Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML061420375 | 31 December 2002 | PNPS Radiological Effluent and Waste Disposal Report Jan 1- Dec 31, 2002 | |
ML030220450 | 30 December 2002 | Response to NRC Request for Additional Information Appendix K Measurement Uncertainty Recovery - Power Uprate Request | |
ML030150157 | 30 December 2002 | Registration of Use of Cask to Store Spent Fuel | |
ML033160420 | 23 December 2002 | Facility Request for Waiver W/O Enclosures Dtd 12/23/2002 | |
ML023570386 | 23 December 2002 | RAI, Appendix K Measurement Uncertainty Recovery - Power Uprate Request | |
ML023540035 | 20 December 2002 | Request for Withholding Information from Public Disclosure | |
ML040720257 | 16 December 2002 | Final Report for November 15, 2002, Medical Support MS-1 Drill | |
ML030100335 | 16 December 2002 | Final Report for November 15, 2002, Medical Support MS-1 Drill of Offsite Radiological Emergency Plans for Pilgrim Station | |
ML070780603 | 13 December 2002 | CR-PNP-2002-12941, P-208D (D Salt Service Water Pump) Shaft Had Pitting | Coatings |
ML023520484 | 12 December 2002 | November 2002 Monthly Operating Report for Pilgrim | |
ML023010155 | 10 December 2002 | G20020606/LTR-02-298 - Sen John Kerry Ltr. Security at Pilgrim, Response Ltr | |
ML023520071 | 10 December 2002 | Request for Amendment to the Technical Specifications (Ts), Jet Pump Operability Surveillance Requirements and Correction to Reference Cited in TS 4.11.C.1 | |
ML023500381 | 6 December 2002 | Fourth Ten-Year Inservice Testing (IST) Program & Request for Approval of IST Relief Requests | Safe Shutdown High Radiation Area Ultimate heat sink Stroke time Squib Locked High Radiation Area Scram Discharge Volume Cold shutdown justification Power-Operated Valves Power Operated Valves Scaffolding Power change |
ML081090442 | 6 December 2002 | Pilgrim April 2008 Evidentiary Hearing - Staff Exhibit 13, Letter from Entergy to NRC Re Pilgrim Nuclear Power Station Fourth Ten-Year Inservice Testing (IST) Program and Request for Approval of IST Relief Requests | Safe Shutdown |
ML023440237 | 4 December 2002 | Proposed Change to Applicability of Pilgrim'S Pressure-Temperature Curves as Described in Technical Specification Figures 3.6.1, 3.6.2, & 3.6.3, Revision 1 | Hydrostatic |
ML023390067 | 22 November 2002 | Supplementary Information in Support of Request for Technical Specification Change Re Change of Trip Level Settings, Calibration Frequencies and Editorial Changes, Rev 1 | |
ML023380395 | 22 November 2002 | Revision to Emergency Plan Implementing Procedures EPIP-310, EPIP-440 and TOC | Deep Dose Equivalent |
ML023360084 | 21 November 2002 | Response to NRC Request for Additional Information Appendix K Measurement Uncertainty Recovery - Power Uprate Request | Ultimate heat sink Anticipated operational occurrence |
Press Release-I-02-066, NRC Assigns New Resident Inspector at Pilgrim Nuclear Plant | 21 November 2002 | Press Release-I-02-066: NRC Assigns New Resident Inspector at Pilgrim Nuclear Plant | New Resident Inspector |
ML023250187 | 14 November 2002 | October 2002 Monthly Operating Report for Pilgrim Nuclear Power Station | |
ML023170174 | 13 November 2002 | Request for Additional Information, Regarding Appendix K Measurement Uncertainty Recovery, Power Uprate Request | Ultimate heat sink Anticipated operational occurrence |
IR 05000293/2002006 | 7 November 2002 | IR 05000293-02-006; on 06/30-09/28/2002; Entergy Nuclear Operations, Inc.; Pilgrim Nuclear Power Station, Resident Inspection Report | Fitness for Duty High Radiation Area Ultimate heat sink Fire Barrier Stroke time Contraband Operability Determination Power Uprate |
ML023220147 | 6 November 2002 | Response to NRC Request for Additional Information, Appendix K Measurement Uncertainty Recovery - Power Uprate Request | Safe Shutdown Shutdown Margin Safety Limit Minimum Critical Power Ratio Ultimate heat sink Non-Destructive Examination Offsite Dose Calculation Manual Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Hydrostatic Abnormal operational transient Process Control Program MELLLA Earthquake Fire Protection Program Flow Induced Vibration GOTHIC Power Uprate Measurement Uncertainty Recapture Affidavit |
ML023100283 | 1 November 2002 | Request for Withholding Information from Public Disclosure Pilgrim Nuclear Power Station | |
ML023040180 | 31 October 2002 | Request for Additional Information, Appendix K Measurement Uncertainty Recovery - 1.5% Power Uprate Request | |
ML023100302 | 28 October 2002 | Withdrawal of Pilgrim Relief Request (PRR)-27 Relief from 1989 ASME Code Section XI Requirements for Certification of VT-2 Visual Examination Personnel | VT-2 |
ML023330335 | 25 October 2002 | G20020676 - Nilofer Mirza Ltr Re Pilgrim Nuclear Power Station and Exposure Records (Mushaf Raza Mirza) | |
IR 05000293/2002008 | 17 October 2002 | IR 05000293-02-008; on 09/09-09/27/2002; Pilgrim Nuclear Power Station, Engineering Team Inspection Report | |
ML022960294 | 15 October 2002 | Correction of Technical Specification Typographical Errors | High Radiation Area |
ML022960351 | 11 October 2002 | 10 CFR Part 21 Report for Defective Fuel Injector Pump for Pilgrim Nuclear Power Station | |
ML022910068 | 11 October 2002 | September 2002 Monthly Operating Report for Pilgrim | |
ML040350267 | 10 October 2002 | Letter from Sen. Kerry to Dennis Rathbun Regarding Constituent'S Concerns About Security at Pilgrim Nuclear Power Plant | |
ML022910379 | 10 October 2002 | Request for Technical Specification Change Concerning Change of Trip Level Settings, Calibration Frequencies, and Editorial Changes, Revision 1 | Safe Shutdown Mission time |
BVY 02-078, Proof of Financial Protection (10 CFR.140.15) and Guarantee Payment of Deferred Premiums (10 CFR 140.21) | 9 October 2002 | Proof of Financial Protection (10 CFR.140.15) and Guarantee Payment of Deferred Premiums (10 CFR 140.21) | |
ML022840137 | 9 October 2002 | Service List, Withholding from Public Disclosure, General Electric Report, NEDC-33050P, Safety Analysis Report for Pilgrim Nuclear Power Station Thermal Power Organization, Dated July 2002 | |
ML022770037 | 9 October 2002 | Withholding from Public Disclosure, General Electric Report, NEDC-33050P, Safety Analysis Report for Pilgrim Nuclear Power Station Thermal Power Organization, Dated July 2002 | |
ML022660137 | 2 October 2002 | Withholding from Public Disclosure, General Electric Proprietary Document, NEDC-33050P, Safety Analysis Report for Pilgrim Nuclear Power Station Thermal Power Optimization, Dated July 2002 |