Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CNRO-2017-00009, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)31 March 2017Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)Decommissioning Funding Plan
Exemption Request
NL-17-039, Updated Response to Request for Additional Information for the Review of License Renewal Application Environmental Review-Severe Accident Mitigation Alternatives Based on a Reduced Renewal Period31 March 2017Updated Response to Request for Additional Information for the Review of License Renewal Application Environmental Review-Severe Accident Mitigation Alternatives Based on a Reduced Renewal PeriodInternal Flooding
Incorporated by reference
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
License Renewal
ML17094A21231 March 2017FOIA/PA-2016-0656 - Resp 1 - Final
IR 05000247/201600230 March 2017Revised Integrated Inspection Report 05000247/2016002 and 05000286/2016002Unanalyzed Condition
Boric Acid
High Radiation Area
Non-Destructive Examination
Offsite Dose Calculation Manual
Fire Barrier
Water Inventory Control
Enforcement Discretion
Functionality Assessment
Aging Management
Significance Determination Process
Operability Determination
Maintenance Rule Program
Through-Wall Leak
Power change
CNRO-2017-00007, Nuclear Property Damage Insurance (10 CFR 50.54(w)(3))30 March 2017Nuclear Property Damage Insurance (10 CFR 50.54(w)(3))
ENOC-17-00006, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2016 - 10 CFR 50.82(a)(8)(vii)30 March 2017Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2016 - 10 CFR 50.82(a)(8)(vii)Exemption Request
IR 05000247/201740527 March 2017Problem Identification and Resolution Cyber Security Inspection Report 05000247/2017405 and 05000286/2017405 (Letter Only)Cyber Security
Affidavit
ML17065A17127 March 2017Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Loop seal
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Design basis earthquake
Spent Fuel Pool Instrumentation
Battery sizing
Earthquake
Fire Protection Program
Coast down
ML17086A31424 March 2017NRR E-mail Capture - Acceptance Review for the Indian Point Inter-Unit Fuel Transfer Amendment Application
ML17096A21223 March 2017Entergy Engineering Report No. IP-RPT-16-00078, Indian Point RAI CLI-16-07 SAMA Cost-Benefit Sensitivities Rev. 1 (March 23, 2017)High winds
ML17081A45320 March 2017Part 21 - Plastic Jar Dedication Sampling
ML17069A28316 March 2017Relief Request No. IP3-ISI-RR-09, for Alternative to the Depth Sizing Qualification RequirementIncorporated by reference
DM weld
ML17072A39213 March 2017Order LBP-17-13 (Granting Motion to Dismiss Contentions and to Terminate This Proceeding)Aging Management
Environmental Justice
ML17046A2318 March 2017Request for Additional Information for the Review of the Indian Point License Renewal - Set 2017-01Nondestructive Examination
Aging Management
Through-Wall Leak
ML17034A4806 March 2017NRC to NMFS, New information relevant to ongoing section 7 conference for Indian Point Nuclear Generating Unit Nos. 2 and 3 related to the NMFS's Proposed Rule to List Atlantic Sturgeon Critical Habitat in the Hudson River
ML17061A1122 March 2017Withdrawal of Non-Cited Violation 05000286/2016002-02
ML17187A3942 March 2017State of New York Department of State Coastal Zone Management Act Consistency Determination, Concurrence with Consistency Certification (March 2, 2017)
ML17060A6861 March 2017NRC Staff'S 61st Status Report in Response to the Atomic Safety and Licensing Board'S Order of February 16, 2012Aging Management
License Renewal
NL-17-031, 2016 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report1 March 20172016 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data ReportFitness for Duty
IR 05000247/20160061 March 2017Annual Assessment Letter for Indian Point Nuclear Generating, Units 2 and 3 (Report 05000247/2016006 and 05000286/2016006)Open Phase Condition
ML17059D30128 February 2017Single Positive Test Form Collected on 12/07/2016
05000247/LER-2016-01028 February 2017Safety System Functional Failure Due to an Inoperable Containment Caused by a Through Wall Defect in a Service Water Supply Pipe Elbow to the 24, Fan Cooler Unit
LER 16-010-01 for Indian Point 2 Regarding Safety System Functional Failure Due to an Inoperable Containment Caused by a Through Wall Defect in a Service Water Supply Pipe Elbow to the 24 Fan Cooler Unit
Coatings
Through-Wall Leak
Through Wall Leak
ML17059D30228 February 2017Annual Fatigue Report Form for 2016
ML17059D29728 February 2017Single Positive Test Form Collected on 07/20/2016
ML17059D28528 February 2017Annual Report Form for Drug and Alcohol Tests for 2016
ML17059D29428 February 2017Single Positive Test Form Collected on 03/04/2016
ML17059D29528 February 2017Single Positive Test Form Collected on 05/31/2016
ML17059D30028 February 2017Single Positive Test Form Collected on 10/11/2016
ML17059D29628 February 2017Single Positive Test Form Collected on 06/14/2016
ML17059D28728 February 2017Single Positive Test Form Collected on 02/22/2016
ML17059D28928 February 2017Single Positive Test Form Collected on 02/24/2016
ML17059D29128 February 2017Single Positive Test Form Collected on 02/29/2016
05000247/LER-2016-00228 February 2017Automatic Actuation of Emergency Diesel Generators (EDGs) Due to 480 VAC Bus Undervoltage Condition and Loss of Residual Heat Removal (RHR) While in Cold Shutdown
LER 16-002-01 for Indian Point, Unit 2 Regarding Automatic Actuation of Emergency Diesel Generators (EDGs) Due to 480 VAC Bus Undervoltage Condition and Loss of Residual Heat Removal (RHR) While in Cold Shutdown
Boric Acid
Past operability
ML17059D29028 February 2017Single Positive Test Form Collected on 02/24/2016
ML17059D29228 February 2017Single Positive Test Form Collected on 02/29/2016
ML17059D28628 February 2017Single Positive Test Form Collected on 01/06/2016
ML17059D29328 February 2017Single Positive Test Form Collected on 03/01/2016
ML17059D28828 February 2017Single Positive Test Form Collected on 02/24/2016
NL-17-025, Post Accident Monitoring (PAM) Report for an Inoperable Gross Failed Fuel Detector27 February 2017Post Accident Monitoring (PAM) Report for an Inoperable Gross Failed Fuel DetectorPost Accident Monitoring
NL-17-032, Registration of Spent Fuel Cask Use27 February 2017Registration of Spent Fuel Cask Use
ML17054C39023 February 2017Request to Appear at Public Hearing (Indian Point Nuclear Power Plant Shutdown) on February 28, 2017
NL-17-023, Revision to the Core Operating Limits Report22 February 2017Revision to the Core Operating Limits ReportShutdown Margin
NL-17-022, Reply to a Notice of Violation; EA-16-19316 February 2017Reply to a Notice of Violation; EA-16-193Significance Determination Process
NL-17-024, Registration of Unit 3 Spent Fuel Cask Use16 February 2017Registration of Unit 3 Spent Fuel Cask Use
ML17046A13815 February 2017Notice (Opportunity for Comment on Motion to Withdraw)
ML17032A39715 February 2017Reassignment of U.S. Nuclear Regulatory Commission Branch Chief - James Danna
NL-17-017, Entergy Nuclear Operations Comments on Proposed Director'S Decision for 10 CFR 2.206 Petition on Indian Point Baffle Former Bolts Filed by the Union of Concerned Scientists9 February 2017Entergy Nuclear Operations Comments on Proposed Director'S Decision for 10 CFR 2.206 Petition on Indian Point Baffle Former Bolts Filed by the Union of Concerned ScientistsAging Management
ML17039B0928 February 2017Declaration of Diane Curran
ML17039B0908 February 2017NYS and Riverkeeper Notice of Withdrawal and Unopposed Motion to Dismiss Contentions and ProceedingAging Management
Environmental Justice
NL-17-021, Notification of Permanent Cessation of Power Operations8 February 2017Notification of Permanent Cessation of Power Operations