' En tergy Entergy Nuclear Operations, Inc.

Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 William J. Riggs Director, Nuclear Assessment October 28, 2002 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35

REFERENCE:

LETTER NUMBER:

Withdrawal of Pilgrim Relief Request (PRR)-27 Relief from1 989 ASME Code Section XI requirements for Certification of VT-2 visual examination personnel.

1.

Entergy Letter No. 2.02.051, "Pilgrim Relief Request (PRR)-27 Relief from1989 ASME Code Section Xl requirements for Certification of VT-2 visual examination personnel", dated June 5, 2002.

2.

Entergy Letter No. 2.02.083, "Supplement to Pilgrim Relief Request (PRR)-27 Relief froml989 ASME Code Section XI requirements for Certification of VT-2 visual examination personnel", dated September 18, 2002.

2.02.097

Dear Sir or Madam:

By this letter, Entergy withdraws Pilgrim Relief Request (PRR)-27, which was submitted on June 5, 2002 and supplemented on September 18, 2002 (References 1 and 2).

Our reason for the withdrawal is as follows:

1. The NRC has published Final Rule, "Industry Codes and Standards; Amended Requirements",

by Federal Register Notice Dated September 26, 2002, providing requirements for certification of VT-2 visual examination personnel. These amended requirements become effective on October 28, 2002.

2. Our review of the Final Rule confirms that the amended requirements include the relief provisions described in the PRR -27 for certification of VT-2 visual examination personnel and the effective date supports the Pilgrim refueling outage schedule. Therefore, we have concluded that the PRR-27 approval is not necessary.

202097

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Letter Number: 2.02.097 Page 2 If you have any questions regarding the information contained in this letter, please contact Bryan Ford at (508) 830-8403.

Sincerely,

."ZW.J. Riggs WGL/dd cc:

Mr. Travis Tate, Project Manager Office of Nuclear Reactor Regulation Mail Stop: 0-8B-1 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. NRC, Region 1 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Pilgrim Nuclear Power Station 202097