Notification of NRC Integrated Inspection 05000458/2016004 and Request for Information
ML16202A110
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/19/2016
From: Vincent Gaddy
Operations Branch IV
To: Maguire W
Entergy Operations
References
IR 2016004
Download: ML16202A110 (8)


See also: IR 05000458/2016004

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511

July 19, 2016

Mr. William F. Maguire

Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

SUBJECT: RIVER BEND STATION - NOTIFICATION OF INSPECTION

(NRC INTEGRATED INSPECTION REPORT 05000458/2016004) AND

REQUEST FOR INFORMATION

Dear Mr. Maguire:

From August 29 through September 2, 2016, inspectors from the NRCs Region IV office will

perform the baseline biennial requalification inspection at River Bend Station using NRC

Inspection Procedure 71111.11B, Licensed Operator Requalification Program and Licensed

Operator Performance. Experience has shown that this inspection is a resource intensive

inspection both for the NRC inspectors and your staff. In order to minimize the impact to your

on-site resources and to ensure a productive inspection, we have enclosed a request for

documents needed for this inspection. These documents have been divided into three groups.

The first group (Section A of the enclosure) identifies information to be provided prior to the

inspection to ensure that the inspectors are adequately prepared. The second group (Section B

of the enclosure) identifies information the inspectors will need upon arrival at the site. The third

group (Section C of the enclosure) identifies the items which are necessary to close out the

inspection and are usually sent within a few weeks after the team has left the site. It is

important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. John Hedgepeth of your training

organization. Our inspection dates are subject to change based on your updated schedule of

examination activities. If there are any questions about this inspection or the material

requested, please contact Brian Larson, lead inspector, at 817-200-1172

(brian.larson@nrc.gov).

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

W. Maguire -2-

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice and Procedure," a copy of

this letter and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket No. 50-458

License No. NPF-47

Enclosure:

Biennial Requalification Inspection

Document Request

cc: Electronic Distribution

ML16202A110

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: BLarson Yes No Non-Publicly Available Sensitive RGN-002

OFFICE SOE:OB C:OB

NAME BLarson VGaddy

SIGNATURE /RA/ JK for /RA/

DATE

Letter to William F. Maguire from Vincent G. Gaddy, dated July 19, 2016

SUBJECT: RIVER BEND STATION - NOTIFICATION OF INSPECTION

(NRC INTEGRATED INSPECTION REPORT 05000458/2016004) AND

REQUEST FOR INFORMATION

Electronic distribution by RIV:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Jeffrey.Sowa@nrc.gov)

Resident Inspector (Brian.Parks@nrc.gov)

RBS Administrative Assistant (Lisa.Day@nrc.gov)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer (Cale.Young@nrc.gov)

Project Engineer (Michael.Stafford@nrc.gov)

Project Engineer (Lindsay.Brandt@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Stephen.Koenick@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST

FROM: Brian Larson

Senior Operations Engineer, NRC RIV

817-200-1172

To: John Hedgepeth

Senior Operations Instructor, River Bend Station

225-378-3523

Subject: Information Request to Support August 29 through September 2, 2016

Licensed Operator Requalification Program and Licensed Operator Performance

Inspection (IP 71111.11B)

A. The following information is requested in order to support inspection preparation

activities. These items are listed by section as they appear in the inspection module

(i.e., 2.02, 2.04, etc.). Requested materials should be sent either electronically or

hardcopy in order to arrive at the Region IV office no later than August 19, 2016.

  • Electronically To: brian.larson@nrc.gov

cc: michael.bloodgood@nrc.gov

  • Hardcopy to: U.S. Nuclear Regulatory Commission, Region IV

1600 E. Lamar Blvd

Arlington, TX 76011

ATTN: Brian Larson

General Requests:

  • Index of the materials provided in response to this request
  • List of licensed operators (SRO & RO) by crew (operating and staff)
  • Training and Operations Department organization charts (with qualified LOR

evaluators identified)

  • Procedures that identify process for revising and maintaining LO continuing training

program up to date

  • List of outstanding LOR program changes
  • List of plant events and industry operating experience incorporated into LOR

program since last BRQ

  • Audits and/or self-assessment reports addressing the licensed operator

requalification training program

  • Last two years of Simulator Review Committee (or equivalent) meeting minutes
  • Last two years of Curriculum Review Committee (or equivalent) meeting minutes

02.03: Biennial Requalification Written Examination Quality

  • The current and approved biennial written examination schedule
  • The current requalification cycle written examination results for both SRO and RO

that have already been administered up to the week prior to the inspection team

arrival on-site, if any

Enclosure

  • All written examinations that have been approved for administration up to and

including the week before the inspection team is on-site, if any. This will need to

have adequate password protection if e-mailed or double envelope protection if

mailed via regular mail per NUREG-1021.

  • The current requalification cycle examination methodology (sample plan)

02.04: Annual Requalification Operating Test Quality

  • The schedule for the operating tests (JPMs & scenarios) to be given the week of

August 29, 2016

  • The operating tests (JPMs & scenarios) (password protected and provide separately

via telephone at later date) to be given the week of August 29, 2016

  • Current requalification cycle operating tests (SRO & RO) and results up to the week

prior to the inspection team arrival on-site

  • All of the previous years NRC required annual operating tests
  • Current requalification cycle operating test methodology (sample plan)
  • All portions of the UFSAR that identify operator response times for time critical

operator actions

  • A list of station-specific Critical Tasks used to develop dynamic scenarios, if

applicable

02.05: Licensee Admin of Requalification Exams

  • All procedures used to administer the annual operating test
  • All procedures used to assess operator performance
  • All procedures that describe conduct of simulator training
  • All procedures used to test, operate, and maintain the simulator
  • An index for referencing the above procedures

02.06: Requalification Examination Security

  • Submit any tracking tools that you use as a means to prevent excessive overlap on

the written examinations and also meet the intent of sampling all required topics on a

periodic basis

  • Submit any tracking tools that you use as a means to prevent excessive overlap on

the operating tests and also meet the intent of sampling all required malfunctions

(including major events, instrument/component malfunctions, TS calls, etc.) on a

periodic basis

  • All Procedures that describe examination security, including procedures used to

develop the examinations that include guidelines on overlap between examinations

in current exam cycle tests and prior year examinations

  • List of all Condition Reports since the last biennial requalification inspection related

to examination security and overlap

02.07: Licensee Remedial Training Program

  • List of remedial training conducted or planned since last requalification exams

(includes training provided to operators to enable passing requalification exams and

training provided to correct generic or individual weaknesses observed during

previous requalification exam cycle)

-2-

  • Remediation plans (lesson plans, reference materials, and attendance

documentation)

02.08: Conformance with Operator License Conditions

  • All Procedures and Program documentation for maintaining active operator licenses,

tracking training attendance, and ensuring medical fitness of licensed operators

  • All Procedures and associated documentation that supports reactivation of any

SRO/RO license (operating or staff crew) since the last biennial inspection

  • List of licensed operators whose licenses were reactivated since the last BRQ

inspection

02.09: Simulator Performance

  • All Simulator Management and Configuration Procedures if not already provided for

section 02.05 above

  • Simulator Discrepancy Report summary list for all open DRs. For closed DRs,

summary list for those items closed between September 5, 2014, and August 18,

2016

02.10: Problem Identification and Resolution

  • A summary report of all condition reports related to operator actions/errors in the

control room

  • Any revised requalification training that was based on licensed operator performance

issues

B. The following information is requested in order to support the on-site inspection

activities. Requested materials should be available to the inspection team, either

electronically or hardcopy, upon site arrival on August 29, 2016.

02.02: Exam Results / 02.03 and 02.04: Written Exam and Op Test Quality

  • All approved Operating Tests (JPMs and scenarios) not previously submitted
  • All results up to the day the team leaves the site

02.08: Conformance with Operator License Conditions

  • Access to licensed operators records (operating and staff crews)
  • Access to licensed operators training attendance records
  • Access to licensed operators medical records

02.09: Simulator Performance

  • Simulator discrepancies (DRs) from September 5, 2014, and August 18, 2016. This

should include all open DRs and DRs that have been closed, including the

documentation/justification for closure

  • Acceptance test documentation, including hardware and software model revisions at

the time of acceptance (as available)

  • Documentation that validates current models, including the thermal-hydraulics and

neutronics models, to the actual plant

  • All current model deficiencies, including FSAR vs. Design differences in the simulator

(any documentation on this)

-3-

  • Summary list of modifications from September 5, 2014, and August 18, 2016.
  • Plant Modifications (both hardware and software) completed on the Simulator by due

date from September 5, 2014, and August 18, 2016

  • Simulator Differences lesson plan used in training (current to August 28, 2016)
  • The complete book of all Simulator annual performance test packages (usually in a

single book, but may be electronic or in single test packages), complete with all

transient tests, steady state tests, and malfunction tests. This should also include

the test procedures for each test, the acceptance criteria, and results. For each

transient test, the reference chart should be included or an equivalent subject matter

expert review versus the simulator results with a write-up for any differences beyond

the ANSI 3.5 standard requirements.

  • All test packages used to verify core physics parameters (such as MTC, IRW). The

applicable reference graphs from the plant physics data book (electronic or other

means as available) should also be included as well as the test procedures used and

the acceptance criteria with results.

  • All Simulator test, configuration management, and related documents available in the

room for inspectors to review. This includes training needs analysis packages,

simulator review committee meeting minutes, etc.

  • Current copy of ANSI 3.5 standard you are committed to for Simulator testing

02.10: Problem Identification and Resolution

  • All condition reports related to operator actions/errors in the control room

C. River Bend Station is required to send the final results summary and any remaining

exams and operating tests that have not been reviewed to the regional office lead

inspectors for final review and comparison against the Significance Determination

Tools in order to communicate the exit results for the inspection.