ML083240091
| ML083240091 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/29/2008 |
| From: | Hollaway C Dominion Nuclear Connecticut |
| To: | Document Control Desk, Office of Nuclear Security and Incident Response |
| References | |
| C OP 606, Rev 05 | |
| Download: ML083240091 (2) | |
Text
T-02 PASSPORT DOCUMENT Vý To Facility Address DOCUMENT CONTROL DESK MP Department : 806 NUC REGULATORY COMMISSION (0140)
DOCUMENT CONTROL DESK WASHINGTON, DC 20555 TRANSMITTAL PageII N IIfN1 u l iII I From NDS Date/Time 10/29/08 20:26 Trans No.
- 000106169 Tr Total Items: 00001 CONT DOCUMENTS ansmittal Group Id: 08-04592A Item Facility Type Sub Document Number / Title Sheet Revision Doc Date Copy #
Media Copies
01 COMMUNICATION RADIOPAGING CALLBACK MONTHLY OPERABILITY TEST Please check the appropriate response and return form to NDS Bldg 475/3 Millstone Power Station or Fax to 860-440-2057.
All documents received.
Documents noted above not received (identify those not received).
I no longer require distribution of these documents.
Date:
Signature:
02/26/08 02/27/08 Approval Date Effective Date Procedure Action Request Document No.:
C OP 606 Writer:
Chris Hollaway Rev. No.
Minor Rev.
Initiator Chris Hollaway 005 05
Title:
COMMUNICATION RADIOPAGING CALLBACK MONTHLY OPERABILITY TEST For New Documents: Document is QA F]
DH
Title:
(Include distribution information on page 2)
El Revision Z Minor Revision El Cleanup Revision El Biennial Review 0] Void (Cancel)
[E Suspend (Do Not Use)
[] Expire 0 Superceded By:
C SP 600.2 Comments:
[] Administrative Correction FLS:
C OP 606 is being superceded by C SP 600.2 and its forms.
Associated ARs Reviews Print Sign Date Department E]
El
_ _ _ _ Li
_ _ _ _ LI EL j
-t 4
~J.
A..
+
4 Chris Hollaway NP&RM m
WC 9 Att 3 Req. 0 Yes El N o
C4 z
Chris Hollaway NP&RM Licensing Basis / RCD (50.59/72.48 Screen Req. El Yes El No)
Tech Independent El Validation LI None Field -Use LI Simulated Performance -
LI Table Top and EI Comparison MP-05-DC-SAP01-004 Use MP-05-DC-SAP01-004 Walk-through (minimum of two)
Print Sign Date Dept.
Coordinator Member I
Training:
E] None LI Nuclear Training El Briefing El Familiarization
.CSQR Review and Approval F] FSRC Review and Approval F] Department Head Review and Approval A
1_0
.Disapproval El NA
/
Appvl~
ov al L N/A N/A (1) Department Head Sign/Date (1) Department Head Approval Sign (1)S inDt
()
,7.
(2) FSRC Meeting Number (2) Department Head Approval Sign (3) FSRC Approval Sign Approval Date:
,Effective Date OCT 3 12008 WC 9 database Aproa Dae ffcieDt:Updated If Req.,
MP-05-DC-FAPOI.1-005 Rev. 002-03 Page 1 of_
4