Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13358A049 | 24 December 2013 | Acceptance Review Following Supplement, License Amendment Request to Revise TS 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip | |
ML13357A249 | 20 December 2013 | NRR E-mail Capture - Acceptance Review of Palo Verde Amendment Request Regarding Startup Test Activity Reduction (STAR) Program | |
ML13357A289 | 18 December 2013 | ISFSI - Registration of Dry Spent Fuel Transportable Storage Canister Identification No. AMZDFX109 | |
ML13357A218 | 18 December 2013 | Revision 2 to Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | Safe Shutdown Boric Acid Reactor Vessel Water Level Mission time Hydrostatic Coatings Temporary Modification Locked High Radiation Area Foreign Material Exclusion Exemption Request Fuel cladding Scaffolding |
IR 05000528/2013301 | 17 December 2013 | Er 05000528/2013301; 05000529/2013301; 05000530/2013301; October 1 - November 20, 2013; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report | |
ML13351A102 | 17 December 2013 | Notification of Generic Fundamentals Examinations for 2014 | Generic Fundamentals Examination |
ML13339A680 | 16 December 2013 | Audit of the Licensee'S Management of Regulatory Commitments; Audit Performed 11/25-12/4/2013 | Coatings Cyber Security Aging Management Surveillance Frequency Control Program License Renewal |
ML13343A285 | 15 December 2013 | 2013-11 Draft Written Exam | Boric Acid Shutdown Margin Stroke time Temporary Modification |
ML13343A132 | 15 December 2013 | 2013-11 Final Written Exam | |
ML13347B157 | 13 December 2013 | Closure of Investigation (OI 4-2012-034) | |
TAC:MF0154 | 12 December 2013 | ||
ML13352A007 | 12 December 2013 | Supplemental Information Concerning Request for Amendment to Technical Specification (TS) 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip | Coatings Surveillance Frequency Control Program |
ML13352A008 | 12 December 2013 | Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
ML14037A108 | 12 December 2013 | Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
IR 07200044/2013401 | 10 December 2013 | IR 07200044-13-401, on 11/21/2013, Palo Verde Nuclear Generating Station, Independent Spent Fuel Storage Facility | |
IR 05000528/2013403 | 10 December 2013 | IR 05000528-13-403, 05000529-13-403, 05000530-13-403, on 11/21/2013, Palo Verde Nuclear Generating Station, Units 1, 2, & 3, NRC Security Inspection | Affidavit |
ML13330A573 | 5 December 2013 | Verbal Authorization of Relief Request 51, Alternative to ASME Code for Flaw Removal, Reactor Vessel Bottom-mounted Instrumentation Nozzle, Third 10-Year ISI Interval | Boric Acid |
ML13333B574 | 5 December 2013 | Summary of 11/1/2013 Conference Call Regarding the Fall 2013 Steam Generator Tube Inspections | |
IR 05000528/2013407 | 4 December 2013 | IR 05000528-13-407, 05000529-13-407 and 05000530-13-407, on 10/25/13, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, NRC Material Control and Accounting Program Inspection Report | Significance Determination Process Affidavit |
ML13336A775 | 2 December 2013 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies - Correction Letter | |
ML13294A576 | 25 November 2013 | Issuance of Amendment Nos. 192, 192, and 192, Adopt TSTF-490, Revision 0, Deletion of E-Bar Definition and Revision to RCS Specific Activity Technical Specifications | Safe Shutdown Shutdown Margin Surveillance Frequency Control Program Pressure Boundary Leakage Fire Protection Program Power change |
ML13308C153 | 25 November 2013 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Emergency Lighting FLEX Fukushima Dai-Ichi Battery sizing Earthquake |
ML13324B123 | 20 November 2013 | NRR E-mail Capture - Request for Additional Information #2: Relief Request Regarding Axial Flaw Indications (MF3051) | |
ML13329A700 | 20 November 2013 | Transmittal of Proprietary Documents for Startup Test Activity Reduction (STAR) Program License Amendment Request | |
ML13325A098 | 20 November 2013 | APS Response to Second Request for Additional Information (RAI) Regarding Relief Request 51 | |
ML13329A037 | 20 November 2013 | Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance for Startup Testactivity Reduction Program Using the Consolidated Line Item Improvement Process | Incorporated by reference |
ML13326B021 | 20 November 2013 | APS Response to Second Request for Additional Information (RAI) Regarding Relief Request 51 | |
ML13324A494 | 19 November 2013 | Deferral of Baseline Inspection Activities | |
ML13312A540 | 18 November 2013 | 11/5/2013 Summary of Preapplication Meeting to Discuss License Amendment Request to Incorporate Nuclear Energy Institute NEI-11-04 Quality Assurance Program at Palo Verde, Units 1, 2, and 3 | |
ML13323A763 | 18 November 2013 | Response to Request for Additional Information - American Society of Mechanical Engineers (ASME) Code, Section XI, Request for Approval of an Alternative to Flaw Removal and Characterization - Relief Request 51 | Safe Shutdown Earthquake Hydrostatic Finite Element Analysis |
ML13311B183 | 18 November 2013 | Summary of Meeting with Arizona Public Service Company to Discuss Non-destructive Examination Efforts, Repairs, and Progress on Root Cause Identified During Inspection of Bottom-Mounted Instrumentation Nozzles at Palo Verde, Unit 3 | Nondestructive Examination Pressure Boundary Leakage |
TAC:MF3051 | 18 November 2013 | ||
ML13322A016 | 15 November 2013 | NRR E-mail Capture - Request for Additional Information: Relief Request Regarding Axial Flaw Indications (MF3051) | |
ML13343A136 | 14 November 2013 | 2013-11 Post Exam Comments Analysis | |
ML13339A768 | 13 November 2013 | Letter from Tom Homer Notification of Part 21 Report on a CR7 Diode Wiring Reversed on the Automatic Voltage Regular (AVR) Panels for Palo Verde | |
IR 05000528/2013004 | 13 November 2013 | IR 05000528, 529, 530-13-004, on 07/01/2013 - 09/30/2013, Palo Verde Nuclear Generating Station Units 1, 2, and 3, Integrated Resident and Regional Report, Identification & Resolution of Problems, Event Followup | Operating Basis Earthquake Functionality Assessment Significance Determination Process Operability Determination Fire Protection Program |
IR 07200122/2000100 | 13 November 2013 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0110, Rev. 0, CR7 Diode Wiring Reversed: AVR Panel P/N D72-12200-100-PVNGS | |
ML13324A490 | 13 November 2013 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0110, Rev. 0, CR7 Diode Wiring Reversed: AVR Panel P/N D72-12200-100-PVNGS | |
ML13343A275 | 9 November 2013 | 2013-11 Draft Outlines | Downpower |
ML13343A135 | 9 November 2013 | PV-2013-11 Final Op Test | Safe Shutdown Unanalyzed Condition Boric Acid Fitness for Duty High winds Shutdown Margin Packing leak High Radiation Area Non-Destructive Examination Contraband Internal Flooding Hydrostatic Nondestructive Examination Temporary Modification Locked High Radiation Area Job Performance Measure Pressure and Temperature Limits Report Surveillance Frequency Control Program Foreign Material Exclusion Safeguards Contingency Plan Earthquake Deep Dose Equivalent Fatigue Rule Pressure Boundary Leakage Scaffolding Power change Downpower Unidentified leakage |
ML13343A357 | 9 November 2013 | PV-2013-11 Public Forms | |
ML13343A280 | 9 November 2013 | 11 Draft Outline Comments | |
ML13343A291 | 9 November 2013 | PV-2013-11 ES-401-9 Draft Written Exam Comments | |
ML13343A304 | 9 November 2013 | PV-2013-11 Draft Operating Test Comments | |
ML13343A309 | 9 November 2013 | PV-2013-11 Final Outlines | Unanalyzed Condition Downpower |
ML13317A072 | 8 November 2013 | Attachment 2 - Flaw Fracture Mechanics Evaluation to Support Restart, Calculation 32-9212942-001, Palo Verde Unit .3 Bmi Nozzle Repair - Section XI Analysis for Restart | Finite Element Analysis |
ML13317A071 | 8 November 2013 | American Society of Mechanical Engineers (ASME) Code, Section XI, Request for Approval of an Alternative to Flaw Removal and Characterization - Relief Request 51 | Boric Acid Nondestructive Examination Liquid penetrant |
ML14149A342 | 8 November 2013 | Calculation 51-9214650-000, Corrosion Evaluation for Reactor Vessel Bmi Nozzle Modification, (Non-Proprietary), Attachment 2 | Boric Acid Pressure Boundary Leakage |
TAC:MF4169 | 8 November 2013 | ||
IR 05000528/2013203 | 7 November 2013 | IR 05000528-13-203,05000529-13-203, and 05000530-13-203, 10/1/2013, Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - NRC Security Inspection Report; Cover Letter | Affidavit |