Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13358A04924 December 2013Acceptance Review Following Supplement, License Amendment Request to Revise TS 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip
ML13357A24920 December 2013NRR E-mail Capture - Acceptance Review of Palo Verde Amendment Request Regarding Startup Test Activity Reduction (STAR) Program
ML13357A28918 December 2013ISFSI - Registration of Dry Spent Fuel Transportable Storage Canister Identification No. AMZDFX109
ML13357A21818 December 2013Revision 2 to Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water ReactorsSafe Shutdown
Boric Acid
Reactor Vessel Water Level
Mission time
Hydrostatic
Coatings
Temporary Modification
Locked High Radiation Area
Foreign Material Exclusion
Exemption Request
Fuel cladding
Scaffolding
IR 05000528/201330117 December 2013Er 05000528/2013301; 05000529/2013301; 05000530/2013301; October 1 - November 20, 2013; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report
ML13351A10217 December 2013Notification of Generic Fundamentals Examinations for 2014Generic Fundamentals Examination
ML13339A68016 December 2013Audit of the Licensee'S Management of Regulatory Commitments; Audit Performed 11/25-12/4/2013Coatings
Cyber Security
Aging Management
Surveillance Frequency Control Program
License Renewal
ML13343A28515 December 20132013-11 Draft Written ExamBoric Acid
Shutdown Margin
Stroke time
Temporary Modification
ML13343A13215 December 20132013-11 Final Written Exam
ML13347B15713 December 2013Closure of Investigation (OI 4-2012-034)
TAC:MF015412 December 2013
ML13352A00712 December 2013Supplemental Information Concerning Request for Amendment to Technical Specification (TS) 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual TripCoatings
Surveillance Frequency Control Program
ML13352A00812 December 2013Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
ML14037A10812 December 2013Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
IR 07200044/201340110 December 2013IR 07200044-13-401, on 11/21/2013, Palo Verde Nuclear Generating Station, Independent Spent Fuel Storage Facility
IR 05000528/201340310 December 2013IR 05000528-13-403, 05000529-13-403, 05000530-13-403, on 11/21/2013, Palo Verde Nuclear Generating Station, Units 1, 2, & 3, NRC Security InspectionAffidavit
ML13330A5735 December 2013Verbal Authorization of Relief Request 51, Alternative to ASME Code for Flaw Removal, Reactor Vessel Bottom-mounted Instrumentation Nozzle, Third 10-Year ISI IntervalBoric Acid
ML13333B5745 December 2013Summary of 11/1/2013 Conference Call Regarding the Fall 2013 Steam Generator Tube Inspections
IR 05000528/20134074 December 2013IR 05000528-13-407, 05000529-13-407 and 05000530-13-407, on 10/25/13, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, NRC Material Control and Accounting Program Inspection ReportSignificance Determination Process
Affidavit
ML13336A7752 December 2013Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies - Correction Letter
ML13294A57625 November 2013Issuance of Amendment Nos. 192, 192, and 192, Adopt TSTF-490, Revision 0, Deletion of E-Bar Definition and Revision to RCS Specific Activity Technical SpecificationsSafe Shutdown
Shutdown Margin
Surveillance Frequency Control Program
Pressure Boundary Leakage
Fire Protection Program
Power change
ML13308C15325 November 2013Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation StrategiesSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Battery sizing
Earthquake
ML13324B12320 November 2013NRR E-mail Capture - Request for Additional Information #2: Relief Request Regarding Axial Flaw Indications (MF3051)
ML13329A70020 November 2013Transmittal of Proprietary Documents for Startup Test Activity Reduction (STAR) Program License Amendment Request
ML13325A09820 November 2013APS Response to Second Request for Additional Information (RAI) Regarding Relief Request 51
ML13329A03720 November 2013Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance for Startup Testactivity Reduction Program Using the Consolidated Line Item Improvement ProcessIncorporated by reference
ML13326B02120 November 2013APS Response to Second Request for Additional Information (RAI) Regarding Relief Request 51
ML13324A49419 November 2013Deferral of Baseline Inspection Activities
ML13312A54018 November 201311/5/2013 Summary of Preapplication Meeting to Discuss License Amendment Request to Incorporate Nuclear Energy Institute NEI-11-04 Quality Assurance Program at Palo Verde, Units 1, 2, and 3
ML13323A76318 November 2013Response to Request for Additional Information - American Society of Mechanical Engineers (ASME) Code, Section XI, Request for Approval of an Alternative to Flaw Removal and Characterization - Relief Request 51Safe Shutdown Earthquake
Hydrostatic
Finite Element Analysis
ML13311B18318 November 2013Summary of Meeting with Arizona Public Service Company to Discuss Non-destructive Examination Efforts, Repairs, and Progress on Root Cause Identified During Inspection of Bottom-Mounted Instrumentation Nozzles at Palo Verde, Unit 3Nondestructive Examination
Pressure Boundary Leakage
TAC:MF305118 November 2013
ML13322A01615 November 2013NRR E-mail Capture - Request for Additional Information: Relief Request Regarding Axial Flaw Indications (MF3051)
ML13343A13614 November 20132013-11 Post Exam Comments Analysis
ML13339A76813 November 2013Letter from Tom Homer Notification of Part 21 Report on a CR7 Diode Wiring Reversed on the Automatic Voltage Regular (AVR) Panels for Palo Verde
IR 05000528/201300413 November 2013IR 05000528, 529, 530-13-004, on 07/01/2013 - 09/30/2013, Palo Verde Nuclear Generating Station Units 1, 2, and 3, Integrated Resident and Regional Report, Identification & Resolution of Problems, Event FollowupOperating Basis Earthquake
Functionality Assessment
Significance Determination Process
Operability Determination
Fire Protection Program
IR 07200122/200010013 November 2013Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0110, Rev. 0, CR7 Diode Wiring Reversed: AVR Panel P/N D72-12200-100-PVNGS
ML13324A49013 November 2013Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0110, Rev. 0, CR7 Diode Wiring Reversed: AVR Panel P/N D72-12200-100-PVNGS
ML13343A2759 November 20132013-11 Draft OutlinesDownpower
ML13343A1359 November 2013PV-2013-11 Final Op TestSafe Shutdown
Unanalyzed Condition
Boric Acid
Fitness for Duty
High winds
Shutdown Margin
Packing leak
High Radiation Area
Non-Destructive Examination
Contraband
Internal Flooding
Hydrostatic
Nondestructive Examination
Temporary Modification
Locked High Radiation Area
Job Performance Measure
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Foreign Material Exclusion
Safeguards Contingency Plan
Earthquake
Deep Dose Equivalent
Fatigue Rule
Pressure Boundary Leakage
Scaffolding
Power change
Downpower
Unidentified leakage
ML13343A3579 November 2013PV-2013-11 Public Forms
ML13343A2809 November 201311 Draft Outline Comments
ML13343A2919 November 2013PV-2013-11 ES-401-9 Draft Written Exam Comments
ML13343A3049 November 2013PV-2013-11 Draft Operating Test Comments
ML13343A3099 November 2013PV-2013-11 Final OutlinesUnanalyzed Condition
Downpower
ML13317A0728 November 2013Attachment 2 - Flaw Fracture Mechanics Evaluation to Support Restart, Calculation 32-9212942-001, Palo Verde Unit .3 Bmi Nozzle Repair - Section XI Analysis for RestartFinite Element Analysis
ML13317A0718 November 2013American Society of Mechanical Engineers (ASME) Code, Section XI, Request for Approval of an Alternative to Flaw Removal and Characterization - Relief Request 51Boric Acid
Nondestructive Examination
Liquid penetrant
ML14149A3428 November 2013Calculation 51-9214650-000, Corrosion Evaluation for Reactor Vessel Bmi Nozzle Modification, (Non-Proprietary), Attachment 2Boric Acid
Pressure Boundary Leakage
TAC:MF41698 November 2013
IR 05000528/20132037 November 2013IR 05000528-13-203,05000529-13-203, and 05000530-13-203, 10/1/2013, Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - NRC Security Inspection Report; Cover LetterAffidavit