NL-14-2045, Withdrawal of License Amendment Request for Technical Specification Revision for TS 3.7.14 Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System
| ML14353A075 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/19/2014 |
| From: | Pierce C Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NL-14-2045 | |
| Download: ML14353A075 (2) | |
Text
Charles R. Pierce Southern Nuclear RegulatoryAffairs Director Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 DEC 1 Birmingham. AL 35242 A
issrs SOUTHiKI^^
g@MPAflV Docket Nos.:
50-424 NL-14-2045 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Wasfiington, D. C. 20555-0001 Vogtle Electric Generating Plant - Units 1 and 2 Witlidrawal of License Amendment Request for Technical Specification Revision forTS 3.7.14 Engineered Safety Features (ESF)
Room Cooler and Safety-Related Chiller System Ladles and Gentlemen:
By letter dated September 26,2012, Southern Nuclear Operating Company (SNC) submitted a license amendment request (LAR) to revise the Technical Specification (TS) completion time (CT) for the TS 3.7.14 Condition A, one ESF room cooler and safety-related chiller train inoperable (SNC letter NL-12-1192).
After due consideration, SNC hereby withdraws this request.
This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.
Mr. C. R. Pierce states he is Regulatory Affairs Director of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and, to the best of his knowledge and belief, the facts set forth in this letter are true.
Respectfully submitted, C. R. Pierce
\\
Regulatory Affairs Director CRP/RMJ/lac Sworn toandsubscribedbefore me this day ofIhrOaiaJma 2014.
Notary Pu6iic f^y commission expires:
^0^"^
U. S, Nuclear Regulatory Commission NL-14-2045 Page 2 cc:
Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President &CEO Mr. D, G. Bost, Executive Vice President & Chief Nuclear Officer Mr. D. R. Madison, Vice President - Fleet Operations Mr. M. D. Meier, Vice President - Regulatory Affairs Mr. B. K. Taber, Vice President - Vogtle 1 &2 Mr. B. J. Adams, Vice President - Engineering Mr. G. W. Gunn, Regulatory AffairsManager - Vogtle 1 &2 (Acting)
RType: CVC7000 U. S. Nuclear Regulatory Commission Mr.V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager - Vogtle 1 &2 Mr. L. M. Cain, Senior Resident Inspector - Vogtle 1 &2 State of Georgia Mr. J. H. Turner, Director-Environmental Protection Division
Charles R. Pierce Southern Nuclear RegulatoryAffairs Director Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 DEC 1 Birmingham. AL 35242 A
issrs SOUTHiKI^^
g@MPAflV Docket Nos.:
50-424 NL-14-2045 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Wasfiington, D. C. 20555-0001 Vogtle Electric Generating Plant - Units 1 and 2 Witlidrawal of License Amendment Request for Technical Specification Revision forTS 3.7.14 Engineered Safety Features (ESF)
Room Cooler and Safety-Related Chiller System Ladles and Gentlemen:
By letter dated September 26,2012, Southern Nuclear Operating Company (SNC) submitted a license amendment request (LAR) to revise the Technical Specification (TS) completion time (CT) for the TS 3.7.14 Condition A, one ESF room cooler and safety-related chiller train inoperable (SNC letter NL-12-1192).
After due consideration, SNC hereby withdraws this request.
This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.
Mr. C. R. Pierce states he is Regulatory Affairs Director of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and, to the best of his knowledge and belief, the facts set forth in this letter are true.
Respectfully submitted, C. R. Pierce
\\
Regulatory Affairs Director CRP/RMJ/lac Sworn toandsubscribedbefore me this day ofIhrOaiaJma 2014.
Notary Pu6iic f^y commission expires:
^0^"^
U. S, Nuclear Regulatory Commission NL-14-2045 Page 2 cc:
Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President &CEO Mr. D, G. Bost, Executive Vice President & Chief Nuclear Officer Mr. D. R. Madison, Vice President - Fleet Operations Mr. M. D. Meier, Vice President - Regulatory Affairs Mr. B. K. Taber, Vice President - Vogtle 1 &2 Mr. B. J. Adams, Vice President - Engineering Mr. G. W. Gunn, Regulatory AffairsManager - Vogtle 1 &2 (Acting)
RType: CVC7000 U. S. Nuclear Regulatory Commission Mr.V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager - Vogtle 1 &2 Mr. L. M. Cain, Senior Resident Inspector - Vogtle 1 &2 State of Georgia Mr. J. H. Turner, Director-Environmental Protection Division