Revised May Through October 2002 Monthly Report for Cooper Nuclear Station
ML023610111
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/20/2002
From: Hutton J
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2002145
Download: ML023610111 (3)


Text

Nebraska Public Power District Nebraska's Energy Leader NLS2002145 December 20, 2002 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Revised Monthly Operating Report Data for May 2002 Through October 2002, Docket No. 50-298

Reference:

Letter from J. A. Hutton (Nebraska Public Power District) to U. S. Nuclear Regulatory Commission, dated June 14, 2002, Monthly Operating Status Report for May 2002 Nebraska Public Power District has identified errors in the May 2002 Monthly Operating Report (Reference) for Cooper Nuclear Station (CNS). These errors involved the outage duration and generator on-line hours for the month of May. This in turn effects the generator on-line year to date and cumulative hours for the months of May 2002 through October 2002. This error has been entered into the CNS Corrective Action Program.

The May 2002 Monthly Operating Report reported a forced outage, 02-01 and incorrectly reported the duration of this outage. Hours during which the reactor was operating at low power but with the generator off-line were originally included in the forced outage duration. The corrected duration is 167.1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. There is no other change to the reported informnation concerning forced outage 02-01. Additionally, the generator on-line hours were incorrect. The corrected generator on-line hours for May 2002 are 540.5.

In summary, the corrected outage duration is 167.1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and the corrected generator on line hours are 540.5. The following table provides corrected generator on-line year to date and cumulative hours for the months of May 2002 through October 2002.

MONTH YR-TO-DATE CUMULATIVE May 3393.4 184748.2 June 4113.4 185468.2 July 4857.4 186212.2 August 5601.4 186956.2 September 6321.4 187676.2 October 7066.4 188421.2 Cooper Nuclear Station P.O. Box 98/Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 http //www nppd corn

NLS2002145 Page 2 of 2 This error was identified and the database corrected prior to the submission of the November 2002 Monthly Operating Report, which contains correct information.

Should you have any comment or require additional information regarding this report, please contact Paul Fleming at (402) 825-2774.

Sincerely, J/es A. Hutton PIant Manager

/cb cc: NRC Regional Administrator W. R. Mayben NRC Senior Resident Inspector W. D. Shanks ANI Library C. C. Warren J. M. Cline B. Lewis A. L. Dostal G. W. Griffith J. W. Dutton D. T. McNeil R. L. Gumm INPO Records Center Records

I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS Correspondence Number: NLS2002145 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None i