Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
NL-15-0803, Annual Radioactive Effluent Release Report for 2014, Enclosure 331 December 2014Annual Radioactive Effluent Release Report for 2014, Enclosure 3Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
NL-14-1371, Cyber Security Plan Implementation Schedule License Amendment Request30 December 2014Cyber Security Plan Implementation Schedule License Amendment RequestSafe Shutdown
Cyber Security
Fire Protection Program
NL-14-1996, Expedited Seismic Evaluation Process Report - Fukushima Near-Term Task Force Recommendation 2.130 December 2014Expedited Seismic Evaluation Process Report - Fukushima Near-Term Task Force Recommendation 2.1Boric Acid
High Radiation Area
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Locked High Radiation Area
FLEX
Fukushima Dai-Ichi
Earthquake
Power-Operated Valves
Power Operated Valves
Seismic Walkdown Report
TAC:MF548430 December 2014
TAC:MF527130 December 2014
NL-14-2045, Withdrawal of License Amendment Request for Technical Specification Revision for TS 3.7.14 Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System19 December 2014Withdrawal of License Amendment Request for Technical Specification Revision for TS 3.7.14 Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System
ND-14-2009, 4 - 10 CFR 26.719(c) Report: False Negative Results for a Blind Performance Test Sample17 December 20144 - 10 CFR 26.719(c) Report: False Negative Results for a Blind Performance Test SampleFitness for Duty
ML14237A03417 December 2014Issuance of AmendmentsSafe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Safeguards Contingency Plan
Earthquake
ML14338A00716 December 2014Request for Additional Information
NL-14-1974, Clarification of Response to Request for Additional Information on License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Rev. 0, Risk Informed Technical Specifications Initiative 4b, Risk-Managed.12 December 2014Clarification of Response to Request for Additional Information on License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Rev. 0, Risk Informed Technical Specifications Initiative 4b, Risk-Managed.Surveillance Frequency Control Program
ML14227A34711 December 2014Request for Permission to Use Copyrighted Graphics and Material
ML14307B70710 December 2014Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-TProbabilistic Risk Assessment
Fukushima Dai-Ichi
NL-14-1899, Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20138 December 2014Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013
ML14338A0933 December 2014Vg 2014-301 General Correspondence
ML14338A0783 December 2014301 Final Administrative DocumentsTime of Discovery
Shutdown Margin
Missed surveillance
Job Performance Measure
ML14338A0843 December 2014301 Final Administrative JPMsShutdown Margin
Met Tower
Job Performance Measure
Earthquake
Fuel cladding
ML14338A0823 December 2014301 Final Sim and in Plant JPMsBoric Acid
Job Performance Measure
ML14338A0803 December 2014301 Final Simulator ScenariosBoric Acid
Shutdown Margin
Ultimate heat sink
Post Accident Monitoring
Emergency Lighting
Pressure Boundary Leakage
Pressure boundary leak
Offsite Circuit
Power change
ML14338A0653 December 2014301 Draft Administrative JPMsBoric Acid
Met Tower
Job Performance Measure
Earthquake
Fuel cladding
ML14338A0633 December 2014301 Draft Sim In-Plant JPMsBoric Acid
Job Performance Measure
ML14338A0603 December 2014301 Draft Simulator ScenariosBoric Acid
Shutdown Margin
Ultimate heat sink
Emergency Lighting
Pressure Boundary Leakage
Pressure boundary leak
Offsite Circuit
Power change
ML14338A0593 December 2014301 Draft SRO Written ExamSafe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Stroke time
Post Accident Monitoring
Hydrostatic
Locked High Radiation Area
Condition Adverse to Quality
Missed surveillance
Surveillance Frequency Control Program
Pressure Boundary Leakage
Grace period
Power change
Coast down
ML14338A0563 December 2014301 Draft RO Written ExaminationBoric Acid
Time of Discovery
Shutdown Margin
High Radiation Area
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Preplanned Activity
Surveillance Frequency Control Program
B.5.b Mitigating Strategies
Power change
Reverse polarity
Coast down
ML14338A0533 December 2014301 Draft Administrative DocumentsBoric Acid
NL-14-1745, Completion of Required Action by NRC Order EA-12-051 Reliable Spent Fuel Pool Level Instrumentation1 December 2014Completion of Required Action by NRC Order EA-12-051 Reliable Spent Fuel Pool Level InstrumentationFLEX
Spent Fuel Pool Instrumentation
Fire Protection Program
IR 05000424/201400824 November 2014IR 05000424/2014008 and 05000425/2014008, October 27-30, 2014, Vogtle, NRC 95001 Supplemental Inspection Report
ML14303A46521 November 2014Response Requirements for Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Flooding Hazard Integrated Assessments for Recommendation 2.1 of the Near-Term Task Force Review of Insights from tFukushima Dai-Ichi
ML14314A87813 November 2014(VEGP) - Request for Additional Information on Spring 2013 Steam Generator Tube Inspections
TAC:MF428813 November 2014
NL-14-1703, Response to Request for Additional Information on LAR to Revise Technical Specifications to Implement NEI-06-09, Rev 0, Risk Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications Guidelines.11 November 2014Response to Request for Additional Information on LAR to Revise Technical Specifications to Implement NEI-06-09, Rev 0, Risk Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications Guidelines.Ultimate heat sink
Functionality Assessment
Surveillance Frequency Control Program
Large early release frequency
Offsite Circuit
ML14279A3526 November 2014Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism ReevaluationUltimate heat sink
Fukushima Dai-Ichi
Frazil ice
Earthquake
IR 05000424/201400431 October 2014IR 05000424/2014004, 05000425/2014004; on 07/01/2014 - 09/30/2014; Vogtle Electric Generating Plant, Units 1 and 2; Licensed Operator Requalification Program and Licensed Operator Performance, Refueling and Other Outage Activities, IdentifiBoric Acid
Ultimate heat sink
Offsite Dose Calculation Manual
Enforcement Discretion
Temporary Modification
Significance Determination Process
Operability Determination
Fire Protection Program
Flow Induced Vibration
NL-14-1276, Snubber Inspection Plan Submittal in Accordance with ASME OM Code31 October 2014Snubber Inspection Plan Submittal in Accordance with ASME OM CodeSafe Shutdown
Anchor Darling
ML14303A38131 October 2014Biweekly Sholly FRN - Application and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: November 12, 2014High Radiation Area
Surveillance Frequency Control Program
Preemption Authority
Exemption Request
Fuel cladding
NL-14-1719, Cycle 18 Core Operating Limits Report, Version 130 October 2014Cycle 18 Core Operating Limits Report, Version 1Shutdown Margin
ML14304A62223 October 2014Email: Licensee Presentation Slides for November 6, 2014 Meeting on Vogtle GSI-191Boric Acid
Fire Barrier
Coatings
Scaffolding
ML14274A05222 September 2014Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities
TAC:MF482817 September 2014
ML14261A15017 September 2014Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing
NL-14-0115, Units 1 & 2 & Vogtle Electric Generating Plant - Units 1 and 2 - License Amendment Request to Revise Technical Specification Surveillance Requirement 3.1.3.2 and Specification 5.6.517 September 2014Units 1 & 2 & Vogtle Electric Generating Plant - Units 1 and 2 - License Amendment Request to Revise Technical Specification Surveillance Requirement 3.1.3.2 and Specification 5.6.5Shutdown Margin
Post Accident Monitoring
Nondestructive Examination
Pressure and Temperature Limits Report
IR 05000424/201440412 September 2014IR 050004242014404 and 050004252014404, on 08/14/14, Vogtle Electric Generating Plant, NRC Security Inspection ReportAffidavit
ML14261A24410 September 2014Email: Draft Requests for Additional Information (RAI) on the Vogtle License Amendment Request on Extending Completion Times
ML14252A2459 September 2014FOIA/PA-2014-0472-r - All Emergency Planning Records Received After October 1, 2004 by Licensee for the Vogtle Nuclear Plant
ML14247A1545 September 2014Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 2014Safe Shutdown
Surveillance Frequency Control Program
Exemption Request
Fuel cladding
NRC-2014-0917, Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 20145 September 2014Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 2014Safe Shutdown
Surveillance Frequency Control Program
Exemption Request
Fuel cladding
Press Release-14-058, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants4 September 2014Press Release-14-058: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants
ML14245A1782 September 2014Mid-Cycle LetterEnforcement Discretion
Spent Fuel Pool Instrumentation
ML14239A66927 August 2014Notice of Enforcement Discretion, Technical Specification 3.6, Containment Systems, Specific to 2B Containment Spray Pump (NOED No. 14-2-03)Enforcement Discretion
NL-14-1111, Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)26 August 2014Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)FLEX
Spent Fuel Pool Instrumentation
NL-14-1297, Request for Enforcement Discretion from Technical Specification 3.3.6, Containment Spray and Cooling Systems25 August 2014Request for Enforcement Discretion from Technical Specification 3.3.6, Containment Spray and Cooling SystemsInternal Flooding
Enforcement Discretion
Large early release frequency
Pandemic