Issue date | Title | Topic | |
---|---|---|---|
NEI 99-01, Wolf Creek Nuclear Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | 30 September 2016 | Wolf Creek Nuclear Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | Safe Shutdown Time of Discovery High winds Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Spent Fuel Pool Instrumentation Earthquake Fuel cladding Pressure Boundary Leakage Fire Protection Program Grace period Power change |
WO 16-0045, Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | 30 September 2016 | Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | Safe Shutdown Time of Discovery High winds Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Spent Fuel Pool Instrumentation Earthquake Fuel cladding Pressure Boundary Leakage Fire Protection Program Grace period Power change |
ML16271A426 | 28 September 2016 | Project Manager Assignment to Balwant K. Singal Effective 10/2/2016 | |
ML16271A482 | 27 September 2016 | Summary of Regulatory Conference to Discuss Safety Significance of Wolf Creek Generating Station Emergency Generator Excitation Diode Apparent Violation | Probabilistic Risk Assessment |
ML16281A270 | 22 September 2016 | Part 21 - Initial Notification of Masterpact Breaker Fail to Close | |
ML16278A471 | 22 September 2016 | Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close | |
ML16263A035 | 19 September 2016 | NRR E-mail Capture - Acceptance Review (CAC Nos. MF8306 and MF8307) Relief I3R-15 (Steam Generator tubesheet-to-head Weld ISI) and I3R-14 (Pressurizer nozzle-to-vessel Weld ISI) | |
ML16263A350 | 13 September 2016 | Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) | |
ML16256A598 | 12 September 2016 | NRR E-mail Capture - Acceptance Review | |
NEI 99-01, Wolf Creek Generating Station Proposed Revised EAL Technical Basis Document | 12 September 2016 | Wolf Creek Generating Station Proposed Revised EAL Technical Basis Document | Safe Shutdown Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Spent Fuel Pool Instrumentation Earthquake Fuel cladding Pressure Boundary Leakage Fire Protection Program Grace period Power change |
ML16279A327 | 12 September 2016 | Proposed Revised EAL Technical Basis Document | Safe Shutdown Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Spent Fuel Pool Instrumentation Earthquake Fuel cladding Pressure Boundary Leakage Fire Protection Program Grace period Power change |
IR 05000482/2016005 | 12 September 2016 | Errata for Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016005) | B.5.b Spent Fuel Pool Instrumentation |
CAC:MF8308 | 12 September 2016 | ||
ML16250A165 | 9 September 2016 | 8/25/16 Summary of Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Amendment Request to Transition to Westinghouse Analyses Methodologies and Alternate Source Term at Wolf Creek Generating Station | |
Press Release-IV-16-019, NRC Schedules Regulatory Conference to Discuss Apparent Violation at Wolf Creek Nuclear Generating Station | 6 September 2016 | Press Release-IV-16-019: NRC Schedules Regulatory Conference to Discuss Apparent Violation at Wolf Creek Nuclear Generating Station | |
ML16251A310 | 2 September 2016 | Technical Specification Shutdown Due to Reactor Coolant System Leakage | |
ML16243A513 | 1 September 2016 | Summary of August 25, 2016, Public Meeting with Wolf Creek Nuclear Operating Corporation and Amerenue Regarding a Proposed Application for a New Technical Specification for the Class 1E Electrical Equipment Air Conditioning System (MF8118 a | |
ML16260A410 | 1 September 2016 | Operating - Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel | |
IR 05000482/2016401 | 31 August 2016 | Non-Public Security Inspection Plan for Wolf Creek Generating Station (NRC Physical Security Inspection Reports Number 05000482/2016401) | |
ML16237A073 | 31 August 2016 | Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016005) | Spent Fuel Pool Instrumentation B.5.b Mitigating Strategies |
IR 05000482/2016408 | 31 August 2016 | NRC Security Inspection Report 05000482/2016408 (Cover Letter Only) | Affidavit |
ML16236A097 | 25 August 2016 | Operating Corporation - August 25, 2016, Core Design and Safety System Analysis Methodology Transition License Amendment Request Revised | Affidavit |
ML16243A472 | 25 August 2016 | Part 21 Reporting of Defects and Noncompliance | |
ML16236A095 | 25 August 2016 | and Wolf Creek Generating Station - August 25, 2016, Class 1E Electrical Equipment Air Conditioning System Pre-Application Meeting | Safe Shutdown |
CAC:MF8136 | 25 August 2016 | ||
ML16237A021 | 24 August 2016 | NRR E-mail Capture - Acceptance Review for Consent to Indirect Transfer of Control for Wolf Creek Generating Station | |
ET 16-0019, Relief from Impractical Examination Coverage Requirements for the Third 10-Year Inservice Inspection Program Interval | 23 August 2016 | Relief from Impractical Examination Coverage Requirements for the Third 10-Year Inservice Inspection Program Interval | VT-2 |
WO 16-0046, Operating Corporation - Request for Regulatory Conference | 23 August 2016 | Operating Corporation - Request for Regulatory Conference | |
CAC:MF8306 | 23 August 2016 | ||
ML16231A197 | 23 August 2016 | Relief Request I4R-02, from Requirements of ASME Code Table IWF-2500-1 VT-3 Examination for Class 1 Supports, for the Fourth 10-Year Inservice Inspection Interval | Incorporated by reference |
ML16235A132 | 19 August 2016 | NRC Inspection Report 05000482/2016008; January 1, 2016 Through June 29, 2016; Preliminary White Finding | Safe Shutdown High winds Mission time Enforcement Discretion Probabilistic Risk Assessment Condition Adverse to Quality Significance Determination Process Large early release frequency Preliminary White Finding |
ML16229A255 | 18 August 2016 | Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 2016 | Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Squib Exemption Request Earthquake Turbine Missile Fuel cladding |
ET 16-0018, Seventh Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. | 18 August 2016 | Seventh Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. | Safe Shutdown Boric Acid Tornado Missile Safe Shutdown Earthquake FLEX Earthquake |
NRC-2016-0180, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 2016 | 18 August 2016 | Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 2016 | Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Squib Exemption Request Earthquake Turbine Missile Fuel cladding |
ML16239A396 | 17 August 2016 | Correction to Wolf Creek Generating Station 2016 Annual Radioactive Effluent Release Report - Report 39 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
ML16229A444 | 15 August 2016 | Potential Part 21 on Safety Clip, Siemens Part Number 401158 | |
ML16152A129 | 12 August 2016 | Nuclear Regulatory Commission Report for Audit of Wolf Creek Nuclear Operating Corporation'S Flood Hazards Evaluation Reports Submittal Relating to the Near-Term Task Force Recommendation 2.1 -Flooding for Wolf Creek Generating Station | Fukushima Dai-Ichi |
ML18114A805 | 9 August 2016 | After Action Report/Improvement Plan, Drill Date August 9, 2016 | |
ML18114A804 | 9 August 2016 | Submits Copy of Final Report for the August 09, 2016 Wolf Creek Medical Service Drill | |
IR 05000482/2016009 | 9 August 2016 | NRC Problem Identification and Resolution Inspection Report 05000482/2016009 | Condition Adverse to Quality Significance Determination Process Operability Determination Operability Assessment |
ML16179A293 | 3 August 2016 | Issuance of Amendment No. 216, Revise Technical Specification (TS) 4.2.1 and TS 5.6.5 to Allow Use of Optimized Zirlo as Approved Fuel Rod Cladding | Anticipated operational occurrence Exemption Request Fuel cladding |
ML16215A227 | 3 August 2016 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 | Shutdown Margin Ultimate heat sink Safe Shutdown Earthquake Cyber Security Pressure and Temperature Limits Report Exemption Request |
NRC-2016-0161, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 | 3 August 2016 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 | Shutdown Margin Ultimate heat sink Safe Shutdown Earthquake Cyber Security Pressure and Temperature Limits Report Exemption Request |
IR 05000482/2016002 | 3 August 2016 | NRC Integrated Inspection Report 05000482/2016002 | High Radiation Area Mission time Offsite Dose Calculation Manual Anticipated operational occurrence Functionality Assessment Significance Determination Process Pressure and Temperature Limits Report Process Control Program Operability Determination Fire Protection Program Overexposure |
ML16179A443 | 2 August 2016 | Safety Evaluation, Request for Exemption from 10 CFR 50.46 and Appendix K to Allow Use of Optimized Zirlo as Approved Fuel Rod Cladding | Anticipated operational occurrence Exemption Request Fuel cladding |
CAC:MF7286 | 2 August 2016 | ||
ML16179A441 | 2 August 2016 | FRN: Exemption, Issuance. Wolf Creek Generating Station Request for Exemption from 10 CFR 50.46 and Appendix K to Allow Use of Optimized Zirlo as Approved Fuel Rod Cladding | Exemption Request Fuel cladding |
ML16179A440 | 2 August 2016 | Letter, Request for Exemption from 10 CFR 50.46 and Appendix K to Allow Use of Optimized Zirlo as Approved Fuel Rod Cladding | Exemption Request Fuel cladding |
NRC-2016-0162, FRN: Exemption, Issuance. Wolf Creek Generating Station Request for Exemption from 10 CFR 50.46 and Appendix K to Allow Use of Optimized Zirlo as Approved Fuel Rod Cladding | 2 August 2016 | FRN: Exemption, Issuance. Wolf Creek Generating Station Request for Exemption from 10 CFR 50.46 and Appendix K to Allow Use of Optimized Zirlo as Approved Fuel Rod Cladding | Exemption Request Fuel cladding |
ET 16-0017, Updated Response to Generic Letter 89-13 | 26 July 2016 | Updated Response to Generic Letter 89-13 | Biofouling |