Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09069048728 December 2008Draft - RO & SRO Written Exam (Folder 2)Unanalyzed Condition
Boric Acid
Shutdown Margin
High Radiation Area
Grab sample
Scaffolding
Power change
ML09013038226 December 2008Revision 002 to CP 3804L Procedure Action Request, Pass Containment Air Sample, Dated 12/26/2008
ML08354055818 December 2008Nuclear Liability Insurance Endorsement
ML08365000518 December 2008Notice of Completion of Activities Related to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water ReactorsBoric Acid
Mission time
Grab sample
Coatings
IR 05000245/200820117 December 2008
ML08246069017 December 2008Units, 1, 2, and 3 - Issuance of Amendments 116, 308 & 247 Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours (TAC Nos. J00287, MD9507, and MD9508)
ML08323046917 December 2008Request for Additional Information, GL 2004-02Mission time
ML08352054917 December 2008Force-on-Force Inspection Report
Press Release-I-08-063, New NRC Resident Inspector Assigned to Millstone Station15 December 2008Press Release-I-08-063: New NRC Resident Inspector Assigned to Millstone StationNew Resident Inspector
Press Release-I-08-064, NRC Begins Special Inspection at Millstone 3 Nuclear Power Plant15 December 2008Press Release-I-08-064: NRC Begins Special Inspection at Millstone 3 Nuclear Power Plant
ML0835004482 December 2008Revised ERDS Data Point
ML0833603881 December 2008Nuclear Liability Insurance Endorsements
ML09069040025 November 2008Draft - Outlines (Folder 2) (Facility Ltrs. Dtd - 10/30/08, 11/14/08, 11/21/08 & 11/25/08)Shutdown Margin
Time to boil
Job Performance Measure
Earthquake
Downpower
ML08280028924 November 2008Units 2 and 3 - Biennial Decommissioning Funding Report
TAC:MD935224 November 2008
ML08318124821 November 2008Review of Steam Generator Tube Inspection Report for 2007 Refueling Outage
ML08281014721 November 2008Correction Letter Regarding Safety Evaluation for Changes to Technical Specification Section 6.8.4.g, Steam Generator Program and Section 6.9.1.7, Steam Generator Tube Inspection Report.
ML08322025617 November 2008Dominion Nuclear Connecticut'S Brief in Opposition to the Appeal of Connecticut Coalition Against Millstone and Nancy Burton
ML08323042917 November 2008NRC Staffs Brief in Opposition to Ccam and Ms. Burtons Appeal on Motions to File New or Amended Contentions
ML09069032017 November 2008NRC Comments on Draft Licensee-Developed (Millstone Power Station, Unit 2) Exam (Written & Operating Tests) (Folder 2)
TAC:U0163417 November 2008
ML08330035914 November 2008Technical Requirements Manual, Appendix 8.1, Core Operating Limits ReportShutdown Margin
ML08319001712 November 2008Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28
ML08297091410 November 2008Closeout of Generic Letter 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.
ML0831905306 November 2008Connecticut Coalition Against Millstone and Nancy Burton, (Attorney) Notice of Appeal
ML08324009229 October 2008Revision 001 to Surveillance Procedure C Sp 600.4, Communication Radiopaging and Enrs Practice and Weekly Operability Test.
ML08324009129 October 2008C OP 606, Rev 05, Communication Radiopaging Callback Monthly Operability Test.
ML08301026427 October 2008Memorandum and Order (Ruling on Motions to File New or Amended Contentions)
ML08301023327 October 2008Electric Power Research Institute MRP-139 Deviation Notification
TAC:ME125727 October 2008
ML08282061527 October 2008Issuance of Amendments 307 & 246 Deletion of E Bar Definition and Revision to the Reactor Coolant System Specific ActivityShutdown Margin
Packing leak
Pressure Boundary Leakage
Power change
TAC:MD776324 October 2008
ML08309039624 October 2008End of Cycle 18 Steam Generator Tube Inspection ReportNondestructive Examination
TAC:ME009424 October 2008
ML08247062224 October 2008Relief Requests for the Fourth 10-Year Pump and Valve Inservice Testing Programs, Respectively (TAC Nos. MD7763 Through MD7771)Stroke time
Temporary Modification
Incorporated by reference
Grace period
ML08303014121 October 2008Engine Systems, Inc., Transmittal of 10CFR21-0095, Rev. 0 Reporting of Defects and Non-Compliance, Ingersoll-Rand Series 89 Air Start Motors, P/N 8367694-ESI
ML08291083121 October 2008Upcoming Steam Generator Tube Inservice InspectionNondestructive Examination
ML08289026614 October 2008Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray SystemsBoric Acid
Loop seal
IR 05000336/20080073 October 2008IR 05000336-08-007, (Unit 2), & IR 05000423-08-007, (Unit 3), on 08/25/2008 - 08/28/2008, Millstone Power Station, Temporary Instruction 2515/171 Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies CoverB.5.b
ML0827307531 October 2008Millstone Power Station, Units 1, 2 and 3, North Anna Power Station, Unit Nos. 1 and 2- Acceptance of Requested Licensing Action the Use of Weighting Factors for External Exposure (TAC Nos. MD9472,MD9708,MD9473, MD9474,MD9476