Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18226A330 | 28 September 2018 | Review of Update to Spent Fuel Management Plan | Exemption Request |
ML18275A116 | 28 September 2018 | Notification of Revised Post-Shutdown Decommissioning Activities Report and Revised Site-Specific Decommissioning Cost Estimate for Oyster Creek Nuclear Generating Station | Offsite Dose Calculation Manual NJPDES License Renewal Exemption Request Environmental Justice |
ML18270A021 | 27 September 2018 | NRR E-mail Capture - Acceptance Review - Oyster Creek License Transfer Application (L-2018-LLM-0002) | |
RA-18-088, Radiological Emergency Plan Addendum Revision. Includes EP-AA-1010, Addendum 3, Revision 4, Emergency Action Levels for Oyster Creek. | 25 September 2018 | Radiological Emergency Plan Addendum Revision. Includes EP-AA-1010, Addendum 3, Revision 4, Emergency Action Levels for Oyster Creek. | |
ML18274A089 | 25 September 2018 | Attachment 1, 10 CFR 50.54(q)(5) Procedure Change Summary Analysis & Attachment 2, EP-AA-1010, Addendum 3, Revision 4, Emergency Action Levels for Oyster Creek Station. | Safe Shutdown High winds Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Operating Basis Earthquake Operator Manual Action Earthquake Fuel cladding Pressure Boundary Leakage Power change |
RA-18-083, Certification of Permanent Removal of Fuel from the Reactor Vessel for Oyster Creek Nuclear Generating Station | 25 September 2018 | Certification of Permanent Removal of Fuel from the Reactor Vessel for Oyster Creek Nuclear Generating Station | |
ML18269A083 | 25 September 2018 | NRR E-mail Capture - Oyster Creek - No Longer Authorized to Operate the Reactor - 10 CFR 50.82(a)(2) | |
RA-18-087, Response to Request for Additional Information (RAI) Related to Post-Shutdown Decommissioning Activities Report | 24 September 2018 | Response to Request for Additional Information (RAI) Related to Post-Shutdown Decommissioning Activities Report | License Renewal Exemption Request |
ML18263A163 | 17 September 2018 | NRR E-mail Capture - Oyster Creek Permanently Ceases Power Operations | |
RA-18-084, Secondary Containment Capability Test | 14 September 2018 | Secondary Containment Capability Test | |
ML18255A042 | 12 September 2018 | Comment (3) of Ron Martyn on Behalf of Community Civic Affairs Group on Decommissioning Creek Nuclear of Exelon'S Oyster Generating Station | |
ML18256A002 | 12 September 2018 | NRR E-mail Capture - for Your Action: RAIs for Oyster Creek Post Shutdown Decommissioning Activities Report (PSDAR) | License Renewal Exemption Request |
ML18201A263 | 31 August 2018 | Summary of Public Meeting in Forked River, Nj, to Discuss Oyster Creek Nuclear Generating Station Post-Shutdown Decommissioning Activities Report | |
ML18228A534 | 31 August 2018 | Summary of 8/15/2018 Pre-Submittal Meeting with Exelon Generation Company, LLC Regarding the License Transfer of Oyster Creek Nuclear Generating Station to Holtec International | Exemption Request |
ML18030B361 | 30 August 2018 | Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9427; EPID L-2016-LRC-0001) | Functionality Assessment |
CAC:MF9427 | 30 August 2018 | ||
ML18225A175 | 15 August 2018 | Decommissioning License Transfer Application NRC Pre-Submittal Meeting | Exemption Request |
RA-18-078, Submittal of Sea Turtle Incidental Take Report 2018-004 | 15 August 2018 | Submittal of Sea Turtle Incidental Take Report 2018-004 | |
ML18226A002 | 14 August 2018 | Holtec Revised Slides for NRC LTA Pre-Submittal Meeting (Oyster Creek Nuclear Generating Station) | Exemption Request |
RA-18-077, Sea Turtle Incidental Take Report 2018-003 | 14 August 2018 | Sea Turtle Incidental Take Report 2018-003 | |
ML18222A541 | 10 August 2018 | NRR E-mail Capture - for Your Comments - State of New Jersey - Oyster Creek License Amendment Request Regarding Permanently Defueled Technical Specifications | Safe Shutdown Time of Discovery Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Hydrostatic Probabilistic Risk Assessment Cyber Security Emergency Lighting Incorporated by reference Finite Element Analysis Aging Management Missed surveillance Abnormal operational transient Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Feedwater Controller Failure Deep Dose Equivalent Fuel cladding Fire Protection Program Grace period Power change |
ML18221A496 | 9 August 2018 | NRR E-mail Capture - for Your Comments - State of New Jersey - Oyster Creek License Amendment Request Regarding Emergency Plan and Emergency Action Level Scheme for Permanently Defueled Condition | Time of Discovery High winds High Radiation Area Offsite Dose Calculation Manual Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Design basis earthquake Safeguards Contingency Plan Exemption Request Earthquake Fuel cladding Minimum staff Fire Protection Program Grace period Fatality |
ML18194A788 | 8 August 2018 | Environmental Assessment and Finding of No Significant Impact Related to Request for Exemptions from Certain Emergency Planning Requirements (CAC No. MG0153; EPID L-2017-LLE-0020) | License Renewal Exemption Request |
ML18194A787 | 8 August 2018 | Letter, Environmental Assessment and Finding of No Significant Impact Related to Request for Exemptions from Certain Emergency Planning Requirements (CAC No. MG0153; EPID L-2017-LLE-0020) | License Renewal Exemption Request |
ML18205A550 | 6 August 2018 | Memorandum to File - Public Feedback to 7/17/18 Public Meeting in Forked River, Nj, to Receive Public Comments on Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate | |
ML18226A317 | 6 August 2018 | NRR E-mail Capture - Logbook Entry: 08/06/2018 the Retrieval of a Dead Sea Turtle | |
IR 05000219/2018002 | 2 August 2018 | Integrated Inspection Report 05000219/2018002 and Independent Spent Fuel Storage Installation Report 0700015/2018001 | High Radiation Area Hydrostatic Past operability Functionality Assessment Locked High Radiation Area Operability Determination Fire Protection Program Power change |
ML18208A399 | 27 July 2018 | NRR E-mail Capture - for Your Info - Environmental Assessment (EA) and Finding of No Significant Impact (Fonsi) for Oyster Creek EP Exemption | |
ML18226A316 | 26 July 2018 | NRR E-mail Capture - Logbook Entry: 07/26/2018 Oyster Creek Turtle Report a Live Sea Turtle Retrieved from the Oyster Creek Intake | |
ML18193A028 | 20 July 2018 | Transmittal of Final Oyster Creek Nuclear Generating Station Accident Sequence Precursor Report (Licensee Event Report 219-2017-0005) | Mission time Fire Barrier Probabilistic Risk Assessment FLEX Significance Determination Process Earthquake |
ML18130A649 | 20 July 2018 | Final Accident Sequence Precursor Analysis - Oyster Creek Nuclear Generating Station, Failure of Emergency Diesel Generator During Surveillance Testing Due to a Broken Electrical Connector (LER 219-2017-005) - Precursor | Mission time Fire Barrier Probabilistic Risk Assessment FLEX Significance Determination Process Earthquake |
ML18201A377 | 17 July 2018 | Meeting Transcript for 7/17/2018 Public Meeting in Forked River, Nj, to Receive Public Comments on Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate | |
ML18201A237 | 17 July 2018 | Slides 7/17/2018 PSDAR Meeting | High winds |
ML18198A539 | 17 July 2018 | NRR E-mail Capture - Logbook Entry: 07/17/2018 a Dead Juvenile Kemp Ridley Sea Turtle | |
ML18201A284 | 17 July 2018 | PSDAR Public Meeting the NRC Review Process | |
ML18201A307 | 17 July 2018 | Post Shutdown Decommissioning Activities Report (PSDAR) Public Meeting Presentation | |
ML18193B121 | 12 July 2018 | Decommissioning Inspection Plan for Oyster Creek Nuclear Generating Station - 2018 | |
ML18192A165 | 11 July 2018 | Response to Questions Pertaining to Licensed Operator (RA-18-066) | |
ML18187A376 | 6 July 2018 | NRC Region I Twitter Feeds 4-1 to 6-30-2018 | Open House New Resident Inspector |
Press Release-18-028, NRC to Hold Public Meeting for Comments on Oyster Creek Nuclear Power Plant Decommissioning Activities Report | 2 July 2018 | Press Release-18-028: NRC to Hold Public Meeting for Comments on Oyster Creek Nuclear Power Plant Decommissioning Activities Report |