Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML16280A43530 September 20162016-09 Final Written ExamShutdown Margin
Half scram
Grab sample
Post Accident Monitoring
Hydrostatic
Squib
Locked High Radiation Area
Pressure boundary leak
ML16285A01730 September 20162016-09 Public Forms
ML16280A46530 September 20162016-09 Final OutlinesShutdown Margin
ML16280A44930 September 20162016-09-Written Handouts PackageSafe Shutdown
High winds
Post Accident Monitoring
Internal Flooding
Operating Basis Earthquake
Earthquake
Pressure Boundary Leakage
ML16280A46430 September 20162016-09 Draft Written ExamHot Short
Safe Shutdown
Shutdown Margin
Half scram
Grab sample
Post Accident Monitoring
Hydrostatic
Squib
Locked High Radiation Area
Fuel cladding
ML16280A45330 September 20162016-09 Draft Op Test Comments
ML16280A45630 September 20162016-09 Draft Op TestHalf scram
Squib
Scram Discharge Volume
Unidentified leakage
ML16280A46230 September 20162016-09 Draft Written Comments
ML16280A46030 September 20162016-09 Draft OutlinesShutdown Margin
Half scram
ML16280A45930 September 20162016-09 Draft Outline Comments
ML16259A36229 September 2016River Bend Station, Unit 1 - Staff Review of Mitigation Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter
ML16278A64123 September 2016FEMA, Submittal of After Action Report/Improvement Plan for the River Bend Station Exercise Evaluated on June 29, 2016
ML16278A47122 September 2016Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close
ML16281A27022 September 2016Part 21 - Initial Notification of Masterpact Breaker Fail to Close
CAC:MF685619 September 2016
ML16224B07519 September 2016NRC Response to Request for Interpretation of Technical SpecificationsSafe Shutdown
Ultimate heat sink
Functionality Assessment
ML16251A62013 September 2016Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097)
IR 05000458/201600512 September 2016Errata for Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2016005)B.5.b
Spent Fuel Pool Instrumentation
License Renewal
RBG-47709, Response to Request for Additional Information on Nineteenth Fuel Cycle Core Operating Limits Report12 September 2016Response to Request for Additional Information on Nineteenth Fuel Cycle Core Operating Limits Report
RBG-47710, Report of Changes and Errors12 September 2016Report of Changes and Errors
ML16280A43712 September 20162016-09 Final Op TestHalf scram
Squib
Scram Discharge Volume
Offsite Circuit
Unidentified leakage
ML16246A0011 September 2016NRC Initial Operator Licensing Examination Approval 05000458/2016301
ML16242A32631 August 2016Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2016005)Spent Fuel Pool Instrumentation
B.5.b Mitigating Strategies
ML16204A20731 August 2016River Bend Station, Unit 1 - Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation (CAC MF3675)
RBG-47706, Unit 1- Seismic Mitigating Strategies Assessment Report31 August 2016Unit 1- Seismic Mitigating Strategies Assessment ReportSafe Shutdown Earthquake
FLEX
Fukushima Dai-Ichi
IR 05000458/201640131 August 2016Non-Public Security Inspection Plan for River Bend Station (NRC Physical Security Inspection Report Number 05000458/2016401)
ML16252A27429 August 2016Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay
ML16243A47426 August 2016Potential Part 21 Unqualified Component in Certain Allen Bradley Timing Relays
ML16236A37025 August 2016Reassignment of U.S. Nuclear Regulatory Commission Branch Chief to Stephen S. Koenick for Plant Licensing IV-2 and Decommissioning Transition Branch, Effective September 4, 2016
ML16236A38225 August 2016Project Manager Assignment to James Kim Effective September 4, 2016 for Plant Licensing IV-2 and Decommissioning Transition Branch
RBG-47703, Updated Schedule of Submittal of Future License Renewal Application18 August 2016Updated Schedule of Submittal of Future License Renewal Application
ML16232A60415 August 2016Potentially Unqualified Component in Certain Allen Bradley Timing Relays
ML16238A18615 August 2016Update - Report of Potential l0CFR Part 21, Allen Bradley Timing Relay Model 700RTC-NRC Event Number 51030, Accession Number ML15134A016
RBG-47701, Notification of Readiness for 92702, Follow-up on Corrective Actions for Violations and Deviations15 August 2016Notification of Readiness for 92702, Follow-up on Corrective Actions for Violations and Deviations
ML15292A50811 August 2016Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051High winds
Shutdown Margin
Ultimate heat sink
Mission time
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Tornado-Generated Missile
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
B.5.b Mitigating Strategies
Earthquake
Fire Protection Program
IR 05000458/201601110 August 2016NRC Supplemental Inspection Report 05000458/2016011Reactor Vessel Water Level
Temporary Modification
IR 05000458/201600229 July 2016NRC Integrated Inspection Report 5000458/2016002 & 07200049/2016001Safe Shutdown
High winds
High Radiation Area
Non-Destructive Examination
Hydrostatic
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Annual Radiological Environmental Operating Report
Operability Determination
Liquid penetrant
Fire Protection Program
RBG-47695, Response to Request to Additional Information Regarding RBS License Amendment Request to Extend Type a and Type C Test Frequencies27 July 2016Response to Request to Additional Information Regarding RBS License Amendment Request to Extend Type a and Type C Test FrequenciesHigh winds
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Large early release frequency
05000458/LER-2016-00725 July 20161 Operations Prohibited by Technical Specifications Due to Failure to Implement Required Actions Within Completion Time
LER 16-007-00 for River Bend Station, Unit 1, Regarding Operations Prohibited by Technical Specifications Due to Failure to Implement Required Actions Within Completion Time
Time of Discovery
ML16202A11019 July 2016Notification of NRC Integrated Inspection 05000458/2016004 and Request for Information
CNRO-2016-00017, Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual19 July 2016Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual
ML16209A04813 July 2016Part 21 - Initial Notification of Masterpact Breaker Fail to Close
ML16197A00713 July 2016NRR E-mail Capture - (External_Sender) RAI Response Extension
RBG-47689, Response to Regulatory Issue Summary 2016-09 - River Bend Station, Unit 112 July 2016Response to Regulatory Issue Summary 2016-09 - River Bend Station, Unit 1
05000458/LER-2016-00612 July 2016Potential Loss of Safety Function of Multiple Systems Due to Design Deficiency in 480-volt Circuit Breakers
LER 16-006-00 for River Bend Station re: Potential Loss of Safety Function of Multiple Systems Due to Design Deficiency in 480-volt Circuit Breakers