IR 05000293-02-008; on 09/09-09/27/2002; Pilgrim Nuclear Power Station, Engineering Team Inspection Report
ML022900745
Person / Time
Site: Pilgrim
Issue date: 10/17/2002
From: Doerflein L
Division of Reactor Safety I
To: Bellamy R
Entergy Nuclear Operations
References
IR-02-008
Download: ML022900745 (14)


Text

ber 17, 2002

SUBJECT:

PILGRIM NUCLEAR POWER STATION - NRC INSPECTION REPORT 50-293/02-008

Dear Mr. Bellamy:

On September 27, 2002, the NRC completed a team inspection at the Pilgrim Nuclear Power Station. The enclosed report documents the results of that inspection which were discussed with Mr. C. Dugger, and other members of your staff, on September 27, 2002.

The inspection examined activities conducted under your license as they relate to safety system design and performance capability of the low pressure coolant injection and reactor building closed cooling water systems, and compliance with the Commissions rules and regulations.

The inspection consisted of a review of selected procedures and records, examination of components and systems, observation of activities, and interviews with site personnel.

On the basis of the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Lawrence T. Doerflein, Chief Systems Branch Division of Reactor Safety Docket No. 50-293 License No. DPR-35 Enclosure: Inspection Report 50-293/02-008 Attachment 1: Supplemental Information

Mr. Robert