Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
NEI 99-01, Wolf Creek Nuclear Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors30 September 2016Wolf Creek Nuclear Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive ReactorsSafe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Grace period
Power change
WO 16-0045, Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors30 September 2016Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive ReactorsSafe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Grace period
Power change
ML16271A42628 September 2016Project Manager Assignment to Balwant K. Singal Effective 10/2/2016
ML16271A48227 September 2016Summary of Regulatory Conference to Discuss Safety Significance of Wolf Creek Generating Station Emergency Generator Excitation Diode Apparent ViolationProbabilistic Risk Assessment
ML16281A27022 September 2016Part 21 - Initial Notification of Masterpact Breaker Fail to Close
ML16278A47122 September 2016Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close
ML16263A03519 September 2016NRR E-mail Capture - Acceptance Review (CAC Nos. MF8306 and MF8307) Relief I3R-15 (Steam Generator tubesheet-to-head Weld ISI) and I3R-14 (Pressurizer nozzle-to-vessel Weld ISI)
ML16263A35013 September 2016Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)
ML16256A59812 September 2016NRR E-mail Capture - Acceptance Review
NEI 99-01, Wolf Creek Generating Station Proposed Revised EAL Technical Basis Document12 September 2016Wolf Creek Generating Station Proposed Revised EAL Technical Basis DocumentSafe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Grace period
Power change
ML16279A32712 September 2016Proposed Revised EAL Technical Basis DocumentSafe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Grace period
Power change
IR 05000482/201600512 September 2016Errata for Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016005)B.5.b
Spent Fuel Pool Instrumentation
CAC:MF830812 September 2016
ML16250A1659 September 20168/25/16 Summary of Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Amendment Request to Transition to Westinghouse Analyses Methodologies and Alternate Source Term at Wolf Creek Generating Station
Press Release-IV-16-019, NRC Schedules Regulatory Conference to Discuss Apparent Violation at Wolf Creek Nuclear Generating Station6 September 2016Press Release-IV-16-019: NRC Schedules Regulatory Conference to Discuss Apparent Violation at Wolf Creek Nuclear Generating Station
ML16251A3102 September 2016Technical Specification Shutdown Due to Reactor Coolant System Leakage
ML16243A5131 September 2016Summary of August 25, 2016, Public Meeting with Wolf Creek Nuclear Operating Corporation and Amerenue Regarding a Proposed Application for a New Technical Specification for the Class 1E Electrical Equipment Air Conditioning System (MF8118 a
ML16260A4101 September 2016Operating - Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel
IR 05000482/201640131 August 2016Non-Public Security Inspection Plan for Wolf Creek Generating Station (NRC Physical Security Inspection Reports Number 05000482/2016401)
ML16237A07331 August 2016Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016005)Spent Fuel Pool Instrumentation
B.5.b Mitigating Strategies
IR 05000482/201640831 August 2016NRC Security Inspection Report 05000482/2016408 (Cover Letter Only)Affidavit
ML16236A09725 August 2016Operating Corporation - August 25, 2016, Core Design and Safety System Analysis Methodology Transition License Amendment Request RevisedAffidavit
ML16243A47225 August 2016Part 21 Reporting of Defects and Noncompliance
ML16236A09525 August 2016and Wolf Creek Generating Station - August 25, 2016, Class 1E Electrical Equipment Air Conditioning System Pre-Application MeetingSafe Shutdown
CAC:MF813625 August 2016
ML16237A02124 August 2016NRR E-mail Capture - Acceptance Review for Consent to Indirect Transfer of Control for Wolf Creek Generating Station
ET 16-0019, Relief from Impractical Examination Coverage Requirements for the Third 10-Year Inservice Inspection Program Interval23 August 2016Relief from Impractical Examination Coverage Requirements for the Third 10-Year Inservice Inspection Program IntervalVT-2
WO 16-0046, Operating Corporation - Request for Regulatory Conference23 August 2016Operating Corporation - Request for Regulatory Conference
CAC:MF830623 August 2016
ML16231A19723 August 2016Relief Request I4R-02, from Requirements of ASME Code Table IWF-2500-1 VT-3 Examination for Class 1 Supports, for the Fourth 10-Year Inservice Inspection IntervalIncorporated by reference
ML16235A13219 August 2016NRC Inspection Report 05000482/2016008; January 1, 2016 Through June 29, 2016; Preliminary White FindingSafe Shutdown
High winds
Mission time
Enforcement Discretion
Probabilistic Risk Assessment
Condition Adverse to Quality
Significance Determination Process
Large early release frequency
Preliminary White Finding
ML16229A25518 August 2016Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 2016Ultimate heat sink
Anticipated operational occurrence
Safe Shutdown Earthquake
Squib
Exemption Request
Earthquake
Turbine Missile
Fuel cladding
ET 16-0018, Seventh Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.18 August 2016Seventh Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.Safe Shutdown
Boric Acid
Tornado Missile
Safe Shutdown Earthquake
FLEX
Earthquake
NRC-2016-0180, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 201618 August 2016Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 2016Ultimate heat sink
Anticipated operational occurrence
Safe Shutdown Earthquake
Squib
Exemption Request
Earthquake
Turbine Missile
Fuel cladding
ML16239A39617 August 2016Correction to Wolf Creek Generating Station 2016 Annual Radioactive Effluent Release Report - Report 39Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
ML16229A44415 August 2016Potential Part 21 on Safety Clip, Siemens Part Number 401158
ML16152A12912 August 2016Nuclear Regulatory Commission Report for Audit of Wolf Creek Nuclear Operating Corporation'S Flood Hazards Evaluation Reports Submittal Relating to the Near-Term Task Force Recommendation 2.1 -Flooding for Wolf Creek Generating StationFukushima Dai-Ichi
ML18114A8059 August 2016After Action Report/Improvement Plan, Drill Date August 9, 2016
ML18114A8049 August 2016Submits Copy of Final Report for the August 09, 2016 Wolf Creek Medical Service Drill
IR 05000482/20160099 August 2016NRC Problem Identification and Resolution Inspection Report 05000482/2016009Condition Adverse to Quality
Significance Determination Process
Operability Determination
Operability Assessment
ML16179A2933 August 2016Issuance of Amendment No. 216, Revise Technical Specification (TS) 4.2.1 and TS 5.6.5 to Allow Use of Optimized Zirlo as Approved Fuel Rod CladdingAnticipated operational occurrence
Exemption Request
Fuel cladding
ML16215A2273 August 2016Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016Shutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
Cyber Security
Pressure and Temperature Limits Report
Exemption Request
NRC-2016-0161, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 20163 August 2016Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016Shutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
Cyber Security
Pressure and Temperature Limits Report
Exemption Request
IR 05000482/20160023 August 2016NRC Integrated Inspection Report 05000482/2016002High Radiation Area
Mission time
Offsite Dose Calculation Manual
Anticipated operational occurrence
Functionality Assessment
Significance Determination Process
Pressure and Temperature Limits Report
Process Control Program
Operability Determination
Fire Protection Program
Overexposure
ML16179A4432 August 2016Safety Evaluation, Request for Exemption from 10 CFR 50.46 and Appendix K to Allow Use of Optimized Zirlo as Approved Fuel Rod CladdingAnticipated operational occurrence
Exemption Request
Fuel cladding
CAC:MF72862 August 2016
ML16179A4412 August 2016FRN: Exemption, Issuance. Wolf Creek Generating Station Request for Exemption from 10 CFR 50.46 and Appendix K to Allow Use of Optimized Zirlo as Approved Fuel Rod CladdingExemption Request
Fuel cladding
ML16179A4402 August 2016Letter, Request for Exemption from 10 CFR 50.46 and Appendix K to Allow Use of Optimized Zirlo as Approved Fuel Rod CladdingExemption Request
Fuel cladding
NRC-2016-0162, FRN: Exemption, Issuance. Wolf Creek Generating Station Request for Exemption from 10 CFR 50.46 and Appendix K to Allow Use of Optimized Zirlo as Approved Fuel Rod Cladding2 August 2016FRN: Exemption, Issuance. Wolf Creek Generating Station Request for Exemption from 10 CFR 50.46 and Appendix K to Allow Use of Optimized Zirlo as Approved Fuel Rod CladdingExemption Request
Fuel cladding
ET 16-0017, Updated Response to Generic Letter 89-1326 July 2016Updated Response to Generic Letter 89-13Biofouling