 Issue dateTitleTopic
ML03003078617 December 2002Revisions to Emergency Plan Implementing Procedures, Including Revision 133 to Table of Contents, Revision 9 to EPIP 2.6 & Revision 5 to EPIP Note-05
ML02352009413 December 2002DAEC Emergency Planning Dept Procedure Transmittal Acknowledgement Memo (TAM-18) Entire EPIP DocumentPressure Boundary Leakage
ML02352015313 December 2002DAEC Emergency Planning Dept Procedure Transmittal Acknowledgement Memo (TAM-15) EAL Basis Document (Table of Contents Rev)Safe Shutdown
NG-02-1132, November 2002 Monthly Operating Report for Duane Arnold Energy Center13 December 2002November 2002 Monthly Operating Report for Duane Arnold Energy CenterPower change
NG-02-1121, Transmittal of Signed Indemnity Agreement Amendment6 December 2002Transmittal of Signed Indemnity Agreement Amendment
NG-02-1106, Single Failure-Proof Status of Reactor Building Crane4 December 2002Single Failure-Proof Status of Reactor Building CraneSafe Shutdown
Control of Heavy Loads
ML03002033730 November 2002RO Initial License Examination November 2002Shutdown Margin
High Radiation Area
Squib
Scram Discharge Volume
MELLLA
Fuel cladding
Power change
ML03002037530 November 2002SRO Initial License Examination November 2002Shutdown Margin
Loop seal
High Radiation Area
Squib
Scram Discharge Volume
Fuel cladding
Power change
ML02337036925 November 2002GFE Registration Letter - February 2003 ExaminationGeneric Fundamentals Examination
IR 05000331/200201220 November 2002IR 05000331-02-012 (Drs), on 10-21-25/2002, Alliant, Ies Utilities Inc.; Duane Arnold Energy Center. Emergency Preparedness Specialist Report. No Violations Noted
ML02326047920 November 200202, Duane Arnold Notification of NRC Triennial Fire Protection Baseline Inspection 05000331-03-002Safe Shutdown
Fire Barrier
Fire impairment
Fire Protection Program
ML03058017718 November 2002Outline Submittal and NRC Comments for the Duane Arnold Examination - November 2002Shutdown Margin
High Radiation Area
Half scram
Operability Determination
ML03058010618 November 2002Miscellaneous Correspondence for the Duane Arnold Examination - November 2002Generic Fundamentals Examination
ML03058016018 November 2002Various Checklist for the Duane Arnold Examination - November 2002Job Performance Measure
ML03058020318 November 2002NRC Comments on the Operating Test and Written Examination Including Forms ES-401-9 and ES-401-10 for the Duane Arnold Examination - November 2002
ML03058025718 November 2002Initial Submittal of the Administrative Jpms for the Duane Arnold Examination - November 2002Fitness for Duty
High Radiation Area
Locked High Radiation Area
Job Performance Measure
ML03058035218 November 2002Initial Submittal of the Walkthrough Jpms for the Duane Arnold Examination - November 2002Loop seal
Job Performance Measure
Scram Discharge Volume
ML03058059318 November 2002Initial Submittal of the Scenarios for the Duane Arnold Examination - November 2002Half scram
Time to boil
Squib
Overtravel
Power change
ML03058070818 November 2002Initial Submittal of the RO Written Examination for the Duane Arnold Examination - November 2002Shutdown Margin
High Radiation Area
Squib
Scram Discharge Volume
Overtravel
Fuel cladding
Power change
Power Uprate
ML03058074718 November 2002Initial Submittal of the SRO Written Examination for the Duane Arnold Examination - November 2002Shutdown Margin
Loop seal
High Radiation Area
Squib
Scram Discharge Volume
Overtravel
Fuel cladding
Power change
Unidentified leakage
Power Uprate
ML03059001618 November 2002Final AS-ADMINISTERED Administrative Jpms for the Duane Arnold Examination - November 2002Fitness for Duty
High Radiation Area
Job Performance Measure
ML03059010218 November 2002Final AS-ADMINISTERED Walkthrough Jpms for the Duane Arnold Examination - November 2002Loop seal
Job Performance Measure
Scram Discharge Volume
ML03059021418 November 2002Final AS-ADMINISTERED Scenarios for the Duane Arnold Examination - November 2002Half scram
Time to boil
Squib
Overtravel
Power change
NG-02-1036, October 2002 Monthly Operating Report for Duane Arnold Energy Center15 November 2002October 2002 Monthly Operating Report for Duane Arnold Energy CenterDownpower
ML0230905581 November 2002Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination Administered on 10/09/2002Generic Fundamentals Examination
IR 05000331/200200629 October 2002IR 05000331-02-006, on 06/30-09/28/2002, Ies Utilities, Inc.; Duane Arnold Energy Center; Maintenance Risk Assessments and Emergent Work Control, and Personnel Performance During Nonroutine Plant Evolutions and EventsHigh Radiation Area
Probabilistic Risk Assessment
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Process Control Program
ML02295010728 October 2002Correction to Issuance of Amendment No. 248, TAC MB4269High Radiation Area
ML02291008322 October 2002Correction of Issuance of Amendment 247, Page 2 of the Amendment Page.
ML02302045319 October 2002Entire EAL Basis Document (Table of Contents Rev) (Copy 91)
ML02302044917 October 2002Entire EPIP Document (Copy 28)Temporary Modification
ML02287000816 October 2002Enclosures 1 & 2, Order for Interim Safeguards & Compensatory Measures for Dry Independent Spent Fuel Storage Installation & Regulatory Issuance Summary 2002-12D
NG-02-0926, September 2002 Monthly Operating Report for Duane Arnold15 October 2002September 2002 Monthly Operating Report for Duane Arnold
ML0224703392 October 2002License Amendent, Technical Specifications Task Force Change No. 258, Revision 4, Changes to Section 5.0, Administrative Controls.High Radiation Area
TAC:MB42692 October 2002
ML0227703442 October 2002Tech Spec for Amendment No. 248, Organization 5.2 for Duane ArnoldHigh Radiation Area
Process Control Program
ML0222800411 October 2002License Amendment, Extends On-line Battery Replacement TimeHigh winds
Probabilistic Risk Assessment
Large early release frequency
Earthquake
Turbine Missile
TAC:MB38101 October 2002
ML0227703311 October 2002Technical Specifications, Extends On-line Battery Replacement Time