IR 05000293/2002008
ML022900745 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 10/17/2002 |
From: | Doerflein L Division of Reactor Safety I |
To: | Bellamy R Entergy Nuclear Operations |
References | |
IR-02-008 | |
Download: ML022900745 (14) | |
Similar Documents at Pilgrim | |
---|---|
Category:Inspection Report
MONTHYEARIR 05000293/20240022024-08-21021 August 2024
[Table view]NRC Inspection Report No. 05000293/2024002 IR 05000293/19570012024-06-12012 June 2024 640304-Amendment 10 License 50-29357-01/030-38077 for Providence Imaging Center (PIC) IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 IR 05000293/20220012022-05-11011 May 2022 NRC Inspection Report No. 05000293/2022001 IR 05000293/20210042022-02-0909 February 2022 NRC Inspection Report No. 05000293/2021004 IR 05000293/20210032021-11-12012 November 2021 NRC Inspection Report No. 05000293/2021003 IR 05000293/20210022021-08-10010 August 2021 NRC Innspection Report No. 05000293/2021002 ML21187A2702021-07-12012 July 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07201044/2021401 IR 05000293/20214022021-07-12012 July 2021 Security Decommissioning Inspection Report 05000293/2021402 IR 05000293/20210012021-05-13013 May 2021 NRC Inspection Report No. 05000293/2021001, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station IR 05000293/20214012021-04-27027 April 2021 Security Decommissioning Inspection Report 05000293/2021401 IR 05000293/20200042021-02-22022 February 2021 NRC Inspection Report No. 05000293/2020004, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts IR 05000293/20204012020-12-17017 December 2020 Security Decommissioning Inspection Report 05000293/2020401 Without OUO Enclosure (Public Cover Letter Only) IR 05000293/20200022020-11-30030 November 2020 NRC Inspection Report No. 05000293/2020002 & 2020003, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts ML20335A0092020-11-30030 November 2020 NRC Inspection Report No. 05000293/2020002 & 2020003, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts ML20070P3342020-03-10010 March 2020 NRC Inspection Report No. 07201044/2019001, Holtec Decomissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts IR 05000293/19820012020-01-0303 January 2020 David Paul Dba C.Q.C. Company; Termination; License 50-29382-01; Docket 030-38241; Control 616184 IR 05000293/20190022019-07-24024 July 2019 Integrated Inspection Report 05000293/2019002 and Assessment Follow-up Letter IR 05000293/20190012019-05-13013 May 2019 Integrated Inspection Report 05000293/2019001 IR 05000293/20180062019-03-0404 March 2019 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2018006) and Confirmatory Action Letter Closure IR 05000293/20180042019-02-13013 February 2019 Integrated Inspection Report 05000293/2018004 and Independent Spent Fuel Storage Installation Report 07201044/2018201 IR 05000293/20180132019-01-23023 January 2019 Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018013 IR 05000293/20185012018-12-0606 December 2018 Evaluated Emergency Preparedness Exercise Inspection Report 05000293/2018501 IR 05000293/20180152018-11-21021 November 2018 Triennial Fire Protection Inspection Report 05000293/2018015 IR 05000293/20180032018-11-13013 November 2018 Integrated Inspection Report 05000293/2018003 and Independent Spent Fuel Storage Installation Inspection Report 07201014/2018001 IR 05000293/20180122018-11-0101 November 2018 Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018012 IR 05000293/20180112018-10-0909 October 2018 Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018011 IR 05000293/20184112018-09-24024 September 2018 Baseline Security Inspection Report 05000293/2018411 IR 05000293/20180052018-08-28028 August 2018 Assessment Follow-up Letter and Updated Inspection Plan (Inspection Report 05000293/2018005) IR 05000293/20180022018-08-14014 August 2018 Integrated Inspection Report 05000293/2018002 IR 05000293/20184102018-06-20020 June 2018 Baseline Security Inspection Report 05000293/2018410 (Letter Only) IR 05000293/20180102018-06-13013 June 2018 Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018010 IR 05000293/20180012018-05-14014 May 2018 Integrated Inspection Report 05000293/2018001 IR 05000416/20170142018-03-12012 March 2018 Confirmatory Order, NRC Inspection Report 05000416/2017014, and NRC Investigation Reports 4-2016-004 and 4-2014-021 IR 05000293/20170062018-02-28028 February 2018 Annual Assessment Letter for Pilgrim Nuclear Power Station (Reports 05000293/2017006, 05000293/2017402, and 05000293/2017501) IR 05000293/20170042018-02-14014 February 2018 Integrated Inspection Report 05000293/2017004 IR 05000293/20170102018-02-0101 February 2018 Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2017010 IR 05000293/20170092017-12-21021 December 2017 Problem Identification and Resolution Inspection Report 05000293/2017009 IR 05000293/20172012017-11-21021 November 2017 NRC Security Inspection Report 05000293/2017201 IR 05000293/20170032017-11-14014 November 2017 Integrated Inspection Report 05000293/2017003 IR 05000293/20174042017-10-17017 October 2017 Material Control and Accounting Program Inspection Report 05000293/2017404 (Letter Only) IR 05000293/20174032017-10-12012 October 2017 Baseline Security Inspection Report 05000293/2017403, (Letter Only) IR 05000293/20170072017-09-28028 September 2017 Design Bases Assurance Inspection Report 05000293/2017007 IR 05000293/20174052017-09-0505 September 2017 Problem Identification and Resolution Sample Inspection Report 05000293/2017405 (Letter Only) 2024-08-21 Category:Letter MONTHYEARML24240A1692024-09-18018 September 2024
[Table view]Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23300A0022023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 ML23143A0872023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 And Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 2024-09-18 |
Inspection Report - Pilgrim - 2002008 | |
---|---|
Assessments |
Text
ber 17, 2002
SUBJECT:
PILGRIM NUCLEAR POWER STATION - NRC INSPECTION REPORT 50-293/02-008
Dear Mr. Bellamy:
On September 27, 2002, the NRC completed a team inspection at the Pilgrim Nuclear Power Station. The enclosed report documents the results of that inspection which were discussed with Mr. C. Dugger, and other members of your staff, on September 27, 2002.
The inspection examined activities conducted under your license as they relate to safety system design and performance capability of the low pressure coolant injection and reactor building closed cooling water systems, and compliance with the Commissions rules and regulations.
The inspection consisted of a review of selected procedures and records, examination of components and systems, observation of activities, and interviews with site personnel.
On the basis of the results of this inspection, no findings of significance were identified.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Lawrence T. Doerflein, Chief Systems Branch Division of Reactor Safety Docket No. 50-293 License No. DPR-35 Enclosure: Inspection Report 50-293/02-008 Attachment 1: Supplemental Information
Mr. Robert