Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ZS-2014-0100, Offsite Dose Calculation Manual | 31 December 2013 | Offsite Dose Calculation Manual | Boric Acid Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program B.5.b Mitigating Strategies Deep Dose Equivalent |
RS-13-289, Additional Information Supporting Relief Request I5R-11 Associated with Reactor Pressure Vessel Penetration N-11B Repair | 20 December 2013 | Additional Information Supporting Relief Request I5R-11 Associated with Reactor Pressure Vessel Penetration N-11B Repair | Non-Destructive Examination Hydrostatic Nondestructive Examination Finite Element Analysis |
RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. | 19 December 2013 | Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. | Safe Shutdown Reactor Vessel Water Level Mission time Stroke time Post Accident Monitoring Scram Discharge Volume MELLLA |
TAC:MF3361 | 19 December 2013 | ||
TAC:MF3359 | 19 December 2013 | ||
RA-13-119, Response to RAI - Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI, Division 1. | 12 December 2013 | Response to RAI - Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI, Division 1. | |
ML13309A080 | 11 December 2013 | Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors | |
TAC:MF1176 | 11 December 2013 | ||
RA-13-109, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | 27 November 2013 | Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | Fukushima Dai-Ichi Design basis earthquake |
SVP-13-080, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report | 26 November 2013 | Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report | Post Accident Monitoring |
ML13318A953 | 26 November 2013 | Request for Additional Information Regarding the Overall Integrated Plan for Order EA-12-051, Reliable Spent Fuel Pool Instrumentation | Spent Fuel Pool Instrumentation |
ML13269A287 | 25 November 2013 | County Station, Units 1 and 2; and Quad Cities Nuclear Power Station, Units 1 and 2 - Request for Additional Information Related to Potential Loss of Spent Fuel Pool Cooling | Safe Shutdown Ultimate heat sink Fukushima Dai-Ichi Earthquake |
ML13220A351 | 22 November 2013 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies | Safe Shutdown High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Containment Hardened Vent Frazil ice Earthquake |
ML13317A957 | 20 November 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Quad Cities Nuclear Power Station, TAC Nos.: MF1048 and MF1049 | Safe Shutdown High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Frazil ice Earthquake Hardened vent |
BYRON 2013-0141, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report | 20 November 2013 | Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report | Annual Radioactive Effluent Release Report |
IR 05000254/2013407 | 6 November 2013 | IR 05000254-13-407; 05000265-13-407; on 09/23/2013 - 09/26/2013; Quad Cities Nuclear Power Station, Units 2 & 3; Temporary Instruction (Ti) 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats (Cover | Affidavit |
ML13310B685 | 6 November 2013 | NRR E-mail Capture - Preliminary Additional RAI Questions Regarding Use of Code Case N-786 | |
ML13311A313 | 6 November 2013 | 2013 Annual Report - Guarantees of Payment of Deferred Premiums | |
IR 05000254/2013004 | 4 November 2013 | IR 05000254-13-004 and 05000265-13-004; 07/01/13 - 09/30/13; Quad Cities Nuclear Power Station, Units 1 and 2, Identification and Resolution of Problems | High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Probabilistic Risk Assessment Temporary Modification Aging Management Significance Determination Process Annual Radiological Environmental Operating Report Operability Determination Annual Radiological Effluent Release Report License Renewal Biofouling Fire Protection Program Operability Assessment |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
RS-13-264, Company, Executed Trust Fund Agreement Amendments and Subordinate Trust Agreement | 29 October 2013 | Company, Executed Trust Fund Agreement Amendments and Subordinate Trust Agreement | Incorporated by reference |
RS-13-258, Submittal of Additional Information Supporting Relief Request I5R-11 Associated with Reactor Pressure Vessel Penetration N-11B Repair | 28 October 2013 | Submittal of Additional Information Supporting Relief Request I5R-11 Associated with Reactor Pressure Vessel Penetration N-11B Repair | Nondestructive Examination VT-2 EVT-1 |
RS-13-256, Additional Information Regarding Request for License Amendment to Revise Battery Surveillance Requirements | 24 October 2013 | Additional Information Regarding Request for License Amendment to Revise Battery Surveillance Requirements | |
ML13275A121 | 9 October 2013 | Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA -12-051, Reliable Spent Fuel Pool Instrumentation | High Radiation Area Spent Fuel Pool Instrumentation Fire Protection Program |
ML13290A564 | 9 October 2013 | NRR E-mail Capture - Acceptance Review for Proposed Alternative to Utilize Code Case N-649, Alternative Requirements for IWE-5240 Visual Examination Section XI, Division 1 | |
ML13276A492 | 3 October 2013 | NRR E-mail Capture - Acceptance Review for License Amendment Request to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month | Surveillance Frequency Control Program |
ML13275A054 | 1 October 2013 | FFD (Bbp) | |
ML13309A230 | 30 September 2013 | Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100) | Safe Shutdown Ultimate heat sink Internal Flooding Enforcement Discretion Earthquake Hardened vent Backfit |
ML13267A097 | 30 September 2013 | Safety Evaluation in Support of Request for Relief Associated with the Fifth 10 Year Interval Inservice Inspection Program | Weld Overlay Probabilistic Risk Assessment VT-2 Incorporated by reference Large early release frequency EVT-1 |
ML13270A046 | 26 September 2013 | Requalification Inspection (Bbp) | |
RA-13-094, Proposed Alternative to Utilize Code Case N-649, Alternative Requirements for IWE-5240 Visual Examination Section XI, Division 1 | 25 September 2013 | Proposed Alternative to Utilize Code Case N-649, Alternative Requirements for IWE-5240 Visual Examination Section XI, Division 1 | |
ML13268A509 | 25 September 2013 | NRR E-mail Capture - Seismic Walkdown Delayed Items | |
RS-13-228, Supplemental Information Regarding License Amendment Request Associated with Use of Neutron Absorbing Inserts in Spent Fuel Pool Storage Racks | 18 September 2013 | Supplemental Information Regarding License Amendment Request Associated with Use of Neutron Absorbing Inserts in Spent Fuel Pool Storage Racks | |
RA-13-081, Proposed Resolution for Completion of the Seismic Walkdowns Associated with NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term. | 16 September 2013 | Proposed Resolution for Completion of the Seismic Walkdowns Associated with NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term. | Fukushima Dai-Ichi Foreign Material Exclusion |
RA-13-075, Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites | 12 September 2013 | Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites | Fukushima Dai-Ichi Earthquake |
RA-13-085, 10 CFR 50, Appendix E, Evacuation Time Estimate Analysis Supplemental Response for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island | 5 September 2013 | 10 CFR 50, Appendix E, Evacuation Time Estimate Analysis Supplemental Response for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island | |
ML13254A125 | 5 September 2013 | Attachment 9 - Updated Evacuation Time Estimates for Quad Cities Nuclear Power Station Plume Exposure Pathway and ETE Review Criteria Checklist | |
ML13246A224 | 3 September 2013 | 2013 Quad Cities Nuclear Power Station Mid-Cycle Letter Combined | |
RS-13-137, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process | 3 September 2013 | Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process | Surveillance Frequency Control Program Recently irradiated fuel |
ML13241A510 | 29 August 2013 | Request for Supplemental Information | |
TAC:MF2490 | 29 August 2013 | ||
RS-13-128, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 28 August 2013 | First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | FLEX Spent Fuel Pool Instrumentation |
RS-13-211, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 28 August 2013 | Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Fukushima Dai-Ichi |
RS-13-129, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 28 August 2013 | First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | FLEX |
ML13238A188 | 26 August 2013 | 8/27/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC (Egc)Regarding Areva Xm Fuel Transition Request for Dresden and Quad Cities Nuclear Stations | |
ML13233A364 | 23 August 2013 | Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049 | Fukushima Dai-Ichi |
ML13242A000 | 23 August 2013 | NRR E-mail Capture - Acceptance Review for License Amendment Request to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs | Shutdown Margin |
ML13235A255 | 22 August 2013 | Ltr 8/22/13 Quad Cities Cyber Security Notification and Request for Information | Cyber Security |
RS-13-209, Response to Request for Additional Information Re 2013 Report on Status of Decommissioning Funding for Reactors | 15 August 2013 | Response to Request for Additional Information Re 2013 Report on Status of Decommissioning Funding for Reactors | |
ML13193A048 | 14 August 2013 | Notice of Forthcoming Meeting with Exelon Generation Company, LLC (EGC) Regarding Areva Xm Fuel Transition Request for Dresden and Quad Cities Nuclear Stations |