9.2.6 Instrument
Air System Two of the three air system compressors are powered from the diesel generators in addition to the non-1E
bus. Provide flexibility for loss of offsite power operation.
9.3.1 Compressed
Air System Added redundant instrument air head er. Enhance reliability.
9.3.1 Process
Sampling Systems Added primary coolant sampling capability. Provide prompt sample of reactor coolant under high radioac tivity conditions.
9.3.2 Gross
Failed Fuel Detector
Package Deleted; sample system piping rearranged to accommodate the deletion.
Failed fuel detection is provided by the reactor coolant letdown gross activity monitor in the sample line from the letdown heat exchanger outlet. 9.3.2 Chemical and Volume Control System Eliminate number 1 seal bypass on the reactor coolant pumps. In the pump design, seal injection is physically above the main radial bearing, and the seal bypass function is no longer required to maintain bearing cooling.
9.3.4 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-2 Revision:
Sheet: 10 11 of 17 Item FSAR Change Reasons For Change Reference Section Letdown degasifier changed from Safety Class 3 to NNS. Quality was downgraded because accidental releases were within acceptable limits of Regulatory Guide 1.26.
Boron Recovery System (BRS) BRS evaporator non-condensible gases are vented to the aerated vent header, not the Radioactive Gaseous Waste System. All radioactive liquids entering BRS have been degasified.
9.3.5 Control
Room Air Conditioning System Add bypass damper from supply air duct to HVAC equipment room. Allow operation of both air conditioning systems without over-cooling the control room. 9.4.1 Additional air conditioning equipment provided for computer room cooling. To maintain lower temperature conditions for computer equipment 9.4.1 Fuel Storage Building Normal Exhaust System Normal exhaust fan added. Reduce negative pressures required of PAB exhaust fans.
9.4.2 Fuel Storage Building Ventilation Supply System Modulating supply air dampers added.
Enhances control of negative pressure required during fuel handling and emergency operating mode. 9.4.2 Primary Auxiliary Building Supply Air System Supply ducts are not installed into potentially contaminated areas. Backdraft dampers are installed on transfer openings. Spare supply fan and a spare exhaust fan are provided to maintain system balance.
9.4.3 Waste
Processing Building Exhaust System Potentially contaminated areas exhausted through
HEPA filters. Maintain offsite doses as low as reasonably
achievable.
9.4.4 Exhaust
booster fans added. Reduce negative pressure required of main exhaust fans.
9.4.4 Emergency
exhaust fan added for hydrogen surge tank area. Eliminate possibility of hydrogen gas accumulation in event of a hydrogen leak.
9.4.4 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-2 Revision:
Sheet: 10 12 of 17 Item FSAR Change Reasons For Change Reference Section Waste Solidification System Changed from a polymer-based to an asphalt-based system. To meet Regulatory Guide 1.143 requirements.
11.4 Waste Processing Building Ventilation System Ventilation systems added for boron waste tank, refueling water storage tank, and reactor makeup water storage tank areas. Maintain upper temperature limit for tank
areas. 9.4.4 Waste Processing Building Air Conditioning System Air conditioning system added for ambient carbon delay bed areas. Increase efficiency of ambient carbon delay
beds. 9.4.4 Containment Purge Systems Added Containment Online Purge System. Decreases size of open containment penetrations during reactor operation and
allow purging during reactor operation.
9.4.5 Containment
Enclosure Cooling System Ductwork is partially not redundant. Passive component. Redundancy not required except where a single event could affect redundant cooling system.
9.4.6 Electrical
Penetration Area Air Conditioning System Add air conditioning system. Required to maintain proper environment for equipment during normal operation.
9.4.7 Diesel
Generator Building Ventilation System Delete return and exhaust dampers. Prevent smoke and heat from affecting redundant diesel generators.
9.4.8 Cable
Spreading Area Ventilation System Control of ventilating fans will be local at MCC.
Eliminate routing of control cables through the
cable spreading area in accordance with BTP
9.5-1. 9.4.9 Switchgear Room Ventilation System Each switchgear room has a single supply fan, a single return fan, and a single duct system. Switchgear rooms are redundant.
9.4.10 Emergency Feedwater Pump House Heating and Ventilating System Add Heating and Ventilating System. Required to maintain proper environment for equipment.
9.4.11 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-2 Revision:
Sheet: 10 13 of 17 Item FSAR Change Reasons For Change Reference Section Service Building RCA Area Air Conditioning Air conditioning unit uses 100% outside air.
Enhances control of negative pressures and air flow pattern between areas.
9.4.12 Service Building RCA Area Exhaust System Added HEPA filters. Maintain offsite doses as low as reasonably achievable 9.4.12 . Service Building RCA Area Air System Counting room uses outside air for ventilation. Enhances control of negative pressures. 9.4.12 Service Water Pump House Switchgear Rooms Ventilating System A single Train A and a single Train B ventilating
supply air fans furnish outsi de ventilation air to both switchgear rooms. Switchgear rooms are redundant.
9.4.13 Service Water Cooling Tower Heating and Ventilating System Add Heating and Ventilating System. Required to maintain proper environment for equipment.
9.4.14 Fire Protection System Delete control room complex fixed CO 2 system. Maintain habitability. 9.5.1 Fire Protection System Delete cable spreading room fixed CO 2 system, and add deluge sprinkler system. Conform to BTP 9.5-1.
9.5.1 Add cable spreading room, turbine lube oil storage tank, hydraulic fluid power unit, and diesel fuel oil storage tank deluge systems. Conform to BTP 9.5-1.
9.5.1 Delete
standby reserve auxiliary transformer and station auxiliary transformer systems. Transformers eliminated.
9.5.1 Add photoelectric detectors. Use where best suited.
9.5.1 Change
panel power supply to 120V AC power normal and 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> self-contained battery backup emergency
power. Provide backup power supply.
9.5.1 Add computer room Halon system. Maintain habitability. 9.5.1 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-2 Revision:
Sheet: 10 14 of 17 Item FSAR Change Reasons For Change Reference Section Add diesel generator fuel oil day tank deluge system. Conform to BTP 9.5-1.
9.5.1 Delete
cable tunnels and electrical penetration areas deluge systems. Add preaction systems to above areas. Protection against inadvertent operation.
9.5.1 Add standpipes and hose stations to Diesel Generator Building, Control Building, Waste Processing Building, Primary Auxiliary Building, equipment vaults, Emergency Feedwater Pump Building, Containment Building and Fuel Storage Building. Conform BTP 9.5-1 9.5.1 Fire Protection System Add backup water supply to stand-pipe system from service water system. Provide reliable backup water supply to conform to BTP 9.5-1.
9.5.1 Add automatic sprinkler system coverage to certain areas in the Turbine Generator Building and the
feedwater heater bay. ANI requirements.
9.5.1 Add manually operated open head sprinklers for turbine generator bearings and lube oil lines. Prevent inadvertent operation.
9.5.1 Fire system piping in areas containing Category I equipment is seismically supported as required for a Category I system. All fire system piping in Category I equipment areas is dry pipe
9.5.1 Added
fire detection in several areas. To meet NFPA code requirements.
9.5.1 Added
fire suppression in several areas. To meet BTP 9.5-1 requirements.
9.5.1 Main Condensers Tube material changed from copper-nickel to titanium. Improve reliability.
10.4.1 Tube sheet material changed from copper- nickel to aluminum bronze. To be compatible with titanium tubes. 10.4.1 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-2 Revision:
Sheet: 10 15 of 17 Item FSAR Change Reasons For Change Reference Section Mechanical vacuum pumps used in place of steam jet air ejectors for air evacuation. Simplify operations.
10.4.2 Feedwater Isolation Valves Actuation is pneumatic in lieu of motor- operated.
As purchased.
10.4.7 Steam Generator Blow- down System Blowdown evaporators are natural circulation, internal heating elements, not forced circulation. Natural circulation units are adequate and less costly. 10.4.8 Added a recycle subsystem To reduce site water consumption.
10.4.8 Circulating Water System Added chlorination subsystem for circulating water piping. Reduce marine growth in tunnel.
10.4.9 Radioactive Waste Management Systems Liquid Waste System All filters are cartridge-typ e, not backwashable. Economic evaluation.
11.2 Steam generator blowdown processing is performed by blowdown demineralizers. Steam generator blowdown system is provided with demineralizers for secondary system
water reuse.
11.2 Appendix 11A Hydrogenated drain collection system deleted. Equipment drains will not be recycled. 11.2 Liquid waste system, boron recovery system, and steam generator blowdown system all release directly to the circulating water discharge Minimize contamination of the service water system. 11.2 Aerated waste recovery system deleted.
Volume of equipment drains which could be collected by this system did not warrant a separate collection system.
11.2 Process and Effluent Radiological Monitoring and Sampling Systems Added radiation monitoring instrumentation for main steam lines. Detect radiation resulting from steam generator tube rupture.
11.5 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-2 Revision:
Sheet: 10 16 of 17 Item FSAR Change Reasons For Change Reference Section Radiation monitoring system changed from an analog system to a digital computer based system. Improve system efficiency and reliability. 11.5,12.3.4 Process and Effluent Radiological Monitoring and Sampling Systems Additional radiation monitoring channels have been
added. Improve system efficiency and reliability. 11.5 Radiation monitors on component cooling surge tank vent lines provide no control function, alarm only. Design evolution.
11.5 Steam generator blowdown monitors shut only the blowdown flash tank discharge on high radiation, not the blowdown isolation valves. Design evolution.
11.5 Service water system monitor has been deleted. Sensitivity requirements for the detector would far exceed those commercially available.
11.5 11.5, 9.2.1 Loose Parts Detection System System added. To meet the requirements of Regulatory Guide 1.133.
4.4.6.4 Personnel Protection Access control card readers and alarms added to control access to Zone IV and V areas. To improve reliability and protection. 12.1 Control Room Air Intake Monitors The airborne particulate radioactivity monitors have been changed to in-line GM tubes designed to operate on gross radiation increase. To improve system efficiency.
12.3.4 Radiation Monitoring System Additional in-line gross gamma detectors added in various ventilation ducts. Help locate sources of contamination quickly.
12.3.4 Containment Online Purge System Add automatic isolation of the containment isolation valves on high radiation in the containment. To improve safeguards.
12.3.4 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.3-2 Revision:
Sheet: 10 17 of 17 Item FSAR Change Reasons For Change Reference Section Containment Refueling Purge System Add automatic isolation of the containment isolation valves on high radiation in the containment. To improve safeguards.
12.3.4 Area Radiation and Airborne Radioactivity Monitoring Extended upper range of plant vent stack monitors from 10 2 ci/cc to 10 5 ci/cc and the in-containment post-LOCA monitors from 10 7 rads/hr to 10 8 rads/hr. Quantify high level releases.
12.3.4 Added containment post-LOCA radiation monitors. Provide instrumentation capable of withstanding post-LOCA environment in containment 12.3.4 Onsite Technical Support Center Added in Control Building at elevation 75'. Provide area for display and transmission of plant status, and for technical consultation during an emergency situation.
13.3 Onsite Operational Support Center Added onsite area for this purpose. Provide assembly area for shift personnel during an emergency situation.
13.3 Shutdown Monitor A safety-related excore nuclear instrumentation system and shutdown monitor have been added. To comply with the guidance of Regulatory Guide 1.97 and to provide additional indication to the operators of a boron dilution
event. 7.6.10 Inadequate Core Cooling Instrumentation (ICCI) An ICCI system has been added to monitor reactor vessel level, core differential pressure, core exit temperatures, and subcooling margin. To comply with the requirements of NUREG-0737.
Later Safety Parameter Display System (SPDS) A SPDS was incorporated into the Main Plant Computer System. To comply with the requirements of NUREG-0737, Supplement 1.
Later Instrument Sensing Line Installation The design criteria for instrument line installation has been modified to comply with Regulatory Guide 1.151. To comply with Regulatory Guide 1.151.
7.1.2.12 S EABROOK S TATION U F S A R I NTRODUCTION A ND GENERAL D ESCRIPTION OF P LANT TABLE 1.5-1 Revision:
Sheet: 8 1 of 1 TABLE 1.5-1 J-L OOP PHASE I T EST P ARAMETERS Parameters Nominal Value Initial Steady State Conditions Pressure 1250 to 2250 psia Test section mass velocity 2.3 to 2.5x10 6 lb/hr-ft 2 Core inlet temperature 560 F to 600 F Maximum heat flux 306,000 to 531,000 Btu/hr-ft 2 Transient Ramp Conditions Pressure decrease 0 to 350 psi/sec and subcooled depressurization from 2250 psia Flow decrease 0 to 100%/sec Inlet enthalpy Constant S EABROOK S TATION U F S A R I NTRODUCTION AND GENERAL D ESCRIPTION OF P LANT TABLE 1.5-2 Revision:
Sheet: 8 1 of 1 TABLE 1.5-2 PHASE II T EST P ARAMETERS Parameters Nominal Value Initial Steady State Conditions Pressure 2250 psia Test section mass velocity 2.5x10 6 lb/hr-ft 2 Inlet coolant temperature 560 F Maximum heat flux 531,000 Btu/hr-ft 2 Transient Conditions Simulated break Double-ended cold leg guillotine breaks
S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL D ESCRIPTION OF P LANT TABLE 1.6-1 Revision:
Sheet: 10 1 of 9 TABLE 1.6-1 T OPICAL REPORTS I NCORPORATED B Y R EFERENCE Report Reference Section(s) "Single Phase Local Boiling and Bulk Boiling Pressure Drop Correlations," WCAP-2850 (Proprietary), April 1966 and WCAP-7916, June 1972.
4.4 "Hydraulic Tests of the San Onofre Reactor Model," WCAP-3269-8, June 1964.
4.4 "LEOPARD - A Spectrum Dependent Non-Spatial Depletion Cod for the IBM-7094,"
WCAP-3269-26, September 1963e 4.3, 9.1, 15.0 "Control Procedures for Xenon-Induced X-Y Instabilities in Large PWRs," WCAP-3680-21, (EURAEC-2111), February 1969.
4.3 "Xenon-Induced Spatial Instabilities in Three-Dimensions," WCAP-3680-22 (EURAEC-2116), September 1969.
4.3 "Pressurized Water Reactor pH - Reactivity Effect Final Report," WCAP-3696-8 (EURAEC-2074), October 1968.
4.3 "Melting Point of Irradiated UO 2" WCAP-6065, February 1965.
4.2 "SATAN-VI Program: Comprehensive Space-Time Dependent Analysis of Loss-of-Coolant,"
WCAP-6174, June 1974.
6.2 "The TURTLE 24.0 Diffusion Depletion Code," WCAP-7213-P-A (Proprietary) and WCAP-7758-A (Nonproprietary), February 1975.
15.0, "A Comprehensive Space-Time Dependent Analysis of Loss-of- Coolant (SATAN-IV Digital Code)," WCAP-7263, August 1971 (Proprietary) and WCAP-7750 (Nonproprietary), August
1971. 3.6(N) "Solid-State Logic Protection System Description," WCAP-7488-L, (Proprietary) January 1971 and WCAP-7672 (Nonproprietary), June 1971.
7.2, 7.3 "Radiological Consequences of a Fuel Handling Accident," WCAP-7518-L (Proprietary) July 1971 and WCAP-7828 (Nonproprietary), December 1971.
15.7 "Seismic Vibration Testing with Sine Beats," WCAP-7558, October 1971.
3.10(N) "An Evaluation of the Rod Ejection Accident in Westinghouse Pressurized Water Reactors Using Spatial Kinetics Methods," WCAP-7588, Revision 1A, January 1975.
15.4 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL D ESCRIPTION OF P LANT TABLE 1.6-1 Revision:
Sheet: 10 2 of 9 Report Reference Section(s) "Interchannel Thermal Mixing with Mixing Vane Grids," WCAP-7667-P-A (Proprietary), January 1975 and WCAP-7755-A, January 1975.
4.4 "Testing of Engineered Safety Features Actuation System," WCAP-7705, Revision 2, January 1976. (Information only; i.e., not a generic topical WCAP.)
7.3 "An Evaluation of Solid-State Logic Reactor Protection in Anticip ated Transients," WCAP-7706-L (Proprietary) and WCAP-7706 (Nonproprietary), July 1971.
4.6, 7.1, 7.2 "Electric Hydrogen Recombiner for PWR Containments," WCAP-7709 (Proprietary) and WCAP-7820, Supplements, 1, 2, 3, 4 and 5 (Nonproprietary).
6.2 "Sensitized Stainless Steel in Westinghouse PWR Nuclear Steam Supply Systems,"
WCAP-7735, August 1971.
5.2 "Overpressure Protection for Westinghouse Pressurized Water Reactors," WCAP-7769, October 1971. 15.2 "Overpressure Protection for Westinghouse Pressurized Water Reactors," WCAP-7769, Revision 1, June 1972.
5.2 "Nuclear Fuel Division Quality Assurance Program Plan," WCAP-7800, Revision 5, December 1977. 17.3 "Behavior of Austenitic Stainless Steel in Post Hypothetical Loss-of-Coolant Accident Environment," WCAP-7803, December 1971.
6.1 "Power Distribution Control of Westinghouse Pressurized Water Reactors," WCAP-7811, December 1971.
4.3 "Evaluation of Protective Coatings for Use in Reactor Containments," WCAP-7825, December 1971. 6.1 "Evaluation of Steam Generator Tube, Tube Sheet, and Divider Plate Under Combined LOCA Plus SSE Conditions," WCAP-7832-A, April 1978.
5.4 "Neutron Shielding Pads," WCAP-7870, May 1972.
3.9(N) "LOFTRAN Code Description," WCAP-7907, October 1972. 5.2, 15.0, 15.3, 15.5 "MARVEL, A Digital Computer Code for Transient Analysis of a Multiloop PWR System," WCAP-7909, June 1972.
6.3 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL D ESCRIPTION OF P LANT TABLE 1.6-1 Revision:
Sheet: 10 3 of 9 Report Reference Section(s) "Process Instrumentation for Westinghouse Nuclear Steam Supply System (4 Loop Plant using WCID-7300 Series Process Instrumentation)," WCAP-7913, January 1973.
7.2, 7.3 "Damping Values of Nuclear Power Plant Components," WCAP-7921-AR, May 1974.
1.8, 3.7(N) "Basis for Heatup and Cooldown Limit Curves," WCAP-7924-A, April 1975.
5.3 "Effect of Axial Spacing on Interchannel Thermal Mixing with the R Mixing Vane Grid,"
WCAP-7941-P-A (Proprietary), January 1975 and WCAP-7959-A, January 1975.
4.4 "THINC-IV An Improved Program for Thermal-Hydraulic Analysis of Rod Bundle Cores,"
WCAP-7956, June 1973.
4.4 "Axial Xenon Transient Tests at the Rocheste r Gas and Electric Reactor," WCAP-7964, June 1971. 4.3 "Application of the THINC IV Program to PWR Design," WCAP-8054 (Proprietary), October 1973, and WCAP-8195, October 1973.
4.4 "Pipe Breaks for the LOCA Analysis of the Westinghouse Primary Coolant Loop,"
WCAP-8082-P-A, January 1975 (Proprietary) and WCAP-8172-A (Nonproprietary), January 1975. 3.6(N) "A Summary Analysis of the April 30 Incident at the San Onofre Nuclear Generating Station Unit 1," WCAP-8099, April 1973.
5.3 "Reactor Coolant Pump Integrity in LOCA," WCAP-8163, September 1973.
5.4 "Calculation Model for Core Reflooding After a Loss-of-Coolant Accident (WREFLOOD Code)," WCAP-8170 (Proprietary) and WCAP-8171 (Nonproprietary), June 1974.
6.2, 15.6 "Operational Experience with Westinghouse Cores," (Up to December 31, 1977) WCAP-8183, Revision 7, March 1978.
4.2 "Fuel Densification Experimental Results and Model for Reactor Application," WCAP-8218-P-A (Proprietary), and WCAP-8219-A (Nonproprietary), March 1975. 1.8, 4.1, 4.2, 4.3, 4.4 "Safety Analysis of the 17x17 Fuel Assembly for Combined Seismic and Loss-of-Coolant Accident," WCAP-8236 (Proprietary) and WCAP-8288 (Nonproprietary), December 1973.
3.7(N), 4.2 "Safety Analysis of the 8-Grid 17x17 Fuel Assembly for Combined Seismic and Loss-of-Coolant Accident," WCAP-8236, Addendum 1 (Proprietary), March 1974 and WCAP-8288, Addendum 1 (Nonproprietary), April 1974.
3.7(N)
S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL D ESCRIPTION OF P LANT TABLE 1.6-1 Revision:
Sheet: 10 4 of 9 Report Reference Section(s) "Documentation of Selected Westinghouse Structural Analysis Computer Codes," WCAP-8252, April 1974.
3.6(N), 3.9(N) "Source Term Data for Westinghouse Pressurized Water Reactors," WCAP-8253, Amendment 1, July 1975.
11.1 "Nuclear Instrumentation System," WCAP-8255, January 1974. (Additional background information only.)
7.2, 7.7 "Hydraulic Flow Test of the 17x17 Fuel Assembly," WCAP-8278 (Proprietary) and WCAP-8279 (Nonproprietary), February 1974.
4.2 "The Effect of 17x17 Fuel Assembly Geometry on Interchannel Thermal Mixing,"
WCAP-8298-P-A (Proprietary), January 1975 and WCAP-8299-A, January 1975.
4.4 "LOCTA-IV Program: Loss-of-Coolant Transient Analysis," WCAP-8301 (Proprietary) and WCAP-8305 (Nonproprietary), June 1974.
15.0, 15.6 "SATAN-VI Program: Comprehensive Space Time Dependent Analysis of Loss-of-Coolant,"
WCAP-8302 (Proprietary) and WCAP-8306 (Nonproprietary), June 1974.
15.0, 15.6 "Prediction of the Flow-Induced Vibration of Reactor Intern als by Scale Model Tests," WCAP-8303-P-A (Proprietary) and WCAP-8317-A (Nonproprietary), July 1975.
3.9(N) "Westinghouse Mass and Energy Release Data for Containment Design," WCAP-8312-A, August 1975.
6.2 "Control of Delta Ferrite in Austenitic Stainless Steel Weldments," WCAP-8324-A, June 1975.
1.8, 5.2 "Containment Pressure Analysis Code (COCO)," WCAP-8327 (Proprietary) and WCAP-8326 (Nonproprietary), June 1974.
15.6 "Westinghouse Anticipated Transients Without Reactor Trip Analysis," WCAP-8330, August 1974 4.3, 4.6, 15.1, 15.2, 15.8 "Westinghouse Emergency Core Cooling System Evaluation Model-Summary," WCAP-8339, June 1974.
6.2, 15.6 "Westinghouse ECCS -- Plant Sensitivity Studies," WCAP-8340 (Proprietary) and WCAP-8356 (Nonproprietary), July 1974.
15.6 "Westinghouse ECCS Evaluation Model Sensitivity Studies," WCAP-8341 (Proprietary) and WCAP-8342 (Nonproprietary), July 1974.
15.6 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL D ESCRIPTION OF P LANT TABLE 1.6-1 Revision:
Sheet: 10 5 of 9 Report Reference Section(s) "Westinghouse Nuclear Energy Systems Divisions Quality Assurance Plan," WCAP-8370, Revision 7A, February 1975.
17.1 "Westinghouse Water Reaction Divi sion Quality Assurance Plan," WCAP-8370, Revision 8A, September 1977, and Revision 9A, October 1979.
17.1 "Westinghouse Water Reactor Division Quality Assurance Plan," WCAP-8370/7800, Revision 10A/6A, November 1984 17.1 "Revised Clad Flattening Model," WCAP-8377 (Proprietary) and WCAP-8381 (Nonproprietary), July 1974.
4.2 "An Evaluation of Loss of Flow Accidents Caused by Power System Frequency Transients in Westinghouse PWRs," WCAP-8424, Revision 1, June 1975.
15.3 "17x17 Drive Line Components Tests - Phase IB, II, III, D-Loop Drop and Deflection," WCAP-8446 (Proprietary) and WCAP-8449 (Nonproprietary), December 1974.
3.9(N) "Westinghouse ECCS Evaluation Model -- Supplementary Information," WCAP-8471 (Proprietary) and WCAP-8472 (Nonproprietary), April 1975.
15.6 "UHI Plant Internals Vibration Measurement Program and Pre and Post Hot Functional Examinations," WCAP-8516-P (Proprietary) and WCAP-8517 (Nonproprietary), April 1975.
3.9(N) "Westinghouse ECCS-Four Loop Plant (17x17) Sensitivity Studies," WCAP-8565-P-A (Proprietary) and WCAP-8566-A (Nonproprietary), July 1975.
15.6 "The Application of Preheat Temperatures after Welding Pressure Vessel Steels," WCAP-8577, February 1976.
1.8 "Failure Mode and Effects Analysis (FMEA) of the Engineering Safeguard Features Actuation System," WCAP-8584 (Proprietary) and WCAP-8760 (Nonproprietary), April 1976.
4.6, 7.3 "Methodology For Qualifying Westinghouse PWR-SD Supplied NSSS Safety-Related Electrical Equipment," WCAP-8587, Revision 6, November 1983.
1.8, 3.11(N) "Methodology for Qualifying Westinghouse WRD Supplied NSSS Safety-Related Electric Equipment," WCAP-8587, Revision 2, February 1979.
3.10(N) "Westinghouse ECCS Evaluation Model -- October 1975 Version," WCAP-8622 (Proprietary) and WCAP-8623 (Nonproprietary), November 1975.
15.6 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL D ESCRIPTION OF P LANT TABLE 1.6-1 Revision:
Sheet: 10 6 of 9 Report Reference Section(s) "General Method of Developing Multi-frequency Biaxial Te st Inputs for Bistables," WCAP-8624 (Proprietary) September 1975 and WCAP-8695 (Nonproprietary), August 1975.
3.10(N) "Fuel Rod Bow Evaluation," WCAP-8691 Revision 1 (Proprietary) and WCAP-8692 Revision 1 (Nonproprietary), July 1979.
4.2 "Delta Ferrite in Production Austenitic Stainless Steel Weldments," WCAP-8693, January 1976.
1.8, 5.2 "MULTIFLEX-A Fortran-IV Computer Program for Analyzing Thermal-Hydraulic-Structure System Dynamics," WCAP-8708, (Proprietary) and WCAP-8079 (Nonproprietary), February
1976. 3.9(N) "Improved Analytical Models Used in Westinghouse Fuel Rod Design Computations,"
WCAP-8720 (Proprietary) and WCAP-8785 (Nonproprietary), October 1976.
4.2 "Verification of Neutron Pad and 17x17 Guide Tube Designs by Preoperational Tests on the Trojan 1 Power Plant," WCAP-8766 (Proprietary) and WCAP-8780 (Nonproprietary), May
1976. 3.9(N) "Safety-Related Research and Development for Westinghouse Pressurized Water Reactors, Program Summaries," WCAP-8768, latest revision.
1.5 5.4 "Mass and Energy Releases Following A Steam Line Rupture," WCAP-8822, September 1976.
6.2 "Westinghouse 7300 Series Process Control System Noise Tests," WCAP-8892-A, June 1977.
7.1, 7.2 "Benchmark Problem Solutions Employed for Verification of the WECAN Computer Program,"
WCAP-8929, June 1977.
3.9(N) "Safety Analysis for the Revised Fuel Rod Internal Pressure Design Basis," WCAP-8963 (Proprietary), November 1976 and WCAP-8964 (Nonproprietary), August 1977.
4.2 "Failure Mode and Effects Analysis (FMEA) of the Solid-State Full Length Rod Control System," WCAP-8976, September 1977.
4.6 "Inlet Orificing of Open PWR Cores," WCAP-9004, (Proprietary) January 1969 and WCAP-7836, (Nonproprietary) January 1972.
4.4 "Properties of Fuel and Core Component Materials," WCAP-9179, Revision 1 (Proprietary),
July 1978.
4.2 "Westinghouse ECCS Evaluation Model, February 1978 Version," WCAP-9220-P-A (Proprietary Version), WCAP-9221-P-A (Nonproprietary Version), February 1978.
6.2 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL D ESCRIPTION OF P LANT TABLE 1.6-1 Revision:
Sheet: 10 7 of 9 Report Reference Section(s) "Reactor Core Response to Excessive Secondary Steam Releases," WCAP-9226 (Proprietary), WCAP-9227 (Nonproprietary), January 1978.
15.1 "Report on the Consequences of a Postulated Main Feedline Rupture," WCAP-9230 (Proprietary) and WCAP-9231 (Nonproprietary), January 1978.
15.2 "Combination of Safe Shutdown Earthquake and Loss-of-Coolant Accident Responses for Faulted Condition Evaluation of Nuclear Power Plants," WCAP-9279, March 1978.
3.9(N) "Integrity of Primary Piping System of Westinghouse Nuclear Power Plants During Postulated Seismic Events," WCAP-9283, March 1978.
3.9(N) "Dynamic Fracture Toughness of ASME SA508 Class 2a and ASME SA533 Grade A Class 2 Base and Heat Affected Zone Material and Applicable Weld Metal," WCAP-9292, March 1978.
5.2 "COMPRESS, A Code for Calculating Subcompartment Pressure Responses," UEC-TR-004-1, July 1976.
6.2 "Prediction of Containment Pressure-Temperatu re Transients Using CONTRAST-S, A Digital Computer Program," UE&C-TR-006-0, March 1976.
6.2 "Quality Assurance Program," UE&C-TR-001-05A, March 21, 1978.
17.1 "Fire Protection System Evaluation and Comparison to Branch Technical Position APCSB 9.5-1, Appendix A," August 1977.
9.5 "A Method for Computing the Gamma-Dose Integrals I 1 and II 2 for the Finite Cloud Sector-Averaged Model," YAEC-1105, April 1976.
2.3 "Technical Bases for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for Seabrook Units 1 and 2," WCAP-10567, (Proprietary), June 1984 WCAP-10566, (Nonproprietary), June 1984.
3.6(N) "The 1981 Version of the Westinghouse ECCS Evaluation Model Using the BASH Code," WCAP-10266-P-A Rev. 2 (Proprietary) and WCAP-11524-A (Nonproprietary), March 1987.
15.6 Special Report NS-NRC-85-3025(NP), "BART-WREFLOOD Input Revision." 15.6 "BART-A1: A Computer Code for the Best Estimate Analysis of Reflood Transients",
WCAP-9561, January 1980.
15.6 "NOTRUMP - A Nodal Transient Small Break and General Network Code",
WCAP-10079-P-A (Proprietary) and WCAP-10080-A (Nonproprietary), August 1985.
15.6 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL D ESCRIPTION OF P LANT TABLE 1.6-1 Revision:
Sheet: 10 8 of 9 Report Reference Section(s) "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," WCAP-10054-P-A (Proprietary) and 10081-A (Nonproprietary), August 1985.
15.6 "Westinghouse Small Break LOCA ECCS Evaluation Model Generic Study with the NOTRUMP Code," WCAP-11145-P-A (Proprietary), and WCAP-11372-A (Non-Proprietary),
October 1986.
15.6 "RETRAN A Program for Transient Thermal-Hydraulic Analysis of Complex Fluid Flow Systems, Volume 1: Theory and Numerics (Rev. 4)", EPRI NP-1850, November 1988.
15.0, 15.1, 15.2, 15.3, 15.4, 15.6 "VIPRE-01: A Thermal-Hydraulic Code for Reactor Cores", NP-2511-CCM, Electric Power Research Institute.
4.4, 15.1, 15.4 "Thermal-Hydraulic Analysis of PWR Fuel Elements Using the CHIC-KIN Code", YAEC-1241, March 1981. 1.8, 15.0, 15.3, 15.4 "CASMO-3G Validation", YAEC-1363, April 1988.
4.3 "SIMULATE-3 Validation and Verification", YAEC-1659-A, September 1988 4.3, 15.0, 15.1, 15.4 "STAR Methodology Application for PWRs, Control Rod Ejection, Main Steam Line Break",
Volumes 1 and 2, YAEC-1752A, September/October 1990.
1.8, 15.0, 15.1, 15.4 "Thermal-Hydraulic Analysis Methodology Using VIPRE-01 for PWR Applications",
YAEC-1849-P-A (Proprietary), October 1992.
4.4, 15.0, 15.1, 15.4 "Core Thermal Limit Protection Function Setpoint Methodology for Seabrook Station",
YAEC-1854-P-A (Proprietary), October 1992.
4.4, 15.0 "Seabrook Station Unit 1 Fixed Incore Detector System Analysis", YAEC-1855-P-A (Proprietary), October 1992.
4.3 "System Transient Analysis Methodology Using RETRAN for PWR Applications",
YAEC-1856-P-A (Proprietary), December 1992.
15.2 "Safety Analysis in Support of Wide-Band Operation and Core Design Enhancements for Seabrook Station", YAEC-1871-A, September 1993.
4.3 "GENRUP - A Computer Code for the Radiological Assessment of Steam Generator Tube Rupture Accidents", J. N. Hamawi, October 1987.
15.6 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL D ESCRIPTION OF P LANT TABLE 1.6-1 Revision:
Sheet: 10 9 of 9 Report Reference Section(s) "Analysis of a Postulated Design Basis Steam Generator Tube Rupture for the Seabrook Nuclear Power Station". YAEC-1698, February 1991.
15.6 WCAP-13247, " Report on the Methodology for the Resolution of the Steam Generator Tube Uncovery Issue":, dated March 1992.
15.6 WCAP-13589-A, "Assessment of Clad Flattening and Densification Power Spike Factor Elimination in Westinghouse Nuclear Fuel," March 1995.
4.2, 4.3 WCAP-12488-A, "Westinghouse Fuel Criteria Evaluation Process," October 1994.
4.2 WCAP-10216-P-A, Revision 1A, "Relaxation of Constant Axial Offset Control, F Q Surveillance Technical Specification," February 1994.
4.3 WCAP-10965-P-A, "ANC-A Westinghouse Advanced Nodal Code," September 1986.
4.3 WCAP-11596-P-A, "Qualification of the PHOENIX-P/ANC Nuclear Design System for Pressurized Water Reactor Cores," June 1998.
4.3 S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.8-1 Revision:
Sheet: 8 1 of 5 TABLE 1.8-1 G EI L ABORATORY TESTING P ROCEDURES SEABROOK STATION SEABROOK , N EW H AMPSHIRE GEI Project Number GEI Report Title and Da te Laboratory Test NRC Preferred Procedure (Regulatory Guide 1.138)
Test Procedure Used Reference Number 7286 Sample Descriptions For Borings Made November December, 1972 (Jan. 1973) Water Contents on Split- spoon Jar Samples ASTM D2216 ASTM D2216 1 Plastic Limit ASTM D424 ASTM D424, except perform two determinations within +2% of average.
qu (penetrometer) on Splitspoon Jar Samples Not given No ASTM or other standard established. 2 Laboratory Soil Descriptions ASTM D2488 ASTM D2488, except: a. Munsell color chart not used
- b. Consistency and density not described.
c Mineralogy not described.
- d. Moisture condition not described.
3 Cyclic Mobility Potential of Foundation Sands From Borings FIA and F2, Circulating Water Conduits (June 1973, revised Oct 1973) Sieve Analyses ASTM D421 and D422 ASTM D421 and D422, except:
- a. Samples not air-dried prior to splitting and preparation. b. Samples separated on #4 sieve rather than #10 sieve.
3 CR Tests on Undisturbed Sand Samples 1.138 Paper by M.L. Silver referenced in Reg. Guide 1.138 CR test procedure described in GEI Report.
S u (Torvane)
Not given No ASTM or other standard established.
Laboratory Soil Descriptions ASTM D2488 See Reference Number 2 above.
S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.8-1 Revision:
Sheet: 8 2 of 5 GEI Project Number GEI Report Title and Date Laboratory Test NRC Preferred Procedure (Regulatory Guide 1.138)
Test Procedure Used Reference Number Handling and Storage of Undisturbed Samples Reg. Guide 1.138, Section C.2 General procedures in use at the time of sampling conform to comments in NRC Reg. Guide 1.138 Geotechnical Report, Circulating Water Tunnels (June 1974) Chloride Determination on Water Samples AWWA Methods AWWA Methods Unconfined Compression on Rock ASTM 2938 ASTM 2938 Density of Rock U.S. Army Manual EM-1110 2-1906 referenced in Reg Guide 1.138 Tested by M.I.T.; procedures described in report by Gene Simmons 4 Compression-wave velocity on Rock ASTM D2845 See Reference Number 4 above.
Unit Weight of Rock EM 1110-2-1906 procedure not noted or described in report.
Tested by University of Illinois; 5 Unconfined Compression on Rock ASTM D2938 See Reference Number 5 above.
Compression-wave-velocity on Rock ASTM D2845 See Reference Number 5 above.
Hardness Not given. See Reference Number 5 above.
Geotechnical Report, Reactor Borings (July 31, 1974) Laboratory Soil Descriptions ASTM D2488 See Reference Number 2 above.
S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.8-1 Revision:
Sheet: 8 3 of 5 GEI Project Number GEI Report Title and Date Laboratory Test NRC Preferred Procedure (Regulatory Guide 1.138)
Test Procedure Used Reference Number Geotechnical Report, Additional Plant-Site Borings...G-Series Borings (Oct. 1974)
Sieve Analysis Laboratory Soil Descriptions ASTM D421 and D422 ASTM D2488 See Reference Number 3 above See Reference Number 2 above.
Geotechnical Report, Intake Tunnel Extension (Sept. 1975) Laboratory Soil Descriptions ASTM D2488 See Reference Number 2 above.
Atterberg Limits ASTM D423 and D424 ASTM D423, except a. Soil not air-dried prior to preparation (i.e., used ASTM D2217 rather than D421). b. Groove formed with Casagrande grooving tool. c. Successive tests run from a wetter to a dryer state. Also see Reference Number 1 above.
Sieve Analyses ASTM D421 and D422 See Reference Number 3 above.
Rock Hardness (Schmidt) Hammmer) Not given No ASTM or other standard established.
76287 N.A. None - - 76301 N.A. None - - 77363 Heavy Equipment Haul Route Soil and Pavement Investigation (June Sieve and Hydrometer Analyses ASTM D 421 and D422 See Reference Number 3 above. GEI hydrometer procedure used.
S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.8-1 Revision:
Sheet: 8 4 of 5 GEI Project Number GEI Report Title and Date Laboratory Test NRC Preferred Procedure (Regulatory Guide 1.138)
Test Procedure Used Reference Number 1978) Simplified Boring Log Descriptions ASTM D2488 Not ASTM D2488 content or format.
77386 Preliminary Report Compression Tests on Structural Backfill and Sand-Cement (Jan. 1978) and letters dated Feb. 14, Feb. 27, March 10, 1978 Sieve Analysis ASTM D421 and D422 See Reference Number 3 above.
Specific Gravity ASTM D854 ASTM D854, except a. Temperature measured to 0.1 C b. Pycnometer calibrated at several temperatures.
- c. Oven-dried sample not soaked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to vacuum de-airing.
Moisture Density Relation ASTM D1557 ASTM D1557 S Tests Not given GEI procedures used, details described in report.
7 R tests Not given See Reference Number 7 above.
Sand Cement Compression Tests, 2.8-in.-dia. specimens Not given ASTM C192 and D1632 Sand Cement Compressive Strength in. Cubes Not given ASTM C305, C109 78508 N.A. None - - 76301 Test Fill Study of Quartzite Moisture Density Relation AS TM D1557 ASTM D1557, except 11/2-in. maximum particle size
S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL DESCRIPTION OF P LANT TABLE 1.8-1 Revision:
Sheet: 8 5 of 5 GEI Project Number GEI Report Title and Date Laboratory Test NRC Preferred Procedure (Regulatory Guide 1.138)
Test Procedure Used Reference Number Molecuttings (July 1979) used for molecuttings.
Sieve Analyses Bulk Specific Gravity Rock Cuttings ASTM D421 and D422 Not given See Reference Number 3 above. ASTM C127 Specific Gravity - Soil ASTM D854 See Reference Number 6 above.
Geotechnical Engineers Inc.
S EABROOK S TATION UFSAR I NTRODUCTION AND GENERAL P LANT DESCRIPTION TABLE 1.8-2 Revision:
Sheet: 8 1 of 1 TABLE 1.8-2 CODE C ASES A PPROVED F OR U SE FOR THE BOP The information in this Table was not revised, but has been extracted from the original FSAR and is provided for historical information. Code cases applicable to Seabrook are contained in the Seabrook Station Section XI Program.
Code Case Date of Report Letter Date of NRC Approved Letter
Title Comments N-218 10/15/79 5/30/80 Testing Lots of Carbon Steel solid, Bare Welding Electrode or Wire,Section III, Division 2 N-228 10/15/79 5/30/80 Alternate Rules for Sequence of Completion of Code Data Report Forms and Stamping for Section III, Class 1, 2, 3 and MC Construction N-237 10/15/79 5/30/80 Hydrostatic Testing of Internal Piping,Section III, Division I N-103-1 11/21/79 7/9/80 Assignment of P-Nos. to ASTM Materials,Section III, Division 2, Class CB and CC N-279 12/8/80 12/29/80 Use of Torquing as a Locking Device for Section III, Division I, Class 1, 2 3, and MC Component Supports The use of this code case by Seabrook is subject to the condition that when pre loading is used as a locking device and the joint is required to be removed, the bolting shall be replaced unless proof is presented that the bolting shall be replaced unless original bolting has not been permanently strained N-368 6/22/84 7/30/84 Pressure Testing of Pump Discharge,Section III Division 1, Classes 2 and 3.
Conditionally acceptable providing applicant provides information to demonstrate that the length of discharge piping to which the code case is applied is reasonably short.
N-411 9/10/84 12/13/84 Alternative Damping Values for Seismic Analysis of Piping N-413 4/5/85 4/22/85 Minimum Size of Fillet Welds for Linear Type Supports,Section III, Division 1, Subsection NF
S EABROOK S TATION U PDATED F INAL S AFETY A NALYSIS R EPORT C HAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT F IGURES Lead Sheet Nuclear P&I Diagrams [2 Sheets]
S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.1-1 Sh. 1 of 2 See LEGEND 1 This drawing is provided for historical purposes only and is not updated.
Lead Sheet Nuclear P&I Diagrams [2 Sheets]
S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.1-1 Sh. 2 of 2 See LEGEND 2 This drawing is provided for historical purposes only and is not updated.
Logic Diagram Symbols S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.1-2 See 1-NHY-503100 This drawing is provided for historical purposes only and is not updated.
Station Layout S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Rev. 12 Figure 1.2-1 See Figure 2.1-5 Containment Structure Plan at Elevation (-)26'-0" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-2 See 1-NHY-805051 This drawing is provided for historical purposes only and is not updated.
Containment Structure Plan at Elevation 0'-0" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-3 See 1-NHY-805052 This drawing is provided for historical purposes only and is not updated.
Containment Structure Plan at Elevation 25'-0" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-4 See 1-NHY-805053 This drawing is provided for historical purposes only and is not updated.
Containment Structure Plan at Elevation (-)44'-9", "A-A", "B-B" and "C-C" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-5 See 1-NHY-805055 This drawing is provided for historical purposes only and is not updated.
Containment Structure Plan at Elevation "D-D", "E-E" and "F-F" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-6 See 1-NHY-805056 This drawing is provided for historical purposes only and is not updated.
Simplified Head Assembly and Cable Bridges S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-6A
Primary Auxiliary Building Pl ans at Elevation 7'-0" and Below General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-7 See 805061 This drawing is provided for historical purposes only and is not updated.
Primary Auxiliary Building Plans at Elevation 25'-0" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-8 See 1-NHY-805062 This drawing is provided for historical purposes only and is not updated.
Primary Auxiliary Building Plan s at Elevations 53'-0" and 81'-0" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-9 See 805063 This drawing is provided for historical purposes only and is not updated.
Primary Auxiliary Building Elevation "A-A" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-10 See 805064 This drawing is provided for historical purposes only and is not updated.
Primary Auxiliary Building Elevation "C-C" and "D-D" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-11 See 805065 This drawing is provided for historical purposes only and is not updated.
Primary Auxiliary Building Elevation "B-B" and "E-E" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-12 See 805066 This drawing is provided for historical purposes only and is not updated.
R.H.R., Containment Spray, S.I., Equipment Vault General Arrangement - Plans S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-13 See 805060 This drawing is provided for historical purposes only and is not updated.
R.H.R., Containment Spray, S.I., Equipment Vault General Arrangement - Sections S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-14 See 805078 This drawing is provided for historical purposes only and is not updated.
Fuel Storage Building Plan at Elevations 7'-0" and 10'-0" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-15 See 1-NHY-805058 This drawing is provided for historical purposes only and is not updated.
Fuel Storage Building Plan at Elevations 21'-6" and 25'-0" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-16 See 1-NHY-805059 This drawing is provided for historical purposes only and is not updated.
Fuel Storage Building Plan at Elevations 64'-0" and 84'-0" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-17 See 805084 This drawing is provided for historical purposes only and is not updated.
Fuel Storage Building Sections "A-A" and "B-B" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-18 See 805085 This drawing is provided for historical purposes only and is not updated.
Fuel Storage Building Section "C-C" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-19 See 805086 This drawing is provided for historical purposes only and is not updated.
Fuel Storage Building Section "D-D" "F-F" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-20 See 805087 This drawing is provided for historical purposes only and is not updated.
Fuel Storage Building Section "E-E" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-21 See 1-NHY-805088 This drawing is provided for historical purposes only and is not updated.
Waste Processing Building Secti ons "G-G", "H-H" and "J-J" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-22 See 805659 This drawing is provided for historical purposes only and is not updated.
Waste Processing Building Plan at Elevation (-)3'-0" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-23 See 1-NHY-805660 This drawing is provided for historical purposes only and is not updated.
Waste Processing Building Plan at Elevation 25'-0" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-24 See 805661 This drawing is provided for historical purposes only and is not updated.
Waste Processing Building Plan at Elevation 53'-0" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-25 See 805662 This drawing is provided for historical purposes only and is not updated.
Waste Processing Building Elevation "A-A" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-26 See 1-NHY-805663 This drawing is provided for historical purposes only and is not updated.
Waste Processing Building Elevation "B-B" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-27 See 805664 This drawing is provided for historical purposes only and is not updated.
Waste Processing Building Elevation "C-C" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-28 See 805665 This drawing is provided for historical purposes only and is not updated.
Waste Processing Building Elevation "E-E" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-29 See 805667 This drawing is provided for historical purposes only and is not updated.
Waste Processing Building Plan s at Elevation (-)31'-0", (-)18'-3" and 13'-0" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-30 See 805669 This drawing is provided for historical purposes only and is not updated.
Control Building Elevation 21'-6" Electrical General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-31 See 1-NHY-310431 This drawing is provided for historical purposes only and is not updated.
Control Building Control Room Arrangement Plan at Elevation 75'-0" S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-32 See 1-NHY-500090 This drawing is provided for historical purposes only and is not updated.
Control Building Section "B-B" S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-33 See 500091 This drawing is provided for historical purposes only and is not updated.
Diesel Generator Building Plan and Sections below Grade General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-34 See 202068 This drawing is provided for historical purposes only and is not updated.
Diesel Generator Building Plans above Grade General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-35 See 1-NHY-202069 This drawing is provided for historical purposes only and is not updated.
Diesel Generator Building S ections above Grade General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-36 See 202070 This drawing is provided for historical purposes only and is not updated.
Turbine Building Plan - Ground Floor Elevation 21'-0" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-37 See 1-NHY-202052 This drawing is provided for historical purposes only and is not updated.
Turbine Building Plan - Mezzanine Floor Elevations 46'-0" and 50'-0" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-38 See 1-NHY-202053 This drawing is provided for historical purposes only and is not updated.
Turbine Building Plan - Operating Floor Elevation 75'-0" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-39 See 1-NHY-202054 This drawing is provided for historical purposes only and is not updated.
Turbine Building Longitudinal Section "A-A" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-40 See 202055 This drawing is provided for historical purposes only and is not updated.
Turbine Building Longitudinal Section "B-B" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-41 See 202056 This drawing is provided for historical purposes only and is not updated.
Turbine Building Longitudinal Section "C-C" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-42 See 202057 This drawing is provided for historical purposes only and is not updated.
Turbine Building Transverse Section "D-D" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-43 See 1-NHY-202058 This drawing is provided for historical purposes only and is not updated.
Turbine Building Transverse Section "E-E" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-44 See 202059 This drawing is provided for historical purposes only and is not updated.
Turbine Building Transverse Section "F-F" General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-45 See 202060 This drawing is provided for historical purposes only and is not updated.
Service and Circulating Water Pumphouse Plan and Section General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-46 See 1-NHY-202476 This drawing is provided for historical purposes only and is not updated.
Service and Circulating Water Pumphouse Plan below Grade General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-47 See 202477 This drawing is provided for historical purposes only and is not updated.
Service and Circulating Water Pumphouse Sections General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-48 See 202478 This drawing is provided for historical purposes only and is not updated.
Administration and Service Building First Floor Plan Elevation 21'-0" S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-49 See 1-NHY-119522-1 This drawing is provided for historical purposes only and is not updated.
Administration and Service Building Second Floor Plan Elevation 43'-0" S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-50 See CIV-1-ASB-119523 This drawing is provided for historical purposes only and is not updated.
Emergency Feedwater Pump Building Plan and Sections General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-51 See 202065 This drawing is provided for historical purposes only and is not updated.
Circulating Water System - Tunnels General Plan S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-52 See 101112 This drawing is provided for historical purposes only and is not updated.
Profile of Intake and Discharge Tunnels - Circulating Water System S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-53
Ocean Intake Structure - Typical Section through Top of Intake Shaft and Head S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-54
Circulating Water System Double Discharge Nozzle (Typical)
S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-55
Service Water Cooling Tower General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-56 See 1-NHY-805068 This drawing is provided for historical purposes only and is not updated.
Chlorination Building General Arrangement Plan S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-57 See 1-NHY-202474 This drawing is provided for historical purposes only and is not updated.
Chlorination Building General Arrangement Sections S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-58 See 1-NHY-202475 This drawing is provided for historical purposes only and is not updated.
Waste Processing Building - Steam Generator Blowdown Recovery General Arrangement S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.2-59 See 1-NHY-805657 This drawing is provided for historical purposes only and is not updated.
Vertical Design Response Spectra Scaled 1g Horizontal Ground Acceleration (from Reg. Guide 1.60, Rev. 1, 12/73)
S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 1.8-1