 Issue dateTitleTopic
ML06142037531 December 2002PNPS Radiological Effluent and Waste Disposal Report Jan 1- Dec 31, 2002
ML03022045030 December 2002Response to NRC Request for Additional Information Appendix K Measurement Uncertainty Recovery - Power Uprate Request
ML03015015730 December 2002Registration of Use of Cask to Store Spent Fuel
ML03316042023 December 2002Facility Request for Waiver W/O Enclosures Dtd 12/23/2002
ML02357038623 December 2002RAI, Appendix K Measurement Uncertainty Recovery - Power Uprate Request
ML02354003520 December 2002Request for Withholding Information from Public Disclosure
ML04072025716 December 2002Final Report for November 15, 2002, Medical Support MS-1 Drill
ML03010033516 December 2002Final Report for November 15, 2002, Medical Support MS-1 Drill of Offsite Radiological Emergency Plans for Pilgrim Station
ML07078060313 December 2002CR-PNP-2002-12941, P-208D (D Salt Service Water Pump) Shaft Had PittingCoatings
ML02352048412 December 2002November 2002 Monthly Operating Report for Pilgrim
ML02301015510 December 2002G20020606/LTR-02-298 - Sen John Kerry Ltr. Security at Pilgrim, Response Ltr
ML02352007110 December 2002Request for Amendment to the Technical Specifications (Ts), Jet Pump Operability Surveillance Requirements and Correction to Reference Cited in TS 4.11.C.1
ML0235003816 December 2002Fourth Ten-Year Inservice Testing (IST) Program & Request for Approval of IST Relief RequestsSafe Shutdown
High Radiation Area
Ultimate heat sink
Stroke time
Squib
Locked High Radiation Area
Scram Discharge Volume
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Scaffolding
Power change
ML0810904426 December 2002Pilgrim April 2008 Evidentiary Hearing - Staff Exhibit 13, Letter from Entergy to NRC Re Pilgrim Nuclear Power Station Fourth Ten-Year Inservice Testing (IST) Program and Request for Approval of IST Relief RequestsSafe Shutdown
ML0234402374 December 2002Proposed Change to Applicability of Pilgrim'S Pressure-Temperature Curves as Described in Technical Specification Figures 3.6.1, 3.6.2, & 3.6.3, Revision 1Hydrostatic
ML02339006722 November 2002Supplementary Information in Support of Request for Technical Specification Change Re Change of Trip Level Settings, Calibration Frequencies and Editorial Changes, Rev 1
ML02338039522 November 2002Revision to Emergency Plan Implementing Procedures EPIP-310, EPIP-440 and TOCDeep Dose Equivalent
ML02336008421 November 2002Response to NRC Request for Additional Information Appendix K Measurement Uncertainty Recovery - Power Uprate RequestUltimate heat sink
Anticipated operational occurrence
Press Release-I-02-066, NRC Assigns New Resident Inspector at Pilgrim Nuclear Plant21 November 2002Press Release-I-02-066: NRC Assigns New Resident Inspector at Pilgrim Nuclear PlantNew Resident Inspector
ML02325018714 November 2002October 2002 Monthly Operating Report for Pilgrim Nuclear Power Station
ML02317017413 November 2002Request for Additional Information, Regarding Appendix K Measurement Uncertainty Recovery, Power Uprate RequestUltimate heat sink
Anticipated operational occurrence
IR 05000293/20020067 November 2002IR 05000293-02-006; on 06/30-09/28/2002; Entergy Nuclear Operations, Inc.; Pilgrim Nuclear Power Station, Resident Inspection ReportFitness for Duty
High Radiation Area
Ultimate heat sink
Fire Barrier
Stroke time
Contraband
Operability Determination
Power Uprate
ML0232201476 November 2002Response to NRC Request for Additional Information, Appendix K Measurement Uncertainty Recovery - Power Uprate RequestSafe Shutdown
Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Non-Destructive Examination
Offsite Dose Calculation Manual
Anticipated operational occurrence
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Abnormal operational transient
Process Control Program
MELLLA
Earthquake
Fire Protection Program
Flow Induced Vibration
GOTHIC
Power Uprate
Measurement Uncertainty Recapture
Affidavit
ML0231002831 November 2002Request for Withholding Information from Public Disclosure Pilgrim Nuclear Power Station
ML02304018031 October 2002Request for Additional Information, Appendix K Measurement Uncertainty Recovery - 1.5% Power Uprate Request
ML02310030228 October 2002Withdrawal of Pilgrim Relief Request (PRR)-27 Relief from 1989 ASME Code Section XI Requirements for Certification of VT-2 Visual Examination PersonnelVT-2
ML02333033525 October 2002G20020676 - Nilofer Mirza Ltr Re Pilgrim Nuclear Power Station and Exposure Records (Mushaf Raza Mirza)
IR 05000293/200200817 October 2002IR 05000293-02-008; on 09/09-09/27/2002; Pilgrim Nuclear Power Station, Engineering Team Inspection Report
ML02296029415 October 2002Correction of Technical Specification Typographical ErrorsHigh Radiation Area
ML02296035111 October 200210 CFR Part 21 Report for Defective Fuel Injector Pump for Pilgrim Nuclear Power Station
ML02291006811 October 2002September 2002 Monthly Operating Report for Pilgrim
ML04035026710 October 2002Letter from Sen. Kerry to Dennis Rathbun Regarding Constituent'S Concerns About Security at Pilgrim Nuclear Power Plant
ML02291037910 October 2002Request for Technical Specification Change Concerning Change of Trip Level Settings, Calibration Frequencies, and Editorial Changes, Revision 1Safe Shutdown
Mission time
BVY 02-078, Proof of Financial Protection (10 CFR.140.15) and Guarantee Payment of Deferred Premiums (10 CFR 140.21)9 October 2002Proof of Financial Protection (10 CFR.140.15) and Guarantee Payment of Deferred Premiums (10 CFR 140.21)
ML0228401379 October 2002Service List, Withholding from Public Disclosure, General Electric Report, NEDC-33050P, Safety Analysis Report for Pilgrim Nuclear Power Station Thermal Power Organization, Dated July 2002
ML0227700379 October 2002Withholding from Public Disclosure, General Electric Report, NEDC-33050P, Safety Analysis Report for Pilgrim Nuclear Power Station Thermal Power Organization, Dated July 2002
ML0226601372 October 2002Withholding from Public Disclosure, General Electric Proprietary Document, NEDC-33050P, Safety Analysis Report for Pilgrim Nuclear Power Station Thermal Power Optimization, Dated July 2002