Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
NLS2002104, License Amendment Request, Adopt Integrated Reactor Vessel Material Surveillance Program31 December 2002License Amendment Request, Adopt Integrated Reactor Vessel Material Surveillance ProgramUnanalyzed Condition
Anticipated operational occurrence
Hydrostatic
Abnormal operational transient
TAC:MB681620 December 2002
NLS2002142, Reporting of Changes and Errors in ECCS Evaluation Models20 December 2002Reporting of Changes and Errors in ECCS Evaluation Models
NLS2002145, Revised May Through October 2002 Monthly Report for Cooper Nuclear Station20 December 2002Revised May Through October 2002 Monthly Report for Cooper Nuclear Station
ML02354025120 December 2002Withholding Information from Public Disclosure, TAC No. MB6816
NLS2002093, Additional Information Related to License Condition 2.C.(6) Seismic Evaluation19 December 2002Additional Information Related to License Condition 2.C.(6) Seismic Evaluation
ML02351012316 December 2002Init EXAM-08/2002 - Final Written Exam OutlinesShutdown Margin
ML03029052313 December 2002Briefing Slides for Presentation Status of the CNS BWRVIP Program from 12/13/2002 Meeting with Nebraska Public Power DistrictEVT-1
NLS2002143, November 2002 Monthly Operating Report for Cooper12 December 2002November 2002 Monthly Operating Report for Cooper
NLS2002144, Notification to the NRC of the New Vice President-Nuclear at Cooper10 December 2002Notification to the NRC of the New Vice President-Nuclear at Cooper
ML0234006236 December 2002Meeting Notice Revision 2 of Strategic Improvement Plan
ML0234001853 December 2002NRC Plans to Administer Generic Fundamentals Section of Written Operator Licensing Examination on 02/05/2003Generic Fundamentals Examination
ML02331044227 November 2002Forthcoming Meeting with Nebraska Public Power District (Nppd), Cooper Licensee'S BWRVIP Briefing
ML02330054726 November 2002Notification of NRC Initial Operator Licensing Examination (Examination Report 50-298/03-301)
NLS2002141, the Strategic Improvement Plan, Revision 2, Appendix A-3, Action Plan 5.4.1.425 November 2002the Strategic Improvement Plan, Revision 2, Appendix A-3, Action Plan 5.4.1.4Temporary Modification
Maintenance Rule Program
Scaffolding
Power change
NLS2002135, Design Basis Accident Radiological Assessment Calculation Methodology Additional Information25 November 2002Design Basis Accident Radiological Assessment Calculation Methodology Additional InformationSafe Shutdown Earthquake
Operating Basis Earthquake
Seismically rugged
NLS2002136, Response to Draft Request for Additional Information on the Supplemental Information Submitted by Nebraska Public Power District for Cooper Nuclear Station License Condition, 2.6 (6)25 November 2002Response to Draft Request for Additional Information on the Supplemental Information Submitted by Nebraska Public Power District for Cooper Nuclear Station License Condition, 2.6 (6)
ML02329020220 November 2002Summary of Meeting with Cooper Nuclear Station. Refers to Meeting Conducted on on 11/18/2002 to Discuss Development & Submission of Revision 2 of Cooper Nuclear Station Strategic Improvement Plan
NLS2009057, Nedc 87-131B, Revision 8, Cooper Nuclear Station, 250 Vdc Division II Load and Voltage Study.20 November 2002Nedc 87-131B, Revision 8, Cooper Nuclear Station, 250 Vdc Division II Load and Voltage Study.Safe Shutdown
Stroke time
NLS2002138, October 2002 Monthly Operating Report for Cooper Nuclear Station15 November 2002October 2002 Monthly Operating Report for Cooper Nuclear Station
NLS2002129, License Amendment Request to Revise TS-Safety Limit Minimum Critical Power Ratio, Cooper Nuclear Station15 November 2002License Amendment Request to Revise TS-Safety Limit Minimum Critical Power Ratio, Cooper Nuclear StationReactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Abnormal operational transient
Fuel cladding
NLS2002111, Inservice Testing Program Relief Request RP-06, RP-0714 November 2002Inservice Testing Program Relief Request RP-06, RP-07Incorporated by reference
ML02310013113 November 2002Memo Draft Documents for June 26, 2002 Through October 28, 2002
NLS2002137, Regulatory Information Summary (RIS) 2002-15, NRC Approval of Commercial Data Encryption Systems for the Electronic Transmission of Safeguards Information.6 November 2002Regulatory Information Summary (RIS) 2002-15, NRC Approval of Commercial Data Encryption Systems for the Electronic Transmission of Safeguards Information.
NLS2002133, Clarification of Safety Evaluation, Quality Assurance Program6 November 2002Clarification of Safety Evaluation, Quality Assurance Program
ML0230902075 November 2002Summary of Category 1 Meeting with Nebraska Power, Cooper -Ultimate Heat Sink Amendment RequestUltimate heat sink
ML0230905504 November 2002Generic Fundamentals Examination - Copy of PWR & BWR GFEs & Answer Keys Available on NRCs Website 60 Days Following ExamGeneric Fundamentals Examination
ML0230900664 November 2002Meeting with Nebraska Public Power District Development and Submission of Revision 2 of Cooper Nuclear Station Strategic Improvement Plan
IR 05000298/200200331 October 2002IR 05000298-02-003, on 07/07-10/05/02; Cooper Nuclear Station. Integrated Resident/Regional Report; Permanent Plant Modifications, Access Authorization, Identification & Resolution of ProblemsSafe Shutdown
Grab sample
Fire Barrier
Contraband
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Maintenance Rule Program
Continuous fire watch
Fire Protection Program
Power change
Downpower
Siren
ML02170016825 October 2002Boiling Water Reactor Vessel and Internals Project (BWRVIP) Project Implementation
TAC:MB519125 October 2002
ML02305020021 October 2002Attachment 18, Cooper Nuclear Station, Draft RAI on Supplemental Information Submitted by Nebraska Public Power District, Collapsed Load Method Used for Stress Analysis of Main Steam Line Piping
NLS2002123, Reply, IR 05000298-02-007, Dated 09/20/02, Cooper Nuclear Station18 October 2002Reply, IR 05000298-02-007, Dated 09/20/02, Cooper Nuclear StationCondition Adverse to Quality
Power change
NLS2002122, 10CFR50.59(d)(2) Summary Report17 October 200210CFR50.59(d)(2) Summary ReportSafe Shutdown
Stroke time
Internal Flooding
Fire impairment
Nondestructive Examination
Temporary Modification
Qualified Offsite Circuit
Systematic Assessment of Licensee Performance
Offsite Circuit
Hourly Fire Watch
Unidentified leakage
Overspeed trip
ML02273051611 October 2002Y020020211 - Reply to M. Mulligan Dated 10/11/02 (3) e-mails to V Dricks-Safety Concern & Corruption: Cooper & Missouri River, NRC and Cooper Ethical & Safety Concern, and Cooper Nuclear StationUltimate heat sink
NLS2002126, September 2002 Monthly Operating Report for Cooper Nuclear Station10 October 2002September 2002 Monthly Operating Report for Cooper Nuclear Station
ML02284021210 October 2002OI 4-2001-043, Nebraska Public Power District, Closure of Investigation
ML02276052810 October 2002Letter and Safety Evaluation, Quality Assurance Plan. Review of Cooper Nuclear Station Quality Assurance Program Plan Changes
TAC:MB627110 October 2002
ML0228903398 October 2002Proposed Technical Specification Amendment - Personnel Title Revisions and Reference Correction to Technical Specification Section 5.0, Administrative Controls for Cooper Nuclear Station
NLS2002125, Clarification of Amendment No.194 Safety Evaluation Cooper Nuclear Station7 October 2002Clarification of Amendment No.194 Safety Evaluation Cooper Nuclear Station
NLS2002128, Revision to Service List7 October 2002Revision to Service List