Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML090690487 | 28 December 2008 | Draft - RO & SRO Written Exam (Folder 2) | Unanalyzed Condition Boric Acid Shutdown Margin High Radiation Area Grab sample Scaffolding Power change |
ML090130382 | 26 December 2008 | Revision 002 to CP 3804L Procedure Action Request, Pass Containment Air Sample, Dated 12/26/2008 | |
ML083540558 | 18 December 2008 | Nuclear Liability Insurance Endorsement | |
ML083650005 | 18 December 2008 | Notice of Completion of Activities Related to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | Boric Acid Mission time Grab sample Coatings |
IR 05000245/2008201 | 17 December 2008 | ||
ML082460690 | 17 December 2008 | Units, 1, 2, and 3 - Issuance of Amendments 116, 308 & 247 Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours (TAC Nos. J00287, MD9507, and MD9508) | |
ML083230469 | 17 December 2008 | Request for Additional Information, GL 2004-02 | Mission time |
ML083520549 | 17 December 2008 | Force-on-Force Inspection Report | |
Press Release-I-08-063, New NRC Resident Inspector Assigned to Millstone Station | 15 December 2008 | Press Release-I-08-063: New NRC Resident Inspector Assigned to Millstone Station | New Resident Inspector |
Press Release-I-08-064, NRC Begins Special Inspection at Millstone 3 Nuclear Power Plant | 15 December 2008 | Press Release-I-08-064: NRC Begins Special Inspection at Millstone 3 Nuclear Power Plant | |
ML083500448 | 2 December 2008 | Revised ERDS Data Point | |
ML083360388 | 1 December 2008 | Nuclear Liability Insurance Endorsements | |
ML090690400 | 25 November 2008 | Draft - Outlines (Folder 2) (Facility Ltrs. Dtd - 10/30/08, 11/14/08, 11/21/08 & 11/25/08) | Shutdown Margin Time to boil Job Performance Measure Earthquake Downpower |
ML082800289 | 24 November 2008 | Units 2 and 3 - Biennial Decommissioning Funding Report | |
TAC:MD9352 | 24 November 2008 | ||
ML083181248 | 21 November 2008 | Review of Steam Generator Tube Inspection Report for 2007 Refueling Outage | |
ML082810147 | 21 November 2008 | Correction Letter Regarding Safety Evaluation for Changes to Technical Specification Section 6.8.4.g, Steam Generator Program and Section 6.9.1.7, Steam Generator Tube Inspection Report. | |
ML083220256 | 17 November 2008 | Dominion Nuclear Connecticut'S Brief in Opposition to the Appeal of Connecticut Coalition Against Millstone and Nancy Burton | |
ML083230429 | 17 November 2008 | NRC Staffs Brief in Opposition to Ccam and Ms. Burtons Appeal on Motions to File New or Amended Contentions | |
ML090690320 | 17 November 2008 | NRC Comments on Draft Licensee-Developed (Millstone Power Station, Unit 2) Exam (Written & Operating Tests) (Folder 2) | |
TAC:U01634 | 17 November 2008 | ||
ML083300359 | 14 November 2008 | Technical Requirements Manual, Appendix 8.1, Core Operating Limits Report | Shutdown Margin |
ML083190017 | 12 November 2008 | Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 | |
ML082970914 | 10 November 2008 | Closeout of Generic Letter 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. | |
ML083190530 | 6 November 2008 | Connecticut Coalition Against Millstone and Nancy Burton, (Attorney) Notice of Appeal | |
ML083240092 | 29 October 2008 | Revision 001 to Surveillance Procedure C Sp 600.4, Communication Radiopaging and Enrs Practice and Weekly Operability Test. | |
ML083240091 | 29 October 2008 | C OP 606, Rev 05, Communication Radiopaging Callback Monthly Operability Test. | |
ML083010264 | 27 October 2008 | Memorandum and Order (Ruling on Motions to File New or Amended Contentions) | |
ML083010233 | 27 October 2008 | Electric Power Research Institute MRP-139 Deviation Notification | |
TAC:ME1257 | 27 October 2008 | ||
ML082820615 | 27 October 2008 | Issuance of Amendments 307 & 246 Deletion of E Bar Definition and Revision to the Reactor Coolant System Specific Activity | Shutdown Margin Packing leak Pressure Boundary Leakage Power change |
TAC:MD7763 | 24 October 2008 | ||
ML083090396 | 24 October 2008 | End of Cycle 18 Steam Generator Tube Inspection Report | Nondestructive Examination |
TAC:ME0094 | 24 October 2008 | ||
ML082470622 | 24 October 2008 | Relief Requests for the Fourth 10-Year Pump and Valve Inservice Testing Programs, Respectively (TAC Nos. MD7763 Through MD7771) | Stroke time Temporary Modification Incorporated by reference Grace period |
ML083030141 | 21 October 2008 | Engine Systems, Inc., Transmittal of 10CFR21-0095, Rev. 0 Reporting of Defects and Non-Compliance, Ingersoll-Rand Series 89 Air Start Motors, P/N 8367694-ESI | |
ML082910831 | 21 October 2008 | Upcoming Steam Generator Tube Inservice Inspection | Nondestructive Examination |
ML082890266 | 14 October 2008 | Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | Boric Acid Loop seal |
IR 05000336/2008007 | 3 October 2008 | IR 05000336-08-007, (Unit 2), & IR 05000423-08-007, (Unit 3), on 08/25/2008 - 08/28/2008, Millstone Power Station, Temporary Instruction 2515/171 Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies Cover | B.5.b |
ML082730753 | 1 October 2008 | Millstone Power Station, Units 1, 2 and 3, North Anna Power Station, Unit Nos. 1 and 2- Acceptance of Requested Licensing Action the Use of Weighting Factors for External Exposure (TAC Nos. MD9472,MD9708,MD9473, MD9474,MD9476 |