ML083190830 | 19 December 2008 | Request for Additional Information, License Amendment Request to Revise Technical Specification 3.7.5, Main Turbine Bypass System | Feedwater Controller Failure |
TAC:MD7966 | 19 December 2008 | ||
RBG-46875, Notification of Spent Fuel Cask Use | 17 December 2008 | Notification of Spent Fuel Cask Use | |
RBG-46872, Submittal of Notification of Spent Fuel Cask Use | 15 December 2008 | Submittal of Notification of Spent Fuel Cask Use | |
RBG-46870, License Amendment Request (LAR 2008-08) Surveillance Frequency Extension Request | 8 December 2008 | License Amendment Request (LAR 2008-08) Surveillance Frequency Extension Request | Reactor Vessel Water Level |
RBG-46868, Notification of the Use of Spent Fuel Cask on 11/21/2008 | 3 December 2008 | Notification of the Use of Spent Fuel Cask on 11/21/2008 | |
RBG-46867, Submittal of Notification of Spent Fuel Cask Use | 25 November 2008 | Submittal of Notification of Spent Fuel Cask Use | |
ML090200102 | 21 November 2008 | 2008-12-Draft OP Test Comments | |
ML090200087 | 21 November 2008 | 2008-12-Draft Outlines | |
ML090200091 | 21 November 2008 | 2008-12-Draft Outline Comments | |
ML090200092 | 21 November 2008 | 2008-12-Draft Written Exams | Shutdown Margin Half scram Squib Scram Discharge Volume Earthquake Fuel cladding Pressure boundary leak |
ML090200099 | 21 November 2008 | 2008-12-Draft OP Test | Fitness for Duty Half scram Stroke time Job Performance Measure Recently irradiated fuel |
ML090200104 | 21 November 2008 | 2008-12-Final Outlines | Half scram |
ML090200105 | 21 November 2008 | RB-2008-12 - Final Written Exams | Shutdown Margin Half scram Temporary Modification Squib Scram Discharge Volume Earthquake Pressure boundary leak |
ML090200107 | 21 November 2008 | 2008-12 - Final OP Test | Fitness for Duty Half scram Stroke time Job Performance Measure Recently irradiated fuel |
ML090200108 | 21 November 2008 | RB-2008-12 - Post Exam Comments-analysis | |
ML090200110 | 21 November 2008 | 2008-12-Public Forms | |
ML090750879 | 21 November 2008 | 2008-12-Draft Written Exam Comments | |
ML083570192 | 20 November 2008 | License Amendment Request (LAR) Changes to Technical Specification 5.6.5, Core Operating Limits Report (COLR) | Anticipated operational occurrence Fuel cladding |
ML083250062 | 19 November 2008 | RBS - 12/2008 - Initial Examination - Examination Approval Letter | |
IR 05000458/2008004 | 6 November 2008 | IR 05000458-08-004; Energy Operations, Inc; 06/29/2008 - 09/27/2008; River Bend Station, NRC Integrated Inspection Report | High winds Water Inventory Control Past operability Probabilistic Risk Assessment Temporary Modification Condition Adverse to Quality Tornado-Generated Missile Significance Determination Process Biofouling Fire Protection Program Operability Assessment |
ML101620055 | 5 November 2008 | Entergy Condition Report CR-RBS-2008-06385 | |
RBG-46861, Submittal of Revision 33 to the Emergency Plan (E-Plan) in Electronic Format (Cd) | 4 November 2008 | Submittal of Revision 33 to the Emergency Plan (E-Plan) in Electronic Format (Cd) | Offsite Dose Calculation Manual |
IR 05000458/2008006 | 27 October 2008 | IR 05000458-08-006 on 04/28 - 08/26/2008 for River Bend, Component Design Bases Inspection | Ultimate heat sink Stroke time Probabilistic Risk Assessment Significance Determination Process Large early release frequency Operability Determination Fuel cladding Power Uprate |
TAC:MD4371 | 24 October 2008 | ||
ML082880464 | 24 October 2008 | Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients | |
ML082940484 | 17 October 2008 | Modification No. 001 to Task Order No. 003 Under Contract No. NRC-03-08-071 | |
TAC:RE6803 | 16 October 2008 | ||
ML082900266 | 16 October 2008 | Results of Acceptance Review for the River Bend Station, Unit 3 Combined License Application | |
RBG-46848, Nine Month Response to NRC Generic Letter 2008-001, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | 14 October 2008 | Nine Month Response to NRC Generic Letter 2008-001, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | Safe Shutdown Mission time Locked High Radiation Area |
ML082820242 | 8 October 2008 | Letter Regional Administrator, Appreciation of Staff | |
IR 05000458/2008007 | 2 October 2008 | IR 05000458-08-007, on 08/21/2008, for River Bend, Inspection Site-Specific Implementation of B.5.B Phase 2 and 3, Mitigating Strategies Temporary Instruction | B.5.b |