Issue date | Title | Topic | |
---|---|---|---|
NL-18-0397, Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) | 28 March 2018 | Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) | |
NL-18-0398, Southern Nuclear Operating Co. - Nuclear Property Insurance Coverage as of April 1, 2018 | 28 March 2018 | Southern Nuclear Operating Co. - Nuclear Property Insurance Coverage as of April 1, 2018 | |
NL-18-0265, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 Concerning Non-Conforming Conditions with Current Licensing Basis for Tornado-Generated Missile Protection | 28 March 2018 | Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 Concerning Non-Conforming Conditions with Current Licensing Basis for Tornado-Generated Missile Protection | Unanalyzed Condition High winds Enforcement Discretion Tornado Generated Missile Tornado Missile Protection TORMIS Tornado Missile Risk Evaluator |
NL-18-0396, Special Report 2018-001-00 for Joseph M. Farley Nuclear Plant, Unit 2, Nonfunctional Radiation Monitor R-158 | 23 March 2018 | Special Report 2018-001-00 for Joseph M. Farley Nuclear Plant, Unit 2, Nonfunctional Radiation Monitor R-158 | |
ML17276A086 | 16 March 2018 | Summary of March 12, 2018, Pre-Application Meeting with Southern Nuclear Company, Inc., to Discuss a Future Risk-Informed Completion Times Amendment | Probabilistic Risk Assessment |
NL-18-0341, Special Report 2018-001-00. Nonfunctional Radiation Monitors R-60A, B, C, and D | 14 March 2018 | Special Report 2018-001-00. Nonfunctional Radiation Monitors R-60A, B, C, and D | |
ML18065A020 | 12 March 2018 | March 12, 2018, Public Meeting Presentation | Internal Flooding Probabilistic Risk Assessment Surveillance Frequency Control Program |
NL-18-0305, Southern Nuclear Operating Co., Submittal of Certificate Pertaining to FOCI Information Update | 6 March 2018 | Southern Nuclear Operating Co., Submittal of Certificate Pertaining to FOCI Information Update | |
ML18065A025 | 6 March 2018 | Joseph M Farley March 12, 2018, Public Meeting - Draft 4b Application Enclosures | Hot Short Safe Shutdown High winds Ultimate heat sink Mission time Fire Barrier Stroke time Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Temporary Modification Zebra Mussel FLEX Tornado Missile Protection Large early release frequency Earthquake Turbine Missile Offsite Circuit Fire Protection Program GOTHIC |
ML18065A022 | 6 March 2018 | March 12, 2018, Public Meeting - Draft 4b Application | Stroke time Probabilistic Risk Assessment Offsite Circuit |
ML18064A224 | 5 March 2018 | Annual Fatigue Report Form for 2017 | |
ML17291A781 | 1 March 2018 | Issuance of Amendments to Correct Non-Conservative Technical Specification 3.7.1 (CAC Nos. MF9465 and MF9466; EPID L-2017-LLA-0181) | Anticipated operational occurrence Past operability |
ML18059A153 | 28 February 2018 | EOC Assessment Letter | Cyber Security |
ML17261A087 | 28 February 2018 | Issuance of Amendments to Revise Actions of TS 5.5.17, Containment Leakage Rate Testing Program (CAC Nos. MF8844 and MF8845; EPID No. L-2016-LLA-0015) | Internal Flooding Probabilistic Risk Assessment Coatings Aging Management Moisture barrier Very Early Warning Fire Detection Grace period |
ML18058A082 | 27 February 2018 | Letter: RAI for Review of Southern Nuclear Operating Company'S Decommissioning Funding Plan Updates for Joseph M. Farley, Unit 1 and 2; Edwin I. Hatch, Units 1 and 2; and Vogtle Electric Generating Plant, Units 1 and 2 ISFSI | Decommissioning Funding Plan |
ML18058B152 | 27 February 2018 | Emailed RP RFI 2018-02 | High Radiation Area Offsite Dose Calculation Manual Locked High Radiation Area |
ML18058A081 | 27 February 2018 | Enclosurequest for Additional Information(Rai for Review of Southern Nuclear Operating Company'S Decommissioning Funding Plan Updates for Joseph M. Farley,Unit 1 and 2;Edwin I. Hatch,Units 1 and 2; and Vogtle Electric Generating Plant, Unit | Decommissioning Funding Plan Authorized possession limits |
ML18054A110 | 23 February 2018 | Single Positive Test Form Collected on 09/25/2017 | |
ML18054A093 | 23 February 2018 | Annual Report Form for Drug and Alcohol Tests for 2017 | |
ML18054A098 | 23 February 2018 | Single Positive Test Form Collected on 03/09/2017 | |
ML18054A099 | 23 February 2018 | Single Positive Test Form Collected on 04/10/2017 | |
ML18054A100 | 23 February 2018 | Single Positive Test Form Collected on 04/11/2017 | |
ML18054A101 | 23 February 2018 | Single Positive Test Form Collected on 07/10/2017 | |
ML18054A102 | 23 February 2018 | Single Positive Test Form Collected on 07/17/2017 | |
ML18054A103 | 23 February 2018 | Single Positive Test Form Collected on 07/17/2017 | |
ML18054A104 | 23 February 2018 | Single Positive Test Form Collected on 08/21/2017 | |
ML18054A105 | 23 February 2018 | Single Positive Test Form Collected on 09/13/2017 | |
ML18054A106 | 23 February 2018 | Single Positive Test Form Collected on 09/20/2017 | |
ML18054A112 | 23 February 2018 | Single Positive Test Form Collected on 10/09/2017 | |
ML18054A113 | 23 February 2018 | Single Positive Test Form Collected on 10/09/2017 | |
ML18054A114 | 23 February 2018 | Single Positive Test Form Collected on 10/11/2017 | |
ML18054A115 | 23 February 2018 | Single Positive Test Form Collected on 12/20/2017 | |
ML18054A116 | 23 February 2018 | Single Positive Test Form Collected on 12/20/2017 | |
ML18054A674 | 23 February 2018 | Annual Fatigue Report Form for 2017 | |
ML18053A094 | 22 February 2018 | Baseline In-Service Inspection Initial Information Request ISI 2018002 Rpc | Boric Acid Non-Destructive Examination Nondestructive Examination Incorporated by reference Liquid penetrant |
NL-18-0237, Independent Spent Fuel Storage Installation - Submittal of 2017 Annual Radioactive Effluent Release Report | 22 February 2018 | Independent Spent Fuel Storage Installation - Submittal of 2017 Annual Radioactive Effluent Release Report | Annual Radioactive Effluent Release Report |
ML18086B044 | 16 February 2018 | Facility Cover Letter - Rii - March 2018 - GFE | |
NL-18-0192, Submittal of Refueling Outage 2R25 Lnservice Inspection Report | 12 February 2018 | Submittal of Refueling Outage 2R25 Lnservice Inspection Report | |
IR 05000348/2017004 | 12 February 2018 | NRC Integrated Inspection Report 05000348/2017004 and 05000364/2017004 | Boric Acid Packing leak High Radiation Area Non-Destructive Examination Functionality Assessment Locked High Radiation Area Missed surveillance Significance Determination Process Operability Determination Earthquake Liquid penetrant Fire Protection Program |
NL-17-2135, License Amendment Request to Revise Technical Specification Section 5.5.17 Containment Leakage Rate Testing Program, Response to NRC Request for Additional Information | 9 February 2018 | License Amendment Request to Revise Technical Specification Section 5.5.17 Containment Leakage Rate Testing Program, Response to NRC Request for Additional Information | |
NL-18-0171, Comment (10) of Justin T. Wheat, on Behalf of Southern Nuclear Operating Co., on Draft Project Plan to Prepare the U.S Nuclear Regulatory Commission to License and Regulate Accident Tolerant Fuel | 6 February 2018 | Comment (10) of Justin T. Wheat, on Behalf of Southern Nuclear Operating Co., on Draft Project Plan to Prepare the U.S Nuclear Regulatory Commission to License and Regulate Accident Tolerant Fuel | |
NL-18-0014, Southern Nuclear Operating Company Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, Revision 16 | 31 January 2018 | Southern Nuclear Operating Company Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, Revision 16 | |
NL-18-0107, Southern Nuclear Operating Company - Certificate Pertaining to FOCI Information Update | 29 January 2018 | Southern Nuclear Operating Company - Certificate Pertaining to FOCI Information Update | |
ML18022A107 | 25 January 2018 | Inservice Inspection Alternative GEN-ISI-ALT-2017-02, Version 1.0, Regarding the Use of ASME Code Case N-789-1 (CAC Nos. MF9942, MF9943, MF9944, and MF9945; EPID L-2017-LLR-0059) | Liquid penetrant |
CAC:MG0188 | 25 January 2018 | ||
ML17331A410 | 24 January 2018 | Staff Assessment of Flooding Focused Evaluation (Public)(Cac Nos. MF9863 and MF9864; Epids 000495/05000348/L-2017-JLD-0043 and 000495/05000364/L-2017-JLD-0043) | Hydrostatic FLEX Fukushima Dai-Ichi Flooding Focused Evaluation |
NL-17-2015, Response to NRC RAIs Regarding Decommissioning Funding Status Reports | 22 January 2018 | Response to NRC RAIs Regarding Decommissioning Funding Status Reports | Decommissioning Funding Plan |
ML18019A074 | 19 January 2018 | NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Acceptance of Requested Licensing Action Related to TSTF-412, Revision 3, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable | |
ML18018B038 | 18 January 2018 | NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Acceptance of Requested Licensing Action Regarding TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation | |
NL-18-0033, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis | 12 January 2018 | Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis | Minimum staff |